We are given n jobs where each job is associated with a deadline And profit. If the job is finished before the death .
We have single CPU with non-pre-emptive scheduling.
With each job, we assume arrival time is 0 burst time of each job requirement is 1.
Select a subset of N jobs, such that the job in a subset can be completed within the deadline and generate maximum profit.