SlideShare a Scribd company logo
2
Most read
3
Most read
4
Most read
KASANGILI KATONGO
Biggie.Katongo7@gmail.com
0977360153-0966325553
1911 Lilongwe Street, Ndola Town, Zambia.
PERSONAL STATEMENT
I’m an accomplished Electrical Engineer with a background in commercial and industrial
installations.
I have an in depth knowledge of Operations and Maintenance of Electrical works and am
looking to expand my experience within a role that combines field work as well as
management.
EMPLOYMENT
Operations and Maintenance]
Assistant Electrical Engineer
Maamba Colleries Limited Zambia [2*150MW COAL FIRED THERMAL POWER PLANT]
To Date > 01-03-2013
Works under the mentorship of Experienced Tata Consulting Company and Nava Bharat
Ventures Senior Electrical Engineers.
Achievements
o Assigned to carry out supervision of Electrical installations, construction and quality
assurance on designs and installation works in the Thermal Power Plant.
o Ensure that safety procedures and standards are adhered to by the contractor and
personnel.
o Working experience in HT and LT Switchgears, protection of the switchgear, and
maintenance of the electrical equipment’s.
o Testing and Commissioning of Motors
o Working experience in above ground earthing, below ground earthing, equipment
earthing like motors, HT and LT panels, Transformers and all electrical equipment.
o Having thorough knowledge of ladder, perforated and control cable tray installation in
cable racks, cable trenches, and cable wells, switchyard and below panels.
o Preparation of cable schedule, cable laying work from 1.5sq.mm size to
400sq.mm size (both Al & Cu) for MCCs, PCCs and other electrical equipment.
o Experience in 330KV Transmission Tower Erection and Conductor Stringing.
Conductors involved: Lead wires on two circuits (Bison conductor) and OPGW
for communication and ACS for grounding in a span of 48.7KM from the Plant
to ZESCO substation-Muzuma.
o Erection, Testing commissioning of Generator Transformer (200MVA *2),Unit
Auxilary Transformers(37.5MVA*2),Service Dry Type Transformers(1MVA*24)
and12 Transformer Rectifiers at the Electrostatic Precipitator unit 1
o Erection, Testing and Commissioning of HT-33KV Schneider Switchgear
panels PCC, 6.6 KV K-fine Switchgear PCC and LT-400V switchgear panels and
HT & LT Dry Type Transformer.
o Testing and commissioning of HT motors & LT motors in the plant-highest
rating being the BFP motor-4300KW and least rating being 0.37KW rapping
motor at the ESP.
o Overseas the Erection, Testing and commissioning of 330KV switchyard (one
and half breaker scheme) Electric equipment: SF6 breakers, Disconnect
switches, CTs, CVTs, Surge arrestors and sound knowledge of the protection
schemes associated.
o Co-ordinates with Electrical Engineer from Tata consulting prior for inspection
about field work.
o Participated in the Electrical installation at the New Coal Washing plant: 750KVA
Transformer installation at site, MCC Panel set up, cable laying and termination,
Commissioning of Plant Motors.
o Carrying out Maintenance works and Understanding Operations of Equipment at the
old coal washing plant.
o Perform routine maintenance inspections (condition monitoring) on Equipment.
o Electrical Maintenance duties including trouble shooting and repairs.
o Carrying out tests such as dissipation factor, insulation resistance tests on electrical
equipment.
o Installation of Motor Starter Panels (DOL) at the Coal Washing Plant.
o Take all electrical drawings to familiarize with the system.
PROJECTS ACHIEVED THUS FAR
START UP POWER FOR THE 300MW THERMAL POWER PLANT PROJECT
(INSTALLATION, TESTING AND COMMISIONING)
o Installation of 20MVA Transformer (SHENIEDER).
o Installation of 145KV and 36KV isolator (ABB).
o Installation of 145KV and 36KV SF6 Circuit Breaker (CG).
o Installation of 88KV and 33KV Potential Transformer (CG).
o Installation of 80KV lightning Arrestor (CG).
o Installation of 33KV Current Transformer (CG).
o Earthing grid and Earth Pit for the Project including putting of aggregate stones.
o Conductor stringing, cable trench preparation (and Cable laying) and termination.
COMMISIONING TESTS INVOLVED.
20MVA TRANSFORMER TESTS CARRIED.
o Tan delta and Capacitance insulation test
o Bushing Capacitance and Power Factor test
o Excitation Current test
o Leakage Reactance (% impedance) test
o Transformer turns ratio
o D.C winding resistance test
o Vector group verification test
o Polarization index and Transformer insulation resistance(IR) test
o Oil breakdown voltage test
o Earth resistance test of the transformer bay
INSTRUMENT TRANSFORMER TESTS
88KV and 33KV PT’S
o Ratio and Polarity test
88KV and 33KV CT’S
o Ratio , Burden , Polarity and Excitation Curve
SWITCHGEAR TESTS
145KV AND 36KV SF6 CIRCUIT BREAKER TEST
o Timing test
o Contact resistance
o Wipe and Stroke test
145KV AND 36KV ISOLATOR
o Contact resistance test
o Open and Close operation test
Offshore Training at Nava Bharat India Energy Limited, in India [1*150MW COAL
FIRED THERMAL POWER PLANT IN INDIA].
o Introductory to single line diagram of 220KV High Voltage switchyard and Electrical
main switchgear and auxiliary switchgear of whole power plant and components
o 220KV High Voltage Switchyard operation and interlocks at different conditions. Type
of bus system is used in the switchyard. Equipment in switchyard. Protections
provided for the switchyard.
o HV/LV Electric Motors/Transformers.
o HV/LV switchgears and protection.
o 150MW Synchronous/1000KVA Diseal Generators/Power Systems
o Electrical Maintenance and planning
o Equipment isolation process before maintenance
o Usage of maintenance tools and tackles
o Testing/ checking of equipment before and after maintenance
o Periodic maintenance- Battery Testing ,Relay testing and Thermography
o Line clearance procedure
o Sound knowledge about generator start up and synchronization procedure during
starting and island mode
o Monitoring and control of generator parameters (voltage, reactive power and power
factor) during full load, partial load and in emergency condition.
o Shutdown procedure of generator-Planned and Emergency
o Maintenance of Generator and Generator auxiliary equipment
o Maintenance of Power transformer and distribution transformer
o Maintenance of Substation equipment
o 150MW Generator protections and interlocks
o Monitoring of Transformers and Motors parameters during running, abnormalities and
action to be taken. Protection Provided for the transformer and motor
o Auxiliary consumption calculation.
o DC supply system distribution, interlocks and protections
o Operation sequence of emergency supply extension and restoration
o Schedule trail runs on standby electrical equipment
o DC system maintenance
o 1000KVA DG operation and maintenance and testing
o Switchyard System (L.A, SF6 C.B, C.T, CVT, Post insulators, knowledge of earthing
layout)
o Maintenance of MV switchgear equipment
o Maintenance of LV switchgear equipment
o Generator excitation system operation and maintenance
o Maintenance of MV and LV motors(CWP, CEP ,ID fan , FD fan ,BFP , ACWP , PA
fan)
o Pumps
o 220KV Transmission Line Inspection, routine and Breakdown maintenance
o Sound knowledge about Power line Carrier Communication and OPGW in
Transmission lines
o Distributed Control systems-main features and its control loop
o UPS systems distribution, operation and interlocks
o Welding in Power station
o Transformer oil preservation and Oil Filtration Procedure
o Bearings
Student Electrical Engineer
Kansanshi Mining PLC (FQM) Solwezi
Worked under the supervision of Electrician
Achievements
o Preventive and periodic maintenance of electrical equipment in mine site and
substations.
o Had an understanding of the operation of the Slip Energy recovery used to control
induction motors which run the ball mill.
o Worked on variable Speed Drives.
o Commissioned an 11kV/380V transformer at Solwezi river, for purpose of pumping of
water into the mines.
o Did periodic maintenance on overhead cranes and rectifier transformers used for
Electro winning.
Student Electrical Engineer
Indeni Oil Refinery Limited
Worked Under the supervision of an Electrical Engineer
Achievements
o Had an extensive understanding and appreciation of a power system.
o Did annual maintenance on equipment such as, transformers, circuit
breakers, isolators, current transformers and voltage transformers.
o Substation practices such as housekeeping of equipment, operations, safety
and switching procedures.
o Exposure to removal of accumulated moisture in the transformer using an
oven.
o Fault finding on equipment like squirrel cage motors
o BDV test of Transformer oil with Test Kit
o Motor insulation test.
Student Electrical Engineer
Rural Electrification Authority
Worked under the supervision of an Electrical engineer
Achievements
o Carrying out planning and design of rural electrification projects.
o Coordinating development and implementation of rural electrification plans.
o Conducting regular project inspections for all projects at provincial level.
o Participating in monitoring of programs and projects in provinces.
o Carrying out inspection route surveys for the determination of route for
distribution lines.
o Designing and maintaining a documentation on diagrams and maps related
to rural electrification projects.
KEY SKILLS
Technical Skills
o MS Office
o AutoCAD
o Power World
o Mat lab
Memberships
o Engineering Institute of Zambia
o University of Zambia Engineering Society
EDUCATION
o University of Zambia
Electrical Engineering
Major [Power systems and Electrical Machines and Control]
o Senior Secondary Education at Kansenshi High School
o Junior Secondary Education at Masala Secondary school
o Primary Education at Ndola modern High school
PERSONAL INTERESTS
Traveling | Reading | Golf | Soccer
REFERENCES
o Mr Eneya Zulu,
Mine Mechanical Engineer,
Maamba Colileries Limited
0978640746
o Mr Ackim Zulu
Power Systems and Electrical machines Lecturer
University of Zambia
ackimzulu@unza.zm
o Mr Malichi
Lecture School of Enginering,
Department of Electrical and Electronics
0966641527/0977882292
o AutoCAD
o Power World
o Mat lab
Memberships
o Engineering Institute of Zambia
o University of Zambia Engineering Society
EDUCATION
o University of Zambia
Electrical Engineering
Major [Power systems and Electrical Machines and Control]
o Senior Secondary Education at Kansenshi High School
o Junior Secondary Education at Masala Secondary school
o Primary Education at Ndola modern High school
PERSONAL INTERESTS
Traveling | Reading | Golf | Soccer
REFERENCES
o Mr Eneya Zulu,
Mine Mechanical Engineer,
Maamba Colileries Limited
0978640746
o Mr Ackim Zulu
Power Systems and Electrical machines Lecturer
University of Zambia
ackimzulu@unza.zm
o Mr Malichi
Lecture School of Enginering,
Department of Electrical and Electronics
0966641527/0977882292

More Related Content

PDF
RESUME ELECTRICAL ENGINEER
DOC
Senior Electrical Engineer resume Jan 2016
DOCX
MBN CV-SENIOR ELECTRICAL ENGINEER
DOC
Resume electrical engineer- for oil & gas
DOCX
resume krishna electrical engineer
DOC
CV of Kiran - Electrical Engineer 1
DOC
Kumar RESUME
PDF
Chandrasekar G resume - Instrument Engineer new
RESUME ELECTRICAL ENGINEER
Senior Electrical Engineer resume Jan 2016
MBN CV-SENIOR ELECTRICAL ENGINEER
Resume electrical engineer- for oil & gas
resume krishna electrical engineer
CV of Kiran - Electrical Engineer 1
Kumar RESUME
Chandrasekar G resume - Instrument Engineer new

What's hot (20)

DOC
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
DOC
TESTING AND COMMISSIONING ENGINEER
DOCX
cv Instrument Commissioning Engineer
PDF
Electrical Engineer CV
PDF
Senior Electrical Engineer CV
DOC
Sr. Instrument Commissioning & Maintenance Technician
DOCX
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
RTF
CV OF ELECTRICAL ENGINEER
DOC
Instrument Supervisor CV
DOCX
Cv electrical
PDF
Electrical-power-engineer-CV
DOC
E&I inspector cv
PDF
Karthik Resume
DOC
RATHEESH - CV - 19-08-2015
DOCX
mubashir Electrical engineer
DOCX
Nitinkumar CV. ( Instrument Supervisor)
PDF
Electrical and Instrumentation Engineer- MZameel CV
PDF
Electrical Engineer cv.PDF
DOCX
ELECTRICAL ENGINEER CV
DOC
Resume electrical design and site engineer(mep) 9+ years of exp
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
TESTING AND COMMISSIONING ENGINEER
cv Instrument Commissioning Engineer
Electrical Engineer CV
Senior Electrical Engineer CV
Sr. Instrument Commissioning & Maintenance Technician
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
CV OF ELECTRICAL ENGINEER
Instrument Supervisor CV
Cv electrical
Electrical-power-engineer-CV
E&I inspector cv
Karthik Resume
RATHEESH - CV - 19-08-2015
mubashir Electrical engineer
Nitinkumar CV. ( Instrument Supervisor)
Electrical and Instrumentation Engineer- MZameel CV
Electrical Engineer cv.PDF
ELECTRICAL ENGINEER CV
Resume electrical design and site engineer(mep) 9+ years of exp
Ad

Viewers also liked (13)

PDF
Derek MacDonald -resume
PPTX
Navidad
PDF
Allen Stimson CV5
PPTX
Numerical distance pr
PDF
LinkedinSuresh Kumar S BE
PDF
Gaurav_Resume
PPTX
Microcontroller based mho relay for distance protection
DOC
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
PDF
Resume:Sarah Lombard
DOCX
Directional over current relay
DOC
Jaikaran Dan ( Testing and Commissioning Engineer )
PPTX
Feeder Protection Relays
PPTX
Esp design, operation & maintenance
Derek MacDonald -resume
Navidad
Allen Stimson CV5
Numerical distance pr
LinkedinSuresh Kumar S BE
Gaurav_Resume
Microcontroller based mho relay for distance protection
BE-ELECTRICAL SENIOR TESTING AND COMMISSIONING ENGINEER
Resume:Sarah Lombard
Directional over current relay
Jaikaran Dan ( Testing and Commissioning Engineer )
Feeder Protection Relays
Esp design, operation & maintenance
Ad

Similar to CV-Electrical-Engineer (1) (20)

DOC
cv of pjnehru
DOC
NESTOR-UPDATED-CV-1 ALEGA
DOCX
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
DOCX
UPDATED CV-1
DOC
ajit-cv-2015
DOC
NAVNATH UPDATED CV
DOCX
Jose_Transmission_Engineer
PDF
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
PDF
Resume E&I Engineer
DOC
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
DOCX
DOC
QA/QC ENGINEER
DOCX
Tamil E&I Compex inspector
DOC
Engr kashif cv
DOCX
New cv jithesh
PDF
Commission resume
DOCX
Vipin Resume
DOCX
bala.1
DOCX
muhammad Usman CV
DOC
Tahir Mahmood Butt
cv of pjnehru
NESTOR-UPDATED-CV-1 ALEGA
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
UPDATED CV-1
ajit-cv-2015
NAVNATH UPDATED CV
Jose_Transmission_Engineer
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Resume E&I Engineer
ONYEJOSE CHUKWUMA CONTRL ROOM OPERATOR.
QA/QC ENGINEER
Tamil E&I Compex inspector
Engr kashif cv
New cv jithesh
Commission resume
Vipin Resume
bala.1
muhammad Usman CV
Tahir Mahmood Butt

CV-Electrical-Engineer (1)

  • 1. KASANGILI KATONGO Biggie.Katongo7@gmail.com 0977360153-0966325553 1911 Lilongwe Street, Ndola Town, Zambia. PERSONAL STATEMENT I’m an accomplished Electrical Engineer with a background in commercial and industrial installations. I have an in depth knowledge of Operations and Maintenance of Electrical works and am looking to expand my experience within a role that combines field work as well as management. EMPLOYMENT Operations and Maintenance] Assistant Electrical Engineer Maamba Colleries Limited Zambia [2*150MW COAL FIRED THERMAL POWER PLANT] To Date > 01-03-2013 Works under the mentorship of Experienced Tata Consulting Company and Nava Bharat Ventures Senior Electrical Engineers. Achievements o Assigned to carry out supervision of Electrical installations, construction and quality assurance on designs and installation works in the Thermal Power Plant. o Ensure that safety procedures and standards are adhered to by the contractor and personnel. o Working experience in HT and LT Switchgears, protection of the switchgear, and maintenance of the electrical equipment’s. o Testing and Commissioning of Motors o Working experience in above ground earthing, below ground earthing, equipment earthing like motors, HT and LT panels, Transformers and all electrical equipment. o Having thorough knowledge of ladder, perforated and control cable tray installation in cable racks, cable trenches, and cable wells, switchyard and below panels. o Preparation of cable schedule, cable laying work from 1.5sq.mm size to 400sq.mm size (both Al & Cu) for MCCs, PCCs and other electrical equipment. o Experience in 330KV Transmission Tower Erection and Conductor Stringing. Conductors involved: Lead wires on two circuits (Bison conductor) and OPGW for communication and ACS for grounding in a span of 48.7KM from the Plant to ZESCO substation-Muzuma.
  • 2. o Erection, Testing commissioning of Generator Transformer (200MVA *2),Unit Auxilary Transformers(37.5MVA*2),Service Dry Type Transformers(1MVA*24) and12 Transformer Rectifiers at the Electrostatic Precipitator unit 1 o Erection, Testing and Commissioning of HT-33KV Schneider Switchgear panels PCC, 6.6 KV K-fine Switchgear PCC and LT-400V switchgear panels and HT & LT Dry Type Transformer. o Testing and commissioning of HT motors & LT motors in the plant-highest rating being the BFP motor-4300KW and least rating being 0.37KW rapping motor at the ESP. o Overseas the Erection, Testing and commissioning of 330KV switchyard (one and half breaker scheme) Electric equipment: SF6 breakers, Disconnect switches, CTs, CVTs, Surge arrestors and sound knowledge of the protection schemes associated. o Co-ordinates with Electrical Engineer from Tata consulting prior for inspection about field work. o Participated in the Electrical installation at the New Coal Washing plant: 750KVA Transformer installation at site, MCC Panel set up, cable laying and termination, Commissioning of Plant Motors. o Carrying out Maintenance works and Understanding Operations of Equipment at the old coal washing plant. o Perform routine maintenance inspections (condition monitoring) on Equipment. o Electrical Maintenance duties including trouble shooting and repairs. o Carrying out tests such as dissipation factor, insulation resistance tests on electrical equipment. o Installation of Motor Starter Panels (DOL) at the Coal Washing Plant. o Take all electrical drawings to familiarize with the system. PROJECTS ACHIEVED THUS FAR START UP POWER FOR THE 300MW THERMAL POWER PLANT PROJECT (INSTALLATION, TESTING AND COMMISIONING) o Installation of 20MVA Transformer (SHENIEDER). o Installation of 145KV and 36KV isolator (ABB). o Installation of 145KV and 36KV SF6 Circuit Breaker (CG). o Installation of 88KV and 33KV Potential Transformer (CG). o Installation of 80KV lightning Arrestor (CG). o Installation of 33KV Current Transformer (CG). o Earthing grid and Earth Pit for the Project including putting of aggregate stones. o Conductor stringing, cable trench preparation (and Cable laying) and termination. COMMISIONING TESTS INVOLVED. 20MVA TRANSFORMER TESTS CARRIED.
  • 3. o Tan delta and Capacitance insulation test o Bushing Capacitance and Power Factor test o Excitation Current test o Leakage Reactance (% impedance) test o Transformer turns ratio o D.C winding resistance test o Vector group verification test o Polarization index and Transformer insulation resistance(IR) test o Oil breakdown voltage test o Earth resistance test of the transformer bay INSTRUMENT TRANSFORMER TESTS 88KV and 33KV PT’S o Ratio and Polarity test 88KV and 33KV CT’S o Ratio , Burden , Polarity and Excitation Curve SWITCHGEAR TESTS 145KV AND 36KV SF6 CIRCUIT BREAKER TEST o Timing test o Contact resistance o Wipe and Stroke test 145KV AND 36KV ISOLATOR o Contact resistance test o Open and Close operation test Offshore Training at Nava Bharat India Energy Limited, in India [1*150MW COAL FIRED THERMAL POWER PLANT IN INDIA]. o Introductory to single line diagram of 220KV High Voltage switchyard and Electrical main switchgear and auxiliary switchgear of whole power plant and components o 220KV High Voltage Switchyard operation and interlocks at different conditions. Type of bus system is used in the switchyard. Equipment in switchyard. Protections provided for the switchyard. o HV/LV Electric Motors/Transformers. o HV/LV switchgears and protection. o 150MW Synchronous/1000KVA Diseal Generators/Power Systems o Electrical Maintenance and planning o Equipment isolation process before maintenance o Usage of maintenance tools and tackles o Testing/ checking of equipment before and after maintenance o Periodic maintenance- Battery Testing ,Relay testing and Thermography o Line clearance procedure o Sound knowledge about generator start up and synchronization procedure during starting and island mode o Monitoring and control of generator parameters (voltage, reactive power and power factor) during full load, partial load and in emergency condition. o Shutdown procedure of generator-Planned and Emergency o Maintenance of Generator and Generator auxiliary equipment
  • 4. o Maintenance of Power transformer and distribution transformer o Maintenance of Substation equipment o 150MW Generator protections and interlocks o Monitoring of Transformers and Motors parameters during running, abnormalities and action to be taken. Protection Provided for the transformer and motor o Auxiliary consumption calculation. o DC supply system distribution, interlocks and protections o Operation sequence of emergency supply extension and restoration o Schedule trail runs on standby electrical equipment o DC system maintenance o 1000KVA DG operation and maintenance and testing o Switchyard System (L.A, SF6 C.B, C.T, CVT, Post insulators, knowledge of earthing layout) o Maintenance of MV switchgear equipment o Maintenance of LV switchgear equipment o Generator excitation system operation and maintenance o Maintenance of MV and LV motors(CWP, CEP ,ID fan , FD fan ,BFP , ACWP , PA fan) o Pumps o 220KV Transmission Line Inspection, routine and Breakdown maintenance o Sound knowledge about Power line Carrier Communication and OPGW in Transmission lines o Distributed Control systems-main features and its control loop o UPS systems distribution, operation and interlocks o Welding in Power station o Transformer oil preservation and Oil Filtration Procedure o Bearings Student Electrical Engineer Kansanshi Mining PLC (FQM) Solwezi Worked under the supervision of Electrician Achievements o Preventive and periodic maintenance of electrical equipment in mine site and substations. o Had an understanding of the operation of the Slip Energy recovery used to control induction motors which run the ball mill. o Worked on variable Speed Drives. o Commissioned an 11kV/380V transformer at Solwezi river, for purpose of pumping of water into the mines. o Did periodic maintenance on overhead cranes and rectifier transformers used for Electro winning. Student Electrical Engineer
  • 5. Indeni Oil Refinery Limited Worked Under the supervision of an Electrical Engineer Achievements o Had an extensive understanding and appreciation of a power system. o Did annual maintenance on equipment such as, transformers, circuit breakers, isolators, current transformers and voltage transformers. o Substation practices such as housekeeping of equipment, operations, safety and switching procedures. o Exposure to removal of accumulated moisture in the transformer using an oven. o Fault finding on equipment like squirrel cage motors o BDV test of Transformer oil with Test Kit o Motor insulation test. Student Electrical Engineer Rural Electrification Authority Worked under the supervision of an Electrical engineer Achievements o Carrying out planning and design of rural electrification projects. o Coordinating development and implementation of rural electrification plans. o Conducting regular project inspections for all projects at provincial level. o Participating in monitoring of programs and projects in provinces. o Carrying out inspection route surveys for the determination of route for distribution lines. o Designing and maintaining a documentation on diagrams and maps related to rural electrification projects. KEY SKILLS Technical Skills o MS Office
  • 6. o AutoCAD o Power World o Mat lab Memberships o Engineering Institute of Zambia o University of Zambia Engineering Society EDUCATION o University of Zambia Electrical Engineering Major [Power systems and Electrical Machines and Control] o Senior Secondary Education at Kansenshi High School o Junior Secondary Education at Masala Secondary school o Primary Education at Ndola modern High school PERSONAL INTERESTS Traveling | Reading | Golf | Soccer REFERENCES o Mr Eneya Zulu, Mine Mechanical Engineer, Maamba Colileries Limited 0978640746 o Mr Ackim Zulu Power Systems and Electrical machines Lecturer University of Zambia ackimzulu@unza.zm o Mr Malichi Lecture School of Enginering, Department of Electrical and Electronics 0966641527/0977882292
  • 7. o AutoCAD o Power World o Mat lab Memberships o Engineering Institute of Zambia o University of Zambia Engineering Society EDUCATION o University of Zambia Electrical Engineering Major [Power systems and Electrical Machines and Control] o Senior Secondary Education at Kansenshi High School o Junior Secondary Education at Masala Secondary school o Primary Education at Ndola modern High school PERSONAL INTERESTS Traveling | Reading | Golf | Soccer REFERENCES o Mr Eneya Zulu, Mine Mechanical Engineer, Maamba Colileries Limited 0978640746 o Mr Ackim Zulu Power Systems and Electrical machines Lecturer University of Zambia ackimzulu@unza.zm o Mr Malichi Lecture School of Enginering, Department of Electrical and Electronics 0966641527/0977882292