SOURCEFORMCC PANEL
c
KAHRAMAA SUPPLY MV PANELS MCC PANELS LOADS
SOURCEFORMCC PANEL
c
KAHRAMAA SUPPLY MV PANELS B2 Area H SMDB’s All
Electrical Rooms
DB’s All Electrical
Rooms
Loads
MV Panels
The medium voltage switchgear panels metal enclosed,
indoor, with simple busbar, air insulated, are modular
assemblies of electric equipment, for AC, used in medium
voltage networks, which represents the optimal solution in
primary and secondary power distribution.
This type of medium voltage switchgear is broadly used
in the energy sector, both on the power generation and
distribution side, connection points and power points
as well as on the secondary distribution for the MV / LV
medium voltage transformer stations, and industrial or
large individual consumers’ networks
Tests Conducted on Supplied MV Panels
• Type tests
• The Standard foresees the following
type tests:
• • overtemperature limits
• • withstanding the applied voltage
• • short-circuit withstand current
• • efficiency of the protection circuit
• • insulation distances
• • degree of protection
• • mechanical operation
Individual tests
The Standard foresees the following
individual tests:
• Visual inspection of the switchgear,
including checking the cabling, and,
if necessary, an electrical operation
test
• A dielectric test
• Checking the means of protection
and
the electrical efficiency of the
protection circuit
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
ArTu K-The structure is made entirely of hot galvanised steel sheet, which
guarantees the equipotential of the switchgear.
Forms of Segregation
By form of segregation, the type of division foreseen inside the switchgear is intended. Segregation
by means of barriers or partitions (metal or insulating) can have the purpose of:
- ensuring protection against direct contacts (at least IPXXB), in the case of access to
a part of the switchgear cut off from the power supply, in relation to the rest of the
switchgear which remains supplied with power
- reducing the probability of striking and propagation of an internal arc
- preventing passage of solid bodies between different parts of the switchgear (at least
IP2X degree of protection).
By partition, the separating element between two compartments is intended, whereas the barrier
protects the operator from direct contacts and from the effects of the breaking apparatus arc
in the normal direction of access.
The following table given in the IEC 60439-1 Standard highlights the typical forms of segregation
which can be obtained by using barriers or partitions:
symbol
changwon MVP, EMDB, SMDB & DB
Protection against the effects of short-circuit
Example
Existing plant data:
Vn=400 V
fn=50Hz
Icc=35kA
Let us suppose that in an existing plant there is electric switchgear with an Icw of 35kA and
that, in the installation point of the switchgear, the prospective short-circuit current is 35kA.
Now let us imagine that it is decided to extend the power of the plant and that the short-circuit
value increases to 60 kA.
Plant data after extension:
Vn=400 V
Fn=50Hz
Icc=60kA
Since the switchgear Icw is lower than the short-circuit current of the plant, to check that the
existing switchgear is still compatible, you must:
- determine the values of I2 t and of Ip let through by the circuit-breaker placed on the
supply side of the switchgear
- check that the protection devices located inside the switchgear have adequate breaking
capacity, individually or for back-up.
Icw = 35kA from which:
I2 t switchgear = 352 x1 =1225 MA2s
Ipswitchgear = 73.5 kA
Let us suppose that, on the supply side of the switchgear, a Tmax T5H moulded-case circuit-breaker
(Icu=70kA@415V) is installed
I2 tinterruttore< 4MA2 s
Ipinterruttore<40kA
since
I2 tcircuit-breaker > I 2 tswitchgear
Ipcircuit-breaker > Ipswitchgear
The switchgear (structure and busbar system) turns out to be suitable.
With regard to the circuit-breakers located inside the switchgear, let us suppose that these
are Tmax T1,T2,T3 moulded-case circuit-breakers, version N with Icu=36kA@415V. From the
Back-up tables it can be seen that the circuit-breakers present in the switchgear are suitable
for the plant as their breaking capacity is increased to 65 kA by the T5H circuit-breaker placed
on the supply side.
Protection against the effects of short-circuit
Protection against the direct contacts
• - Protection by means of insulation of the live parts
The live parts must be completely covered with insulation which can only be
removed by destroying it. This insulation must be made of suitable materials
able to resist the mechanical, electrical and thermal stresses they may be
subjected to during service over time. Paints, varnishes, lacquers and other
similar products used alone are not generally considered suitable for
providing adequate insulation for protection against direct contacts.
• - Protection by means of barriers or housings
All the external surfaces must have a degree of protection of at least IP2X or
IPXXB.
The distance between the mechanical devices provided for protection and
the live parts protected by them, must not be less than the values specified
for the surface and air distances. All the barriers and housings must be
securely fixed in place. Bearing in mind their type, size and arrangement,
they must be sturdy and long-lasting enough to resist the forces and stresses
which can develop during normal service, without reducing the air insulation
distances.
Protection against the indirect contacts
• - Protection made using protection circuits
• The protection circuit can be made separate from the metal housing, or the same
housing can be used as part of the protection circuit. The exposed conductive
parts of the switchgear which do not constitute a danger, since they cannot be
touched on large surfaces or taken hold of by hand because they are small (for
example, screws, nameplates, etc.), do not require connection to the protection
circuit. The manual operating parts, such as levers, handles and other devices
made of metal, must, on the other hand, be connected securely to the parts
connected to the protection circuit or must have additional insulation suitable for
the maximum insulation voltage of the switchgear. The metal parts coated with a
layer of paint or enamel cannot normally be considered suitably insulated to
satisfy these prescriptions.
• For covers, doors, closure plates, etc., the normal connections made using metal
screws or hinges are sufficient for electrical continuity, as long as electrical
apparatus which requires a connection of the exposed conductive parts to earth
is not mounted on them. In this case, the exposed conductive parts must be
connected by means of a protection conductor with a cross-section at least the
same as the maximum cross-section of the phase conductor supplying the
apparatus.
changwon MVP, EMDB, SMDB & DB
ArTu K
changwon MVP, EMDB, SMDB & DB
Overall dimensions of ArTu K structures
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
ArTu K-Useful space inside the switchgear
Practical indications for constructing the
switchgear
• Positioning the circuit-breakers
With regard to positioning the circuit-breakers inside the switchgear,
there are some indications which are in contrast with each other. This is
because requirements of thermal type often contrast with the needs of
another kind. It is therefore the panel builder who, knowing the plant
details, its installation location and its actual use better, can design the
front of the switchgear in an optimal way.
• A good rule is to try to position the circuit-breakers so as to reduce
the higher current paths as far as possible, thereby reducing the power
dissipated inside the switchgear with undoubted benefits from the
thermal and economic points of view.
changwon MVP, EMDB, SMDB & DB
In the case of switchgear with a lot of columns, where possible it is advisable to position the main circuit
breaker in the central column.
This way the current is immediately divided into the two branches of the switchgear and the cross-section of
the main distribution busbars can be reduced.
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
Anchoring the conductors near the circuit-breakers
It is necessary for the cables and busbars to be fixed to the structure inside the switchgear. In fact, during a short-
circuit, the dynamic stresses produced in the conductors could damage the terminals of the circuit-breakers.
changwon MVP, EMDB, SMDB & DB
Certification according to the IEC 60439-1 Standard
Illustrative diagrams for the construction of ArTu
switchgear
• Single-line diagram
Example of construction of ArTuK switchgear
Selection of the circuit-breakers and ducts outside the switchgear
Circuit-breakers
As shown on the single-line diagram, the circuit-breakers selected are:
1 Emax E3N3200 PR111-LSI In 3200 (main switchgear circuit-breaker)
3 Emax E1N1250 PR111-LSI In 1250 (circuit-breakers for the three outgoing feeders)
Ducts
Incoming, from the transformer there is the following:
1 Bus duct with Iz = 3150 A; L = 5 m
Outgoing from the switchgear, hypothesising overhead laying on perforated trays, there is:
1 cable with L = 20m 3x(3x120) Iz = 876,3 A
1 cable with L = 70m 3x(3x120) Iz = 876,3 A
1 cable with L = 100m 3x(3x120) Iz = 876,3 A
Front of switchgear, distribution system and metal
structure
• A possible layout
for the busbars
and circuit-
breakers is given
in the following
figure
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
MVP BREAKER DETAILS
MVP-1
MVP-1
MVP-2
MVP-2
MVP-3
MVP-3
MVP-4
MVP-4
MVP-5
MVP-5
changwon MVP, EMDB, SMDB & DB
Sub-Main Distribution Board (Mirage)
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
Types of Breakers Used
changwon MVP, EMDB, SMDB & DB
Mirage 250 Dimensions
Mirage 400 Dimensions
Mirage 630 Dimensions
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
Dimensional Details
changwon MVP, EMDB, SMDB & DB
changwon MVP, EMDB, SMDB & DB
THANK YOU
Sheikh Imran
(Sales Engineer)
Qatar Switchgear
MH-Al Muftah Est

More Related Content

PPT
Practical Electrical Substation Safety for Engineers and Technicians
PPTX
Electrical safety
PPT
Electrical Safety
PDF
Grounding,Earthing,Bonding
PDF
The different types of conduits
PDF
Siemens MV GIS Switchgear
PPT
Electrical Safety
PPT
Power System Protection
Practical Electrical Substation Safety for Engineers and Technicians
Electrical safety
Electrical Safety
Grounding,Earthing,Bonding
The different types of conduits
Siemens MV GIS Switchgear
Electrical Safety
Power System Protection

What's hot (20)

PPTX
Overhead line work ppt
PPTX
Design and construction of underground cable transmission line
PPT
Electrical Safety Techniques
PPT
Electrical Maintenance for Engineers and Technicians
PPT
Hazardous Area Classification
PDF
Dl arc flash presentation2013 r3
PPTX
Electrical safety potection
PPTX
Electrical safety slideshare
PPT
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
PDF
Transformer differential protection
PPT
Distribution boards and Protection devices ppt
PPTX
Electrical safety
PDF
Switchgear presentation
PPTX
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
PPT
Electrical safety
PDF
Power cables
PDF
Motor Protection
PPTX
Transmission &amp; distribution of electrical power
PDF
Protection Relays Numbering (ANSI)
PPT
Rotary and Key Lock Switches
Overhead line work ppt
Design and construction of underground cable transmission line
Electrical Safety Techniques
Electrical Maintenance for Engineers and Technicians
Hazardous Area Classification
Dl arc flash presentation2013 r3
Electrical safety potection
Electrical safety slideshare
BUS BAR PROTECTION PPT BY:-R.K.PANDIT
Transformer differential protection
Distribution boards and Protection devices ppt
Electrical safety
Switchgear presentation
Vacuum Circuit Breaker (VCB) Working and Applications | Uses Of VCB
Electrical safety
Power cables
Motor Protection
Transmission &amp; distribution of electrical power
Protection Relays Numbering (ANSI)
Rotary and Key Lock Switches
Ad

Viewers also liked (17)

PDF
Indigenization of Russian Make WHR by Vizag Steel
PDF
Keynote technical daily report for 050313
PPT
Lscc fa project 1 getting to know lawson state
PDF
2011 10-12 migbank-daily technical-analysis-report
PPT
Factory Tour Report 120309
DOCX
vizag steel plant 2014 synonyms
PPTX
Study of WRM FURNACE of Vizag Steel Plant.
PPTX
role of ECE in steel plant
PPT
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
PPT
Power Plant Major Losses
DOCX
Internship Report on thermal power station in vizag steel plant
PDF
MCC PANEL WIRING, GA and BOM Sample
PPTX
Control Panel
PPT
Hazards in steel plant and their control, By B C das
DOCX
Switchgear
PPTX
Bhilai Steel Plant Training Presentation
PPTX
THERMAL POWER PLANT (COAL TO POWER)
Indigenization of Russian Make WHR by Vizag Steel
Keynote technical daily report for 050313
Lscc fa project 1 getting to know lawson state
2011 10-12 migbank-daily technical-analysis-report
Factory Tour Report 120309
vizag steel plant 2014 synonyms
Study of WRM FURNACE of Vizag Steel Plant.
role of ECE in steel plant
SUMMER INTERNSHIP(INDUSTRAIL REPORT) ON THERMAL POWER PLANT
Power Plant Major Losses
Internship Report on thermal power station in vizag steel plant
MCC PANEL WIRING, GA and BOM Sample
Control Panel
Hazards in steel plant and their control, By B C das
Switchgear
Bhilai Steel Plant Training Presentation
THERMAL POWER PLANT (COAL TO POWER)
Ad

Similar to changwon MVP, EMDB, SMDB & DB (20)

DOCX
Switchgear Equipment in a Substation
PPTX
protection scheme of a grid substation prsentation
DOCX
Report on MCB
PPT
ms ppt.ppt
PDF
Lv switchgear &amp; lv cable sizing
PDF
Introduction to mv switchgear
PPTX
#Building wiring system#presentation#Wire is a single electrical conductor, w...
PPTX
Components of LT Switchgear.pptx
PPTX
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
DOCX
Mcb Breaker
PPTX
Over/Under Voltage Protection Circuit
PPTX
buildinggroupppt-130512115915-phpapp02.pptx
PPT
Solar junction boxes jmv lps ltd
PPT
Solar junction boxes jmv lps ltd
PDF
KYN28 12kV Medium voltage metal clad switchgear
PPT
Basic electrical comp upload1
PDF
Crouzet Aerospace - Electrical Protection & Distribution
PDF
Sharp 32 pulg 32c24
PDF
Schneider Technical Guide - Medium Voltage Equipment Designers
Switchgear Equipment in a Substation
protection scheme of a grid substation prsentation
Report on MCB
ms ppt.ppt
Lv switchgear &amp; lv cable sizing
Introduction to mv switchgear
#Building wiring system#presentation#Wire is a single electrical conductor, w...
Components of LT Switchgear.pptx
“STUDY OF THE PROTECTIVE EQUIPMENTS OF A SUBSTATION AND POWER FACTOR IMPROVEM...
Mcb Breaker
Over/Under Voltage Protection Circuit
buildinggroupppt-130512115915-phpapp02.pptx
Solar junction boxes jmv lps ltd
Solar junction boxes jmv lps ltd
KYN28 12kV Medium voltage metal clad switchgear
Basic electrical comp upload1
Crouzet Aerospace - Electrical Protection & Distribution
Sharp 32 pulg 32c24
Schneider Technical Guide - Medium Voltage Equipment Designers

changwon MVP, EMDB, SMDB & DB

  • 13. SOURCEFORMCC PANEL c KAHRAMAA SUPPLY MV PANELS MCC PANELS LOADS
  • 14. SOURCEFORMCC PANEL c KAHRAMAA SUPPLY MV PANELS B2 Area H SMDB’s All Electrical Rooms DB’s All Electrical Rooms Loads
  • 15. MV Panels The medium voltage switchgear panels metal enclosed, indoor, with simple busbar, air insulated, are modular assemblies of electric equipment, for AC, used in medium voltage networks, which represents the optimal solution in primary and secondary power distribution. This type of medium voltage switchgear is broadly used in the energy sector, both on the power generation and distribution side, connection points and power points as well as on the secondary distribution for the MV / LV medium voltage transformer stations, and industrial or large individual consumers’ networks
  • 16. Tests Conducted on Supplied MV Panels • Type tests • The Standard foresees the following type tests: • • overtemperature limits • • withstanding the applied voltage • • short-circuit withstand current • • efficiency of the protection circuit • • insulation distances • • degree of protection • • mechanical operation Individual tests The Standard foresees the following individual tests: • Visual inspection of the switchgear, including checking the cabling, and, if necessary, an electrical operation test • A dielectric test • Checking the means of protection and the electrical efficiency of the protection circuit
  • 19. ArTu K-The structure is made entirely of hot galvanised steel sheet, which guarantees the equipotential of the switchgear.
  • 20. Forms of Segregation By form of segregation, the type of division foreseen inside the switchgear is intended. Segregation by means of barriers or partitions (metal or insulating) can have the purpose of: - ensuring protection against direct contacts (at least IPXXB), in the case of access to a part of the switchgear cut off from the power supply, in relation to the rest of the switchgear which remains supplied with power - reducing the probability of striking and propagation of an internal arc - preventing passage of solid bodies between different parts of the switchgear (at least IP2X degree of protection). By partition, the separating element between two compartments is intended, whereas the barrier protects the operator from direct contacts and from the effects of the breaking apparatus arc in the normal direction of access. The following table given in the IEC 60439-1 Standard highlights the typical forms of segregation which can be obtained by using barriers or partitions:
  • 23. Protection against the effects of short-circuit
  • 24. Example Existing plant data: Vn=400 V fn=50Hz Icc=35kA Let us suppose that in an existing plant there is electric switchgear with an Icw of 35kA and that, in the installation point of the switchgear, the prospective short-circuit current is 35kA. Now let us imagine that it is decided to extend the power of the plant and that the short-circuit value increases to 60 kA. Plant data after extension: Vn=400 V Fn=50Hz Icc=60kA Since the switchgear Icw is lower than the short-circuit current of the plant, to check that the existing switchgear is still compatible, you must: - determine the values of I2 t and of Ip let through by the circuit-breaker placed on the supply side of the switchgear - check that the protection devices located inside the switchgear have adequate breaking capacity, individually or for back-up. Icw = 35kA from which: I2 t switchgear = 352 x1 =1225 MA2s Ipswitchgear = 73.5 kA
  • 25. Let us suppose that, on the supply side of the switchgear, a Tmax T5H moulded-case circuit-breaker (Icu=70kA@415V) is installed I2 tinterruttore< 4MA2 s Ipinterruttore<40kA since I2 tcircuit-breaker > I 2 tswitchgear Ipcircuit-breaker > Ipswitchgear The switchgear (structure and busbar system) turns out to be suitable. With regard to the circuit-breakers located inside the switchgear, let us suppose that these are Tmax T1,T2,T3 moulded-case circuit-breakers, version N with Icu=36kA@415V. From the Back-up tables it can be seen that the circuit-breakers present in the switchgear are suitable for the plant as their breaking capacity is increased to 65 kA by the T5H circuit-breaker placed on the supply side.
  • 26. Protection against the effects of short-circuit
  • 27. Protection against the direct contacts • - Protection by means of insulation of the live parts The live parts must be completely covered with insulation which can only be removed by destroying it. This insulation must be made of suitable materials able to resist the mechanical, electrical and thermal stresses they may be subjected to during service over time. Paints, varnishes, lacquers and other similar products used alone are not generally considered suitable for providing adequate insulation for protection against direct contacts. • - Protection by means of barriers or housings All the external surfaces must have a degree of protection of at least IP2X or IPXXB. The distance between the mechanical devices provided for protection and the live parts protected by them, must not be less than the values specified for the surface and air distances. All the barriers and housings must be securely fixed in place. Bearing in mind their type, size and arrangement, they must be sturdy and long-lasting enough to resist the forces and stresses which can develop during normal service, without reducing the air insulation distances.
  • 28. Protection against the indirect contacts • - Protection made using protection circuits • The protection circuit can be made separate from the metal housing, or the same housing can be used as part of the protection circuit. The exposed conductive parts of the switchgear which do not constitute a danger, since they cannot be touched on large surfaces or taken hold of by hand because they are small (for example, screws, nameplates, etc.), do not require connection to the protection circuit. The manual operating parts, such as levers, handles and other devices made of metal, must, on the other hand, be connected securely to the parts connected to the protection circuit or must have additional insulation suitable for the maximum insulation voltage of the switchgear. The metal parts coated with a layer of paint or enamel cannot normally be considered suitably insulated to satisfy these prescriptions. • For covers, doors, closure plates, etc., the normal connections made using metal screws or hinges are sufficient for electrical continuity, as long as electrical apparatus which requires a connection of the exposed conductive parts to earth is not mounted on them. In this case, the exposed conductive parts must be connected by means of a protection conductor with a cross-section at least the same as the maximum cross-section of the phase conductor supplying the apparatus.
  • 32. Overall dimensions of ArTu K structures
  • 37. ArTu K-Useful space inside the switchgear
  • 38. Practical indications for constructing the switchgear • Positioning the circuit-breakers With regard to positioning the circuit-breakers inside the switchgear, there are some indications which are in contrast with each other. This is because requirements of thermal type often contrast with the needs of another kind. It is therefore the panel builder who, knowing the plant details, its installation location and its actual use better, can design the front of the switchgear in an optimal way. • A good rule is to try to position the circuit-breakers so as to reduce the higher current paths as far as possible, thereby reducing the power dissipated inside the switchgear with undoubted benefits from the thermal and economic points of view.
  • 40. In the case of switchgear with a lot of columns, where possible it is advisable to position the main circuit breaker in the central column. This way the current is immediately divided into the two branches of the switchgear and the cross-section of the main distribution busbars can be reduced.
  • 43. Anchoring the conductors near the circuit-breakers It is necessary for the cables and busbars to be fixed to the structure inside the switchgear. In fact, during a short- circuit, the dynamic stresses produced in the conductors could damage the terminals of the circuit-breakers.
  • 45. Certification according to the IEC 60439-1 Standard
  • 46. Illustrative diagrams for the construction of ArTu switchgear • Single-line diagram
  • 47. Example of construction of ArTuK switchgear Selection of the circuit-breakers and ducts outside the switchgear Circuit-breakers As shown on the single-line diagram, the circuit-breakers selected are: 1 Emax E3N3200 PR111-LSI In 3200 (main switchgear circuit-breaker) 3 Emax E1N1250 PR111-LSI In 1250 (circuit-breakers for the three outgoing feeders) Ducts Incoming, from the transformer there is the following: 1 Bus duct with Iz = 3150 A; L = 5 m Outgoing from the switchgear, hypothesising overhead laying on perforated trays, there is: 1 cable with L = 20m 3x(3x120) Iz = 876,3 A 1 cable with L = 70m 3x(3x120) Iz = 876,3 A 1 cable with L = 100m 3x(3x120) Iz = 876,3 A
  • 48. Front of switchgear, distribution system and metal structure • A possible layout for the busbars and circuit- breakers is given in the following figure
  • 57. MVP-1
  • 58. MVP-1
  • 59. MVP-2
  • 60. MVP-2
  • 61. MVP-3
  • 62. MVP-3
  • 63. MVP-4
  • 64. MVP-4
  • 65. MVP-5
  • 66. MVP-5
  • 84. THANK YOU Sheikh Imran (Sales Engineer) Qatar Switchgear MH-Al Muftah Est

Editor's Notes