This document outlines the steps to integrate the HSE subnet into the Industrial IT 800xA system, including uploading the subnet into the control structure and checking for live data via the OPC server. Key objectives include ensuring proper communication between HSE and control networks, and assigning CI860 objects in the Aspect Integrator platform. It also emphasizes the importance of monitoring the status of the uploads and connections for successful integration.