SlideShare a Scribd company logo
Curriculum Vitae
Utkarsh Kumar
ENGINEER –WSP | PARSONS BRINCKERHOFF INDIA
PROFESSIONAL MEMBERSHIPS
2016 - Graduate Member - iStructE
YEAR OF BIRTH
1991
SUMMARY
Completed his Civil Engineering in 2013. He has worked in Building sector as a site
engineer. Joined WSP Group in october 2013 as Graduate Engineer and now working
as Engineer, he has completed the analysis and design of bridges, footbridges, culverts
and signal gantries. The current responsibilities include design and assessment of road
bridges, footbridges and rail bridges.
KEY ACHIEVEMENTS
 Level 0 assessments for CAFA / CEFA Wessex, Western, Sussex and Wales.
 Well versed in SuperSUITE, SAM analysis, Tedds and LUSAS Bridges FEA.
EDUCATION
2013 - Graduation Degree - Civil Engineering - Delhi College of Engineering, University
of Delhi
2009 - Senior Secondary - English, Physics, Chemistry, Maths and Information Practices
- CSKM Public School
2007 - Secondary - English, Hindi, Maths, Science and Social Sciences - St. Mary's
Convent School
PROJECT EXPERIENCE
Rail
2016-04 - 2016-06 CAFA Sussex - Amberley Station FB, Network Rail
Level 2 assessment of Amberley Station Footbridge using Supersuite analysis.
2016-01 - 2016-06 CAFA Canopies and Undercrofts, Network Rail
Preparation of GA, detail and defect drawings based on archive data and concurrent site
inspection findings.
2015-10 - 2016-01 New Bridge & St. John's Road CAFA Sussex, Network Rail
Assessment of two underbridges for current RA number.
2015-10 Paddington Station Cabway and FB, Network Rail
Visual Inspection of footbridge and cabway for CAFA assessment.
2015-10 Oxford Station Subway, Network Rail
Check for the assessment calculations done by graduate for current capacity.
2015-08 - 2015-11 Wrexham General Footbridge, Network Rail
Check for the assessment calculation by graduate for pedestrian loading capacity.
2015-08 - 2015-10 Chirk Station Footbridge, Network Rail
Assessment of station footbridge for current pedestrian loading capacity.
2015-08 - 2015-09 Dn XACL Signal Gantry, Network Rail
Assessment of structure for signal and walkway loading.
2015-06 - 2015-12 CAFA Reports, Network Rail
Preparation of AiP, AR, Sketches, Inspection Report and supervision of drawings for
multiple highway and railway bridges for Western, Wessex and Sussex Regions.
2015-06 - 2015-07 XACL Bracket Junction Signals, Network Rail
Assessment of cantilever gantry for signal and walkway loading.
2015-01 - 2015-02 Paddington Central Ramp Bridge, Network Rail
Assessment Check - Cat 2
2014-08 - 2015-03 Langport, Network Rail
Assessment of the Langport Bridge for the current RA number.
2014-08 - 2014-10 Occupation Road, Network Rail
Railway underbridge - Assessment for the current RA number.
2014-08 - 2014-09 Paddington Footbridge, Network Rail
Assessment of the structure for the different load cases
2014-06 - 2016-08 CAFA L0 assessments, Network Rail
Year 1, 2 & 3 for Sussex, Wessex, Western and Wales region. Level Zero Assessments
of rail bridges, Foot bridges, Over bridges and Arches-Project Ongoing. AC1 checker for
Wales region.
2014-06 - 2014-07 CAFA Sussex S2J Footbridge, Network Rail
Station Footbridge - Assessment for current capacity for live loading.
2014-03 - 2014-04 Wilesdon TMD Shed
Design and modelling of TMD pits.
2014-03 - 2014 M9J1a Detailed Design and check, Network Rail
Retrofit detail check
2013-11 - 2014-04 CEFA-Cat 2 checks, Network Rail
Assessment of various bridges including Mountain Ash, S2J FB, Castle Foregate Bridge
(superstructure and substructure). (CAT 2 check)
2013-11 - 2014-02 Mountain Ash Station Footbridge, Network Rail CEFA
Assessment of superstructure and substructure. (CAT 2 check)
Roads and Bridges
2016-05 - 2016-06 CAFA Sussex Gloucester Road, Network Rail
Level 2 assessment of parapet girder using second order buckling analysis using
LUSAS Bridges.
2016-01 - 2016-06 LUSAIL Plaza Infrastructure, Qatari DIAR Real Estate Investment
Company
Finite Element analysis of concre underpass along with Pergola structure using LUSAS
15.2
2015-11 - 2015-12 A45 Northampton to Daventry Development Link Road, WSP
Parsons Brinckerhoff
Brockhall Road Bridge - Cat 2 assessment for design of three-span continuous
composite highway bridge.
2014-08 - 2014-10 Astmoor Bridge, Halton Borough Council
Strenghtening of Astmoor Bridge
2014-03 - 2014-04 Inverness Bridge, Highland Council
Design of Steel composite bridge on Eurocodes.
2014-03 - 2014-04 Abercynon Bridge, Highland Council
Assessment and analysis of concrete arch bridge.
2014-01 - 2014-02 Norton Priory Footbridge, Halton Borough Council
Assessment of the superstructure of the footbridge according to the norms of british
standard including the use of Super-SUITE and SAM.
2014-01 - 2014-02 Astmoor Bridge, Halton Borough Council
Assessment of the superstructure of the footbridge according to the norms of british
standard including the use of Super-SUITE and SAM.
2013-12 - 2014-01 Addison Way Box Culvert, North Bersted
Responsible for the assessment of the culvert and its foundation for the different
loadcases according to the british standards.
EMPLOYMENT HISTORY
Ansal Hi-Tech Townships Limited
2013-2013 - Graduate Enginner
Worked as a Site-Engineer at a Group Housing project (Sushant Serene Residency)
Assisted Project Manager and Deputy Project Manager in smooth execution of the
construction process.
WSP Group India Limited
2013- - Graduate Engineer
Responsible for assessment and design of Highway and Railway Bridges, Footbridges,
signal gantries and culverts etc. in Bridges and Heavy Civil department.
COURSES
2013 - Bachelor of Engineering - Delhi College of Engineering, New Delhi

More Related Content

PDF
CADS Capability Statement
PDF
SMRT - Your Journey Matters
PDF
Sindiong Project Examples
PPTX
January 2015 Public Information Meetings
DOCX
Jeff Carpenter-1
PDF
EPMS Iron Ore Magnetite Capability Statement
PDF
Rail Report 2017
PDF
Scandinavian Rail Development 2013 - Anders Björnström
CADS Capability Statement
SMRT - Your Journey Matters
Sindiong Project Examples
January 2015 Public Information Meetings
Jeff Carpenter-1
EPMS Iron Ore Magnetite Capability Statement
Rail Report 2017
Scandinavian Rail Development 2013 - Anders Björnström

What's hot (9)

DOCX
CV_Ravi Kancherla - Photo
PDF
January service change final page spread
PDF
Dui resource guide
PPTX
Chain Bridge Road Walkway
PPTX
Eglinton Station Open House
PDF
2019 12 09 Winter Hill in Motion public hearing
PDF
檢視南區欠缺或未符合標準的行人路 Identification of missing and sub-standard pedestrian links ...
DOCX
JAMES READ - CV 2014
PDF
Lifts footbridge in Metz, France
CV_Ravi Kancherla - Photo
January service change final page spread
Dui resource guide
Chain Bridge Road Walkway
Eglinton Station Open House
2019 12 09 Winter Hill in Motion public hearing
檢視南區欠缺或未符合標準的行人路 Identification of missing and sub-standard pedestrian links ...
JAMES READ - CV 2014
Lifts footbridge in Metz, France
Ad

Similar to cv_Utkarsh_Kumar (20)

PDF
CV_Appas J
PDF
Steve Miller CV 2017
PDF
Patrick Asiedu - Employment CV3
DOC
SR-FJD-CV-Feb15
PDF
Resume of Ashwani Tyagi
DOCX
Shahzad Sikandaruk
PDF
P Kennedy CV Nov 2016
PDF
Sumesh_Appunni_CV
PDF
Prashant - CV simple format
DOCX
Resume akgupta
PDF
Asen Kostadinov_Portfolio#2
DOC
URS CV_Ritu Zopey_new
PDF
Alex Williams Resume
DOCX
Stuart Brench CV 2016
DOC
RESUME_ARP
DOC
Stephen parish c.v. 14 03-17
DOCX
Roberts CV
PDF
Sinchan halder cv
DOC
Abhinandan_Sen_3D_CV_latest
PDF
Neil Todd CV
CV_Appas J
Steve Miller CV 2017
Patrick Asiedu - Employment CV3
SR-FJD-CV-Feb15
Resume of Ashwani Tyagi
Shahzad Sikandaruk
P Kennedy CV Nov 2016
Sumesh_Appunni_CV
Prashant - CV simple format
Resume akgupta
Asen Kostadinov_Portfolio#2
URS CV_Ritu Zopey_new
Alex Williams Resume
Stuart Brench CV 2016
RESUME_ARP
Stephen parish c.v. 14 03-17
Roberts CV
Sinchan halder cv
Abhinandan_Sen_3D_CV_latest
Neil Todd CV
Ad

cv_Utkarsh_Kumar

  • 1. Curriculum Vitae Utkarsh Kumar ENGINEER –WSP | PARSONS BRINCKERHOFF INDIA PROFESSIONAL MEMBERSHIPS 2016 - Graduate Member - iStructE YEAR OF BIRTH 1991 SUMMARY Completed his Civil Engineering in 2013. He has worked in Building sector as a site engineer. Joined WSP Group in october 2013 as Graduate Engineer and now working as Engineer, he has completed the analysis and design of bridges, footbridges, culverts and signal gantries. The current responsibilities include design and assessment of road bridges, footbridges and rail bridges. KEY ACHIEVEMENTS  Level 0 assessments for CAFA / CEFA Wessex, Western, Sussex and Wales.  Well versed in SuperSUITE, SAM analysis, Tedds and LUSAS Bridges FEA. EDUCATION 2013 - Graduation Degree - Civil Engineering - Delhi College of Engineering, University of Delhi 2009 - Senior Secondary - English, Physics, Chemistry, Maths and Information Practices - CSKM Public School 2007 - Secondary - English, Hindi, Maths, Science and Social Sciences - St. Mary's Convent School
  • 2. PROJECT EXPERIENCE Rail 2016-04 - 2016-06 CAFA Sussex - Amberley Station FB, Network Rail Level 2 assessment of Amberley Station Footbridge using Supersuite analysis. 2016-01 - 2016-06 CAFA Canopies and Undercrofts, Network Rail Preparation of GA, detail and defect drawings based on archive data and concurrent site inspection findings. 2015-10 - 2016-01 New Bridge & St. John's Road CAFA Sussex, Network Rail Assessment of two underbridges for current RA number. 2015-10 Paddington Station Cabway and FB, Network Rail Visual Inspection of footbridge and cabway for CAFA assessment. 2015-10 Oxford Station Subway, Network Rail Check for the assessment calculations done by graduate for current capacity. 2015-08 - 2015-11 Wrexham General Footbridge, Network Rail Check for the assessment calculation by graduate for pedestrian loading capacity. 2015-08 - 2015-10 Chirk Station Footbridge, Network Rail Assessment of station footbridge for current pedestrian loading capacity. 2015-08 - 2015-09 Dn XACL Signal Gantry, Network Rail Assessment of structure for signal and walkway loading. 2015-06 - 2015-12 CAFA Reports, Network Rail Preparation of AiP, AR, Sketches, Inspection Report and supervision of drawings for multiple highway and railway bridges for Western, Wessex and Sussex Regions. 2015-06 - 2015-07 XACL Bracket Junction Signals, Network Rail Assessment of cantilever gantry for signal and walkway loading. 2015-01 - 2015-02 Paddington Central Ramp Bridge, Network Rail Assessment Check - Cat 2 2014-08 - 2015-03 Langport, Network Rail Assessment of the Langport Bridge for the current RA number.
  • 3. 2014-08 - 2014-10 Occupation Road, Network Rail Railway underbridge - Assessment for the current RA number. 2014-08 - 2014-09 Paddington Footbridge, Network Rail Assessment of the structure for the different load cases 2014-06 - 2016-08 CAFA L0 assessments, Network Rail Year 1, 2 & 3 for Sussex, Wessex, Western and Wales region. Level Zero Assessments of rail bridges, Foot bridges, Over bridges and Arches-Project Ongoing. AC1 checker for Wales region. 2014-06 - 2014-07 CAFA Sussex S2J Footbridge, Network Rail Station Footbridge - Assessment for current capacity for live loading. 2014-03 - 2014-04 Wilesdon TMD Shed Design and modelling of TMD pits. 2014-03 - 2014 M9J1a Detailed Design and check, Network Rail Retrofit detail check 2013-11 - 2014-04 CEFA-Cat 2 checks, Network Rail Assessment of various bridges including Mountain Ash, S2J FB, Castle Foregate Bridge (superstructure and substructure). (CAT 2 check) 2013-11 - 2014-02 Mountain Ash Station Footbridge, Network Rail CEFA Assessment of superstructure and substructure. (CAT 2 check) Roads and Bridges 2016-05 - 2016-06 CAFA Sussex Gloucester Road, Network Rail Level 2 assessment of parapet girder using second order buckling analysis using LUSAS Bridges. 2016-01 - 2016-06 LUSAIL Plaza Infrastructure, Qatari DIAR Real Estate Investment Company Finite Element analysis of concre underpass along with Pergola structure using LUSAS 15.2 2015-11 - 2015-12 A45 Northampton to Daventry Development Link Road, WSP Parsons Brinckerhoff Brockhall Road Bridge - Cat 2 assessment for design of three-span continuous composite highway bridge.
  • 4. 2014-08 - 2014-10 Astmoor Bridge, Halton Borough Council Strenghtening of Astmoor Bridge 2014-03 - 2014-04 Inverness Bridge, Highland Council Design of Steel composite bridge on Eurocodes. 2014-03 - 2014-04 Abercynon Bridge, Highland Council Assessment and analysis of concrete arch bridge. 2014-01 - 2014-02 Norton Priory Footbridge, Halton Borough Council Assessment of the superstructure of the footbridge according to the norms of british standard including the use of Super-SUITE and SAM. 2014-01 - 2014-02 Astmoor Bridge, Halton Borough Council Assessment of the superstructure of the footbridge according to the norms of british standard including the use of Super-SUITE and SAM. 2013-12 - 2014-01 Addison Way Box Culvert, North Bersted Responsible for the assessment of the culvert and its foundation for the different loadcases according to the british standards. EMPLOYMENT HISTORY Ansal Hi-Tech Townships Limited 2013-2013 - Graduate Enginner Worked as a Site-Engineer at a Group Housing project (Sushant Serene Residency) Assisted Project Manager and Deputy Project Manager in smooth execution of the construction process. WSP Group India Limited 2013- - Graduate Engineer Responsible for assessment and design of Highway and Railway Bridges, Footbridges, signal gantries and culverts etc. in Bridges and Heavy Civil department. COURSES 2013 - Bachelor of Engineering - Delhi College of Engineering, New Delhi