ABOUT ARUVIKKUZHI
It is located at Pallickathode,Kottayam having coordinates 9°36′12″N 76°40′2″E.
The waterfall is about 31m in height .
AIM OF PROJECT
• Preliminary study about the feasibility of the hydroelectric
project at the concerned area.
• Design and estimation of the project.
• Detailed study of the implementation of the project in the
area.
The 3 phases of the project
• Phase 1:Collection of data at various times of the year.The data include flow
rate,head,etc.
• Phase 2:Analyze the recorded data to understand the requirements of the
developing project and the problems and solutions.
• Phase 3:A complete report regarding the feasibility and development of the
project.
PRELIMINARY STUDY
A visit to Aruvikkuzhi was done on 21st November 2015.The preliminary observations
recorded are as follows:
• The head of water calculated is 10m.
• Water flow rate is 200 litre/second.
• The output power is approximately 19.6 kW.
Again,a visit was conducted at Aruvikkuzhi on 9th January 2016.The observations then
recorded are:
• The head of water calculated is 10m.
• Water flow rate is 180 litre/second.
• The output power is approximately 17.6 kW.
Significance of the project
• If the project is feasible,the next step is the implementation of the hydel project.
• The implemented project will provide electricity to the village nearby.
• Electronic load control.
DESCRIPTION ABOUT THE ANALYSIS
• By the observation of various parameters,the water fall is checked for sufficient
flow rate for most part of an year.
• The site is checked whether there is adequate space to build the power house.
• By the analysis of head and flow rate,the output power is calculated.
• These data are analyzed throughout the year .
• The feasibility of the project is thus checked.
• The estimation and cost can be calculated if feasible.
Similar Projects
Similar micro hydro electric project done in Kerala:
Mankulam Micro Hydro Electric Power Project(Near Munnar in Idukki)
The output power is 110kW.It comprises of two 55kW turgo-impulse generators with
a net head of 70m and a discharge of 0.1 cubic metre per second.The annual
generation estimated is 4.5 Lakh kWh.The plant is synchronised to a 11kV grid of KSEB
through a step up transformer.
PROJECT BUDGET
Sl No Specifications Amount
1 Equipments Rs 15000
2 Consumables Rs 5000
3 Travelling Rs 2000
4 Research Literature Rs 1000
5 Contingency Rs 2000
Total RS 25000
PICTURES OF THE WATER FALL
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT
NAMES OF INVESTIGATORS
a) Principal Investigator : Rajesh K (Assistant Professor)
b) Co-Investigator : Haseena A (Assistant Professor)
c) Student Investigators : Aishwarya Raphael (S6 EEE)
Gokul G (S6 EEE)
Noel Toms (S6 EEE)
Ponnu Chandran (S6 EEE)
Vaisakh Shanmughan (S6 EEE)
DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT

More Related Content

PDF
HydrogenStoragePoster
PDF
Wind Resource Assessment
PPT
Sam Chapman | Electricity Sensitivity
DOCX
final new c.v
PDF
Small Council, Big Vision, Bigger Savings - AIRAH Pre-loved Buildings 2014
PPT
GeoExchange Heating and Cooling: The 5 Slide Challenge
PPTX
Harnessing the WhirlWind by AVE Technology
PDF
Best School Presentation - KV NTPC Kayamkulam Sulekha Rani.R 22-4-13
HydrogenStoragePoster
Wind Resource Assessment
Sam Chapman | Electricity Sensitivity
final new c.v
Small Council, Big Vision, Bigger Savings - AIRAH Pre-loved Buildings 2014
GeoExchange Heating and Cooling: The 5 Slide Challenge
Harnessing the WhirlWind by AVE Technology
Best School Presentation - KV NTPC Kayamkulam Sulekha Rani.R 22-4-13

Viewers also liked (18)

PPT
PPT
Mercy to Living Beings - Jiva Karunya Panchakam
PDF
Shoaib Report
PPTX
NTPC KAHALGAON BIHAR
PPTX
NTPC DADRI.
PDF
ntpc soft
PPTX
Presentation Prerana bhavan
DOCX
Internship report RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
PDF
Malabar cements internship report
PDF
Final Report
DOCX
Project on Corporate Social Responsibility
PPT
Ntpc badarpur training ppt
PPTX
Micro hydro power plant
PPT
Micro hydro power plant
PDF
ambuja cement report
PDF
Performance Evaluation of Small Hydro Power Plant
PDF
Ambuja cement project report
Mercy to Living Beings - Jiva Karunya Panchakam
Shoaib Report
NTPC KAHALGAON BIHAR
NTPC DADRI.
ntpc soft
Presentation Prerana bhavan
Internship report RAJIV GANDHI COMBINED CYCLE POWER PLANT-NTPC LTD. Kayamkulam
Malabar cements internship report
Final Report
Project on Corporate Social Responsibility
Ntpc badarpur training ppt
Micro hydro power plant
Micro hydro power plant
ambuja cement report
Performance Evaluation of Small Hydro Power Plant
Ambuja cement project report
Ad

Similar to DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT (20)

PPT
SMALL HYDRO POWER PLANT
PPTX
Design of microhydro turbine for sewage treatment plant.
PPTX
Summer Training Presentation
PPTX
4th yer ppt
PDF
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
PPTX
sadiq proposal.pptx am student I still learning from the above Matters in t...
PPTX
Piezo Electric Based Harvesting
PPTX
Quaid‑e‑Azam Solar Park 1.pptx
PPT
Small hydropower potentials
PPTX
Micro Hydrro electricc projects
DOCX
Low cost automatic water level control for domestic or industrial applicat...
PPTX
HPE unit1, &3.pptx_building materials and motata
DOC
Copy of BhaskarSarkar_AECOM
PDF
Final Year Project
PDF
KE House Solar Project Highlights Dec 2016
PPTX
GENERATING A POWER THROUGH WAVE AND TIDAL ENERGY... (1) (1).pptx
PPTX
Micro-hydropower’s.pptx
PPTX
Hydro Energy Technology
PDF
050218 chapter 10 microhydro plant
DOC
Yogesh 8th sem project report
SMALL HYDRO POWER PLANT
Design of microhydro turbine for sewage treatment plant.
Summer Training Presentation
4th yer ppt
IRJET- Design of Small Hydro Electric Power Plant at Cheeyappara
sadiq proposal.pptx am student I still learning from the above Matters in t...
Piezo Electric Based Harvesting
Quaid‑e‑Azam Solar Park 1.pptx
Small hydropower potentials
Micro Hydrro electricc projects
Low cost automatic water level control for domestic or industrial applicat...
HPE unit1, &3.pptx_building materials and motata
Copy of BhaskarSarkar_AECOM
Final Year Project
KE House Solar Project Highlights Dec 2016
GENERATING A POWER THROUGH WAVE AND TIDAL ENERGY... (1) (1).pptx
Micro-hydropower’s.pptx
Hydro Energy Technology
050218 chapter 10 microhydro plant
Yogesh 8th sem project report
Ad

DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT

  • 1. DEPARTMENT OF ELECTRICAL ENGINEERING RAJIV GANDHI INSTITUTE OF TECHNOLOGY GOVERNMENT ENGINEERING COLLEGE KOTTAYAM 686501
  • 2. DEVELOPMENT OF MICRO HYDRO-ELECTRIC PROJECT AT ARUVIKKUZHI, KOTTAYAM
  • 3. ABOUT ARUVIKKUZHI It is located at Pallickathode,Kottayam having coordinates 9°36′12″N 76°40′2″E. The waterfall is about 31m in height .
  • 4. AIM OF PROJECT • Preliminary study about the feasibility of the hydroelectric project at the concerned area. • Design and estimation of the project. • Detailed study of the implementation of the project in the area.
  • 5. The 3 phases of the project • Phase 1:Collection of data at various times of the year.The data include flow rate,head,etc. • Phase 2:Analyze the recorded data to understand the requirements of the developing project and the problems and solutions. • Phase 3:A complete report regarding the feasibility and development of the project.
  • 6. PRELIMINARY STUDY A visit to Aruvikkuzhi was done on 21st November 2015.The preliminary observations recorded are as follows: • The head of water calculated is 10m. • Water flow rate is 200 litre/second. • The output power is approximately 19.6 kW. Again,a visit was conducted at Aruvikkuzhi on 9th January 2016.The observations then recorded are: • The head of water calculated is 10m. • Water flow rate is 180 litre/second. • The output power is approximately 17.6 kW.
  • 7. Significance of the project • If the project is feasible,the next step is the implementation of the hydel project. • The implemented project will provide electricity to the village nearby. • Electronic load control.
  • 8. DESCRIPTION ABOUT THE ANALYSIS • By the observation of various parameters,the water fall is checked for sufficient flow rate for most part of an year. • The site is checked whether there is adequate space to build the power house. • By the analysis of head and flow rate,the output power is calculated. • These data are analyzed throughout the year . • The feasibility of the project is thus checked. • The estimation and cost can be calculated if feasible.
  • 9. Similar Projects Similar micro hydro electric project done in Kerala: Mankulam Micro Hydro Electric Power Project(Near Munnar in Idukki) The output power is 110kW.It comprises of two 55kW turgo-impulse generators with a net head of 70m and a discharge of 0.1 cubic metre per second.The annual generation estimated is 4.5 Lakh kWh.The plant is synchronised to a 11kV grid of KSEB through a step up transformer.
  • 10. PROJECT BUDGET Sl No Specifications Amount 1 Equipments Rs 15000 2 Consumables Rs 5000 3 Travelling Rs 2000 4 Research Literature Rs 1000 5 Contingency Rs 2000 Total RS 25000
  • 11. PICTURES OF THE WATER FALL
  • 13. NAMES OF INVESTIGATORS a) Principal Investigator : Rajesh K (Assistant Professor) b) Co-Investigator : Haseena A (Assistant Professor) c) Student Investigators : Aishwarya Raphael (S6 EEE) Gokul G (S6 EEE) Noel Toms (S6 EEE) Ponnu Chandran (S6 EEE) Vaisakh Shanmughan (S6 EEE)