Types of risk
Market risk
-Risk of losses for a portfolio that the firms owns.
-Risk factors: interest rate, foreign exchange, equity prices, commodity
prices...
-Estimation of market risk: VAR models
-IB manage these risks by diversifying exposures, controlling position
sizes, and establishing hedges.
Credit risk
- Possible loss that occurs when a counterparty or an issuer of
securities held by the firm fails to meet its contractual obligations.
- To reduce risk, IB establish limits of credit exposures, and require
collateral.
Operating risk
Risk resulting from failed internal process, people and systems.
Reputational risk
Risk of a financial loss resulting from the loss of business
attributable to a decrease in reputation.
Value at Risk (VAR)
The VAR of a portfolio is the loss in value in the portfolio that can be
expected over a given period of time (e.g., 1-Day) with a probability not
exceeding a given number (e.g., 5%).
Probability (Portfolio Loss < -VAR) = K
K = Given Probability
5%
Possible Profit/Loss
-10MM
• VAR is a measure of the losses due to “normal” market
movements.
• It gives an estimate of the likelihood of a loss greater
than the VAR
• VAR takes into account how prices changes of different
assets are related to each other
• VAR must be combined with other measures of risk to
provide a comprehensive risk measure
VAR for portfolios
Consider assets A and B, and the combined portfolio A+B
VAR(A)+VAR(B)>VAR(A+B)
Two assets: Investor has proportion x of asset A and (1-x) of asset B.
Expected return:
Variance:
)
(
)
1
(
)
(
)
( B
A
P R
E
x
R
xE
R
E 


)
,
(
)
1
(
2
)
(
)
1
(
)
(
)
( 2
2
2
2
2
B
A
B
A
P R
R
Cov
x
x
R
x
R
x
R 



 


 
))
(
))(
(
(
)
,
( , A
A
A
A
B
A
B
A R
E
R
R
E
R
E
R
R
Cov 



Diversification effect
The standard deviation of a portfolio composed of two securities is
less than a weighted average of the standard deviations of the two
securities
Correlation:
The correlation is between -1 and 1.
1: perfect positive correlation
0: no correlation
-1: perfect negative correlation
)
(
)
(
)
,
(
)
,
(
,
B
A
B
A
B
A
B
A
R
SD
R
SD
R
R
Cov
R
R
Corr 


E(R)
A
B

corr=-1
corr=0
corr=1
Example:
Consider a forward contract:
On delivery you will deliver $15m and receive £10m.
At date t the contract has 91 days remaining until delivery.
The 3-month $ and £ interest rates are 5.469% and 6.063% respectively.
The spot exchange rate is S=1.5335$/£.
• The USD mark-to-market value is:
• The risk factors are the exchange rate and the interest
rates.
• The distribution of changes in these variables allows us
to determine the value at risk
• See Figure 1
771
,
327
$
)
360
/
91
(
05469
.
0
1
15
$
)
360
/
91
(
06063
.
0
1
10
£
5335
.
1











m
m
Variance-covariance approach
Based on the assumption that the underlying factors have a
multivariate Normal distribution.
Under this assumption, we can compute the distribution of portfolio
profits and losses.
Then, standard properties of the normal distribution determine the
VAR.
VAR= 1.65 * (standard deviation of change in portfolio value)
Step 1
Identify the risk factors, and map the forward contract into
standardized positions:
























)
360
/
91
(
06063
.
0
1
10
£
)
360
/
91
(
1
10
£
5335
.
1
)
360
/
91
(
05469
.
0
1
15
$
3
2
1
m
S
X
S
r
m
X
r
m
X
r
GBP
GBP
USD
Step 2
Assume that percentage changes in the risk factors have a
multivariate Normal distribution with means of zero, and
estimate the parameters of the distribution (standard
deviations, correlation coefficients).
Step 3
Use the standard deviations and correlations of the risk
factors to determine the standard deviations and
correlations of changes in the value of the standardized
positions (using the sensitivities of standardized positions
to changes in the risk factors).
Percentage change in X1:
Hence, stdev of percentage change in X1:
where
USD
USD
USD
USD r
r
r
r
X
X 



/
/ 1
1
USD
USD
USD r
r
X
X

 




/
/ 1
1
1







 

USD
USD
USD
r
r
STDEV

Same for X2 and X3:
GBP
GBP
GBP r
r
X
X

 




/
/ 2
2
2
S
S
S
X
X

 




/
/ 3
3
3
Step 4
Calculate the portfolio standard deviation using the
properties of Normal distributions:
Then, the VAR is:
3
2
23
3
2
3
1
13
3
1
2
1
12
2
1
2
3
2
3
2
2
2
2
2
1
2
1
2
2
2
2













X
X
X
X
X
X
X
X
X
P






P
VAR 

 65
.
1
Historical simulation
Simple atheoretical approach, that requires relatively few assumptions.
It consists of using historical changes in market rates and prices to
construct a distribution of potential future profits and losses.
The distribution of profits and losses takes the current portfolio,
subjecting it to actual changes in risk factors experienced in the past N
periods (trade-off regarding N).
We calculate N historical percentage changes in risk factors, and see
how these changes would affect the portfolio value today.
Steps:
- Obtain historical values of the markets factors for the last N
periods (100 days for instance)
- Subject the current portfolio to the changes in market factors in
the last N periods, calculating the daily profits and losses that
would occur if comparable daily changes in the market factors are
experienced
- Order the results and select a loss that is equaled or exceeded 5%
of the time.
Monte-Carlo simulation
Used when historical data is not sufficiently available.
Consists of choosing a (multivariate) statistical distribution that is
believed to adequately capture the possible changes in the risk factors.
The distribution is not necessarily normal.
Using this distribution, thousands of risk factor changes are
simulated.
Then, the possible losses are calculated using the simulated risk factors.
Comparing the methods
Ability to capture the risk of portfolios that include options
• Variance-covariance approach and options
Problem with options: skewed distribution of options payoff.
The variance-covariance approach linearizes the option positions.
This leads to a normal payoff distribution, which biases the results.
The problem is more significant more for long holding periods.
Both historical simulation and MonteCarlo work with options because
they compute the value of the portfolio for each draw of the basic
market factors.
Exchange rate
Price
Exchange rate
Frequency
Payoff
Frequency
Normal distribution
Exchange rate
Option price
Exchange rate
Frequency
Payoff
Frequency
OPTIONS
Skewed distribution
VAR and options: the Delta-Gamma estimation
Call S the dollar price of British pound and C(S) the option price as a
function of S.
For example, if Δ=0.51 and the price changes by $0.01, the predicted
change in the option price is $0.0051=0.51*$0.01
Problem: the Delta changes as the price of the underlying asset.
Gamma or Γ measures how Δ changes. Gamma is the partial derivative
of delta wrt the price of the underlying asset. Gamma is equivalently
the second partial derivative of the option price wrt the price of the
underlying asset.
S
S
C




)
(
With Gamma:
Change in price
Adding Gamma improves the Delta estimation for options.
2
2
2
)
(
2
1
)
(
dS
S
S
C
dS
S
S
C






Generalities on the reliability of the results
• For historical simulation, there is the risk that recent history is not
typical (volatility).
• Other methodologies also use historical data, but by assuming
particular distributions, limit the possible shape that the
estimated distribution can have.
• Variance-covariance and MonteCarlo approaches: the assumed
distributions do not necessarily correspond to the true
distributions (fat tails...).
VAR performance
Beder (1995)
-Do VAR assumptions matter?
-Do parameters matter?
-Does the methodology matter?
Analysis of eight methods:
Historical, 100days, 1day holding period
Historical, 250days, 1day holding period
Historical, 100days, 2weeks holding period
Historical, 250days, 2weeks holding period
MonteCarlo (RiskMetrics), 1day holding period
MonteCarlo (RiskMetrics), 2weeks holding period
MonteCarlo (BIS), 1day holding period
MonteCarlo (BIS), 2weeks holding period
Portfolio 1: Consists of US Treasury strips only.
Portfolio 2: Consists of outright and options positions on the S&P 500.
Portfolio 3: Combination of portfolio 1 and 2.
• Large difference between the methods (see Beder 1995)
Hendricks (1996) : Evaluation of VAR methods
• Analyses the performances of 12 approaches on random
portfolios:
– Equally weighted moving average approaches (50d, 125d, 500d, 1250d)
– Exponentially weighted weighted average (with different decay factors)
– Historical simulation (125d, 250d, 500d, 1250d)
• Performance measures:
– Mean relative bias
– Root mean squared relative bias
– Annualized percentage volatility
– Fraction of outcome covered
– Multiple needed to attain desired coverage
– Average multiple of tail event to risk measure
– Correlation between risk measure and absolute value of outcome
Stress testing
What happens when price changes are extreme?
- Extreme movements in the basic market factors are more frequent
than under Normal distribution
- Uncertainty on the correlation between the basic market factors
- Extreme events rarely repeat themselves in the same way
- Changing distributions over time
- Set of hypothetical extreme markets scenarios, and they price
effect

More Related Content

PPT
Value at risk
PPT
valueatrisk-100926043213-phpapp02.ppt
PPT
Value At Risk Sep 22
PPTX
Chap2a VaR methods presentation for students
PPTX
Chap2a Value at Risk methods presentation
PPTX
Financial Risk Mgt - Lec 12 by Dr. Syed Muhammad Ali Tirmizi
PPTX
Value at risk
PDF
Value_At_Risk_An_Introduction.pptx.pdf
Value at risk
valueatrisk-100926043213-phpapp02.ppt
Value At Risk Sep 22
Chap2a VaR methods presentation for students
Chap2a Value at Risk methods presentation
Financial Risk Mgt - Lec 12 by Dr. Syed Muhammad Ali Tirmizi
Value at risk
Value_At_Risk_An_Introduction.pptx.pdf

Similar to CompleteTrainingofValueAtRiskTypeofRisk.ppt (20)

PPT
Market risk management for corporate finance
PPT
leasing ppt
PDF
CH&Cie white paper value-at-risk in tuburlent times_VaR
PPTX
risk_return_1.pptx, lesson on microeconomics
PPTX
Financial Risk Mgt - Lec 5 & 6 by Dr. Syed Muhammad Ali Tirmizi
PDF
VaR analysis for Mutual funds
PPTX
Financial Risk Mgt - Lec 3 by Dr. Syed Muhammad Ali Tirmizi
PPT
Chap 18
PPT
Risk And Return
PDF
2008 implementation of va r in financial institutions
PDF
Market Risk Paper
PPTX
PPT
Perfmeasure.ppt
PDF
2. Module II (1) FRM.pdf
PPTX
Security analysis and portfolio management
PPTX
Portfolio analysis
PPTX
Modern Portfolio Theory
PPT
Market Risk Modelling
PDF
Portfolio Management - CH 14 - Portfolio Risk & Performance Attribution | CMT...
Market risk management for corporate finance
leasing ppt
CH&Cie white paper value-at-risk in tuburlent times_VaR
risk_return_1.pptx, lesson on microeconomics
Financial Risk Mgt - Lec 5 & 6 by Dr. Syed Muhammad Ali Tirmizi
VaR analysis for Mutual funds
Financial Risk Mgt - Lec 3 by Dr. Syed Muhammad Ali Tirmizi
Chap 18
Risk And Return
2008 implementation of va r in financial institutions
Market Risk Paper
Perfmeasure.ppt
2. Module II (1) FRM.pdf
Security analysis and portfolio management
Portfolio analysis
Modern Portfolio Theory
Market Risk Modelling
Portfolio Management - CH 14 - Portfolio Risk & Performance Attribution | CMT...
Ad

Recently uploaded (20)

PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PDF
Trump Administration's workforce development strategy
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
PPTX
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Lesson notes of climatology university.
PDF
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
PDF
Updated Idioms and Phrasal Verbs in English subject
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PPTX
Cell Structure & Organelles in detailed.
PPTX
master seminar digital applications in india
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Trump Administration's workforce development strategy
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Microbial diseases, their pathogenesis and prophylaxis
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
Weekly quiz Compilation Jan -July 25.pdf
Lesson notes of climatology university.
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
Updated Idioms and Phrasal Verbs in English subject
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Cell Structure & Organelles in detailed.
master seminar digital applications in india
Anesthesia in Laparoscopic Surgery in India
LDMMIA Reiki Yoga Finals Review Spring Summer
What if we spent less time fighting change, and more time building what’s rig...
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
Ad

CompleteTrainingofValueAtRiskTypeofRisk.ppt

  • 1. Types of risk Market risk -Risk of losses for a portfolio that the firms owns. -Risk factors: interest rate, foreign exchange, equity prices, commodity prices... -Estimation of market risk: VAR models -IB manage these risks by diversifying exposures, controlling position sizes, and establishing hedges.
  • 2. Credit risk - Possible loss that occurs when a counterparty or an issuer of securities held by the firm fails to meet its contractual obligations. - To reduce risk, IB establish limits of credit exposures, and require collateral. Operating risk Risk resulting from failed internal process, people and systems. Reputational risk Risk of a financial loss resulting from the loss of business attributable to a decrease in reputation.
  • 3. Value at Risk (VAR) The VAR of a portfolio is the loss in value in the portfolio that can be expected over a given period of time (e.g., 1-Day) with a probability not exceeding a given number (e.g., 5%). Probability (Portfolio Loss < -VAR) = K K = Given Probability 5% Possible Profit/Loss -10MM
  • 4. • VAR is a measure of the losses due to “normal” market movements. • It gives an estimate of the likelihood of a loss greater than the VAR • VAR takes into account how prices changes of different assets are related to each other • VAR must be combined with other measures of risk to provide a comprehensive risk measure
  • 5. VAR for portfolios Consider assets A and B, and the combined portfolio A+B VAR(A)+VAR(B)>VAR(A+B) Two assets: Investor has proportion x of asset A and (1-x) of asset B. Expected return: Variance: ) ( ) 1 ( ) ( ) ( B A P R E x R xE R E    ) , ( ) 1 ( 2 ) ( ) 1 ( ) ( ) ( 2 2 2 2 2 B A B A P R R Cov x x R x R x R           )) ( ))( ( ( ) , ( , A A A A B A B A R E R R E R E R R Cov    
  • 6. Diversification effect The standard deviation of a portfolio composed of two securities is less than a weighted average of the standard deviations of the two securities Correlation: The correlation is between -1 and 1. 1: perfect positive correlation 0: no correlation -1: perfect negative correlation ) ( ) ( ) , ( ) , ( , B A B A B A B A R SD R SD R R Cov R R Corr   
  • 8. Example: Consider a forward contract: On delivery you will deliver $15m and receive £10m. At date t the contract has 91 days remaining until delivery. The 3-month $ and £ interest rates are 5.469% and 6.063% respectively. The spot exchange rate is S=1.5335$/£.
  • 9. • The USD mark-to-market value is: • The risk factors are the exchange rate and the interest rates. • The distribution of changes in these variables allows us to determine the value at risk • See Figure 1 771 , 327 $ ) 360 / 91 ( 05469 . 0 1 15 $ ) 360 / 91 ( 06063 . 0 1 10 £ 5335 . 1            m m
  • 10. Variance-covariance approach Based on the assumption that the underlying factors have a multivariate Normal distribution. Under this assumption, we can compute the distribution of portfolio profits and losses. Then, standard properties of the normal distribution determine the VAR. VAR= 1.65 * (standard deviation of change in portfolio value)
  • 11. Step 1 Identify the risk factors, and map the forward contract into standardized positions:                         ) 360 / 91 ( 06063 . 0 1 10 £ ) 360 / 91 ( 1 10 £ 5335 . 1 ) 360 / 91 ( 05469 . 0 1 15 $ 3 2 1 m S X S r m X r m X r GBP GBP USD
  • 12. Step 2 Assume that percentage changes in the risk factors have a multivariate Normal distribution with means of zero, and estimate the parameters of the distribution (standard deviations, correlation coefficients). Step 3 Use the standard deviations and correlations of the risk factors to determine the standard deviations and correlations of changes in the value of the standardized positions (using the sensitivities of standardized positions to changes in the risk factors).
  • 13. Percentage change in X1: Hence, stdev of percentage change in X1: where USD USD USD USD r r r r X X     / / 1 1 USD USD USD r r X X        / / 1 1 1           USD USD USD r r STDEV 
  • 14. Same for X2 and X3: GBP GBP GBP r r X X        / / 2 2 2 S S S X X        / / 3 3 3
  • 15. Step 4 Calculate the portfolio standard deviation using the properties of Normal distributions: Then, the VAR is: 3 2 23 3 2 3 1 13 3 1 2 1 12 2 1 2 3 2 3 2 2 2 2 2 1 2 1 2 2 2 2              X X X X X X X X X P       P VAR    65 . 1
  • 16. Historical simulation Simple atheoretical approach, that requires relatively few assumptions. It consists of using historical changes in market rates and prices to construct a distribution of potential future profits and losses. The distribution of profits and losses takes the current portfolio, subjecting it to actual changes in risk factors experienced in the past N periods (trade-off regarding N). We calculate N historical percentage changes in risk factors, and see how these changes would affect the portfolio value today.
  • 17. Steps: - Obtain historical values of the markets factors for the last N periods (100 days for instance) - Subject the current portfolio to the changes in market factors in the last N periods, calculating the daily profits and losses that would occur if comparable daily changes in the market factors are experienced - Order the results and select a loss that is equaled or exceeded 5% of the time.
  • 18. Monte-Carlo simulation Used when historical data is not sufficiently available. Consists of choosing a (multivariate) statistical distribution that is believed to adequately capture the possible changes in the risk factors. The distribution is not necessarily normal. Using this distribution, thousands of risk factor changes are simulated. Then, the possible losses are calculated using the simulated risk factors.
  • 19. Comparing the methods Ability to capture the risk of portfolios that include options • Variance-covariance approach and options Problem with options: skewed distribution of options payoff. The variance-covariance approach linearizes the option positions. This leads to a normal payoff distribution, which biases the results. The problem is more significant more for long holding periods. Both historical simulation and MonteCarlo work with options because they compute the value of the portfolio for each draw of the basic market factors.
  • 21. Exchange rate Option price Exchange rate Frequency Payoff Frequency OPTIONS Skewed distribution
  • 22. VAR and options: the Delta-Gamma estimation Call S the dollar price of British pound and C(S) the option price as a function of S. For example, if Δ=0.51 and the price changes by $0.01, the predicted change in the option price is $0.0051=0.51*$0.01 Problem: the Delta changes as the price of the underlying asset. Gamma or Γ measures how Δ changes. Gamma is the partial derivative of delta wrt the price of the underlying asset. Gamma is equivalently the second partial derivative of the option price wrt the price of the underlying asset. S S C     ) (
  • 23. With Gamma: Change in price Adding Gamma improves the Delta estimation for options. 2 2 2 ) ( 2 1 ) ( dS S S C dS S S C      
  • 24. Generalities on the reliability of the results • For historical simulation, there is the risk that recent history is not typical (volatility). • Other methodologies also use historical data, but by assuming particular distributions, limit the possible shape that the estimated distribution can have. • Variance-covariance and MonteCarlo approaches: the assumed distributions do not necessarily correspond to the true distributions (fat tails...).
  • 25. VAR performance Beder (1995) -Do VAR assumptions matter? -Do parameters matter? -Does the methodology matter? Analysis of eight methods: Historical, 100days, 1day holding period Historical, 250days, 1day holding period Historical, 100days, 2weeks holding period Historical, 250days, 2weeks holding period MonteCarlo (RiskMetrics), 1day holding period MonteCarlo (RiskMetrics), 2weeks holding period MonteCarlo (BIS), 1day holding period MonteCarlo (BIS), 2weeks holding period
  • 26. Portfolio 1: Consists of US Treasury strips only. Portfolio 2: Consists of outright and options positions on the S&P 500. Portfolio 3: Combination of portfolio 1 and 2. • Large difference between the methods (see Beder 1995)
  • 27. Hendricks (1996) : Evaluation of VAR methods • Analyses the performances of 12 approaches on random portfolios: – Equally weighted moving average approaches (50d, 125d, 500d, 1250d) – Exponentially weighted weighted average (with different decay factors) – Historical simulation (125d, 250d, 500d, 1250d) • Performance measures: – Mean relative bias – Root mean squared relative bias – Annualized percentage volatility – Fraction of outcome covered – Multiple needed to attain desired coverage – Average multiple of tail event to risk measure – Correlation between risk measure and absolute value of outcome
  • 28. Stress testing What happens when price changes are extreme? - Extreme movements in the basic market factors are more frequent than under Normal distribution - Uncertainty on the correlation between the basic market factors - Extreme events rarely repeat themselves in the same way - Changing distributions over time - Set of hypothetical extreme markets scenarios, and they price effect