Lesson Outcome
   1.1 The needs to manage stakeholder
   1.2 Organizational stakeholder
   1.3 Project stakeholder
   1.4 Some examples of stakeholder influence
   1.5 Some examples of successful stakeholder
        management
Introduction

                           SUCCESSFUL
                         ORGANIZATION /
                            PROJECTS



 Bring project in on time, on             Meet all stakeholder
  budget and satisfying its                  expectations
 objectives for the customers
Stake
   A stake is an interest or a share in an undertaking.
   Example: If a group is planning to go out to dinner
    and a show for the evening, each person in the
    group has a stake, or interest, in the group‟s
    decision. No money is being invested yet but each
    member sees his / her interest (preference, taste,
    priority) in the decision.
   A stake is also a claim.
   A claim is a right to something. A claim is a
    demand for something due or believed to be due.
   Example: Stockholder has an interest in and an
    ownership of a share of a business.
Stakeholder
   Stakeholder is an individual or a group that has one
    or various kinds of stakes in a business.
   Stakeholders may be affected by the actions,
    decision, policies, or practices of the organization.
    Also, these stakeholders also may affect the
    organization‟s actions, decisions, policies, or
    practices.
   Therefore, there is a potential two-way interaction
    or exchange of influence between stakeholders and
    organization.
What is Stakeholder?
   Classic definition (Freeman, 1984):
       “Any group or individual who can affect or is affected
        by the achievement of the organization‟s objectives”
   Freeman, 2004:
       “Those groups who are vital to the         survival
        and success of the           organization”



                                                  R. Edward Freeman
                                                  (December 18, 1951-
                                                  Present)
                                                       Click Here
Stockholders

                The
              General                   Creditors
               Public



   Local                                            Employees
Communities

                            Type of
                         Stakeholders


  Competitors                                       Customers




               Unions                      Suppliers

                        Governments
Example of stakeholders and their
interests
Stakeholders   Examples of interests
               Participate in distribution of profits, election of board of directors,
Stockholders   additional rights as established in the contract with the
               corporation.
Creditors      Credit score, new contracts, liquidity.
Employees      Rates of pay, job security, compensation, respect.
Customers      Value, quality, customer care, ethical products.
               Providers of products and services used in the end product for the
Suppliers
               customer, equitable business opportunities.
Government     Taxation, low unemployment, social welfare.
Trade Unions   Product quality, staff protection.
               Norms established by society and the industry for competitive
Competitors
               conduct.
Community      Jobs, environmental protection, social protection.
The Need to Manage Stakeholder

   Stakeholders are individuals or groups that benefit
    from an organization.
   Stakeholders can affect an organization‟s
    functioning, goals, development and survival.
   They are beneficial when they help you achieve
    your goals and they are antagonistic when they
    oppose your mission.
   Therefore, stakeholders have power to be either a
    threat or a benefit to an organization (Gibson,
    2000).
The Need to Manage Stakeholder

   Their influence can be small or great and can be
    exercised either intentionally or incidentally.
   Individuals and organizations need to be wary of
    their stakeholders and their influences.
   If stakeholders have negative influence on us, why
    should we deal with or bother about them? WHY?
The Need to Manage Stakeholder

   Simply because organizations are depending on
    external stakeholders for resources, services and
    information.
   Stakeholders have claims, rights and expectations
    that ought to be honored and not taken lightly.
   Thus, stakeholders must be managed properly to
    avoid any negative influences, especially those that
    could contrary to the organization‟s objectives.
Organizational Stakeholder




Example of an organization‟s stakeholders (Caroll &Buchholtz, 1999)
   There are 2 steps for analyzing organizational
    stakeholders
    1. Step 1: Identify Stakeholders
       Think of all the people within the organization
         who are impacted by your work, who have
         influence over it, or have a stake in its successful
         completion.
    2. Step 2: Prioritize Stakeholders
       Which stakeholder influence or interest is at the
         highest priority.
   It is important that an organization understands it‟s
    stakeholders, strategies to satisfy all stakeholder‟s
    goal and objectives, along with a prediction of the
    future impact of that stakeholder‟s actions on a
    project‟s outcome.
Project Stakeholders
Project Stakeholders
   Each project has its own unique set of stakeholders.

                              Considering the
                             potential influence
                              of the project‟s
                               stakeholders
                                                      Development of
     Identification of all                         strategies to facilitate
    project stakeholders                           the “management” of
      and their relevant                              the stakeholders
    stakes in the project.                         during the life cycle of
                                                         the project.


                               Successful
                                Project
                              Management
Example
   A    project    managers    who    must    make
    recommendation concerning the design of a new
    plant must be aware of the state and local land
    use, plant design, tax laws and the area’s likely
    pattern of growth.



                   Hmm…Is that all?
                    Are you sure?
    The project manager also must be aware of:
1.    Local political climate.
2.    Availability of a skilled labor force.
3.    Public attitudes towards the location of the plant in
      the community.
    Politics can also have profound impact on the outcome
     of a project.
1.    E.g.: The project manager who neglects the building
      and maintenance of alliances with key political
      stakeholders will soon find indifference or opposition
      to his/her project.
   The success of a project depends on taking into
    account the potential impact of project decisions on
    all stakeholders during the entire life of the project.
Stakeholder Influence
   Stakeholders will manifest the attributes of
    legitimacy and power (Carroll and Buchholts,
    2006).
   Legitimacy - validity of a claim to a stake
   Power - the capacity to induce or persuade the
    actions of others and is displayed when one part in
    a relationship is able to impose its will on the other
    part (Johnson et al.,2005).
Stakeholder Influence
   Power may be displayed through:
    1. Force (coercive power)

    2. Material or financial resources (utilitarian
       power)
    3. Symbolic resources (normative power)
Stakeholder Influence
   Therefore, stakeholders must be managed to avoid
    any of their influences contrary to an organization
    or project objectives.
   An ideal way is to optimize by maximizing the
    benefits from stakeholders while minimizing their
    potential negative impacts.
Example of Stakeholder Influence

    Example 1
   In a 1-million-square-foot addition to the New York
    Hospital, environment, political and social
    challenges existed.
     Over   45 agencies – „stakeholders‟ – Need to be
      satisfied even though no public money was involved in
      the project. Issues such as the highway, the river,
      working space, historical preservation and other issues
      need to be considered.
Example of Successful Stakeholder
Management
    Example 1
   James Webb and his colleagues at NASA practiced
    stakeholder management during the Apollo
    program.
     NASA  gained the support not only from the aerospace
     industry and related constitutions but also from the
     educational community, the basic sciences and weather
     forecast profession.
Example of Successful Stakeholder
Management
    Example 1
   The 12.5 miles, $490 million highway project
    through Glenwood Canyon in Colorado is one of the
    expensive nonurban sections of the interstate
    system.
     Required   more than 10 years to plan and 12 years to
      construct.
     Involved a high degree of cooperation among project
      team, environmentalists and tourists to create a major
      highway that preserved and enhanced the nation's
      premier natural settings.
 Theproject experienced fierce opposition initially,
 countless design changes and physical constraints but a
 remarkable cooperation between all stakeholders
 created a four-lane highway that even
 environmentalists love.




                                                                            NEXT
                              Glenwood Canyon highway (source: wikipedia)
Group Activity
   Gather one example of a successful and one
    example of a failure in the implementation of
    stakeholder management.

   Requirements (due date: 20/9/2012)
    1.   Work in a group of 5
    2.   Explain the background or purpose of the project.
    3.   Why is the project a successful / failure one.
    4.   Groups will be randomly picked to present their
         findings.
    Additional Requirement:
1.    Successful in Implementation (minimum 200 words).
2.    Failure in Implementation (minimum 200 words).
3.    Hard copy – Typed
4.    Presentation slides – Max 6 slides.
END

More Related Content

PDF
Project quality management
PPT
Chap 3 Organization Structure
PDF
Pmp risk chapter 11
PDF
Stakeholder Analysis
PDF
Introduction to Project Management
PPTX
Project Communications Management - PMBOK6
PDF
PMP Chap9 - Project Human Resource management
PDF
PMP Chap 13 - Project stakeholder management Overview
Project quality management
Chap 3 Organization Structure
Pmp risk chapter 11
Stakeholder Analysis
Introduction to Project Management
Project Communications Management - PMBOK6
PMP Chap9 - Project Human Resource management
PMP Chap 13 - Project stakeholder management Overview

What's hot (20)

PPTX
Project Risk Management
PPT
Project audit & closure
PPT
Chap 1 Modern Project Management
PDF
PMP_Project Stakeholder Management
PPTX
The role of the project manager
PPT
Earned value
PPT
11. Project Communication Management
PDF
Introduction to Project Management by Javid Hamdard
PPT
Chap 5 Estimating Project Times
PPT
project management essentials
PPTX
Stakeholder Engagement vs Stakeholder Management
PDF
Business Readiness Assessment & Ocm Platform
PPTX
Managing project teams
PPT
05. Project And Organizational Structure
PPTX
Project Management
PDF
4 Project Management Challenges and Solutions
PPTX
Stakeholder analysis
PDF
PMP Lecture 3: Project Management Processes
Project Risk Management
Project audit & closure
Chap 1 Modern Project Management
PMP_Project Stakeholder Management
The role of the project manager
Earned value
11. Project Communication Management
Introduction to Project Management by Javid Hamdard
Chap 5 Estimating Project Times
project management essentials
Stakeholder Engagement vs Stakeholder Management
Business Readiness Assessment & Ocm Platform
Managing project teams
05. Project And Organizational Structure
Project Management
4 Project Management Challenges and Solutions
Stakeholder analysis
PMP Lecture 3: Project Management Processes
Ad

Viewers also liked (20)

PDF
Project Stakeholder Management [read-only] [compatibility mode]
PDF
Stakeholder Engagement: Avoid It At Your Own Risk
PDF
Stakeholder Engagement Strategy - EN
PDF
Stakeholder Engagement & Co-Creation: Reducing Project Risk
PDF
Brunswick Future of Stakeholder Engagement Report February 2013
PPTX
PMBOK 5th edition Project Stakeholder Management
PPTX
Project Procurement Management
PDF
Pmp chap13 - project stakeholder management details
PPTX
Four Keys to Managing Stakeholder Expectations and Delivering Value
PPT
Stakeholder theory
PDF
Introduction to Stakeholder Analysis
PDF
Pmbok 4th edition chapter 11 - Project Risk Management
PPTX
Project Management-Project procurement Management
PDF
Project risk management - Methodology and application
PPT
An Introduction To Stakeholder Theory
PDF
Project Stakeholder Management - PMBOK 5
PDF
Project Risk Management
PDF
Project Procurement Management PMBOK 5
PPT
Chap12 project procurement management
PDF
Big-tent UX (UX Camp West 2016)
Project Stakeholder Management [read-only] [compatibility mode]
Stakeholder Engagement: Avoid It At Your Own Risk
Stakeholder Engagement Strategy - EN
Stakeholder Engagement & Co-Creation: Reducing Project Risk
Brunswick Future of Stakeholder Engagement Report February 2013
PMBOK 5th edition Project Stakeholder Management
Project Procurement Management
Pmp chap13 - project stakeholder management details
Four Keys to Managing Stakeholder Expectations and Delivering Value
Stakeholder theory
Introduction to Stakeholder Analysis
Pmbok 4th edition chapter 11 - Project Risk Management
Project Management-Project procurement Management
Project risk management - Methodology and application
An Introduction To Stakeholder Theory
Project Stakeholder Management - PMBOK 5
Project Risk Management
Project Procurement Management PMBOK 5
Chap12 project procurement management
Big-tent UX (UX Camp West 2016)
Ad

Similar to Chapter 1 -_intro_to_project_stakeholder_management[1] (20)

PDF
Selecting stakeholders
DOC
Presentation by dhruva sen
PPTX
PMI AK Presentation_Neil Murray_September 2015 (handouts)
DOCX
2.13 stakeholder management 1
PPTX
Trends in stakeholder management somrita sen
PDF
Handling Adversaries and Allies
PDF
Project Management 09
PPTX
RoyalRoads
PPTX
Stakeholder Engagement in the Context of Conflict Analysis and Intervention
PPTX
Best_Practices_Managing_Stakeholder_Expectations
PDF
Raci project management session 4
PPTX
Project PC Lecture-7 Project Stakeholder Planning.pptx
PPTX
Stakeholders In Business
PDF
Stakeholder Analysis
DOCX
Project Stakeholder Management.docx
PPTX
The Administrative Assistant’s Role in Promoting the Organization’s Goodwill....
PPTX
Stakeholder Management.pptx
DOCX
How stakeholders impact business activity
DOCX
ISQS4350-ManagingStakeholderExpectations
DOCX
ISQS4350-ManagingStakeholderExpectations
Selecting stakeholders
Presentation by dhruva sen
PMI AK Presentation_Neil Murray_September 2015 (handouts)
2.13 stakeholder management 1
Trends in stakeholder management somrita sen
Handling Adversaries and Allies
Project Management 09
RoyalRoads
Stakeholder Engagement in the Context of Conflict Analysis and Intervention
Best_Practices_Managing_Stakeholder_Expectations
Raci project management session 4
Project PC Lecture-7 Project Stakeholder Planning.pptx
Stakeholders In Business
Stakeholder Analysis
Project Stakeholder Management.docx
The Administrative Assistant’s Role in Promoting the Organization’s Goodwill....
Stakeholder Management.pptx
How stakeholders impact business activity
ISQS4350-ManagingStakeholderExpectations
ISQS4350-ManagingStakeholderExpectations

More from Saddan Juhari (9)

PPTX
Bpp 3213 lecture 2
PPTX
Bpp 3213 lecture 1
PPTX
Wk 4 technology life cycle
PPTX
Wk 3 critical factors in managing technology
PPTX
Wk 2 role of technology
PPTX
Wk 1 technology mgmt.
PPTX
Chapter 4 balancing stakeholders
PPTX
Chapter 2b project stakeholder management process
PPTX
Chapter 2a project stakeholder management process
Bpp 3213 lecture 2
Bpp 3213 lecture 1
Wk 4 technology life cycle
Wk 3 critical factors in managing technology
Wk 2 role of technology
Wk 1 technology mgmt.
Chapter 4 balancing stakeholders
Chapter 2b project stakeholder management process
Chapter 2a project stakeholder management process

Chapter 1 -_intro_to_project_stakeholder_management[1]

  • 2. Lesson Outcome  1.1 The needs to manage stakeholder  1.2 Organizational stakeholder  1.3 Project stakeholder  1.4 Some examples of stakeholder influence  1.5 Some examples of successful stakeholder management
  • 3. Introduction SUCCESSFUL ORGANIZATION / PROJECTS Bring project in on time, on Meet all stakeholder budget and satisfying its expectations objectives for the customers
  • 4. Stake  A stake is an interest or a share in an undertaking.  Example: If a group is planning to go out to dinner and a show for the evening, each person in the group has a stake, or interest, in the group‟s decision. No money is being invested yet but each member sees his / her interest (preference, taste, priority) in the decision.
  • 5. A stake is also a claim.  A claim is a right to something. A claim is a demand for something due or believed to be due.  Example: Stockholder has an interest in and an ownership of a share of a business.
  • 6. Stakeholder  Stakeholder is an individual or a group that has one or various kinds of stakes in a business.  Stakeholders may be affected by the actions, decision, policies, or practices of the organization. Also, these stakeholders also may affect the organization‟s actions, decisions, policies, or practices.  Therefore, there is a potential two-way interaction or exchange of influence between stakeholders and organization.
  • 7. What is Stakeholder?  Classic definition (Freeman, 1984):  “Any group or individual who can affect or is affected by the achievement of the organization‟s objectives”  Freeman, 2004:  “Those groups who are vital to the survival and success of the organization” R. Edward Freeman (December 18, 1951- Present) Click Here
  • 8. Stockholders The General Creditors Public Local Employees Communities Type of Stakeholders Competitors Customers Unions Suppliers Governments
  • 9. Example of stakeholders and their interests Stakeholders Examples of interests Participate in distribution of profits, election of board of directors, Stockholders additional rights as established in the contract with the corporation. Creditors Credit score, new contracts, liquidity. Employees Rates of pay, job security, compensation, respect. Customers Value, quality, customer care, ethical products. Providers of products and services used in the end product for the Suppliers customer, equitable business opportunities. Government Taxation, low unemployment, social welfare. Trade Unions Product quality, staff protection. Norms established by society and the industry for competitive Competitors conduct. Community Jobs, environmental protection, social protection.
  • 10. The Need to Manage Stakeholder  Stakeholders are individuals or groups that benefit from an organization.  Stakeholders can affect an organization‟s functioning, goals, development and survival.  They are beneficial when they help you achieve your goals and they are antagonistic when they oppose your mission.  Therefore, stakeholders have power to be either a threat or a benefit to an organization (Gibson, 2000).
  • 11. The Need to Manage Stakeholder  Their influence can be small or great and can be exercised either intentionally or incidentally.  Individuals and organizations need to be wary of their stakeholders and their influences.  If stakeholders have negative influence on us, why should we deal with or bother about them? WHY?
  • 12. The Need to Manage Stakeholder  Simply because organizations are depending on external stakeholders for resources, services and information.  Stakeholders have claims, rights and expectations that ought to be honored and not taken lightly.  Thus, stakeholders must be managed properly to avoid any negative influences, especially those that could contrary to the organization‟s objectives.
  • 13. Organizational Stakeholder Example of an organization‟s stakeholders (Caroll &Buchholtz, 1999)
  • 14. There are 2 steps for analyzing organizational stakeholders 1. Step 1: Identify Stakeholders  Think of all the people within the organization who are impacted by your work, who have influence over it, or have a stake in its successful completion. 2. Step 2: Prioritize Stakeholders  Which stakeholder influence or interest is at the highest priority.
  • 15. It is important that an organization understands it‟s stakeholders, strategies to satisfy all stakeholder‟s goal and objectives, along with a prediction of the future impact of that stakeholder‟s actions on a project‟s outcome.
  • 17. Project Stakeholders  Each project has its own unique set of stakeholders. Considering the potential influence of the project‟s stakeholders Development of Identification of all strategies to facilitate project stakeholders the “management” of and their relevant the stakeholders stakes in the project. during the life cycle of the project. Successful Project Management
  • 18. Example  A project managers who must make recommendation concerning the design of a new plant must be aware of the state and local land use, plant design, tax laws and the area’s likely pattern of growth. Hmm…Is that all? Are you sure?
  • 19. The project manager also must be aware of: 1. Local political climate. 2. Availability of a skilled labor force. 3. Public attitudes towards the location of the plant in the community.  Politics can also have profound impact on the outcome of a project. 1. E.g.: The project manager who neglects the building and maintenance of alliances with key political stakeholders will soon find indifference or opposition to his/her project.
  • 20. The success of a project depends on taking into account the potential impact of project decisions on all stakeholders during the entire life of the project.
  • 21. Stakeholder Influence  Stakeholders will manifest the attributes of legitimacy and power (Carroll and Buchholts, 2006).  Legitimacy - validity of a claim to a stake  Power - the capacity to induce or persuade the actions of others and is displayed when one part in a relationship is able to impose its will on the other part (Johnson et al.,2005).
  • 22. Stakeholder Influence  Power may be displayed through: 1. Force (coercive power) 2. Material or financial resources (utilitarian power) 3. Symbolic resources (normative power)
  • 23. Stakeholder Influence  Therefore, stakeholders must be managed to avoid any of their influences contrary to an organization or project objectives.  An ideal way is to optimize by maximizing the benefits from stakeholders while minimizing their potential negative impacts.
  • 24. Example of Stakeholder Influence Example 1  In a 1-million-square-foot addition to the New York Hospital, environment, political and social challenges existed.  Over 45 agencies – „stakeholders‟ – Need to be satisfied even though no public money was involved in the project. Issues such as the highway, the river, working space, historical preservation and other issues need to be considered.
  • 25. Example of Successful Stakeholder Management Example 1  James Webb and his colleagues at NASA practiced stakeholder management during the Apollo program.  NASA gained the support not only from the aerospace industry and related constitutions but also from the educational community, the basic sciences and weather forecast profession.
  • 26. Example of Successful Stakeholder Management Example 1  The 12.5 miles, $490 million highway project through Glenwood Canyon in Colorado is one of the expensive nonurban sections of the interstate system.  Required more than 10 years to plan and 12 years to construct.  Involved a high degree of cooperation among project team, environmentalists and tourists to create a major highway that preserved and enhanced the nation's premier natural settings.
  • 27.  Theproject experienced fierce opposition initially, countless design changes and physical constraints but a remarkable cooperation between all stakeholders created a four-lane highway that even environmentalists love. NEXT Glenwood Canyon highway (source: wikipedia)
  • 28. Group Activity  Gather one example of a successful and one example of a failure in the implementation of stakeholder management.  Requirements (due date: 20/9/2012) 1. Work in a group of 5 2. Explain the background or purpose of the project. 3. Why is the project a successful / failure one. 4. Groups will be randomly picked to present their findings.
  • 29. Additional Requirement: 1. Successful in Implementation (minimum 200 words). 2. Failure in Implementation (minimum 200 words). 3. Hard copy – Typed 4. Presentation slides – Max 6 slides.
  • 30. END