AVIONICS CASE STUDY –
IV&V OF ATTITUDE AND HEADING REFERENCE
SYSTEM (AHRS)
Oak Systems Pvt. Ltd.
Salient features of the System
v AHRS is a subsystem of Jaguar Darin-III upgrade with focus on
indegenisation with following features
– Provide Attitude (Roll, Pitch) and magnetic heading data to the ADIU.
– Provide body accelerations and body angular rates data to ADIU.
– Provide BIT health status data to the ADIU.
– Accept external magnetometer input data from ADIU as an input to
AHRS.
– Accept True air speed and pressure-altitude data from ADIU for aiding
of AHRS data.
– Use internal algorithm for estimation of output parameters.
– Perform Magnetometer Calibration
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
2
Architecture
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
3
Major System Functionalites
v Two major independent functional blocks
v Inertial computational Unit (IMU)
v Navigational Unit (NAV)
v Each having its own Built-in tests
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
4
About IMU
v IMU handles complex inertial data computations like
acceleration biases using Temperature coefficients,
calibration coefficients with data available from
accelerometers
v Built in tests for checking beyond range accelerometer
and gyro temperatures and also 70 others
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
5
About NAV
v NAV provides calibrated Pitch, roll, Yaw data and also
magnetic heading using complex calculations.
v Kalman filter algorithms are applied for all NAV parameters
v Has capability to switchover to internal magnetometers in
case of failure to detect external magnetometer
v About 60 built in tests to provide robustness to system
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
6
Trigger for IV&V
As per DO-178B guidelines Independent Verification &
Validation (IV&V) was mandated for DAL (Design
assurance level B with MC/DC)
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
7
Scope of Work
To Conduct IV&V as per RTCA - DO178B Level B compliance -
v Planning phase docs review e.g. PSAC, SVP, SDP, SCMP, SQAP, SRS, SDS, SCS
v High level Requirement Verification
v Low level Requirement (Design) Verification
v Code Evaluation (MISRA Standards)
v Requirement based test case preparation (High level and Low level Tests) for 100%
Requirement coverage
v Source Code Coverage (100% MC/DC, 100 % Statement, 100 % Decision)
v High Level and Low level Test Execution (using LDRA tool)
v Traceability analysis:
§ Requirements ó Design ó Code
§ Requirement ó High level Tests
§ Design ó Low level Tests
v Software Configuration Audit
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
8
In the Works
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
v 450 Functions with cyclomatic complexity ranging from 5 - 55
v Dual language software (C and C++)
v 11000 Executable lines of code
v Complex algorithms viz. Kalman filters, compass swing
v Tight Schedule due to onset of winter for trials
v Distributed Work environment across Multiple cities
v Usage of Multiple testing tools involved RTRT, LDRA to speed up work
v Team size ranging from 3 - 15
9
Software Size: 11 KLOC
Language: C, C++
Accomplishments
v Provided templates and checklists meeting DO178B guidelines
v Thorough plan document review with emphasis on safety measures needed as a suggestion
v Requirement and design review : Uncovered anomalies in the document in form of
traceability, completeness and correctness w.r.t to DO-178B standards
v Test case creation at both HSI and Unit level with emphasis on uncovering faults to make
system robust by adopting testing techniques like BVA, Equivalence partitioning, arithmetic
precision, fault recovery
v Exhaustive test to handle complex algorithms involved in the project
v Test case execution at both levels with emphasis on 100 percent requirement coverage, 100
percent MC/DC coverage, 100 percent decision coverage and 100 statement coverage
v Clearance from regulators in record time with almost zero turnaround time
v Uncovered 55 Critical and Major defects across HLR and LLR tests
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
10
Outcome
Activity/Task Status
Review report of Plan Docs:
PSAC, SDP, SCMP, SRS, SDS, SCS, SQAP, SVP
Delivered
SRD Review report
Delivered
HLR SVCP Preparation
Delivered
SDD Review report
Delivered
LLR SVCP Preparation
Delivered
Code Review report
Delivered
SDD-Code Traceability
Delivered
LLR Test Execution
Delivered
HLR Test Execution
Delivered
IVV Reports (SCI, SECI, SAS)
Delivered
Copyright © 2020 Oak Systems Private Limited. All Rights Reserved
11
Thank you!
Oak Systems Pvt. Ltd.
#27, NGEF Lane, Off 100 Feet Road,
Indira Nagar, Bengaluru – 560 038, INDIA
Tel : +91-80-4126 7681
Email: contact@oaksys.net
URL: www.oaksys.net
We add value through engagement

More Related Content

PDF
Case study - IV&V of Standby Engine Instrument
PDF
Case Study on IV&V of the Landing Gear Controller
PDF
Case Study_IV&V of AutomaticFlightControlPanel.pdf
PDF
Oak Systems - When you build Software, we build Quality in it
DOCX
Ramesh gupta cv
PPTX
Transforming Culture Using DevOps Principles by Ashley Hunsberger
PDF
Case Study on IV&V of an Agriculture Drone
DOC
Kaushik_Dash_Resume
Case study - IV&V of Standby Engine Instrument
Case Study on IV&V of the Landing Gear Controller
Case Study_IV&V of AutomaticFlightControlPanel.pdf
Oak Systems - When you build Software, we build Quality in it
Ramesh gupta cv
Transforming Culture Using DevOps Principles by Ashley Hunsberger
Case Study on IV&V of an Agriculture Drone
Kaushik_Dash_Resume

Similar to Case Study on IV&V of Attitude and Heading Reference System (20)

PDF
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
PDF
V&V Lessons Learnt under multiple Standards
DOCX
Prabhaharan_$CV
PPTX
Enforcing Quality with DevOps Pipeline Gates
PPTX
verification and validation
PDF
Considerations in Verification of Safety Design for Complex Systems
PPTX
SENG202-v-and-v-modeling_121810.pptx
DOCX
Nishar resume
PPT
Module-4 PART-2&3.ppt
DOC
Rajeshkanna_Resume
PPT
Automated Regression Testing for Embedded Systems in Action
PPT
Software Testing Process
PPT
Testing process
DOCX
Nishar_Resume
PPTX
Software testing
PDF
V&V Considerations In Implementing IEC61508-3
PPTX
Verification and Validation with Innoslate
DOC
Maheswara reddy 10+years_avionics
PPT
Software testing-and-analysis
PPT
Sech1920 1200112979886874-3
Bangalore based Test automation and Testing service Company - Oak Systems Pvt...
V&V Lessons Learnt under multiple Standards
Prabhaharan_$CV
Enforcing Quality with DevOps Pipeline Gates
verification and validation
Considerations in Verification of Safety Design for Complex Systems
SENG202-v-and-v-modeling_121810.pptx
Nishar resume
Module-4 PART-2&3.ppt
Rajeshkanna_Resume
Automated Regression Testing for Embedded Systems in Action
Software Testing Process
Testing process
Nishar_Resume
Software testing
V&V Considerations In Implementing IEC61508-3
Verification and Validation with Innoslate
Maheswara reddy 10+years_avionics
Software testing-and-analysis
Sech1920 1200112979886874-3
Ad

More from Oak Systems (15)

PPTX
Case Study on Advanced light weight torpedo (Software IV&V).pptx
PDF
Case study - Test Automation of a Mobile Application
PDF
Case study on operating an Offshore Delivery Center (ODC)
PDF
Banking Case study: UAT Support for CBS Migration
PDF
Oaksys Updated Presentation 2020
PDF
Introduction to TTCN-3 and AUTOSAR Conformance Testing
PDF
Overview of DO-254: Design Assurance Guidance For Airborne Electronic Hardware
PDF
Case study on Test Automation under RUP
PDF
Case study on V&V for Avionics Software System
PDF
Case study on Performance Profiling of Software for Financial Services
PDF
Test Defect Metrics and Analysis
ODP
Radar CDU Testing- A Case Study from Oak Systems Pvt Ltd
PDF
Performance Testing of eLearning Portal- A case study by Oak Systems Pvt Ltd
PDF
A Case Study in Banking UAT
PDF
A Case Study on Testing of e-banking
Case Study on Advanced light weight torpedo (Software IV&V).pptx
Case study - Test Automation of a Mobile Application
Case study on operating an Offshore Delivery Center (ODC)
Banking Case study: UAT Support for CBS Migration
Oaksys Updated Presentation 2020
Introduction to TTCN-3 and AUTOSAR Conformance Testing
Overview of DO-254: Design Assurance Guidance For Airborne Electronic Hardware
Case study on Test Automation under RUP
Case study on V&V for Avionics Software System
Case study on Performance Profiling of Software for Financial Services
Test Defect Metrics and Analysis
Radar CDU Testing- A Case Study from Oak Systems Pvt Ltd
Performance Testing of eLearning Portal- A case study by Oak Systems Pvt Ltd
A Case Study in Banking UAT
A Case Study on Testing of e-banking
Ad

Recently uploaded (20)

PDF
Website Design Services for Small Businesses.pdf
PDF
AI Guide for Business Growth - Arna Softech
PDF
MCP Security Tutorial - Beginner to Advanced
PDF
EaseUS PDF Editor Pro 6.2.0.2 Crack with License Key 2025
PDF
Guide to Food Delivery App Development.pdf
PDF
DuckDuckGo Private Browser Premium APK for Android Crack Latest 2025
PPTX
Airline CRS | Airline CRS Systems | CRS System
PDF
Visual explanation of Dijkstra's Algorithm using Python
PPTX
MLforCyber_MLDataSetsandFeatures_Presentation.pptx
PDF
How AI/LLM recommend to you ? GDG meetup 16 Aug by Fariman Guliev
PPTX
Weekly report ppt - harsh dattuprasad patel.pptx
PPTX
Computer Software - Technology and Livelihood Education
PDF
Top 10 Software Development Trends to Watch in 2025 🚀.pdf
PPTX
WiFi Honeypot Detecscfddssdffsedfseztor.pptx
PDF
Ableton Live Suite for MacOS Crack Full Download (Latest 2025)
PDF
Practical Indispensable Project Management Tips for Delivering Successful Exp...
PPTX
most interesting chapter in the world ppt
PDF
Salesforce Agentforce AI Implementation.pdf
PDF
iTop VPN Crack Latest Version Full Key 2025
PDF
Multiverse AI Review 2025: Access All TOP AI Model-Versions!
Website Design Services for Small Businesses.pdf
AI Guide for Business Growth - Arna Softech
MCP Security Tutorial - Beginner to Advanced
EaseUS PDF Editor Pro 6.2.0.2 Crack with License Key 2025
Guide to Food Delivery App Development.pdf
DuckDuckGo Private Browser Premium APK for Android Crack Latest 2025
Airline CRS | Airline CRS Systems | CRS System
Visual explanation of Dijkstra's Algorithm using Python
MLforCyber_MLDataSetsandFeatures_Presentation.pptx
How AI/LLM recommend to you ? GDG meetup 16 Aug by Fariman Guliev
Weekly report ppt - harsh dattuprasad patel.pptx
Computer Software - Technology and Livelihood Education
Top 10 Software Development Trends to Watch in 2025 🚀.pdf
WiFi Honeypot Detecscfddssdffsedfseztor.pptx
Ableton Live Suite for MacOS Crack Full Download (Latest 2025)
Practical Indispensable Project Management Tips for Delivering Successful Exp...
most interesting chapter in the world ppt
Salesforce Agentforce AI Implementation.pdf
iTop VPN Crack Latest Version Full Key 2025
Multiverse AI Review 2025: Access All TOP AI Model-Versions!

Case Study on IV&V of Attitude and Heading Reference System

  • 1. AVIONICS CASE STUDY – IV&V OF ATTITUDE AND HEADING REFERENCE SYSTEM (AHRS) Oak Systems Pvt. Ltd.
  • 2. Salient features of the System v AHRS is a subsystem of Jaguar Darin-III upgrade with focus on indegenisation with following features – Provide Attitude (Roll, Pitch) and magnetic heading data to the ADIU. – Provide body accelerations and body angular rates data to ADIU. – Provide BIT health status data to the ADIU. – Accept external magnetometer input data from ADIU as an input to AHRS. – Accept True air speed and pressure-altitude data from ADIU for aiding of AHRS data. – Use internal algorithm for estimation of output parameters. – Perform Magnetometer Calibration Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 2
  • 3. Architecture Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 3
  • 4. Major System Functionalites v Two major independent functional blocks v Inertial computational Unit (IMU) v Navigational Unit (NAV) v Each having its own Built-in tests Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 4
  • 5. About IMU v IMU handles complex inertial data computations like acceleration biases using Temperature coefficients, calibration coefficients with data available from accelerometers v Built in tests for checking beyond range accelerometer and gyro temperatures and also 70 others Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 5
  • 6. About NAV v NAV provides calibrated Pitch, roll, Yaw data and also magnetic heading using complex calculations. v Kalman filter algorithms are applied for all NAV parameters v Has capability to switchover to internal magnetometers in case of failure to detect external magnetometer v About 60 built in tests to provide robustness to system Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 6
  • 7. Trigger for IV&V As per DO-178B guidelines Independent Verification & Validation (IV&V) was mandated for DAL (Design assurance level B with MC/DC) Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 7
  • 8. Scope of Work To Conduct IV&V as per RTCA - DO178B Level B compliance - v Planning phase docs review e.g. PSAC, SVP, SDP, SCMP, SQAP, SRS, SDS, SCS v High level Requirement Verification v Low level Requirement (Design) Verification v Code Evaluation (MISRA Standards) v Requirement based test case preparation (High level and Low level Tests) for 100% Requirement coverage v Source Code Coverage (100% MC/DC, 100 % Statement, 100 % Decision) v High Level and Low level Test Execution (using LDRA tool) v Traceability analysis: § Requirements ó Design ó Code § Requirement ó High level Tests § Design ó Low level Tests v Software Configuration Audit Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 8
  • 9. In the Works Copyright © 2020 Oak Systems Private Limited. All Rights Reserved v 450 Functions with cyclomatic complexity ranging from 5 - 55 v Dual language software (C and C++) v 11000 Executable lines of code v Complex algorithms viz. Kalman filters, compass swing v Tight Schedule due to onset of winter for trials v Distributed Work environment across Multiple cities v Usage of Multiple testing tools involved RTRT, LDRA to speed up work v Team size ranging from 3 - 15 9 Software Size: 11 KLOC Language: C, C++
  • 10. Accomplishments v Provided templates and checklists meeting DO178B guidelines v Thorough plan document review with emphasis on safety measures needed as a suggestion v Requirement and design review : Uncovered anomalies in the document in form of traceability, completeness and correctness w.r.t to DO-178B standards v Test case creation at both HSI and Unit level with emphasis on uncovering faults to make system robust by adopting testing techniques like BVA, Equivalence partitioning, arithmetic precision, fault recovery v Exhaustive test to handle complex algorithms involved in the project v Test case execution at both levels with emphasis on 100 percent requirement coverage, 100 percent MC/DC coverage, 100 percent decision coverage and 100 statement coverage v Clearance from regulators in record time with almost zero turnaround time v Uncovered 55 Critical and Major defects across HLR and LLR tests Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 10
  • 11. Outcome Activity/Task Status Review report of Plan Docs: PSAC, SDP, SCMP, SRS, SDS, SCS, SQAP, SVP Delivered SRD Review report Delivered HLR SVCP Preparation Delivered SDD Review report Delivered LLR SVCP Preparation Delivered Code Review report Delivered SDD-Code Traceability Delivered LLR Test Execution Delivered HLR Test Execution Delivered IVV Reports (SCI, SECI, SAS) Delivered Copyright © 2020 Oak Systems Private Limited. All Rights Reserved 11
  • 12. Thank you! Oak Systems Pvt. Ltd. #27, NGEF Lane, Off 100 Feet Road, Indira Nagar, Bengaluru – 560 038, INDIA Tel : +91-80-4126 7681 Email: contact@oaksys.net URL: www.oaksys.net We add value through engagement