CYCLE TIME REDUCTION IN
MANUFACTURING OF KNUCKLE
Presentation on-
By-
Sudhanshu Sengaonkar
Digvijay Phadke
Guided by-
Mr. D. S. Patil
Rough
Turning
Facing and
centering
Finish Turning
Inspection
Knuckle
Storage
Module 1 : Layout
Number
Punching
Module 2: Layout
Fillet Rolling Taper
Bore
Crack
Detection Complete
Inspection Area
Bush Pressing
and
Broaching
Keyway
Broach
(Vertical
Broaching)
Wash/Anti-
Rust
Application
Packaging
Number
Punching
Problems Faced on Knuckle Line
• Number Punching operation being done manually
• Doors of CNC machines need to be closed manually
• One person doing multiple jobs on module 1
• Center drill remains idle
• Checking for tooling problems
• Insert wear
• Turret shifts downwards when idle for long times on FMS
Process Time(T1)(Seconds) T2 T3 T4 T5 T6 T(avg) in sec
1. Pick up job and place
on center drill
41.6 37.4 43.7 31.3 48.2 46.1 41.38
2. Center drill operation 66 64 62 63 63 64 63.66
3. Pick up job from central
drill and place for rough
turning
25.9 32.9 30 37 33.8 31.2 31.8
4. Rough turning 248 240.078 240.076 240.078 240.08 240.07 241.4
5. Remove and Punch 22.6 21.2 18.1 42.8 20.9 21 24.43
6. Pick and place for
finishing and complete
operation time
212 235 206.3 210.5 205 207.6 212.73
7. Inspection after
finishing(Includes picking
job from FMS)
137 57 29.8 44 43 62.16 62.15
Total Average time 677.56
Process Time Evaluation (Module 1)
Process Time T1 T2 T3 T4 T5
T(avg) in
sec
1. Pickup job and place on Centering machine 53.6 54.2 68.9 92 72
68.14
2. centering machine operation time 60.1 59.6 55.8 62 60.2
59.54
3. Pickup from centering machine and place on Proteck 45 32 33.1 36 44
38.02
4. Proteck operation time 248 248 248 248 248 248
5. Pickup job from Proteck and place for number punching 25 19.1 18.6 20 23
21.14
6. Pickup job from punch and place on FMS 30 54 32.9 52 29.3 39.64
7. FMS operation time 216 209 210 212 205 210.4
8. Pickup from FMS place for inspection/complete inspection 70.2 70.8 78 65 72
71.2
Total average time
756.08
Process Time Evaluation(Module 1)
Error Proofing – MCD II
Source of Defect Knuckle Line
Problem Statement
Number punching operation missing & Number
punching location shift
Analysis
Number punching missing & location shift due to
number punching activity is manual.
Occurred at Knuckle Line
Lift the job from input
pallet.
Keep the job on stand
manually with proper
orientation for number
punching –
(Unsafe working
condition )
Manual number
punching operation
done by holding number
punching machine in
hand
ProcessFlowat jobloadingstage-Before
Facing & centeringRough turningFinish turning
Lift the job from input
pallet.
Facing & centering
operation Rough turning
ProcessFlowat jobloadingstage-After
Automatic number
punching operation
with button start.
Finish turning
operation
ErrorProofing–Checklist
Principles Questions to be asked to the process Solution
Effectiv-
ness
Cost
Implim
entatio
n
SPN
Elimination
Can we eliminate the error-prone process in totally? No
Can we eliminate the error from process partially? No
Replace-ment
Can we automate the process? Yes , automation can be done for number
punching operation 3 3 3 27
Can we provide supporting tools like
checklists/gages/samples?
Yes
1 3 3 9
Facilitata-tion
Can we simplify the operation or introduce changes
in the operation? (standardization, color coding,
unique shape, etc)
No
Detection
Can we record the outcome / product parameters of
the earlier operation and verify it before starting
next operation
No
Can we restrict the motion in such way that the
operator will see the abnormality?
No
Can we verify the outcome / product parameters of
the said operation before passing the part to next
operation ?
No
Mitigation
Can we make detection at multiple levels? No
Can we make ergonomic condition better so as not
to produce / miss the defects?
Yes
1 2 3 6
Solution Priority Number (SPN) Criteria
Effecive-ness 1 : Less Effective 2 : Effective 3 : Very Effective Solution
Cost 1 : High 2 : Medium 3 : Low
Automation is required at number punching station
Implemen-tation 1 : Difficult 2 : Easy 3 : Very Easy
ErrorProofing–Before
Before Counter measure :. Job is kept on table as
per required orientation
& number punching is
done manually by hand.
ErrorProofing–After
After Counter measure :
Automatic number punching
operation
Automation setup
with pneumatic
cylinder & solenoid
valve mounted on
stand .
ErrorProofing–DesignReview
Sr.
No.
Design Review
Parameter
Description
1 Fail-Safe
performance
Unsafe working condition eliminated at manual number
punching
2 Cost effectiveness Proposed solution is cost effective.
3 Ease of operation Easy to operate as button start.
4 Protection from
external damage
Automation setup is mounted on stand hence no chance of
damage.
5 Simplicity in design Proposed solution is simple to implement.
Grinding
Operation
Time
T1 T2 T3 T4 T5 Average
Loading 22.5 64 53 61 47 49.50
Commands 6.3 4 14.01 10.58 8.4 8.66
Operation time 180 181 180 180 181 180.40
Inspection 73 63 68 71 62 67.40
Unloading 32 29 31 26 27 29.00
Rotate Job 12.26 12.15 12.33 12.01 11.48 12.05
Input Job Number on
record 12.17 12.35 12.48 12 13.2 12.44
Total time 359.44
Time in min 5.99
Hardening
Operation
Time(sec)
T1 T2 T3 T4 T5 Average
Loading 47.37 25.28 65 50 54 48.33
Operation Time 170 172 170 171 170 170.60
Unloading 97 54 34 45 68 59.60
Total time 278.53
Time in
min 4.64
16
Action plan
Sr. no Machine Activities
Time saved by
(sec) Remark
Grinding and
Hardening
1
Make provision for parking crane near
operator for ease of operation 6
2 Job should be ready prior to operation 8
3
Fixture for resting job and air nozzle for
removal of central burr 5
4
Provide stand near grinding operation for
inspecting the job 40
5
Provide conveyor along with coolant after
hardening 15
6 Stand for log book for better ergonomics 4
7 Combine two snap gauges 12
Thank You!

More Related Content

PDF
Application of Shainin techniques in Manufacturing Industry- Scientific Probl...
PPT
six sigma project
PDF
Manufacturing Excellence - Visual Factory
PPTX
mistake proofing
PPT
PPTX
The Six Big Losses of OEE
PPT
Oee Explained
Application of Shainin techniques in Manufacturing Industry- Scientific Probl...
six sigma project
Manufacturing Excellence - Visual Factory
mistake proofing
The Six Big Losses of OEE
Oee Explained

What's hot (20)

PPT
How to reduce changeover loss
PDF
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
PPTX
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
PPTX
tpm (total productive maintenance)
PPT
Lean Manufacturing and Principles
PDF
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
PPTX
SMED - Quick Change Over
PPTX
History of Lean manufacturing & TPS 14 Principal
PPTX
Autonomous Maintenance (AM)
PPTX
PDF
Single Minute Exchange of Dies
PDF
SMED - Single Minute Exchange of Dies
PPT
Lean Manufacturing Training
PPTX
Tools of lean mfg
PDF
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
PDF
Lean Quick Changeover (SMED) Training Module
PPTX
How to implement Single minute exchange of die
PPT
Line balancing and its formulation
PPT
SMED-Observation Training
PDF
Lead time takt time cycle time and throughput
How to reduce changeover loss
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
tpm (total productive maintenance)
Lean Manufacturing and Principles
PPT ON SINGLE MINUTE EXCHANGE OF DIES (SMED)
SMED - Quick Change Over
History of Lean manufacturing & TPS 14 Principal
Autonomous Maintenance (AM)
Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
Lean Manufacturing Training
Tools of lean mfg
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
Lean Quick Changeover (SMED) Training Module
How to implement Single minute exchange of die
Line balancing and its formulation
SMED-Observation Training
Lead time takt time cycle time and throughput
Ad

Viewers also liked (16)

PPT
Cycle time
PDF
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
PPTX
Application of value stream mapping for reduction of cycle time in machining ...
PPT
Toyota production system
PPTX
Lean testing approach for cycle time reduction
PDF
Kanban For Software Engineering Apr 242
PPTX
Lean management
PPT
Agile manufacturing
PPT
Business Process Reengineering
PPTX
Business Process Reengineering vs Continuous Improvement
PPTX
Agile manufacturing
PPTX
Agile manufacturing(1)
PPT
Agile manufacturing
PPTX
Quality management
PPT
Kaizen Philosophy
PPT
Quality Management Presentation
Cycle time
Lean Manufacturing : Concept & Overview nkchawla@gmail.com
Application of value stream mapping for reduction of cycle time in machining ...
Toyota production system
Lean testing approach for cycle time reduction
Kanban For Software Engineering Apr 242
Lean management
Agile manufacturing
Business Process Reengineering
Business Process Reengineering vs Continuous Improvement
Agile manufacturing
Agile manufacturing(1)
Agile manufacturing
Quality management
Kaizen Philosophy
Quality Management Presentation
Ad

Similar to Cycle time reduction (20)

PDF
CIM report - final
PDF
CIM Report
PDF
CIM report - final
PPTX
Smed implementation on manufacturing stamping line
PPTX
SMED implementation on Automated Stamping Line
PPTX
Impementing cellular manufacturing
PDF
Fine machining lean approach
DOCX
Donner case Operations Management
PPTX
Cam gear process improvement shifter assembly manufacturing
PPT
PDF
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
PPT
SMED Kaizen Event
PPTX
A simulation study of fms tool
PPTX
QC CIRCLE PRESENTATION (1).pptx
PPTX
report for agribot weed management .pptx
PDF
Introduction to TPS (Toyota Production System)
PDF
Case Study: Mass Production in Small Scale Industries
PDF
Case Study: Mass Production in Small Scale Industries
PDF
Process dsign and facility layout
PPTX
MACHINING TIME CALCULATION
CIM report - final
CIM Report
CIM report - final
Smed implementation on manufacturing stamping line
SMED implementation on Automated Stamping Line
Impementing cellular manufacturing
Fine machining lean approach
Donner case Operations Management
Cam gear process improvement shifter assembly manufacturing
MMAE557 Consulting Project-Li He(A20358122),Xingye Dai(A20365915)
SMED Kaizen Event
A simulation study of fms tool
QC CIRCLE PRESENTATION (1).pptx
report for agribot weed management .pptx
Introduction to TPS (Toyota Production System)
Case Study: Mass Production in Small Scale Industries
Case Study: Mass Production in Small Scale Industries
Process dsign and facility layout
MACHINING TIME CALCULATION

Recently uploaded (20)

PPTX
web development for engineering and engineering
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
PPTX
CH1 Production IntroductoryConcepts.pptx
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
DOCX
573137875-Attendance-Management-System-original
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PDF
PPT on Performance Review to get promotions
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
OOP with Java - Java Introduction (Basics)
PPTX
Strings in CPP - Strings in C++ are sequences of characters used to store and...
PPT
Mechanical Engineering MATERIALS Selection
PPT
Project quality management in manufacturing
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
Digital Logic Computer Design lecture notes
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
composite construction of structures.pdf
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
web development for engineering and engineering
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
KTU 2019 -S7-MCN 401 MODULE 2-VINAY.pptx
CH1 Production IntroductoryConcepts.pptx
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
573137875-Attendance-Management-System-original
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPT on Performance Review to get promotions
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
OOP with Java - Java Introduction (Basics)
Strings in CPP - Strings in C++ are sequences of characters used to store and...
Mechanical Engineering MATERIALS Selection
Project quality management in manufacturing
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Digital Logic Computer Design lecture notes
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
composite construction of structures.pdf
CYBER-CRIMES AND SECURITY A guide to understanding

Cycle time reduction

  • 1. CYCLE TIME REDUCTION IN MANUFACTURING OF KNUCKLE Presentation on- By- Sudhanshu Sengaonkar Digvijay Phadke Guided by- Mr. D. S. Patil
  • 3. Module 2: Layout Fillet Rolling Taper Bore Crack Detection Complete Inspection Area Bush Pressing and Broaching Keyway Broach (Vertical Broaching) Wash/Anti- Rust Application Packaging Number Punching
  • 4. Problems Faced on Knuckle Line • Number Punching operation being done manually • Doors of CNC machines need to be closed manually • One person doing multiple jobs on module 1 • Center drill remains idle • Checking for tooling problems • Insert wear • Turret shifts downwards when idle for long times on FMS
  • 5. Process Time(T1)(Seconds) T2 T3 T4 T5 T6 T(avg) in sec 1. Pick up job and place on center drill 41.6 37.4 43.7 31.3 48.2 46.1 41.38 2. Center drill operation 66 64 62 63 63 64 63.66 3. Pick up job from central drill and place for rough turning 25.9 32.9 30 37 33.8 31.2 31.8 4. Rough turning 248 240.078 240.076 240.078 240.08 240.07 241.4 5. Remove and Punch 22.6 21.2 18.1 42.8 20.9 21 24.43 6. Pick and place for finishing and complete operation time 212 235 206.3 210.5 205 207.6 212.73 7. Inspection after finishing(Includes picking job from FMS) 137 57 29.8 44 43 62.16 62.15 Total Average time 677.56 Process Time Evaluation (Module 1)
  • 6. Process Time T1 T2 T3 T4 T5 T(avg) in sec 1. Pickup job and place on Centering machine 53.6 54.2 68.9 92 72 68.14 2. centering machine operation time 60.1 59.6 55.8 62 60.2 59.54 3. Pickup from centering machine and place on Proteck 45 32 33.1 36 44 38.02 4. Proteck operation time 248 248 248 248 248 248 5. Pickup job from Proteck and place for number punching 25 19.1 18.6 20 23 21.14 6. Pickup job from punch and place on FMS 30 54 32.9 52 29.3 39.64 7. FMS operation time 216 209 210 212 205 210.4 8. Pickup from FMS place for inspection/complete inspection 70.2 70.8 78 65 72 71.2 Total average time 756.08 Process Time Evaluation(Module 1)
  • 7. Error Proofing – MCD II Source of Defect Knuckle Line Problem Statement Number punching operation missing & Number punching location shift Analysis Number punching missing & location shift due to number punching activity is manual. Occurred at Knuckle Line
  • 8. Lift the job from input pallet. Keep the job on stand manually with proper orientation for number punching – (Unsafe working condition ) Manual number punching operation done by holding number punching machine in hand ProcessFlowat jobloadingstage-Before Facing & centeringRough turningFinish turning
  • 9. Lift the job from input pallet. Facing & centering operation Rough turning ProcessFlowat jobloadingstage-After Automatic number punching operation with button start. Finish turning operation
  • 10. ErrorProofing–Checklist Principles Questions to be asked to the process Solution Effectiv- ness Cost Implim entatio n SPN Elimination Can we eliminate the error-prone process in totally? No Can we eliminate the error from process partially? No Replace-ment Can we automate the process? Yes , automation can be done for number punching operation 3 3 3 27 Can we provide supporting tools like checklists/gages/samples? Yes 1 3 3 9 Facilitata-tion Can we simplify the operation or introduce changes in the operation? (standardization, color coding, unique shape, etc) No Detection Can we record the outcome / product parameters of the earlier operation and verify it before starting next operation No Can we restrict the motion in such way that the operator will see the abnormality? No Can we verify the outcome / product parameters of the said operation before passing the part to next operation ? No Mitigation Can we make detection at multiple levels? No Can we make ergonomic condition better so as not to produce / miss the defects? Yes 1 2 3 6 Solution Priority Number (SPN) Criteria Effecive-ness 1 : Less Effective 2 : Effective 3 : Very Effective Solution Cost 1 : High 2 : Medium 3 : Low Automation is required at number punching station Implemen-tation 1 : Difficult 2 : Easy 3 : Very Easy
  • 11. ErrorProofing–Before Before Counter measure :. Job is kept on table as per required orientation & number punching is done manually by hand.
  • 12. ErrorProofing–After After Counter measure : Automatic number punching operation Automation setup with pneumatic cylinder & solenoid valve mounted on stand .
  • 13. ErrorProofing–DesignReview Sr. No. Design Review Parameter Description 1 Fail-Safe performance Unsafe working condition eliminated at manual number punching 2 Cost effectiveness Proposed solution is cost effective. 3 Ease of operation Easy to operate as button start. 4 Protection from external damage Automation setup is mounted on stand hence no chance of damage. 5 Simplicity in design Proposed solution is simple to implement.
  • 14. Grinding Operation Time T1 T2 T3 T4 T5 Average Loading 22.5 64 53 61 47 49.50 Commands 6.3 4 14.01 10.58 8.4 8.66 Operation time 180 181 180 180 181 180.40 Inspection 73 63 68 71 62 67.40 Unloading 32 29 31 26 27 29.00 Rotate Job 12.26 12.15 12.33 12.01 11.48 12.05 Input Job Number on record 12.17 12.35 12.48 12 13.2 12.44 Total time 359.44 Time in min 5.99
  • 15. Hardening Operation Time(sec) T1 T2 T3 T4 T5 Average Loading 47.37 25.28 65 50 54 48.33 Operation Time 170 172 170 171 170 170.60 Unloading 97 54 34 45 68 59.60 Total time 278.53 Time in min 4.64
  • 16. 16 Action plan Sr. no Machine Activities Time saved by (sec) Remark Grinding and Hardening 1 Make provision for parking crane near operator for ease of operation 6 2 Job should be ready prior to operation 8 3 Fixture for resting job and air nozzle for removal of central burr 5 4 Provide stand near grinding operation for inspecting the job 40 5 Provide conveyor along with coolant after hardening 15 6 Stand for log book for better ergonomics 4 7 Combine two snap gauges 12