The document provides an introduction to the Padma Multipurpose Bridge Project (PMBP) in Bangladesh. Some key details:
- The PMBP includes a 6.15km bridge across the Padma River, approach roads, river training works, service areas, and toll plazas.
- It aims to unite two divided parts of Bangladesh and optimize use of the Mongla port.
- Construction began in 2013-2014 and is expected to be completed by 2018 at a cost of over $3 billion.
- It will include the deepest pile foundations ever built, with piles over 100m long secured by 240 steel and 24 bored piles.
- Challenges include the