Power Measurements
Prepared by Bill Hardy, TESCO
The Eastern Specialty Company
For North Carolina Electric Meter School
Management Session
Wednesday, June 27, 2018 at 1:45 p.m.
Then – Now – Tomorrow?
Meters
First Meters mid-1890s Westinghouse 1905 2005
2006 2014 2025 ???
2
Then – Now – Tomorrow?
Meters??
3
Then – Now – Tomorrow?
Loads
YESTERDAY
TODAY
4
Then – Now – Tomorrow?
Loads
TODAY
5
Then – Now – Tomorrow?
Communications
THEN NOW
6
Why do these changes matter?
• Changes to our loads have changed the basic
computations of metering.
• When loads were linear the power triangle was all we
needed to know
7
Why do these changes matter?
• Today’s loads look more like these
-150
-100
-50
0
50
100
150
0.00 60.00 120.00 180.00 240.00 300.00 360.00
Voltage/Current
Current for CCFL Light Bulb
Voltage
Current
8
Why do these changes matter?
• Today’s loads look more like these
-150
-100
-50
0
50
100
150
0 60 120 180 240 300 360
Voltage/Current
Variable Speed Motor
Voltage
Current
9
Why do these changes matter?
• Today’s loads look more like these
-150
-100
-50
0
50
100
150
0.00 60.00 120.00 180.00 240.00 300.00 360.00
Voltage
Current for Switching Power Supply
Voltage
Current
10
Standards Changes
• New Revision of C12.20 just Published
 Polyphase meters tested using polyphase
 Recommended now, required 2020
 Unbalanced load testing required
 Full harmonic testing required
 0.1% Accuracy Class added
 Specific call out of Non-Blondel applications
where C12.20 does not apply
 Detailed requirements and specs for test outputs
added
11
Harmonic Load Waveforms
ANSI C12.20 now addresses harmonic waveforms
-400
-300
-200
-100
0
100
200
300
400
-150
-100
-50
0
50
100
150
0 90 180 270 360
-200
-150
-100
-50
0
50
100
150
200
-150
-100
-50
0
50
100
150
0 90 180 270 360
-8
-6
-4
-2
0
2
4
6
8
-200
-150
-100
-50
0
50
100
150
200
0 90 180 270 360
-150
-100
-50
0
50
100
150
0 60 120 180 240 300 360
-250
-200
-150
-100
-50
0
50
100
150
200
250
-150
-100
-50
0
50
100
150
0.00 100.00 200.00 300.00
-150
-100
-50
0
50
100
150
-150
-100
-50
0
50
100
150
0.00 100.00 200.00 300.00
Current
Voltage
12
Standards Changes
• New Revision of C12.20 just Released
 Tighter reference condition performance
specifications
 When using polyphase loading meters must be
tested in each configuration used
13
Standards Changes
• New Revision of C12.1
 0.5% Accuracy Class added
 Testing required for unbalanced loads
 Testing required under unbalanced conditions
 Tighter reference performance requirements
 Bi-directional energy flow testing
 Extensive update on in service testing
14
Standards Changes
• New Revision of C12.10 in 2015
 Accuracy tests moved here from C12.1
 Much broader safety requirements
 Coordinated effort with UL2735
• Utilities exempt from UL2735 but only if they own
and install the equipment
15
Standards Changes
• New Revision of C12.9 in 2014
 Full specifications for test plugs included in
standard
• Ensures safe operation between all switches and
all plugs
• previously some combinations produced safety
hazards
 New barrier requirements between switch
elements
16
Standards Changes
• Communications Standards
 New C12.19 which replaces C12.18 and
C12.19 is in ballot process
• Major changes – major controversy has held up
approval for two years
• Standard will still not guarantee inter-operability
17
ANSI C12.31
• At the moment there is no non-sinusoidal
definition for VA
• New ANSI Standard coming very soon
C12.31
Slide 18
New Definitions
RMS Voltage
Slide 19
Basic Definition
Time Domain
Frequency Domain
Waveform
New Definitions
RMS Current
Slide 20
Basic Definition
Time Domain
Frequency Domain
Waveform
New Definitions
Active Power
Slide 21
Basic Definition
Time Domain
Frequency Domain
New Definitions
Apparent Power
Slide 22
Basic Definition
Time Domain
Frequency Domain
Next Generation Standards
• ANSI C12.46
 New standard in development to replace
C12.1 and C12.20
 Structured like OIML IR-46
 A true digital age standard
 Applies to ALL energy measurements
• Watts, VA and VAR
• Contains precise definitions for the quantities
based on digitally sampled waveforms
23
Next Generation Standards
• ANSI C12.46
 Covers ALL waveform types
• sinusoidal, harmonic, time varying
 Defines the meter as everything under the
cover
• If there is auxiliary functions in the meter they must
be fully operational during accuracy testing
• If a option is added to a meter, it must be tested
with the option running to remain qualified
24
Next Generation Standards
• ANSI C12.46
 View of accuracy changes
• Currently changes with respect to reference
• New approach is absolute error
Philosophy of C12.46 – When a meter is
claimed to be of a specific accuracy class, for
example , AC 0.2%, then it’s accuracy under all
commonly occurring conditions should be within
±0.2% maximum error.
25
What does the Future Hold
• Over the next FEW years metering may
have a whole new meaning
• Do these look like meters to you?
26
What does the Future Hold
• Each has an embedded revenue meter
• They may NOT be regulated by the PSC’s.
METER
27
Questions?
Bill Hardy
TESCO – The Eastern Specialty Company
Bristol, PA
215-785-2338
This presentation can also be found under Meter
Conferences and Schools on the TESCO web site:
www.tescometering.com
28

More Related Content

PPTX
21st Century Power Measurements
PPTX
PDF
An introduction to Zeversolar inverters
PDF
Datasheet Fluke 317. Hubungi PT. Siwali Swantika 021-45850618
PDF
KRYKARD Introduction
PDF
Canadian Solar 265w Poly Modules
PDF
215w Enphase Micro Inverter
PPTX
Electric Vehicle Chargers: Trends in the Marketplace and What They Mean for U...
21st Century Power Measurements
An introduction to Zeversolar inverters
Datasheet Fluke 317. Hubungi PT. Siwali Swantika 021-45850618
KRYKARD Introduction
Canadian Solar 265w Poly Modules
215w Enphase Micro Inverter
Electric Vehicle Chargers: Trends in the Marketplace and What They Mean for U...

What's hot (7)

PPTX
Electric Vehicle Chargers: Trends in the Marketplace and What They Mean for U...
PDF
Zeversolar datasheets 1-phase_inverters
PDF
Seraphim 315w 72 Cell
PPTX
Spot galvanometer
PPTX
On time delivery_SCM 4Q Presentation
PDF
Seraphim Energy Company Brochure
PDF
Applying Stepper Motors: Application Questions You Must Answer & Things to Wa...
Electric Vehicle Chargers: Trends in the Marketplace and What They Mean for U...
Zeversolar datasheets 1-phase_inverters
Seraphim 315w 72 Cell
Spot galvanometer
On time delivery_SCM 4Q Presentation
Seraphim Energy Company Brochure
Applying Stepper Motors: Application Questions You Must Answer & Things to Wa...
Ad

Similar to 21st Century Power Measurements (20)

PPTX
21st Century Power Measurements
PPTX
21st Century Power Measurements
PPTX
21st Century Power Measurements.pptx
PPTX
Learning the Language (Meter Testing 101)
PPT
Electric Meter and Transformer Testing in an AMI World - AclaraConnect 2018
POTX
DC Metering - Moving toward center stage
PDF
Power Transformers regulations - MEPS
PPT
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
PPT
ANSI Standards & Updates
PPT
PPTX
DC Metering and Traceability
PPTX
Single Phase Meter Testing Overview
PDF
Transformers
PDF
Solar pv plant and india
PPTX
DC Metering - Moving toward center stage
PPT
Standards - Accuracy, Precision & Traceability
PPT
ANSI C12.20 and Proposed Field Testing Changes
PPTX
ANSI Best Practices and Current Trends
PPTX
Versatile control of unidirectional ac–dc boost converters for power quality ...
21st Century Power Measurements
21st Century Power Measurements
21st Century Power Measurements.pptx
Learning the Language (Meter Testing 101)
Electric Meter and Transformer Testing in an AMI World - AclaraConnect 2018
DC Metering - Moving toward center stage
Power Transformers regulations - MEPS
Site Verification: Tools and Best Practices to Accurately Meter Complex, High...
ANSI Standards & Updates
DC Metering and Traceability
Single Phase Meter Testing Overview
Transformers
Solar pv plant and india
DC Metering - Moving toward center stage
Standards - Accuracy, Precision & Traceability
ANSI C12.20 and Proposed Field Testing Changes
ANSI Best Practices and Current Trends
Versatile control of unidirectional ac–dc boost converters for power quality ...
Ad

Recently uploaded (20)

PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
A comparative analysis of optical character recognition models for extracting...
PPTX
Big Data Technologies - Introduction.pptx
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Getting Started with Data Integration: FME Form 101
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPTX
A Presentation on Artificial Intelligence
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
MIND Revenue Release Quarter 2 2025 Press Release
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PPTX
1. Introduction to Computer Programming.pptx
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Accuracy of neural networks in brain wave diagnosis of schizophrenia
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Spectral efficient network and resource selection model in 5G networks
Unlocking AI with Model Context Protocol (MCP)
A comparative analysis of optical character recognition models for extracting...
Big Data Technologies - Introduction.pptx
Encapsulation_ Review paper, used for researhc scholars
Getting Started with Data Integration: FME Form 101
20250228 LYD VKU AI Blended-Learning.pptx
A Presentation on Artificial Intelligence
Network Security Unit 5.pdf for BCA BBA.
gpt5_lecture_notes_comprehensive_20250812015547.pdf
The Rise and Fall of 3GPP – Time for a Sabbatical?
MIND Revenue Release Quarter 2 2025 Press Release
Group 1 Presentation -Planning and Decision Making .pptx
Reach Out and Touch Someone: Haptics and Empathic Computing
1. Introduction to Computer Programming.pptx

21st Century Power Measurements

  • 1. 21st Century Power Measurements Prepared by Bill Hardy, TESCO The Eastern Specialty Company For North Carolina Electric Meter School Management Session Wednesday, June 27, 2018 at 1:45 p.m.
  • 2. Then – Now – Tomorrow? Meters First Meters mid-1890s Westinghouse 1905 2005 2006 2014 2025 ??? 2
  • 3. Then – Now – Tomorrow? Meters?? 3
  • 4. Then – Now – Tomorrow? Loads YESTERDAY TODAY 4
  • 5. Then – Now – Tomorrow? Loads TODAY 5
  • 6. Then – Now – Tomorrow? Communications THEN NOW 6
  • 7. Why do these changes matter? • Changes to our loads have changed the basic computations of metering. • When loads were linear the power triangle was all we needed to know 7
  • 8. Why do these changes matter? • Today’s loads look more like these -150 -100 -50 0 50 100 150 0.00 60.00 120.00 180.00 240.00 300.00 360.00 Voltage/Current Current for CCFL Light Bulb Voltage Current 8
  • 9. Why do these changes matter? • Today’s loads look more like these -150 -100 -50 0 50 100 150 0 60 120 180 240 300 360 Voltage/Current Variable Speed Motor Voltage Current 9
  • 10. Why do these changes matter? • Today’s loads look more like these -150 -100 -50 0 50 100 150 0.00 60.00 120.00 180.00 240.00 300.00 360.00 Voltage Current for Switching Power Supply Voltage Current 10
  • 11. Standards Changes • New Revision of C12.20 just Published  Polyphase meters tested using polyphase  Recommended now, required 2020  Unbalanced load testing required  Full harmonic testing required  0.1% Accuracy Class added  Specific call out of Non-Blondel applications where C12.20 does not apply  Detailed requirements and specs for test outputs added 11
  • 12. Harmonic Load Waveforms ANSI C12.20 now addresses harmonic waveforms -400 -300 -200 -100 0 100 200 300 400 -150 -100 -50 0 50 100 150 0 90 180 270 360 -200 -150 -100 -50 0 50 100 150 200 -150 -100 -50 0 50 100 150 0 90 180 270 360 -8 -6 -4 -2 0 2 4 6 8 -200 -150 -100 -50 0 50 100 150 200 0 90 180 270 360 -150 -100 -50 0 50 100 150 0 60 120 180 240 300 360 -250 -200 -150 -100 -50 0 50 100 150 200 250 -150 -100 -50 0 50 100 150 0.00 100.00 200.00 300.00 -150 -100 -50 0 50 100 150 -150 -100 -50 0 50 100 150 0.00 100.00 200.00 300.00 Current Voltage 12
  • 13. Standards Changes • New Revision of C12.20 just Released  Tighter reference condition performance specifications  When using polyphase loading meters must be tested in each configuration used 13
  • 14. Standards Changes • New Revision of C12.1  0.5% Accuracy Class added  Testing required for unbalanced loads  Testing required under unbalanced conditions  Tighter reference performance requirements  Bi-directional energy flow testing  Extensive update on in service testing 14
  • 15. Standards Changes • New Revision of C12.10 in 2015  Accuracy tests moved here from C12.1  Much broader safety requirements  Coordinated effort with UL2735 • Utilities exempt from UL2735 but only if they own and install the equipment 15
  • 16. Standards Changes • New Revision of C12.9 in 2014  Full specifications for test plugs included in standard • Ensures safe operation between all switches and all plugs • previously some combinations produced safety hazards  New barrier requirements between switch elements 16
  • 17. Standards Changes • Communications Standards  New C12.19 which replaces C12.18 and C12.19 is in ballot process • Major changes – major controversy has held up approval for two years • Standard will still not guarantee inter-operability 17
  • 18. ANSI C12.31 • At the moment there is no non-sinusoidal definition for VA • New ANSI Standard coming very soon C12.31 Slide 18
  • 19. New Definitions RMS Voltage Slide 19 Basic Definition Time Domain Frequency Domain Waveform
  • 20. New Definitions RMS Current Slide 20 Basic Definition Time Domain Frequency Domain Waveform
  • 21. New Definitions Active Power Slide 21 Basic Definition Time Domain Frequency Domain
  • 22. New Definitions Apparent Power Slide 22 Basic Definition Time Domain Frequency Domain
  • 23. Next Generation Standards • ANSI C12.46  New standard in development to replace C12.1 and C12.20  Structured like OIML IR-46  A true digital age standard  Applies to ALL energy measurements • Watts, VA and VAR • Contains precise definitions for the quantities based on digitally sampled waveforms 23
  • 24. Next Generation Standards • ANSI C12.46  Covers ALL waveform types • sinusoidal, harmonic, time varying  Defines the meter as everything under the cover • If there is auxiliary functions in the meter they must be fully operational during accuracy testing • If a option is added to a meter, it must be tested with the option running to remain qualified 24
  • 25. Next Generation Standards • ANSI C12.46  View of accuracy changes • Currently changes with respect to reference • New approach is absolute error Philosophy of C12.46 – When a meter is claimed to be of a specific accuracy class, for example , AC 0.2%, then it’s accuracy under all commonly occurring conditions should be within ±0.2% maximum error. 25
  • 26. What does the Future Hold • Over the next FEW years metering may have a whole new meaning • Do these look like meters to you? 26
  • 27. What does the Future Hold • Each has an embedded revenue meter • They may NOT be regulated by the PSC’s. METER 27
  • 28. Questions? Bill Hardy TESCO – The Eastern Specialty Company Bristol, PA 215-785-2338 This presentation can also be found under Meter Conferences and Schools on the TESCO web site: www.tescometering.com 28