Introduction

Marking and layout is the third step in building your deck. The layout is possibly the most important step after you have made
the decision to proceed. The placement of the footings is critical to the location of the support posts, which will ultimately make
your deck a safe and enjoyable place to enjoy the outdoors, and keep it from falling down!


Even though there is room for error in measuring the location of the footings, success comes from striving for accuracy--
measure to the 1/8th of an inch. This layout is simple and can easily be completed by any level of DIYer. Mistakes can be
corrected at a later part of the project if necessary. These mistakes however, will add time and money to your deck project if
left uncorrected.


To set up for this task, gather your drawings, tape measure, marking tools, level, all of your equipment, and put them on a site
worktable for easy reference and a place to find them. A paperweight of tools and other heavy objects will keep the plans in
place if the wind begins to blow.




  Time to complete this project depends on the size of the deck and the level of help available, the times listed here are for two
  people on a 10'x 30' deck with the house defining two sides of the deck.
  • Beginner - 3 hours
  • Intermediate - 2 hours
  • Advanced - 1 hours

               Check for hidden utility lines before you start.


                Check local code restrictions to be sure that you comply with their regulations on deck height off the ground and
  limitations on the amount of lot coverage allowed.


                      Rushing the layout can cause the deck to be built out of "square" which will make the final placement of
  deck boards and hand railings extremely difficult at the end of the project.


                   A helper who understands the overall design and layout process will be invaluable in holding the dummy end
  of the tape and helping to line up marking strings.
STEPS
1. Your first measurements and marking indicate where your deck connects to the house. After
   the height of the deck is marked, move away from the house to locate the remaining deck
   supports. Your measurements should take into account that the deck is an outdoor
   extension of your indoor living space, and needs to slope away from the house to allow any
   water that collects on the deck to drain away from the house and the foundation of your
   home.




2. Begin by marking the top of the ledger, the structural deck support that will attach to your
   house, in several locations. Use your level to verify that the top of the ledger matches your
   structural drawing. Keep in mind that if your finished deck surface is 2x material, the top of
   the ledger will be 1½" below the finished height of the deck as most 2x decking material is
   actually 1½". Repeat this step on all walls that join the deck. Note: The drainage slope on
   the deck will show on any adjacent deck wall markings.




3. Now we will mark the outside perimeter of the deck foundation where the deck will be
   supported from the ground as indicated on your construction drawing. To establish this line,
   take two equal measurements, in separate locations, from the longest parallel house wall as
   shown, and mark the location with the nylon line. These measurements should indicate the
   centerline of the post base. The string line(s) should be directly over the center of the post
   base. Be sure that you keep the measurements parallel to each other and perpendicular
   (square) to the wall.




4. The string line can be attached at the ledger location with a nail or screw at one end and
   tied around a stake driven into the ground at the other end. Be sure to drive the stake
   "outside" the deck perimeter so it can stay in place until the support posts are set. Be sure
   to keep the string line above the top of the ledger height if possible so the footings can be
   dug, the concrete can be poured, and the vertical support posts can be placed, without
   moving them.
5. Measure the distance from any adjacent walls to locate adjacent sides of the deck (post
   base) and mark with nylon line the same way as in step 2. Remember to keep the
   measurements parallel.




6. Layout any interior post bases using the same technique as the perimeter using two equal
   measurements and marking them with a string line.




7. The grid formed by the nylon line should be the same as the grid on your plans showing the
   structural members (girders) which will in turn support the joists, which support the finished
   deck boards. The intersection of the string lines indicates the center of the post bases.




8. Be sure to check your layout for square using the 3-4-5 right triangle method. Or you can
   check for square by measuring from opposite corners and comparing the dimensions, they
   should be equal: within 3/8 inch will be acceptable on this project In the next tutorial we
   will be pouring concrete in the post bases and attaching the ledger board to the house.




                                SHOP LIST


Materials Needed
• 24" to 30" stakes. (Use 1x2 wood or metal stakes) Two stakes per corner
• 16d nails


Tools Needed
• 25' tape measure

• Carpenters pencil or a permanent marker
• 100' "reel" tape, or longer if the diagonal measurement is greater than 100'

• 500' of nylon line (this "string" comes in highly visible colors and is good for laying out piers and footings for any
 construction project)

• Hammer

• Water level, string level or some other tool to find level.

More Related Content

PDF
Ceramic tiles for worktops
PDF
Framing Basics to Remember for Stronger Homes
PDF
Upvc fascia
PDF
How to build a deck
PDF
How to build a retaining wall
PDF
How to construct a suimple garden pond
PDF
How to build a raised formal pool
PDF
Lay a laminate floor
Ceramic tiles for worktops
Framing Basics to Remember for Stronger Homes
Upvc fascia
How to build a deck
How to build a retaining wall
How to construct a suimple garden pond
How to build a raised formal pool
Lay a laminate floor

What's hot (18)

PDF
Garage floor insulation
PDF
Wall tiling
PDF
Timber Panels Installation
PDF
Wall fixings for hollow & solid surfaces
PDF
Build a carport
PDF
Build a shed
PDF
Certainteed Drywall Installation Guide
PDF
Stone Works Canada Alan Block garden walls install catalog
PDF
Designing with Tile
PDF
Superseal Tile Subfloor Installation Instructions
PPTX
Haleys how to guide powerpoint[1]
PDF
Wallpapering techniques
PPTX
Timber floor
PPTX
Low cost puneet
PPTX
FLOORING
PDF
Fireplace
PPTX
Technology of Mateiral, Terrazzo
PDF
newtableconcept user manual
Garage floor insulation
Wall tiling
Timber Panels Installation
Wall fixings for hollow & solid surfaces
Build a carport
Build a shed
Certainteed Drywall Installation Guide
Stone Works Canada Alan Block garden walls install catalog
Designing with Tile
Superseal Tile Subfloor Installation Instructions
Haleys how to guide powerpoint[1]
Wallpapering techniques
Timber floor
Low cost puneet
FLOORING
Fireplace
Technology of Mateiral, Terrazzo
newtableconcept user manual
Ad

Similar to Deck marking (20)

PDF
Deck marking
PDF
Installing deck boards
PDF
Installing deck posts
PDF
Deck structural design
PDF
Installing deck stairs
PDF
Installing the deck railing
PDF
Timber decking
PDF
Deck structural design
PDF
Planning a deck
PDF
Decking steps
PDF
Installing deck joists
PPTX
Building Constructure(CE3G) for construction work.pptx
PDF
Decking steps
PDF
All about decking
PDF
All about decking
PPTX
Setting out of building
PPTX
CONSTRUCTION and types of bonding MODULE final.pptx
DOCX
Layout of a House Plan Foundation - Report
PDF
Apply set out work.pdf
PDF
Jack Tremblay in Deck Builder
Deck marking
Installing deck boards
Installing deck posts
Deck structural design
Installing deck stairs
Installing the deck railing
Timber decking
Deck structural design
Planning a deck
Decking steps
Installing deck joists
Building Constructure(CE3G) for construction work.pptx
Decking steps
All about decking
All about decking
Setting out of building
CONSTRUCTION and types of bonding MODULE final.pptx
Layout of a House Plan Foundation - Report
Apply set out work.pdf
Jack Tremblay in Deck Builder
Ad

More from Praveen Sudarsan (20)

PDF
How to install pvc downpipes
PDF
How to hang wallpaper
PDF
How a lighting circuit works
PDF
Home security
PDF
Heat guns
PDF
Hanging wallpaper
PDF
Hanging a door
PDF
Handrail anatomy
PDF
Timber care
PDF
How to avoid the cowboy builder
PDF
General do it yourself safety comments
PDF
Foundations for light garden walls
PDF
Fixing to plasterboard and plasterboard fixings
PDF
Fixing to lathe & plaster
PDF
Fitting a mortice latch
PDF
Fit extra electrical sockets
PDF
Fit a toilet and bidet
PDF
Fit a bath and wash basin
PDF
Electrical safety
PDF
Earth bonding
How to install pvc downpipes
How to hang wallpaper
How a lighting circuit works
Home security
Heat guns
Hanging wallpaper
Hanging a door
Handrail anatomy
Timber care
How to avoid the cowboy builder
General do it yourself safety comments
Foundations for light garden walls
Fixing to plasterboard and plasterboard fixings
Fixing to lathe & plaster
Fitting a mortice latch
Fit extra electrical sockets
Fit a toilet and bidet
Fit a bath and wash basin
Electrical safety
Earth bonding

Recently uploaded (20)

PPTX
Transportation in Logistics management.pptx
PDF
Engaging Stakeholders in Policy Discussions: A Legal Framework (www.kiu.ac.ug)
PDF
Communication Tactics in Legal Contexts: Historical Case Studies (www.kiu.ac...
PDF
Business Communication for MBA Students.
PDF
Second Hand Fashion Call to Action March 2025
PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
PPTX
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
PPTX
operations management : demand supply ch
PPTX
IMM.pptx marketing communication givguhfh thfyu
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PDF
Kishore Vora - Best CFO in India to watch in 2025.pdf
PDF
#1 Safe and Secure Verified Cash App Accounts for Purchase.pdf
PPTX
Understanding Procurement Strategies.pptx Your score increases as you pick a ...
PPTX
33ABJFA6556B1ZP researhchzfrsdfasdfsadzd
PDF
Value-based IP Management at Siemens: A Cross-Divisional Analysis
DOCX
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PPTX
chapter 2 entrepreneurship full lecture ppt
PDF
Cross-Cultural Leadership Practices in Education (www.kiu.ac.ug)
Transportation in Logistics management.pptx
Engaging Stakeholders in Policy Discussions: A Legal Framework (www.kiu.ac.ug)
Communication Tactics in Legal Contexts: Historical Case Studies (www.kiu.ac...
Business Communication for MBA Students.
Second Hand Fashion Call to Action March 2025
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
operations management : demand supply ch
IMM.pptx marketing communication givguhfh thfyu
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
Kishore Vora - Best CFO in India to watch in 2025.pdf
#1 Safe and Secure Verified Cash App Accounts for Purchase.pdf
Understanding Procurement Strategies.pptx Your score increases as you pick a ...
33ABJFA6556B1ZP researhchzfrsdfasdfsadzd
Value-based IP Management at Siemens: A Cross-Divisional Analysis
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
chapter 2 entrepreneurship full lecture ppt
Cross-Cultural Leadership Practices in Education (www.kiu.ac.ug)

Deck marking

  • 1. Deck Marking & Layout OVERVIEW Introduction Marking and layout is the third step in building your deck. The layout is possibly the most important step after you have made the decision to proceed. The placement of the footings is critical to the location of the support posts, which will ultimately make your deck a safe and enjoyable place to enjoy the outdoors, and keep it from falling down! Even though there is room for error in measuring the location of the footings, success comes from striving for accuracy-- measure to the 1/8th of an inch. This layout is simple and can easily be completed by any level of DIYer. Mistakes can be corrected at a later part of the project if necessary. These mistakes however, will add time and money to your deck project if left uncorrected. To set up for this task, gather your drawings, tape measure, marking tools, level, all of your equipment, and put them on a site worktable for easy reference and a place to find them. A paperweight of tools and other heavy objects will keep the plans in place if the wind begins to blow. Time to complete this project depends on the size of the deck and the level of help available, the times listed here are for two people on a 10'x 30' deck with the house defining two sides of the deck. • Beginner - 3 hours • Intermediate - 2 hours • Advanced - 1 hours Check for hidden utility lines before you start. Check local code restrictions to be sure that you comply with their regulations on deck height off the ground and limitations on the amount of lot coverage allowed. Rushing the layout can cause the deck to be built out of "square" which will make the final placement of deck boards and hand railings extremely difficult at the end of the project. A helper who understands the overall design and layout process will be invaluable in holding the dummy end of the tape and helping to line up marking strings.
  • 2. STEPS 1. Your first measurements and marking indicate where your deck connects to the house. After the height of the deck is marked, move away from the house to locate the remaining deck supports. Your measurements should take into account that the deck is an outdoor extension of your indoor living space, and needs to slope away from the house to allow any water that collects on the deck to drain away from the house and the foundation of your home. 2. Begin by marking the top of the ledger, the structural deck support that will attach to your house, in several locations. Use your level to verify that the top of the ledger matches your structural drawing. Keep in mind that if your finished deck surface is 2x material, the top of the ledger will be 1½" below the finished height of the deck as most 2x decking material is actually 1½". Repeat this step on all walls that join the deck. Note: The drainage slope on the deck will show on any adjacent deck wall markings. 3. Now we will mark the outside perimeter of the deck foundation where the deck will be supported from the ground as indicated on your construction drawing. To establish this line, take two equal measurements, in separate locations, from the longest parallel house wall as shown, and mark the location with the nylon line. These measurements should indicate the centerline of the post base. The string line(s) should be directly over the center of the post base. Be sure that you keep the measurements parallel to each other and perpendicular (square) to the wall. 4. The string line can be attached at the ledger location with a nail or screw at one end and tied around a stake driven into the ground at the other end. Be sure to drive the stake "outside" the deck perimeter so it can stay in place until the support posts are set. Be sure to keep the string line above the top of the ledger height if possible so the footings can be dug, the concrete can be poured, and the vertical support posts can be placed, without moving them.
  • 3. 5. Measure the distance from any adjacent walls to locate adjacent sides of the deck (post base) and mark with nylon line the same way as in step 2. Remember to keep the measurements parallel. 6. Layout any interior post bases using the same technique as the perimeter using two equal measurements and marking them with a string line. 7. The grid formed by the nylon line should be the same as the grid on your plans showing the structural members (girders) which will in turn support the joists, which support the finished deck boards. The intersection of the string lines indicates the center of the post bases. 8. Be sure to check your layout for square using the 3-4-5 right triangle method. Or you can check for square by measuring from opposite corners and comparing the dimensions, they should be equal: within 3/8 inch will be acceptable on this project In the next tutorial we will be pouring concrete in the post bases and attaching the ledger board to the house. SHOP LIST Materials Needed • 24" to 30" stakes. (Use 1x2 wood or metal stakes) Two stakes per corner • 16d nails Tools Needed • 25' tape measure • Carpenters pencil or a permanent marker
  • 4. • 100' "reel" tape, or longer if the diagonal measurement is greater than 100' • 500' of nylon line (this "string" comes in highly visible colors and is good for laying out piers and footings for any construction project) • Hammer • Water level, string level or some other tool to find level.