SlideShare a Scribd company logo
In the above sample curves, the set of curves may apply to batteries of different

 sizes or to only one size.
In ETAP PowerStation, you specify a set of characteristic curves for a given
size. If you want to use a given set of curves for batteries of different sizes, you
can indicate this in the Battery Method Case Editor.
 26.4.3 Battery Sizing Sizing Study
The battery sizing calculation includes determining the number of cells
to meet the system voltage requirement and determining the battery size
and number of strings to meet the load duty cycle requirement.

Number of Cells
The number of cells should be determined to satisfy system

minimum and maximum voltage requirements:
1. When charging the battery, the voltage to be applied to the battery should
   not

be greater than the maximum system voltage.
Let N be the number of cells. The voltage requirements can be given in

the following equation        V sys,     ≤N≤   V sys,
                              V
                              mincell,         V cell,
                                               max
                              disch            ch

     Where
 Vsys,min

 is the minimum system voltage that is equal to the nominal voltage of the

   battery terminal bus multiplied by the minimum system voltage deviation
Vsys,max
is the maximum system voltage that is equal to the nominal voltage of the
   entered in the Battery Sizing Study Case Editor.
battery terminal bus multiplied by the maximum system voltage deviation
Vcell,disch is the battery discharge voltage in V/Cell entered in the
Battery Sizing Study Case Editor.
entered in the Battery Sizing Study Case Editor.

It is clear that the number of cells of the battery is dependent on the four

 values for voltage requirement
entered in the Battery Sizing Study Case Editor. It can happen that for
some incompatible values, we cannot determine a value for N to satisfy
the above equation. When this situation occurs, ETAP will display a
message indicating that it cannot determine the number of cells.
 In practical cases, there is often a range of values that N can take to

satisfy the above equation. In this
case, ETAP will select the value for N that results in the battery rated
voltage being closest to its terminal bus nominal voltage.
Cell Size
In determining the battery size, ETAP will find the smallest size that

 can provide sufficient power for the
specified duty cycle. The capacity of a battery can be increased
either by using a larger size or by adding more strings. Since ETAP
allows you to enter different characteristic curves for different sizes
of batteries, in the battery sizing calculation, the program starts with
one string and the smallest size available for the calculation. If it fails
to meet the load requirement, the program first increases the size and
performs calculations with the characteristic curves for the new size.
When no available sizes can meet the load requirement for the given
number of strings, it then increases the string number and performs
the calculation with the smallest size again. This process continues
until a battery size and a string number are found to meet the load
requirement.
Load Sections in Battery Duty Cycle

A battery duty cycle generally can be represented as a square

waveform. It consists of a number of time periods, with a constant

 current value during a period. The figure below shows a sample
duty
                   i
      S i a=    ∑ It P j
cycle for battery.1 consists of six periods, designated as P1, P2,
                j=



… P6.     A load section Si is a combination of a number of load

periods, defined as:
In the sample duty cycle there are six load sections.




          Load Sections for A Sample Battery Duty Cycle
Determination of Cell Size Based on Battery Characteristic Curves

Based on a given set of battery characteristic curves, we can determine the

 required battery size for a specified duty cycle. Let F represent cell size. It is
                     F= Max Fi           i=1,..Sm
 equal to:

where Sm is the total number of load sections and Fi is the size

calculated for the ith load section. The calculation of Fi depends on the
where Ap is the load current value in period P. RT is the value obtained from the
type of characteristic curve, which is the number of amperes that each positive
battery battery library curves.
Random Load and Non-Random Load

In general, the duty cycle for a battery consists of random loads and

non-random loads. The program determines the cells for random and

non-random loads separately in the same way as described in the

previous section. The sum of the two cell size values is the uncorrected

cell size for the given duty cycle.
 Adjusting Factors

 In the Battery Sizing Study Case Editor, you can select several

 adjusting factors to be considered in calculating battery size. These

   factors include temperature factor, design margin factor, aging
Calculation Cycle

It is clear from the equations for determining cell size that the cell size is

calculated based on a given set of battery characteristic curves, which is for a

given cell size. If the calculated cell size is different from the one

corresponding to the characteristic curves used. We have to do the calculation
26.4.4 Battery Discharging Calculation Method
The purpose of battery discharge calculation is to determine battery
performance for a specified duty cycle. One of the key parameters for battery
performance is the battery terminal voltage. When the battery is supplying
the load as the sole source, it should be able to maintain voltage level for the
whole period of the specified duty cycle.


Battery Characteristic Curves for Voltage Interpolation
The terminal voltage of a battery is dependent on the current drawing from the

battery and the ampere-hour capacity contained in the battery. This

relationship is described by the battery characteristic curve and is very

nonlinear. In ETAP, the battery characteristics are described in the battery

library as discrete points. Because no closed form equation is available to

describe the battery characteristics, numerical interpolation methods have to
Battery Combined Duty Cycle
be used to find the points missing in the curves. Apparently, the more curves
When the load powered by the battery includes random load, the random load
 are entered in the battery library, the more accurate the calculated results will
 should be added to the non-
random load at the worst point, which is the time the battery has the lowest
 be.
voltage value when only the non-random load is considered. To identify this
time moment, the program first performs battery discharge calculation
excluding the random load. It then determine the worst point, add the random
load to the non-random load and perform discharge calculation from the time
when the random load takes effect all the way to the end of battery duty cycle.
Battery Voltage Calculation
An iterative process is conducted to calculated battery discharge

 voltage values. A battery voltage value
is reported at each time step specified in the battery sizing study case
and at each moment when there is a change in the load duty cycle. By
changing the step size from the battery sizing study case, the user can
adjust the level of detail information on discharge calculation to be
reported.
If the battery duty cycle is calculated by the load current summation

 method, the battery current will
change only when there is a change in any load duty cycle. When the
load flow method is selected in the study case, even if there is no
change in the load duty cycle, the battery current will change due to
decrease in the battery voltage. In this case the battery current is
calculated by a full load flow calculation, considering different types
of loads and system losses. In this load flow calculation, the battery is
modeled as a constant voltage source with the voltage calculated in the
previous step. The calculated battery current will be used in the
current step for battery voltage calculation.
Along with battery voltage and current, the battery discharge program

 also calculates battery discharge
capacity. When there is change in the load current, two values of
voltage
When the battery is calculated using load flow method, the battery
and current are calculated, at t –
 discharge calculation also provides a
and t+, one for before the load change and one for after the load change.
26.5Required Data
26.5.1 Source
In battery sizing calculation, the only source is the battery to be

 sized. Batteries may only besized/discharged one at a time as

specified in the study case. A UPS may be considered as a load to the
   Battery
system when its input bus is not connected to an energized bus.

•ID
•Bus connection data
•Battery library type data. This information is used to retrieve library
data for calculations.

  If only the battery discharge calculation is conducted, the

  following additional information is also
        •Battery number of plates and Capacity.
  required:
        •Number of cells
        •Number of Strings
        •SC page battery external resistance.
26.5.2 Load

 UPS
 When a UPS is not connected to an energized input AC bus, it is

  considered a load in battery sizing calculations.
•ID

•Bus connection data

•DC rated voltage kW and kVA. Duty Cycle Page

•If no duty cycle data is entered, this load will be assumed to be zero.


   DC Motor


•ID
•Bus connection data
•Quantity
•Rated voltage

•kW or HP and Efficiency. Duty Cycle Page
Lumped Load

•ID
•Bus connection data
•Rated voltage kW Rating
•Duty Cycle Page
•If no duty cycle data is entered, this load will be assumed to be zero.


  Static Load
   •ID
   •Bus connection data kW Rating.
   •Rated voltage
   •Duty Cycle Page
   •If no duty cycle data is entered, this load will be assumed to
   be zero.


  Elementary Diagram (ED) Load

     •ID
     •Bus connection data
     •Rated voltage kW Rating.
     •Duty Cycle Page
     •If no duty cycle data is entered, this load will be assumed to
     be zero.
Inverter

 •ID
 •Bus connection data
 •DC rated voltage
 •kVA, PF, DC kW rating
 •Duty Cycle Page
 •If no duty cycle data is entered, this load will be assumed to be
 zero.
26.5.3 Branch

DC Cable
 •ID
 •Bus connection data
 •Cable length
 •Resistance and Inductance and cable length
 units

       DC Impedance

       •ID
       •Bus connection data
       •Resistance and inductance impedance
       information.
Tie PD (CB, Fuse, & Single-Throw & Double-ThrowSwitches)

       •ID
       •Bus connection data

      DC Converter
      •ID
      •Bus connection data
      •kW Rating and Rated kV Input and output.
         Library
          •Library type data
          •Battery characteristic curve data

        Study Case

 When you initiate a battery sizing calculation, PowerStation uses the

 study case currently selected from
 the Study Case Toolbar. Every field in the Study Case Editor is set to
 its default value. However, it is important to set the values in the study
 case correctly to meet your calculation requirements.
The battery sizing calculation results are reported graphically on the one-line diagram, in plots and in the
     Crystal Reports format. The graphical one-line display shows the number of cells, number of strings, cell
     size, etc. You can use the Display Options Editor to specify the content to be displayed.




   26.6 Output Reports

The Crystal Reports format provides you with detailed information for a

battery sizing study. You can

utilize the Battery Sizing Report Manager to help you view the output
      26.6.1 Battery Sizing Report Manager
report.

To open the Battery Sizing Report Manager, simply click on the View
Output File button on the Battery
Sizing Study Toolbar.
The editor includes four pages (Complete, Input, Result, and
Summary)

representing different sections of the output report. The Report
Manager

 allows you to select formats
available for different portions of the report and view it via Crystal
Reports. There are several fields and buttons common to every page, as
described below.
Output Report Name

This field displaysName to the output report you want to view.
  Project File the name
   This field displays the name of the project file based on which report was

   Help
   generated, along with the directory where the project file is located.

   Click on this button to access Help.
   OK / Cancel
Click on the OK button to dismiss the editor and bring up the Crystal

Reports view to show the selected portion of the output report. If no

selection is made, it will simply dismiss the editor. Click on the Cancel
  Complete Report Page
button to dismiss the editor without viewing the report.
In this page there is only one format available, Complete, which brings

 up the complete report for the
battery sizing study. The complete report includes input data, results,
and summary reports.
Input Page


 This page allows you to select formats to view different input data,

 grouped according to type. They

 include the following available formats:

   •Battery Characteristics

   •Branch Connection

   •Bus and Connected Load
   •Cable
   •Cover
   •DC Converter Impedance Inverter
   •Load Duty Cycle
   •UPS
Result Page
This page allows you to select formats to view the result portion

 of the output report, including Calculation Results, Battery Load

Profile, and Battery Characteristics. The Calculation Results portion


prints the uncorrected cell size for each load section in non-random

load and random load. The Battery Load Profile is the battery duty

cycle generated based on load duty cycles. The Battery Characteristic

s are mostly data entered by the user

More Related Content

PDF
POWER ELECTRONIC DEVICES
PPTX
BATTERY CHEMISTRY [Autosaved].pptx
PPTX
Design of an Intelligent Battery Management System (BMS)
PPT
Simple mode of Li-ion battery (LTspice)
PPTX
HVDC transmission system and its components
PPT
Battery ppt
PDF
MCC Motor Control Center 1
PDF
DigSILENT PF - 03 load flow_analysis
POWER ELECTRONIC DEVICES
BATTERY CHEMISTRY [Autosaved].pptx
Design of an Intelligent Battery Management System (BMS)
Simple mode of Li-ion battery (LTspice)
HVDC transmission system and its components
Battery ppt
MCC Motor Control Center 1
DigSILENT PF - 03 load flow_analysis

What's hot (20)

PPTX
Synchronous Generator(Alternator).pptx
PDF
Motor protection principles
PPT
Automatic power factor controller by microcontroller
PDF
ETAP - bsd - Battery Sizing & Duscharge
PDF
Active cell balancing of Li-Ion batteries using single capacitor and single L...
PDF
Electric Vehicles in Smart Grid
PPSX
Battery modelling
PDF
Transformer differential protection
PPTX
ENERGY EFFICIENT MOTORS
PDF
BATTERY MANAGEMENT SYSTEM (BMS) IN ELECTRIC VEHICLES
PPTX
17 mse017 battery and battery management system
PDF
Lithium Ion Battery Simplified Simulink Model using MATLAB
PPTX
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
PPTX
Automatic Power Factor Corrector
PPTX
BATTERY MANAGEMENT SYSTEM (BMS) IN ELECTRIC VEHICLES
PDF
MPPT Solar Charge Controller
PPT
Impulse test for power transformers
PPTX
Motor StarterTypes and Technology of Motor Starter And Its Applications
PPTX
Permanent magnet motor drives.pptx
PPTX
Electric machine
Synchronous Generator(Alternator).pptx
Motor protection principles
Automatic power factor controller by microcontroller
ETAP - bsd - Battery Sizing & Duscharge
Active cell balancing of Li-Ion batteries using single capacitor and single L...
Electric Vehicles in Smart Grid
Battery modelling
Transformer differential protection
ENERGY EFFICIENT MOTORS
BATTERY MANAGEMENT SYSTEM (BMS) IN ELECTRIC VEHICLES
17 mse017 battery and battery management system
Lithium Ion Battery Simplified Simulink Model using MATLAB
LOAD FREQUENCY AND VOLTAGE GENERATION CONTROL
Automatic Power Factor Corrector
BATTERY MANAGEMENT SYSTEM (BMS) IN ELECTRIC VEHICLES
MPPT Solar Charge Controller
Impulse test for power transformers
Motor StarterTypes and Technology of Motor Starter And Its Applications
Permanent magnet motor drives.pptx
Electric machine
Ad

Viewers also liked (15)

PPTX
Demanda contra la repuiblica y demanda contra el estado
PDF
Apresentaçao bbom+ grupo valemais
PPTX
Power 123
PPTX
Giardini da rifare
PPT
主日投影片
PDF
Interaction Bridges: Strategic Tool for Keeping Customer Promises
PPS
What willbecomeofthem
PPT
The city, who i want to visit
DOCX
UNIQUE REGISTRATION NUMBER
PDF
The International Journal of Engineering and Science (The IJES)
PDF
Ussage and impediments of technology enabled services in banking sector
PPT
корпоративная культура
PPTX
LO QUE SUELE SUCEDER EN FIN DE AÑO
PDF
SGS Group Profile 2013
 
PDF
¿Sabes cómo gestionar tu información en la era digital?
Demanda contra la repuiblica y demanda contra el estado
Apresentaçao bbom+ grupo valemais
Power 123
Giardini da rifare
主日投影片
Interaction Bridges: Strategic Tool for Keeping Customer Promises
What willbecomeofthem
The city, who i want to visit
UNIQUE REGISTRATION NUMBER
The International Journal of Engineering and Science (The IJES)
Ussage and impediments of technology enabled services in banking sector
корпоративная культура
LO QUE SUELE SUCEDER EN FIN DE AÑO
SGS Group Profile 2013
 
¿Sabes cómo gestionar tu información en la era digital?
Ad

Similar to Chapter 26 battery sizing and discharge analysis norestriction (20)

PPTX
battery is a device that stores energy and then discharges it by converting c...
PDF
Batt 2_042706.pdf
PDF
battery sizing calc and sizing of alcad.
PPTX
Battery standards- ENERGY STORAGE SYSTEMSpptx
PDF
EV - electric vehicles about aerodynamic drag while moving the car in the fre...
PDF
Dynamic Modeling and Simulation of a Lithium Ion Battery
PPTX
Basic Fundamental Electronics by D-Sarda PART VIII
PPTX
BMS_Modelling_Project_PPT.pptx
PPTX
EV BMS DESIGN presentation
PDF
Probabilistic Duration of Power Estimation for Nickel- metal- hydride (NiMH) ...
PPTX
1b. Battery Basics and Equivalent Circuit Model.pptx
PPTX
unit3.0.pptx
PPT
How Many Cycles Can I Expect from My Battery?
PDF
Comparison of one and two time constant models for lithium ion battery
PPTX
Battery thermal management system for Electric vehicle
PDF
Lt3421202123
PDF
Electro thermal model of lion a1 02
PDF
LMS French Users Conference 2013 - Li-ion qging Modeling and battery pack sizing
PDF
Nickel-Metal Hydride Battery Simplified Simulink Model using MATLAB
PDF
Lead-Acid Battery Simplified Simulink Model using MATLAB
battery is a device that stores energy and then discharges it by converting c...
Batt 2_042706.pdf
battery sizing calc and sizing of alcad.
Battery standards- ENERGY STORAGE SYSTEMSpptx
EV - electric vehicles about aerodynamic drag while moving the car in the fre...
Dynamic Modeling and Simulation of a Lithium Ion Battery
Basic Fundamental Electronics by D-Sarda PART VIII
BMS_Modelling_Project_PPT.pptx
EV BMS DESIGN presentation
Probabilistic Duration of Power Estimation for Nickel- metal- hydride (NiMH) ...
1b. Battery Basics and Equivalent Circuit Model.pptx
unit3.0.pptx
How Many Cycles Can I Expect from My Battery?
Comparison of one and two time constant models for lithium ion battery
Battery thermal management system for Electric vehicle
Lt3421202123
Electro thermal model of lion a1 02
LMS French Users Conference 2013 - Li-ion qging Modeling and battery pack sizing
Nickel-Metal Hydride Battery Simplified Simulink Model using MATLAB
Lead-Acid Battery Simplified Simulink Model using MATLAB

Recently uploaded (20)

PDF
advance database management system book.pdf
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
Trump Administration's workforce development strategy
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
Hazard Identification & Risk Assessment .pdf
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PPTX
20th Century Theater, Methods, History.pptx
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
advance database management system book.pdf
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Trump Administration's workforce development strategy
TNA_Presentation-1-Final(SAVE)) (1).pptx
Hazard Identification & Risk Assessment .pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Introduction to pro and eukaryotes and differences.pptx
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
AI-driven educational solutions for real-life interventions in the Philippine...
A powerpoint presentation on the Revised K-10 Science Shaping Paper
20th Century Theater, Methods, History.pptx
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
202450812 BayCHI UCSC-SV 20250812 v17.pptx
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Chinmaya Tiranga quiz Grand Finale.pdf
David L Page_DCI Research Study Journey_how Methodology can inform one's prac...
Computing-Curriculum for Schools in Ghana
Share_Module_2_Power_conflict_and_negotiation.pptx
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc

Chapter 26 battery sizing and discharge analysis norestriction

  • 1. In the above sample curves, the set of curves may apply to batteries of different sizes or to only one size. In ETAP PowerStation, you specify a set of characteristic curves for a given size. If you want to use a given set of curves for batteries of different sizes, you can indicate this in the Battery Method Case Editor. 26.4.3 Battery Sizing Sizing Study The battery sizing calculation includes determining the number of cells to meet the system voltage requirement and determining the battery size and number of strings to meet the load duty cycle requirement. Number of Cells The number of cells should be determined to satisfy system minimum and maximum voltage requirements: 1. When charging the battery, the voltage to be applied to the battery should not be greater than the maximum system voltage.
  • 2. Let N be the number of cells. The voltage requirements can be given in the following equation V sys, ≤N≤ V sys, V mincell, V cell, max disch ch Where Vsys,min is the minimum system voltage that is equal to the nominal voltage of the battery terminal bus multiplied by the minimum system voltage deviation Vsys,max is the maximum system voltage that is equal to the nominal voltage of the entered in the Battery Sizing Study Case Editor. battery terminal bus multiplied by the maximum system voltage deviation Vcell,disch is the battery discharge voltage in V/Cell entered in the Battery Sizing Study Case Editor. entered in the Battery Sizing Study Case Editor. It is clear that the number of cells of the battery is dependent on the four values for voltage requirement entered in the Battery Sizing Study Case Editor. It can happen that for some incompatible values, we cannot determine a value for N to satisfy the above equation. When this situation occurs, ETAP will display a message indicating that it cannot determine the number of cells. In practical cases, there is often a range of values that N can take to satisfy the above equation. In this case, ETAP will select the value for N that results in the battery rated voltage being closest to its terminal bus nominal voltage.
  • 3. Cell Size In determining the battery size, ETAP will find the smallest size that can provide sufficient power for the specified duty cycle. The capacity of a battery can be increased either by using a larger size or by adding more strings. Since ETAP allows you to enter different characteristic curves for different sizes of batteries, in the battery sizing calculation, the program starts with one string and the smallest size available for the calculation. If it fails to meet the load requirement, the program first increases the size and performs calculations with the characteristic curves for the new size. When no available sizes can meet the load requirement for the given number of strings, it then increases the string number and performs the calculation with the smallest size again. This process continues until a battery size and a string number are found to meet the load requirement. Load Sections in Battery Duty Cycle A battery duty cycle generally can be represented as a square waveform. It consists of a number of time periods, with a constant current value during a period. The figure below shows a sample duty i S i a= ∑ It P j cycle for battery.1 consists of six periods, designated as P1, P2, j= … P6. A load section Si is a combination of a number of load periods, defined as:
  • 4. In the sample duty cycle there are six load sections. Load Sections for A Sample Battery Duty Cycle Determination of Cell Size Based on Battery Characteristic Curves Based on a given set of battery characteristic curves, we can determine the required battery size for a specified duty cycle. Let F represent cell size. It is F= Max Fi i=1,..Sm equal to: where Sm is the total number of load sections and Fi is the size calculated for the ith load section. The calculation of Fi depends on the where Ap is the load current value in period P. RT is the value obtained from the type of characteristic curve, which is the number of amperes that each positive battery battery library curves.
  • 5. Random Load and Non-Random Load In general, the duty cycle for a battery consists of random loads and non-random loads. The program determines the cells for random and non-random loads separately in the same way as described in the previous section. The sum of the two cell size values is the uncorrected cell size for the given duty cycle. Adjusting Factors In the Battery Sizing Study Case Editor, you can select several adjusting factors to be considered in calculating battery size. These factors include temperature factor, design margin factor, aging Calculation Cycle It is clear from the equations for determining cell size that the cell size is calculated based on a given set of battery characteristic curves, which is for a given cell size. If the calculated cell size is different from the one corresponding to the characteristic curves used. We have to do the calculation
  • 6. 26.4.4 Battery Discharging Calculation Method The purpose of battery discharge calculation is to determine battery performance for a specified duty cycle. One of the key parameters for battery performance is the battery terminal voltage. When the battery is supplying the load as the sole source, it should be able to maintain voltage level for the whole period of the specified duty cycle. Battery Characteristic Curves for Voltage Interpolation The terminal voltage of a battery is dependent on the current drawing from the battery and the ampere-hour capacity contained in the battery. This relationship is described by the battery characteristic curve and is very nonlinear. In ETAP, the battery characteristics are described in the battery library as discrete points. Because no closed form equation is available to describe the battery characteristics, numerical interpolation methods have to Battery Combined Duty Cycle be used to find the points missing in the curves. Apparently, the more curves When the load powered by the battery includes random load, the random load are entered in the battery library, the more accurate the calculated results will should be added to the non- random load at the worst point, which is the time the battery has the lowest be. voltage value when only the non-random load is considered. To identify this time moment, the program first performs battery discharge calculation excluding the random load. It then determine the worst point, add the random load to the non-random load and perform discharge calculation from the time when the random load takes effect all the way to the end of battery duty cycle.
  • 7. Battery Voltage Calculation An iterative process is conducted to calculated battery discharge voltage values. A battery voltage value is reported at each time step specified in the battery sizing study case and at each moment when there is a change in the load duty cycle. By changing the step size from the battery sizing study case, the user can adjust the level of detail information on discharge calculation to be reported. If the battery duty cycle is calculated by the load current summation method, the battery current will change only when there is a change in any load duty cycle. When the load flow method is selected in the study case, even if there is no change in the load duty cycle, the battery current will change due to decrease in the battery voltage. In this case the battery current is calculated by a full load flow calculation, considering different types of loads and system losses. In this load flow calculation, the battery is modeled as a constant voltage source with the voltage calculated in the previous step. The calculated battery current will be used in the current step for battery voltage calculation. Along with battery voltage and current, the battery discharge program also calculates battery discharge capacity. When there is change in the load current, two values of voltage When the battery is calculated using load flow method, the battery and current are calculated, at t – discharge calculation also provides a and t+, one for before the load change and one for after the load change.
  • 8. 26.5Required Data 26.5.1 Source In battery sizing calculation, the only source is the battery to be sized. Batteries may only besized/discharged one at a time as specified in the study case. A UPS may be considered as a load to the Battery system when its input bus is not connected to an energized bus. •ID •Bus connection data •Battery library type data. This information is used to retrieve library data for calculations. If only the battery discharge calculation is conducted, the following additional information is also •Battery number of plates and Capacity. required: •Number of cells •Number of Strings •SC page battery external resistance.
  • 9. 26.5.2 Load UPS When a UPS is not connected to an energized input AC bus, it is considered a load in battery sizing calculations. •ID •Bus connection data •DC rated voltage kW and kVA. Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero. DC Motor •ID •Bus connection data •Quantity •Rated voltage •kW or HP and Efficiency. Duty Cycle Page
  • 10. Lumped Load •ID •Bus connection data •Rated voltage kW Rating •Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero. Static Load •ID •Bus connection data kW Rating. •Rated voltage •Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero. Elementary Diagram (ED) Load •ID •Bus connection data •Rated voltage kW Rating. •Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero.
  • 11. Inverter •ID •Bus connection data •DC rated voltage •kVA, PF, DC kW rating •Duty Cycle Page •If no duty cycle data is entered, this load will be assumed to be zero. 26.5.3 Branch DC Cable •ID •Bus connection data •Cable length •Resistance and Inductance and cable length units DC Impedance •ID •Bus connection data •Resistance and inductance impedance information.
  • 12. Tie PD (CB, Fuse, & Single-Throw & Double-ThrowSwitches) •ID •Bus connection data DC Converter •ID •Bus connection data •kW Rating and Rated kV Input and output. Library •Library type data •Battery characteristic curve data Study Case When you initiate a battery sizing calculation, PowerStation uses the study case currently selected from the Study Case Toolbar. Every field in the Study Case Editor is set to its default value. However, it is important to set the values in the study case correctly to meet your calculation requirements.
  • 13. The battery sizing calculation results are reported graphically on the one-line diagram, in plots and in the Crystal Reports format. The graphical one-line display shows the number of cells, number of strings, cell size, etc. You can use the Display Options Editor to specify the content to be displayed. 26.6 Output Reports The Crystal Reports format provides you with detailed information for a battery sizing study. You can utilize the Battery Sizing Report Manager to help you view the output 26.6.1 Battery Sizing Report Manager report. To open the Battery Sizing Report Manager, simply click on the View Output File button on the Battery Sizing Study Toolbar. The editor includes four pages (Complete, Input, Result, and Summary) representing different sections of the output report. The Report Manager allows you to select formats available for different portions of the report and view it via Crystal Reports. There are several fields and buttons common to every page, as described below.
  • 14. Output Report Name This field displaysName to the output report you want to view. Project File the name This field displays the name of the project file based on which report was Help generated, along with the directory where the project file is located. Click on this button to access Help. OK / Cancel Click on the OK button to dismiss the editor and bring up the Crystal Reports view to show the selected portion of the output report. If no selection is made, it will simply dismiss the editor. Click on the Cancel Complete Report Page button to dismiss the editor without viewing the report. In this page there is only one format available, Complete, which brings up the complete report for the battery sizing study. The complete report includes input data, results, and summary reports.
  • 15. Input Page This page allows you to select formats to view different input data, grouped according to type. They include the following available formats: •Battery Characteristics •Branch Connection •Bus and Connected Load •Cable •Cover •DC Converter Impedance Inverter •Load Duty Cycle •UPS
  • 16. Result Page This page allows you to select formats to view the result portion of the output report, including Calculation Results, Battery Load Profile, and Battery Characteristics. The Calculation Results portion prints the uncorrected cell size for each load section in non-random load and random load. The Battery Load Profile is the battery duty cycle generated based on load duty cycles. The Battery Characteristic s are mostly data entered by the user