NAME-SUNIL KUMAR MEENA
14-07-2021
1
Different Cross sections of Rails and Railway Station Layout
14-07-2021
2
CROSS SECTION OF BROAD GAUGE
TRACK
14-07-2021
3
CROSS SECTION OF BROAD GAUGE
TRACK
 Horizontal distance from centre of track to face of any platform
wall is 1905 mm (6 ft. 3 in.)
 Minimum horizontal distance of 1600 mm (5ft. 3 in.) from
centre line of track.
14-07-2021
4
DISTANCE B/W CENTRE LINE OF
TRACK TO THE PLATFORM
 Minimum horizontal distance
from center of track to any
structure from RL to 305 mm
above RL
• For existing works -1675 mm
• For new works or alterations to
existing works- 1905 mm
14-07-2021
5
DISTANCE BETWEEN CENTER LINE OF
RAILWAY TRACK TO STRUCTURE
i)For existing works.
 From 305 mm to 4420 mm above RL-- 2135 mm
ii) For new works or alterations to new works
 From 305 mm to1065 mm above R L -- 1905 mm increasing to 2360 mm
 From 1065 mm to 3355 mm -- 2360 mm.
 From 3355 to 4420 mm above rail level-- 2360 mm decreasing to 2135 mm
 From 4420 to 5870 mm above rail level-- 2135 mm decreasing to 915 mm
 Below the rail level up to the formation level on the straight track and curve up
to 875 m -2575 mm
 Below the rail level up to the formation level on the curve Radius< 875m--
2725mm
14-07-2021
6
MINIMUM HORIZONTAL DISTANCE FROM C/LOF
TRACK TO ANY STRUCTURE EXCEPTA PLATFORM
 The distance between any of the crossing conductors and the nearest
traction mast or structure under the most adverse conditions shall
not be less than 5 meters.
 Minimum overhead clearances above top of rail of tracks, shall be
twenty-two feet (22').
14-07-2021
7
CLEARANCE HEIGHT OF ANY STRUCTURE
 The standard height for platforms is 915 mm with a margin
of +0,-25 mm.
 At present, the height of the platforms is 500mm (medium
level) and it will be raised to 840mm (maximum), based on
the requirement at different stations.
14-07-2021
8
HEIGHT OF PLATFORM
 Stair riser heights shall be 7 inches (178 mm) maximum
and 4 inches (102 mm) minimum.
14-07-2021
9
INDIAN RAILWAY STAIRCASE
14-07-2021
10
RAILWAY STATION LAYOUT
14-07-2021
11
LINE DIAGRAM OF THE RAILWAY TRACK
14-07-2021
12
THANK YOU

More Related Content

PPTX
Defects in rails. Railway Engineering
PPTX
Ductile detailing IS 13920
PPTX
1.railway intro and rails
PPTX
Rail fastenings and joints
PPTX
Points and crossings
PPTX
Coning of Wheels in Railways & Rail Creep
PPTX
Sleepers and Ballast
PPTX
Railway Engineering - Geometric design of track
Defects in rails. Railway Engineering
Ductile detailing IS 13920
1.railway intro and rails
Rail fastenings and joints
Points and crossings
Coning of Wheels in Railways & Rail Creep
Sleepers and Ballast
Railway Engineering - Geometric design of track

What's hot (20)

DOCX
Different types of pile
PPTX
Geometric design of the track
PPTX
Stations and Yards of Railway
PPT
ppt on pavement design
PPTX
Pavement
PPTX
Intersection,types
PPTX
Railway Engineering: Turnouts
PPTX
PERMANANT WAY
PDF
Transition curve ppt (geetansh arora)
PPTX
CONSTRUCTION OF ROADS
PPTX
Bridge Engineering
PPTX
Retaining wall
PPTX
Pile foundation
PPTX
Components of railway track
PPTX
Earth resistant design philosophy
PPT
Rigid pavement
PPTX
Left hand turnout
PPTX
Superelevation
PPT
Bridge
PDF
TERZAGHI’S BEARING CAPACITY THEORY
Different types of pile
Geometric design of the track
Stations and Yards of Railway
ppt on pavement design
Pavement
Intersection,types
Railway Engineering: Turnouts
PERMANANT WAY
Transition curve ppt (geetansh arora)
CONSTRUCTION OF ROADS
Bridge Engineering
Retaining wall
Pile foundation
Components of railway track
Earth resistant design philosophy
Rigid pavement
Left hand turnout
Superelevation
Bridge
TERZAGHI’S BEARING CAPACITY THEORY
Ad

Similar to Different Cross sections of Rail Tracks and Railway Station Layout (20)

PPT
SCHEDULE OF DIMENSIONS design refrerence.ppt
PDF
Thomson Linear Movorail Components
PDF
Thomson movorail components_catalog
PDF
Workstation Bridge Cranes - O'Brien MET-TRACK
PPT
Advanced Automation and Technology in Coal Handling Plants
PPTX
APOEM PLANT LAUNCH
PDF
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
PDF
SEB Cable Pulling & Laying Equipment Catalogue
PDF
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
PDF
Cable Pulling & Laying Equipment for Street Lighting
PPTX
Revised ppt High rise OHE (1).pptx
PDF
CASE Construction Equipment for Sale in UAE - SMAGUAE
PPTX
IIBE ppt at Lucknow dt 25.05.18
PPTX
IIBE ppt at Lucknow dt 25.05.18
PDF
Demag-Jib-Cranes
DOCX
PROJECT ON STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - Copy
PDF
Presentation on track works
PDF
Setap1v16 en
PDF
Cable Drum Lifting Jacks, Pfaff Silberblau
PDF
MULTI PURPOSE WORKING STAND IN METRO WORKSHOP
SCHEDULE OF DIMENSIONS design refrerence.ppt
Thomson Linear Movorail Components
Thomson movorail components_catalog
Workstation Bridge Cranes - O'Brien MET-TRACK
Advanced Automation and Technology in Coal Handling Plants
APOEM PLANT LAUNCH
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
SEB Cable Pulling & Laying Equipment Catalogue
SEB - Cable Pulling & Cable Laying Equipment For Low & High Voltage Cables In...
Cable Pulling & Laying Equipment for Street Lighting
Revised ppt High rise OHE (1).pptx
CASE Construction Equipment for Sale in UAE - SMAGUAE
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
Demag-Jib-Cranes
PROJECT ON STUDY OF COMMUNICATION PROBLEM IN ABB DRIVE - Copy
Presentation on track works
Setap1v16 en
Cable Drum Lifting Jacks, Pfaff Silberblau
MULTI PURPOSE WORKING STAND IN METRO WORKSHOP
Ad

More from Sunil Kumar Meena (9)

PPTX
Structural anaysis and design of g + 5 storey building using bentley stadd pr...
DOCX
Structural anaysis and design of g + 5 storey building using bentley stadd pr...
DOCX
Does PM Modi’s foreign visits help India
PPTX
Railway points, crossings and components
PPTX
Railway Recruitment Board (RRB)
PPTX
UPSC Presentation
PPTX
Different types of rail failures
PPTX
USBRL Railway Project Presentation
PPTX
Transportation Engineering
Structural anaysis and design of g + 5 storey building using bentley stadd pr...
Structural anaysis and design of g + 5 storey building using bentley stadd pr...
Does PM Modi’s foreign visits help India
Railway points, crossings and components
Railway Recruitment Board (RRB)
UPSC Presentation
Different types of rail failures
USBRL Railway Project Presentation
Transportation Engineering

Recently uploaded (20)

DOCX
573137875-Attendance-Management-System-original
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PDF
Well-logging-methods_new................
PPTX
Construction Project Organization Group 2.pptx
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
Geodesy 1.pptx...............................................
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PPT
Total quality management ppt for engineering students
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PPT
introduction to datamining and warehousing
PPT
Mechanical Engineering MATERIALS Selection
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
PPT on Performance Review to get promotions
573137875-Attendance-Management-System-original
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Embodied AI: Ushering in the Next Era of Intelligent Systems
III.4.1.2_The_Space_Environment.p pdffdf
Well-logging-methods_new................
Construction Project Organization Group 2.pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
UNIT 4 Total Quality Management .pptx
Fundamentals of safety and accident prevention -final (1).pptx
Geodesy 1.pptx...............................................
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
Total quality management ppt for engineering students
Fundamentals of Mechanical Engineering.pptx
Categorization of Factors Affecting Classification Algorithms Selection
introduction to datamining and warehousing
Mechanical Engineering MATERIALS Selection
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPT on Performance Review to get promotions

Different Cross sections of Rail Tracks and Railway Station Layout

  • 1. NAME-SUNIL KUMAR MEENA 14-07-2021 1 Different Cross sections of Rails and Railway Station Layout
  • 2. 14-07-2021 2 CROSS SECTION OF BROAD GAUGE TRACK
  • 3. 14-07-2021 3 CROSS SECTION OF BROAD GAUGE TRACK
  • 4.  Horizontal distance from centre of track to face of any platform wall is 1905 mm (6 ft. 3 in.)  Minimum horizontal distance of 1600 mm (5ft. 3 in.) from centre line of track. 14-07-2021 4 DISTANCE B/W CENTRE LINE OF TRACK TO THE PLATFORM
  • 5.  Minimum horizontal distance from center of track to any structure from RL to 305 mm above RL • For existing works -1675 mm • For new works or alterations to existing works- 1905 mm 14-07-2021 5 DISTANCE BETWEEN CENTER LINE OF RAILWAY TRACK TO STRUCTURE
  • 6. i)For existing works.  From 305 mm to 4420 mm above RL-- 2135 mm ii) For new works or alterations to new works  From 305 mm to1065 mm above R L -- 1905 mm increasing to 2360 mm  From 1065 mm to 3355 mm -- 2360 mm.  From 3355 to 4420 mm above rail level-- 2360 mm decreasing to 2135 mm  From 4420 to 5870 mm above rail level-- 2135 mm decreasing to 915 mm  Below the rail level up to the formation level on the straight track and curve up to 875 m -2575 mm  Below the rail level up to the formation level on the curve Radius< 875m-- 2725mm 14-07-2021 6 MINIMUM HORIZONTAL DISTANCE FROM C/LOF TRACK TO ANY STRUCTURE EXCEPTA PLATFORM
  • 7.  The distance between any of the crossing conductors and the nearest traction mast or structure under the most adverse conditions shall not be less than 5 meters.  Minimum overhead clearances above top of rail of tracks, shall be twenty-two feet (22'). 14-07-2021 7 CLEARANCE HEIGHT OF ANY STRUCTURE
  • 8.  The standard height for platforms is 915 mm with a margin of +0,-25 mm.  At present, the height of the platforms is 500mm (medium level) and it will be raised to 840mm (maximum), based on the requirement at different stations. 14-07-2021 8 HEIGHT OF PLATFORM
  • 9.  Stair riser heights shall be 7 inches (178 mm) maximum and 4 inches (102 mm) minimum. 14-07-2021 9 INDIAN RAILWAY STAIRCASE
  • 11. 14-07-2021 11 LINE DIAGRAM OF THE RAILWAY TRACK