DAY 1
Target : RM 360
Sale : Banana kebabs : 14 (RM5) , 1 (RM4) = RM74
Mugcakes : 5 (RM 8) , 3 ( RM6) , Mugcake + Add on (RM 12) = RM 70
Vanilla doughnut : 4 ( RM 4) = RM 16
Chocolate doughnut : 2 ( RM 3) = RM 6
Oreo doughnut : 10 ( RM 3) = RM 30
Total sales : RM 196
Donation : RM 97.40
Total for Day 1 = RM 293.40
Therefore, target short of RM 66.60
DAY 2
Target : RM 360
Sale : Banana Kebabs : 8 (RM5) , 3 (RM4)
Mugcakes : 4 (RM10) , 3 (RM8) , 4 (RM7)
Pancakes : 4 (RM5) , 1 (RM3)
Doughnuts : 16 (RM5)
Total sales : RM 247
Donation : RM 73
Total for Day 2 : RM 320
Therefore, target short of RM 40.00
DAY 3
Target : RM470
Sale : Banana Kebabs : 15 (RM5) , 3 (RM4)
Mugcakes : 4 (RM8) , 3 (RM7) , 3 (RM6) ,
Cheerios : 18 (RM5) , 2 (RM4)
Total sales : RM 256
Donation : RM 105.60
Total for Day 3 : RM 361.60
Therefore, target short RM 108.40
DAY 4
Target : 243
Sale : Fruit Kebabs : 5 (RM5)
Mugcakes : 4 (RM8) , 6 (RM6) ,
Churos : 15 (RM5)
Total sales : RM 168
Donation : RM 8.05
Total for Day 4 : RM 176.05
Therefore, target short RM 66.09
DAY 5
Target : RM 200
Sales : S'mores : 14 (RM2)
Marshmallow sticks : 25 (RM2) , 4 (RM1) , 1 (RM4)
Chocolate boxes : 24 (RM3)
Total sales : RM 158
Donation : RM 84.70
Total for Day 5 : RM 242.70
Therefore, target profits by RM 42.70

More Related Content

DOCX
Building service paper
DOC
B. structure project 2 brief august 2016 (updated)
PDF
Asian Architecture Report
PDF
Asian Architecture Report
PDF
B sc (hons) arch asian architecture arc60403 outline aug 2016_v1
PDF
B sc (hons) arch asian architecture arc60403 project aug 2016_v1 (1)
PDF
B sc honsarch-architecture-studio-3-arc60106_outline_mar-2016
PDF
B sc(hons)(arch) architecture studio 3 arc60106 project 3_brief_mar 2016
Building service paper
B. structure project 2 brief august 2016 (updated)
Asian Architecture Report
Asian Architecture Report
B sc (hons) arch asian architecture arc60403 outline aug 2016_v1
B sc (hons) arch asian architecture arc60403 project aug 2016_v1 (1)
B sc honsarch-architecture-studio-3-arc60106_outline_mar-2016
B sc(hons)(arch) architecture studio 3 arc60106 project 3_brief_mar 2016

More from Arvindhan Balasingam (20)

PDF
Studio project 1 brief
PDF
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
PDF
Project brief 1 b construction 2 march 2016
PDF
Project brief 2 b construction 2 march 2016 (new)
PDF
Module outline b construction 2 march 2016 (new)
PDF
Project brief buidling science 1 aug 2015_basic bldg design v2
PDF
Building science 1 (bld60803 arc2423) module outline - 24 august 2015
PDF
Arc 60305 project 3 measured drawings
PDF
Arc60305 project 2 building report and video
PDF
Arc60305 methods of documentation and measured drawings module outline jan 2016
PDF
Group project brief
PDF
Env sus design (arc1413)(bld60203) module outline august 2015 (final)
PDF
Esd project 1 2015
PPTX
Presentation1 culture 5.0
PDF
File download 696969
PDF
DOCX
Arvind sentul boulevard 2.0
PDF
Arch cult 2 project 1 brief march 2015 timeline
PDF
Module outline arch and cult 2 aug 2015 arc 60203 (3)
Studio project 1 brief
B sc(hons)(arch) architecture studio 3 arc60106 project 2_brief_mar 2016
Project brief 1 b construction 2 march 2016
Project brief 2 b construction 2 march 2016 (new)
Module outline b construction 2 march 2016 (new)
Project brief buidling science 1 aug 2015_basic bldg design v2
Building science 1 (bld60803 arc2423) module outline - 24 august 2015
Arc 60305 project 3 measured drawings
Arc60305 project 2 building report and video
Arc60305 methods of documentation and measured drawings module outline jan 2016
Group project brief
Env sus design (arc1413)(bld60203) module outline august 2015 (final)
Esd project 1 2015
Presentation1 culture 5.0
File download 696969
Arvind sentul boulevard 2.0
Arch cult 2 project 1 brief march 2015 timeline
Module outline arch and cult 2 aug 2015 arc 60203 (3)
Ad

Recently uploaded (20)

PPTX
Lecture-05-Audio-lingual. Method & Appro
DOCX
Double Membrane Roofs for Biogas Digesters A sealed cover for biogas producti...
DOCX
Double Membrane Roofs for Cassava Wastewater Treatment Captures biogas from i...
PPTX
Definition, Causes And Effects Of Greenhouse.pptx
PDF
1748933543SJA_41_2_826-834 SJA Ihsan ullha.pdf
PDF
IWRM - City University Presentation 28 may 2018-v3.pdf
PPT
MATERI - LABORATORY - SAFETY.ppt
PPTX
Air_Pollution_Thesis_Presentation (1).pptx
PDF
Cave Diggers Simplified cave survey methods and mapping
PDF
PAKAM TECHNOLOGY LIMTED PITCH DECK pptx.pdf
DOCX
Biogas Balloon for Bio CNG Plants An efficient solution for biogas storage..docx
DOCX
Double Membrane Roofs for Anaerobic Digesters Essential for capturing and sto...
PPTX
Importance of good air quality and different pollutants.
PPTX
Unit 1 - Environmental management, politics and.pptx
PPTX
EME Aerospace.pptx basics of mechanical engineering
PDF
Biomass cookstoves: A review of technical aspects
PPTX
Biodiversity PPT by Gaithanlung Gonmei.pptx
PPTX
STL Academy - Highlights & Impact 2020-21-v2 (1).pptx
DOCX
Double Membrane Roofs for Digester Tank Wastewater Treatment Integral to biog...
PDF
The European Green Deal (EU Green Deal)
Lecture-05-Audio-lingual. Method & Appro
Double Membrane Roofs for Biogas Digesters A sealed cover for biogas producti...
Double Membrane Roofs for Cassava Wastewater Treatment Captures biogas from i...
Definition, Causes And Effects Of Greenhouse.pptx
1748933543SJA_41_2_826-834 SJA Ihsan ullha.pdf
IWRM - City University Presentation 28 may 2018-v3.pdf
MATERI - LABORATORY - SAFETY.ppt
Air_Pollution_Thesis_Presentation (1).pptx
Cave Diggers Simplified cave survey methods and mapping
PAKAM TECHNOLOGY LIMTED PITCH DECK pptx.pdf
Biogas Balloon for Bio CNG Plants An efficient solution for biogas storage..docx
Double Membrane Roofs for Anaerobic Digesters Essential for capturing and sto...
Importance of good air quality and different pollutants.
Unit 1 - Environmental management, politics and.pptx
EME Aerospace.pptx basics of mechanical engineering
Biomass cookstoves: A review of technical aspects
Biodiversity PPT by Gaithanlung Gonmei.pptx
STL Academy - Highlights & Impact 2020-21-v2 (1).pptx
Double Membrane Roofs for Digester Tank Wastewater Treatment Integral to biog...
The European Green Deal (EU Green Deal)
Ad

Daily progress

  • 1. DAY 1 Target : RM 360 Sale : Banana kebabs : 14 (RM5) , 1 (RM4) = RM74 Mugcakes : 5 (RM 8) , 3 ( RM6) , Mugcake + Add on (RM 12) = RM 70 Vanilla doughnut : 4 ( RM 4) = RM 16 Chocolate doughnut : 2 ( RM 3) = RM 6 Oreo doughnut : 10 ( RM 3) = RM 30 Total sales : RM 196 Donation : RM 97.40 Total for Day 1 = RM 293.40 Therefore, target short of RM 66.60 DAY 2 Target : RM 360 Sale : Banana Kebabs : 8 (RM5) , 3 (RM4) Mugcakes : 4 (RM10) , 3 (RM8) , 4 (RM7) Pancakes : 4 (RM5) , 1 (RM3) Doughnuts : 16 (RM5) Total sales : RM 247 Donation : RM 73 Total for Day 2 : RM 320 Therefore, target short of RM 40.00 DAY 3 Target : RM470 Sale : Banana Kebabs : 15 (RM5) , 3 (RM4) Mugcakes : 4 (RM8) , 3 (RM7) , 3 (RM6) , Cheerios : 18 (RM5) , 2 (RM4) Total sales : RM 256 Donation : RM 105.60 Total for Day 3 : RM 361.60 Therefore, target short RM 108.40 DAY 4 Target : 243 Sale : Fruit Kebabs : 5 (RM5) Mugcakes : 4 (RM8) , 6 (RM6) , Churos : 15 (RM5)
  • 2. Total sales : RM 168 Donation : RM 8.05 Total for Day 4 : RM 176.05 Therefore, target short RM 66.09 DAY 5 Target : RM 200 Sales : S'mores : 14 (RM2) Marshmallow sticks : 25 (RM2) , 4 (RM1) , 1 (RM4) Chocolate boxes : 24 (RM3) Total sales : RM 158 Donation : RM 84.70 Total for Day 5 : RM 242.70 Therefore, target profits by RM 42.70