LEARN – DAY 33
Construction Foundation Course
Week Seven: Day 33 (Wednesday)
Content for the day
• Blueprints
• Tools and Equipment
Week Seven: Day 33 (Wednesday)
Materials for the day
• Resource 5.26 – Name That
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 1
• Check-in: Shake hands. Remind students:
binders, seating. Start class.
• Review the day: Review the day’s activities
from the list on the board or chart paper.
• Binder check: This can be done at any time
during the day.
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 2
5 min: Minute Math, slide 15. Tell students to read the
architect’s scale in ¼.
10 min: Tell students that drywall (also called sheetrock and
gypsum board) and plaster are the most frequently used
materials to provide a surface for interior walls. Have students
turn to p. 916. Ask students, as individuals, to create a Venn
diagram as notes while you slowly read the 2 paragraphs under
Understanding Drywall. Have them continue to fill in the
diagram as you read the first paragraph on p. 933.
Have individuals work as pair-shares to come to consensus on
their diagram notes.
Blueprints
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 3
Then call on one pair-share to read the unique
characteristics of plaster while you write them into a
Venn diagram on the board/chart paper. Ask a
second pair-share to read their unique characteristics
of drywall and a third pair-share to read their
similarities.Ask if the notes on the board/chart paper
are accurate and complete. As other pair-shares make
suggestions, work with the group to come to
consensus and ask students to make adjustments in
their own initial diagrams for their notes. Ask the
group what the 2 study questions are for a Venn
diagram. (What are the similarities between X and Y?
What are the differences between X and Y?)
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 4
5 min: Given the differences between drywall and plaster, which
interior wall surface do you think Mr. Plaza chose and why? Wait time.
Call on an individual student. Get a second opinion. Have Work Teams
look carefully through the Plaza cabin blueprints to find the answer.
(Sheet rock, another name for drywall.)
10 min: Assign each Work Team a jigsaw reading from the list below.
They’ll have 3 minutes to prepare and 1 minute to present:
• Standard drywall (sheetrock)
• Fire code drywall
• Moisture-resistant drywall
• Specialty drywall
• Foil-back drywall
• Flexible drywall
• Sound-resistant drywall
• Drywall fasteners
Check for accuracy in vocabulary cards.
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 5
10 min: Do another jigsaw exercise with the following
sections:
• Joint compound (up to Drying-type compounds), p. 918
• Drying-type compounds and setting-type compounds, pp.
918-19
• Drywall trim accessories, p. 919
- Corner bead
• Cutting drywall, p. 923-4 up to Cuts within the sheet
• Cuts within the sheet, p. 924-5 through Cuts at the edge
of a sheet
Check student notes, especially on cutting drywall.
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 6
10 min: Remind students that drywall comes in various
sizes of sheets, the most typical being 4 x 8 and 2 x 12.
Thinking about how a stud wall is built, have Work
Teams take 2 minutes to discuss this question: How
should sheetrock/drywall be installed—horizontally or
vertically? Poll the group. Ask for rationale.
Have students turn to p. 926 and ask individuals to
create a Venn diagram while you read the section,
Fastening drywall, through Horizontal application.
Have students compare notes as pair-shares. Then call
on a pair-share to explain similarities and differences.
Ask for a second opinion
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 7
5 min: Have pair-shares study blueprint
vocabulary words, including today’s.
5 min: Conduct a round of First Down
Stretch Break: Everyone stands. You ask Work
Team 3 to present their math rap. They perform.
Everyone claps and sits down.
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 8
5 min: Minute Math, slide 16; read the architect’s
ruler in 1/8
10 min: Have students take out the Plaza cabin
blueprints and have pair-shares find the cabinets
in the kitchen. Ask if these are wall cabinets or
base cabinets. Wait time. Call on one pair-share
for their answer and logic. (Have to be wall
cabinets across the refrigerator and stove. Could
be wall or base cabinets across the counter to the
right of the stove.)
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 9
The Plazas always eat breakfast and dinner together. Ask
pair-shares to determine
• what size the table should be
• what amount of room the chairs must have to get in
and out
• where the table and chairs should be located in the
house
10 min: Have Work Teams read Planning kitchens, Kitchen
layouts, and Work Centers on pp. 781-783 and make
vocabulary cards for
• Universal design
• Work triangle
• Work centers
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 10
The Plaza cabin kitchen is very small, with very few
cabinets. Ask Work Teams to estimate the linear feet of
cabinets in the kitchen if the cabinets were both above
and below the counter area and to consider if there is
any possibility for additional cabinets. If so
• Where would they be located?
• Would they be base cabinets or wall cabinets?
• How wide would they be?
• How much room would there be in the kitchen to
move around?
Given the trade-offs, what would your Work Team
recommend?
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 11
35 min: Most kitchens have more room than the Plaza
cabin has. Let’s say that you are planning a kitchen in
the U shape design on p. 782. As pair-shares, draw
this design to 1:24 scale if the room size is 10’ x 12’
and the openings (no doors) are each 3’. Put in the
detail for
• GFCI switches
• Electrical outlets
• Ceiling light and switch
• Any other major appliances
• Size and type of window
• Table and chairs
• Room title with dimensions
Week Seven: Day 33 (Wednesday)
First and Second Hours (7:30 – 9:30) - 12
Use graph paper or the architect’s ruler to do
the layout.
Have pair-shares check in every 10 minutes
with the Work Team to ensure that they’re on
track. They’ll need their designs to do the
Work Team homework tonight.
Snack Break (9:30-9:40)
Week Seven: Day 33 (Wednesday)
Third and Fourth Hours (9:40 – 11:30) - 1
15 min: Homework presentation: Have Work Teams
draw nails for order with highest d going first. Each
Team reads their memo and presents their role play
while others rate them on scratch paper, using the
rubric they have. You collect the ratings, quickly review
for appropriateness, and pass on to Work Teams, with
your rating, at the end of the presentations.
Week Seven: Day 33 (Wednesday)
Third and Fourth Hours (9:40 – 11:30) - 2
100 min: Students continue at work stations, moving
on when they’ve reached at least a basic proficiency
level. Students always complete their vocabulary cards
for each new station before beginning work on
proficiencies. Continue to balance the groups at the
work stations so none are too crowded. Monitor
carefully; initial proficiencies on your file copy and the
student’s copy of the rubric as students demonstrate
competency.
Tools and Equipment– Hands-on-exposure
Week Seven: Day 33 (Wednesday)
Third and Fourth Hours (9:40 – 11:30) - 3
Monitor student proficiency completion, so that you set
up project stations as needed. Monitor individual
students for time management. Remind students that
Friday is the last day in shop.
10 min: Play ―Name That…‖ (See Appendix A for
explanation of how to play Name That and use Resource
5.26.)
Reflection
Out the door:Model Notes,Reflection, binders on the
shelf, shake hands.
Week Seven: Day 33 (Wednesday)
AFTER HOURS
• Academic extended day individual work (approximately 1
hour)
• Open Computer Lab
END
If you continue to click forward, you will see links to
presentations of similar content available through
slideshare.com
Content prepared for the National Office of Job Corps through Contract No. DOLJ111A21695
Job Corps Professional Development Support - KUCRL

More Related Content

PPTX
CFC Day 31
PPTX
CFC Day 25
PPTX
Day 30 learn cfc ppt
PDF
Welding Math
DOC
Course syllabus wdt 110 industrial blueprint reading hybrid
DOCX
Construction print screens 2
PPTX
CFC Day 32
PPTX
CFC Day 20
CFC Day 31
CFC Day 25
Day 30 learn cfc ppt
Welding Math
Course syllabus wdt 110 industrial blueprint reading hybrid
Construction print screens 2
CFC Day 32
CFC Day 20

Viewers also liked (20)

PPTX
CFC Day 18
PPTX
CFC Day 21
PDF
Basics of Poly phase transformer _ppt
PDF
[Construction E Book]
DOC
Read and Interpret Construction Drawings & specifications
PDF
Hortonworks Technical Workshop: Apache Ambari
PDF
Construction Management - New Trends
PPT
Engineering Drawing: Chapter 07 dimensioning
PPTX
SSL, FFL, SFL Abbreviations
PPTX
Introduction to Drawing
PDF
Blueprint Reading- Introduction
PPTX
Reading floor plans
PPT
Engineering Drawing
PPT
Signs & Symbols
PPT
Plan, section, elevation revised
PPTX
Architecture drawing presentation
DOCX
types of drawing
PPT
Generating Architectural Concepts & Design Ideas
PPTX
Architectural drawings
PPT
Basic blueprint reading
CFC Day 18
CFC Day 21
Basics of Poly phase transformer _ppt
[Construction E Book]
Read and Interpret Construction Drawings & specifications
Hortonworks Technical Workshop: Apache Ambari
Construction Management - New Trends
Engineering Drawing: Chapter 07 dimensioning
SSL, FFL, SFL Abbreviations
Introduction to Drawing
Blueprint Reading- Introduction
Reading floor plans
Engineering Drawing
Signs & Symbols
Plan, section, elevation revised
Architecture drawing presentation
types of drawing
Generating Architectural Concepts & Design Ideas
Architectural drawings
Basic blueprint reading
Ad

Similar to CFC Day 33 (20)

PPTX
CFC Day 34
PPTX
CFC Day 35
PPTX
CFC Day 27
PPTX
CFC Day 23
PPTX
CFC Day 16
PPTX
Day 18 learn cfc ppt
PPTX
CFC Day 8
PPTX
CFC Day 8
PPTX
CFC Day 28
PPTX
CFC Day 24
PPTX
CFC Day 17
PDF
Masonry learning module
PPTX
CFC Day 38
PPTX
CFC Day 22
PPTX
CFC Day 37
PDF
Apil 2019 week 2 8 12
PDF
PDF
Construction Activities and Process
PDF
k_to_12_masonry_learning_module -2.pdf
CFC Day 34
CFC Day 35
CFC Day 27
CFC Day 23
CFC Day 16
Day 18 learn cfc ppt
CFC Day 8
CFC Day 8
CFC Day 28
CFC Day 24
CFC Day 17
Masonry learning module
CFC Day 38
CFC Day 22
CFC Day 37
Apil 2019 week 2 8 12
Construction Activities and Process
k_to_12_masonry_learning_module -2.pdf
Ad

More from seejaynerun (7)

PPTX
CFC Day 19
PPTX
CFC Day 36
PPTX
CFC Dat 39
PPTX
CFC Day 40
PPTX
CFC Day 29
PPTX
CFC Day 26
PPTX
Fca ice breaker options
CFC Day 19
CFC Day 36
CFC Dat 39
CFC Day 40
CFC Day 29
CFC Day 26
Fca ice breaker options

Recently uploaded (20)

PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
DOCX
Business Management - unit 1 and 2
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
PDF
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
PDF
Tata consultancy services case study shri Sharda college, basrur
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
Keppel_Proposed Divestment of M1 Limited
PPTX
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PPTX
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PPTX
DMT - Profile Brief About Business .pptx
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PPTX
Principles of Marketing, Industrial, Consumers,
Probability Distribution, binomial distribution, poisson distribution
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Business Management - unit 1 and 2
Nidhal Samdaie CV - International Business Consultant
Charisse Litchman: A Maverick Making Neurological Care More Accessible
SBI Securities Weekly Wrap 08-08-2025_250808_205045.pdf
Tata consultancy services case study shri Sharda college, basrur
Lecture 3344;;,,(,(((((((((((((((((((((((
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
Keppel_Proposed Divestment of M1 Limited
Sales & Distribution Management , LOGISTICS, Distribution, Sales Managers
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
3. HISTORICAL PERSPECTIVE UNIIT 3^..pptx
Ôn tập tiếng anh trong kinh doanh nâng cao
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
DMT - Profile Brief About Business .pptx
NEW - FEES STRUCTURES (01-july-2024).pdf
ICG2025_ICG 6th steering committee 30-8-24.pptx
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Principles of Marketing, Industrial, Consumers,

CFC Day 33

  • 1. LEARN – DAY 33 Construction Foundation Course
  • 2. Week Seven: Day 33 (Wednesday) Content for the day • Blueprints • Tools and Equipment
  • 3. Week Seven: Day 33 (Wednesday) Materials for the day • Resource 5.26 – Name That
  • 4. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 1 • Check-in: Shake hands. Remind students: binders, seating. Start class. • Review the day: Review the day’s activities from the list on the board or chart paper. • Binder check: This can be done at any time during the day.
  • 5. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 2 5 min: Minute Math, slide 15. Tell students to read the architect’s scale in ¼. 10 min: Tell students that drywall (also called sheetrock and gypsum board) and plaster are the most frequently used materials to provide a surface for interior walls. Have students turn to p. 916. Ask students, as individuals, to create a Venn diagram as notes while you slowly read the 2 paragraphs under Understanding Drywall. Have them continue to fill in the diagram as you read the first paragraph on p. 933. Have individuals work as pair-shares to come to consensus on their diagram notes. Blueprints
  • 6. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 3 Then call on one pair-share to read the unique characteristics of plaster while you write them into a Venn diagram on the board/chart paper. Ask a second pair-share to read their unique characteristics of drywall and a third pair-share to read their similarities.Ask if the notes on the board/chart paper are accurate and complete. As other pair-shares make suggestions, work with the group to come to consensus and ask students to make adjustments in their own initial diagrams for their notes. Ask the group what the 2 study questions are for a Venn diagram. (What are the similarities between X and Y? What are the differences between X and Y?)
  • 7. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 4 5 min: Given the differences between drywall and plaster, which interior wall surface do you think Mr. Plaza chose and why? Wait time. Call on an individual student. Get a second opinion. Have Work Teams look carefully through the Plaza cabin blueprints to find the answer. (Sheet rock, another name for drywall.) 10 min: Assign each Work Team a jigsaw reading from the list below. They’ll have 3 minutes to prepare and 1 minute to present: • Standard drywall (sheetrock) • Fire code drywall • Moisture-resistant drywall • Specialty drywall • Foil-back drywall • Flexible drywall • Sound-resistant drywall • Drywall fasteners Check for accuracy in vocabulary cards.
  • 8. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 5 10 min: Do another jigsaw exercise with the following sections: • Joint compound (up to Drying-type compounds), p. 918 • Drying-type compounds and setting-type compounds, pp. 918-19 • Drywall trim accessories, p. 919 - Corner bead • Cutting drywall, p. 923-4 up to Cuts within the sheet • Cuts within the sheet, p. 924-5 through Cuts at the edge of a sheet Check student notes, especially on cutting drywall.
  • 9. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 6 10 min: Remind students that drywall comes in various sizes of sheets, the most typical being 4 x 8 and 2 x 12. Thinking about how a stud wall is built, have Work Teams take 2 minutes to discuss this question: How should sheetrock/drywall be installed—horizontally or vertically? Poll the group. Ask for rationale. Have students turn to p. 926 and ask individuals to create a Venn diagram while you read the section, Fastening drywall, through Horizontal application. Have students compare notes as pair-shares. Then call on a pair-share to explain similarities and differences. Ask for a second opinion
  • 10. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 7 5 min: Have pair-shares study blueprint vocabulary words, including today’s. 5 min: Conduct a round of First Down Stretch Break: Everyone stands. You ask Work Team 3 to present their math rap. They perform. Everyone claps and sits down.
  • 11. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 8 5 min: Minute Math, slide 16; read the architect’s ruler in 1/8 10 min: Have students take out the Plaza cabin blueprints and have pair-shares find the cabinets in the kitchen. Ask if these are wall cabinets or base cabinets. Wait time. Call on one pair-share for their answer and logic. (Have to be wall cabinets across the refrigerator and stove. Could be wall or base cabinets across the counter to the right of the stove.)
  • 12. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 9 The Plazas always eat breakfast and dinner together. Ask pair-shares to determine • what size the table should be • what amount of room the chairs must have to get in and out • where the table and chairs should be located in the house 10 min: Have Work Teams read Planning kitchens, Kitchen layouts, and Work Centers on pp. 781-783 and make vocabulary cards for • Universal design • Work triangle • Work centers
  • 13. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 10 The Plaza cabin kitchen is very small, with very few cabinets. Ask Work Teams to estimate the linear feet of cabinets in the kitchen if the cabinets were both above and below the counter area and to consider if there is any possibility for additional cabinets. If so • Where would they be located? • Would they be base cabinets or wall cabinets? • How wide would they be? • How much room would there be in the kitchen to move around? Given the trade-offs, what would your Work Team recommend?
  • 14. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 11 35 min: Most kitchens have more room than the Plaza cabin has. Let’s say that you are planning a kitchen in the U shape design on p. 782. As pair-shares, draw this design to 1:24 scale if the room size is 10’ x 12’ and the openings (no doors) are each 3’. Put in the detail for • GFCI switches • Electrical outlets • Ceiling light and switch • Any other major appliances • Size and type of window • Table and chairs • Room title with dimensions
  • 15. Week Seven: Day 33 (Wednesday) First and Second Hours (7:30 – 9:30) - 12 Use graph paper or the architect’s ruler to do the layout. Have pair-shares check in every 10 minutes with the Work Team to ensure that they’re on track. They’ll need their designs to do the Work Team homework tonight. Snack Break (9:30-9:40)
  • 16. Week Seven: Day 33 (Wednesday) Third and Fourth Hours (9:40 – 11:30) - 1 15 min: Homework presentation: Have Work Teams draw nails for order with highest d going first. Each Team reads their memo and presents their role play while others rate them on scratch paper, using the rubric they have. You collect the ratings, quickly review for appropriateness, and pass on to Work Teams, with your rating, at the end of the presentations.
  • 17. Week Seven: Day 33 (Wednesday) Third and Fourth Hours (9:40 – 11:30) - 2 100 min: Students continue at work stations, moving on when they’ve reached at least a basic proficiency level. Students always complete their vocabulary cards for each new station before beginning work on proficiencies. Continue to balance the groups at the work stations so none are too crowded. Monitor carefully; initial proficiencies on your file copy and the student’s copy of the rubric as students demonstrate competency. Tools and Equipment– Hands-on-exposure
  • 18. Week Seven: Day 33 (Wednesday) Third and Fourth Hours (9:40 – 11:30) - 3 Monitor student proficiency completion, so that you set up project stations as needed. Monitor individual students for time management. Remind students that Friday is the last day in shop. 10 min: Play ―Name That…‖ (See Appendix A for explanation of how to play Name That and use Resource 5.26.) Reflection Out the door:Model Notes,Reflection, binders on the shelf, shake hands.
  • 19. Week Seven: Day 33 (Wednesday) AFTER HOURS • Academic extended day individual work (approximately 1 hour) • Open Computer Lab
  • 20. END If you continue to click forward, you will see links to presentations of similar content available through slideshare.com Content prepared for the National Office of Job Corps through Contract No. DOLJ111A21695 Job Corps Professional Development Support - KUCRL