Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and
              Applications (IJERA)           ISSN: 2248-9622       www.ijera.com
                          Vol. 2, Issue 4, June-July 2012, pp.712-716

 Risk Management Using Spiral Model for Information Technology
                          Rajendra Ganpatrao Sabale, Dr. A.R Dani
              Student of Ph.D., Singhania University, Pacheri Bari, Dist. Jhunjhunu( Rajasthan), India
                   International Institute of Informational Techonology,Pune(Maharashtra),India



Abstract:
        Now a day almost everything has been digitized and networked either through Local Area Network
or Internet. In this digital era, as organizations use automated information technology (IT) systems to process
information for improved support to achieve their objectives, risk management plays a critical role in
protecting an organization‘s information assets, and therefore its aim, from IT-related risk.
This paper provides information about IT risk management and good practices to follow to minimize risk. It
provides a foundation for the development of an effective risk management policy.

Keywords : automated information, digitized, risk management

Introduction:
1. An effective risk management process is an important component of a successful IT security program. .The risk
management process should not be treated primarily as a technical
function carried out by the IT experts who operate and manage the IT system, but as an essential management
function of the organization. The principal goal of an organization‘s risk management process should be to protect
the organization and its ability to perform their objectives. Risk is the net negative impact of the exercise of
vulnerability, considering both the
probability and the impact of occurrence.

2. Purpose
        Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an
acceptable level. This paper provides groundwork for the development of a successful risk management program,

3. Objective
          The objective of performing risk management is to enable the organization to accomplish its task
 By better securing the IT systems that store, process, or transmit organizational information;
 By enabling management to exercise well-informed risk management decisions to
justify the expenditures that are By assisting management in authorizing (or accrediting) the IT systems on the basis
of the supporting documentation resulting from the performance of risk management.

4. Target Addressees
          This paper provides a common foundation for experienced and inexperienced, technical, and non-technical
personnel who support or use the risk management process for their IT
systems. These personnel include: part of an IT budget;
The Designated Approving Authority whether to allow operation of an IT system
The IT security program manager, who implements the security program
 Information system security officers (ISSO), who are responsible for IT security
 Business or functional managers, who are responsible for the IT procurement process
 Technical support personnel (e.g., network, system, application, and database administrators; computer
specialists; data security analysts), who manage and administer security for the IT systems
 IT system and application programmers who develop and maintain code that could
affect system and data integrity
 Information system auditors, who audit IT systems (DAA), who is respond
 IT consultants, who support clients in risk management.


                                                                                                      712 | P a g e
Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and
              Applications (IJERA)           ISSN: 2248-9622       www.ijera.com
                          Vol. 2, Issue 4, June-July 2012, pp.712-716



 5. IMPORTANCE OF RISK MANAGEMENT
          Risk management encompasses three processes: risk assessment, risk evaluation and. risk mitigation Risk
management is the process that allows IT managers to balance the operational and economic costs of protective
measures. This process is not unique to the IT environment; indeed it pervades decision-making in all areas of daily
routine work. Minimizing negative impact on an organization and need for sound basis in decision making are the
fundamental reasons organizations implement a risk management process for their IT systems. sible for the final
Effective risk management must be totally integrated into the System Development Life Cycle. Risk management
can be performed in support of each system development life cycle phase.
Phase 1—Initiation
• Identified risks are used to support the development of the system requirements, including
security requirements, and a security concept.

Phase 2—Development or Acquisition • The risks identified during this phase can be used to support the security
analyses of the IT system that may lead to architecture and design tradeoffs during system development of
operations (strategy) decision
Phase 3— The risk management process supports the assessment of the system implementation against its
requirements and within its modeled operational environment. Decisions regarding risks identified must be made
prior to system operation
 Phase 4—Operation or Maintenance
• Risk management activities are performed for periodic system reauthorization (or reaccreditations) or whenever
major changes are made to an IT system in its operational, production environment (e.g., new system interfaces)
 Phase 5—Disposal
• Risk management activities are performed for system components that will be disposed of or replaced to ensure
that the hardware and software are properly disposed of, that residual data is appropriately handled, and that system
migration is conducted in a secure and systematic manner
 6. Risk Management Process
 Risk management process involves:
 Identify Organizational Risks: By surveys, interviews, and solicitation of input
across divisions and departments of Probability - The likelihood of risk getting realized
o Inherent Risk - The nature of the risk event
o Mitigation Control Effectiveness - The effectiveness of mitigation plans
6.1 How to identify Risks?
Risk Management application provides tools to quickly put together surveys and polls for gathering inputs from
professionals and employees. This data is then collated into a list of identified risks for the organization. The list can
be reviewed periodically and updated based on existing business scenarios.
A frequently used technique in security analysis, and in particular in risk identification, is so-called structured
brainstorming (HazOp-analysis [18] is a kind of structured brainstorming). It may be understood as a structured
―walk-through‖ of the target of analysis.
          The main idea of structured brainstorming is that a group of people with different competencies and
backgrounds will view the target from different perspectives and therefore identify more, and possibly other, risks
than individuals or a more heterogeneous group. The input to a brainstorming session is various kinds of target
models (e.g. UML models). The models are assessed in a stepwise and structured manner under the guidance of the
security analysis leader. The identified risks are documented by an analysis secretary.
          Construction of a conceptual model based on standardized security risk analysis terminology is first step of
developing language model. the most intuitive and common interpretations are used. The conceptual model can be
seen as a kind of abstract syntax for the language, and is shown in diagram.
The conceptual model using UML class diagram notation




                                                                                                          713 | P a g e
Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and
              Applications (IJERA)           ISSN: 2248-9622       www.ijera.com
                          Vol. 2, Issue 4, June-July 2012, pp.712-716




IT system throughout its SDLC. The conceptual model may be explained as follows: stakeholders are those people
and organizations who may affect, be affected by, or perceive themselves to be affected by, a decision or activity
regarding the target of analysis An asset is something to which a stakeholder directly assigns value, and hence for
which the stakeholder requires protection Assets are subject to vulnerabilities, which are weaknesses which can be
exploited by one or more threats A threat is a potential cause of an unwanted incident

6.2 Risk Assessment
Risk assessment is the first process in the risk management methodology. Organizations use risk assessment to
determine the extent of the potential threat and the risk associated with an Risk is a function of the likelihood of a
given threat-source’s exercising a particular vulnerability, and the resulting impact of that adverse event on the
organization. Consequence is the level of impact that the potential risk event can have on the achievement of
business objectives. Consequence will be measured on a 5 level rating Probability is the likelihood of occurrence of
the potential risk event which may lead to the assessed consequences. Probability will be measured on a 5 level
rating scale in the risk survey (25-Almost Certain, 20-likely, 15-Possible, 10-Unlikely, 5-Rare)

6.2.1 Calculating Inherent Risk
Inherent risk signifies the exposure arising from a specific risk event before any action has been taken to manage it.
Inherent Risk = Consequence X Probability Inherent risk rating will be exhibited on a 4 level rating scale (Extreme
Risk, High Risk, Moderate Risk, Low Risk)




                                                                                                       714 | P a g e
Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and
              Applications (IJERA)           ISSN: 2248-9622       www.ijera.com
                          Vol. 2, Issue 4, June-July 2012, pp.712-716




6.3 Risk Assessment Report
There are different kinds of risk assessment reports. As risk assessment follows risk identification, a lot of these
documents will be based on the risk identification reports. Documentation is done in a systematic way and can be
from different inputs. Some of stakeholder Analysis - Risk Report: This identifies probable risks posed by take
holders and the impact the risk might have on other stakeholders or the project at large. WBS - Risk Report: The
work breakdown structure, broken down to work packages can be assessed for risks. It may detail risks at different
stages based on cost, schedule, resource and manpower factors. Scope - Risk Report: The scope statement or
mission statement may be assessed for risks at the beginning of a project. For example, it could be the impact of a
particular project on the community. Cost Evaluation Risk Report: Cost or funds are at constant risk in a project. It
has to be maintained and controlled with as little deviation as possible from the forecasted values. Risks related to
cost are in the cost evaluation risk reports. Schedule Evaluation Risk Report: Time is luxury that a project cannot
afford. It is imperative that time schedules are met with as little delay as possible. Time delays can impact the
progress of a project and put it at risk. Such risks are documented in the schedule evaluation risk report. Technical
Evaluation Risk Report: Risks related to resources, manpower and departments fall under this category. Risks
arising due to quality constraints and those which are due to design errors and poor planning also fall under this
group.
6.3. Risk Mitigation
A systematic reduction in the extent of exposure to a risk and/or the likelihood of its occurrence is called risk
mitigation. It is also called risk reduction. A solution to mitigate the risk is developed and modeled to determine the
level of reduced risk versus the cost to implement. If the solution provides an acceptable level of reduction in risk
                                                                                                       715 | P a g e
Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and
              Applications (IJERA)           ISSN: 2248-9622       www.ijera.com
                          Vol. 2, Issue 4, June-July 2012, pp.712-716
for the associated cost, then it is considered successful and the process is complete.
          The RMP can be thought of as a spiral model that allows a user to complete the process and then review
the results. If the risk mitigation process was successful, then the process stops at the end of the post-mitigation task.
If the risk or cost is not acceptable, then the entire process is repeated to determine if it can be improved. Best
practices require that the known and perceived risk be analyzed according to the degree and likelihood of the
adverse results that are anticipated to take place. Thereafter, all such risks analyzed shall be documented according
to their levels of priority in a form known as the risk mitigation plan. After which, the development and integration
of the corresponding risk mitigation strategies follows, and shall be referenced against the previously prepared risk
management plan. A risk mitigation plan shall serve as the checklist of the anticipated risks, accordance with degree
of their probability, as High, Medium or Low. Some project managers, however, deem it more appropriate to
categorize the risks as most Likely, Likely or Unlikely. There are different kinds of risk assessment reports. As risk
assessment follows risk identification, a lot of these documents will be based on the risk identification reports.
Documentation is done in a systematic way and can be from different inputs. Some of them are discussed below.

7. Good Security Practice
          The risk assessment process is usually repeated at least every 3 years. However, risk management should
be conducted and integrated in the SDLC for IT systems, not because it is required by law or regulation, but because
it is a good practice and supports the organization‘s business objectives. There should be a specific schedule for
assessing and mitigating mission risks, but the Periodically performed process should also be flexible enough to
allow changes where warranted, such as major changes to the IT system and processing environment due to changes
resulting from policies and new technologies.

8. Keys for Success
         A successful risk management program will rely on
 (1) Senior management‘s commitment. (2) The full support and participation of the IT team
(3) The competence of the risk assessment team, which must have the expertise to apply the risk assessment
methodology to a specific site and system, identify mission risks, and provide cost-effective safeguards that meet the
needs of the organization.
(4) The awareness and cooperation of members of the user community, who must follow procedures and comply
with the implemented controls to safeguard the mission of their organization.
 (5) An ongoing evaluation and assessment of the IT-related mission risks.

Reference :
(1) Risk Management guide by National Institute of Standard Technology.
(2) IT security and risk management by Verizon Business.
(3) A graphical approach to risk identification, motivated by Empirical.




                                                                                                          716 | P a g e

More Related Content

PPT
Information Serurity Risk Assessment Basics
PDF
A Practical Approach to Managing Information System Risk
PDF
Information Security Risk Management
PPTX
Information systems risk assessment frame workisraf 130215042410-phpapp01
PDF
INFORMATION AND COMMUNICATIONS TECHNOLOGY PROGRAM
PPTX
DEVELOPING AN ICT RISK REGISTER
PPTX
Microsoft Risk Management
PDF
Risk Assessments
Information Serurity Risk Assessment Basics
A Practical Approach to Managing Information System Risk
Information Security Risk Management
Information systems risk assessment frame workisraf 130215042410-phpapp01
INFORMATION AND COMMUNICATIONS TECHNOLOGY PROGRAM
DEVELOPING AN ICT RISK REGISTER
Microsoft Risk Management
Risk Assessments

What's hot (20)

PPTX
Step by-step for risk analysis and management-yaser aljohani
PDF
Risk Assessment Case Study
PDF
u10a1-Risk Assessment Report-Beji Jacob
PDF
Relative risk benchmarking enabling better decision making for managing infor...
PPT
Review of Enterprise Security Risk Management
PDF
Designing NextGen Threat Identification Solutions
PPT
Risk Management
PPTX
IT Risk Management
PPTX
Risk Management and Security in Strategic Planning
PDF
Vendor Cybersecurity Governance: Scaling the risk
PPTX
NIST 800 30 revision Sep 2012
PPTX
Information Secuirty Vulnerability Management
PDF
Risk Assessment: Approach to enhance Network Security
PDF
IT-Risk-Management Best Practice
PDF
Octav ethreat profiles
PDF
ISO 27005 Risk Assessment
PDF
Satori Whitepaper: Threat Intelligence - a path to taming digital threats
PPT
Risk Based Security and Self Protection Powerpoint
DOCX
Proactive vs. Reactive Approaches to Software Security Strategy
PPTX
Risk management in Software Industry
Step by-step for risk analysis and management-yaser aljohani
Risk Assessment Case Study
u10a1-Risk Assessment Report-Beji Jacob
Relative risk benchmarking enabling better decision making for managing infor...
Review of Enterprise Security Risk Management
Designing NextGen Threat Identification Solutions
Risk Management
IT Risk Management
Risk Management and Security in Strategic Planning
Vendor Cybersecurity Governance: Scaling the risk
NIST 800 30 revision Sep 2012
Information Secuirty Vulnerability Management
Risk Assessment: Approach to enhance Network Security
IT-Risk-Management Best Practice
Octav ethreat profiles
ISO 27005 Risk Assessment
Satori Whitepaper: Threat Intelligence - a path to taming digital threats
Risk Based Security and Self Protection Powerpoint
Proactive vs. Reactive Approaches to Software Security Strategy
Risk management in Software Industry
Ad

Viewers also liked (20)

PDF
Ck24574578
PDF
Co24593599
PDF
Cu24631635
PDF
Cg24551555
PDF
Dx24785787
PDF
Dn24733737
PDF
De24686692
PDF
Ef24836841
PDF
Ep24889895
DOCX
PPTX
Lost mircevski viktor
PPSX
FELIZ NAVIDAD
PPTX
Ppt 3
ODP
Busuu
ODP
Repositório
PPTX
Comportamento e Influência entre Jogadores num Jogo Social Online
PDF
Presentacion economia
PDF
Ley organica reformatoria ala ley electoral y de organizaciones politicas
PPTX
Escola sustentável
PDF
CurriculumVitae
Ck24574578
Co24593599
Cu24631635
Cg24551555
Dx24785787
Dn24733737
De24686692
Ef24836841
Ep24889895
Lost mircevski viktor
FELIZ NAVIDAD
Ppt 3
Busuu
Repositório
Comportamento e Influência entre Jogadores num Jogo Social Online
Presentacion economia
Ley organica reformatoria ala ley electoral y de organizaciones politicas
Escola sustentável
CurriculumVitae
Ad

Similar to Dj24712716 (20)

DOCX
INFORMATION SECURITY MANAGEMENT
 
PDF
Optimization of different objective function in risk assessment system
PPTX
Step by-step for risk analysis and management-yaser aljohani
PPTX
Information Risk Assessment and Analysis.
PDF
IT Risk managment combined
PDF
Machine learning methods for classification and prediction information securi...
PPT
RiskAssesment.ppt
PDF
Information Technology Risk Management
PPT
ENTERPRISE risk management AWARENESS.ppt
PDF
Hands on IT risk assessment
PPTX
Cyber Security # Lec 3
PPTX
crisc_wk_3.pptx
PDF
Risk assesment template
PPTX
Information Security Risk Management
PPTX
IT Security Bachelor in information technology.pptx
PDF
A-Practical-Guide-to-IT-Risk-Management.pdf
PPTX
Crash Course: Managing Cyber Risk Using Quantitative Analysis
PPT
IT Policy, RISK MANAGEMENT
PPTX
Risk Mitigation
PPT
Project Risk management
INFORMATION SECURITY MANAGEMENT
 
Optimization of different objective function in risk assessment system
Step by-step for risk analysis and management-yaser aljohani
Information Risk Assessment and Analysis.
IT Risk managment combined
Machine learning methods for classification and prediction information securi...
RiskAssesment.ppt
Information Technology Risk Management
ENTERPRISE risk management AWARENESS.ppt
Hands on IT risk assessment
Cyber Security # Lec 3
crisc_wk_3.pptx
Risk assesment template
Information Security Risk Management
IT Security Bachelor in information technology.pptx
A-Practical-Guide-to-IT-Risk-Management.pdf
Crash Course: Managing Cyber Risk Using Quantitative Analysis
IT Policy, RISK MANAGEMENT
Risk Mitigation
Project Risk management

Dj24712716

  • 1. Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 4, June-July 2012, pp.712-716 Risk Management Using Spiral Model for Information Technology Rajendra Ganpatrao Sabale, Dr. A.R Dani Student of Ph.D., Singhania University, Pacheri Bari, Dist. Jhunjhunu( Rajasthan), India International Institute of Informational Techonology,Pune(Maharashtra),India Abstract: Now a day almost everything has been digitized and networked either through Local Area Network or Internet. In this digital era, as organizations use automated information technology (IT) systems to process information for improved support to achieve their objectives, risk management plays a critical role in protecting an organization‘s information assets, and therefore its aim, from IT-related risk. This paper provides information about IT risk management and good practices to follow to minimize risk. It provides a foundation for the development of an effective risk management policy. Keywords : automated information, digitized, risk management Introduction: 1. An effective risk management process is an important component of a successful IT security program. .The risk management process should not be treated primarily as a technical function carried out by the IT experts who operate and manage the IT system, but as an essential management function of the organization. The principal goal of an organization‘s risk management process should be to protect the organization and its ability to perform their objectives. Risk is the net negative impact of the exercise of vulnerability, considering both the probability and the impact of occurrence. 2. Purpose Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. This paper provides groundwork for the development of a successful risk management program, 3. Objective The objective of performing risk management is to enable the organization to accomplish its task  By better securing the IT systems that store, process, or transmit organizational information;  By enabling management to exercise well-informed risk management decisions to justify the expenditures that are By assisting management in authorizing (or accrediting) the IT systems on the basis of the supporting documentation resulting from the performance of risk management. 4. Target Addressees This paper provides a common foundation for experienced and inexperienced, technical, and non-technical personnel who support or use the risk management process for their IT systems. These personnel include: part of an IT budget; The Designated Approving Authority whether to allow operation of an IT system The IT security program manager, who implements the security program  Information system security officers (ISSO), who are responsible for IT security  Business or functional managers, who are responsible for the IT procurement process  Technical support personnel (e.g., network, system, application, and database administrators; computer specialists; data security analysts), who manage and administer security for the IT systems  IT system and application programmers who develop and maintain code that could affect system and data integrity  Information system auditors, who audit IT systems (DAA), who is respond  IT consultants, who support clients in risk management. 712 | P a g e
  • 2. Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 4, June-July 2012, pp.712-716 5. IMPORTANCE OF RISK MANAGEMENT Risk management encompasses three processes: risk assessment, risk evaluation and. risk mitigation Risk management is the process that allows IT managers to balance the operational and economic costs of protective measures. This process is not unique to the IT environment; indeed it pervades decision-making in all areas of daily routine work. Minimizing negative impact on an organization and need for sound basis in decision making are the fundamental reasons organizations implement a risk management process for their IT systems. sible for the final Effective risk management must be totally integrated into the System Development Life Cycle. Risk management can be performed in support of each system development life cycle phase. Phase 1—Initiation • Identified risks are used to support the development of the system requirements, including security requirements, and a security concept. Phase 2—Development or Acquisition • The risks identified during this phase can be used to support the security analyses of the IT system that may lead to architecture and design tradeoffs during system development of operations (strategy) decision Phase 3— The risk management process supports the assessment of the system implementation against its requirements and within its modeled operational environment. Decisions regarding risks identified must be made prior to system operation Phase 4—Operation or Maintenance • Risk management activities are performed for periodic system reauthorization (or reaccreditations) or whenever major changes are made to an IT system in its operational, production environment (e.g., new system interfaces) Phase 5—Disposal • Risk management activities are performed for system components that will be disposed of or replaced to ensure that the hardware and software are properly disposed of, that residual data is appropriately handled, and that system migration is conducted in a secure and systematic manner 6. Risk Management Process Risk management process involves:  Identify Organizational Risks: By surveys, interviews, and solicitation of input across divisions and departments of Probability - The likelihood of risk getting realized o Inherent Risk - The nature of the risk event o Mitigation Control Effectiveness - The effectiveness of mitigation plans 6.1 How to identify Risks? Risk Management application provides tools to quickly put together surveys and polls for gathering inputs from professionals and employees. This data is then collated into a list of identified risks for the organization. The list can be reviewed periodically and updated based on existing business scenarios. A frequently used technique in security analysis, and in particular in risk identification, is so-called structured brainstorming (HazOp-analysis [18] is a kind of structured brainstorming). It may be understood as a structured ―walk-through‖ of the target of analysis. The main idea of structured brainstorming is that a group of people with different competencies and backgrounds will view the target from different perspectives and therefore identify more, and possibly other, risks than individuals or a more heterogeneous group. The input to a brainstorming session is various kinds of target models (e.g. UML models). The models are assessed in a stepwise and structured manner under the guidance of the security analysis leader. The identified risks are documented by an analysis secretary. Construction of a conceptual model based on standardized security risk analysis terminology is first step of developing language model. the most intuitive and common interpretations are used. The conceptual model can be seen as a kind of abstract syntax for the language, and is shown in diagram. The conceptual model using UML class diagram notation 713 | P a g e
  • 3. Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 4, June-July 2012, pp.712-716 IT system throughout its SDLC. The conceptual model may be explained as follows: stakeholders are those people and organizations who may affect, be affected by, or perceive themselves to be affected by, a decision or activity regarding the target of analysis An asset is something to which a stakeholder directly assigns value, and hence for which the stakeholder requires protection Assets are subject to vulnerabilities, which are weaknesses which can be exploited by one or more threats A threat is a potential cause of an unwanted incident 6.2 Risk Assessment Risk assessment is the first process in the risk management methodology. Organizations use risk assessment to determine the extent of the potential threat and the risk associated with an Risk is a function of the likelihood of a given threat-source’s exercising a particular vulnerability, and the resulting impact of that adverse event on the organization. Consequence is the level of impact that the potential risk event can have on the achievement of business objectives. Consequence will be measured on a 5 level rating Probability is the likelihood of occurrence of the potential risk event which may lead to the assessed consequences. Probability will be measured on a 5 level rating scale in the risk survey (25-Almost Certain, 20-likely, 15-Possible, 10-Unlikely, 5-Rare) 6.2.1 Calculating Inherent Risk Inherent risk signifies the exposure arising from a specific risk event before any action has been taken to manage it. Inherent Risk = Consequence X Probability Inherent risk rating will be exhibited on a 4 level rating scale (Extreme Risk, High Risk, Moderate Risk, Low Risk) 714 | P a g e
  • 4. Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 4, June-July 2012, pp.712-716 6.3 Risk Assessment Report There are different kinds of risk assessment reports. As risk assessment follows risk identification, a lot of these documents will be based on the risk identification reports. Documentation is done in a systematic way and can be from different inputs. Some of stakeholder Analysis - Risk Report: This identifies probable risks posed by take holders and the impact the risk might have on other stakeholders or the project at large. WBS - Risk Report: The work breakdown structure, broken down to work packages can be assessed for risks. It may detail risks at different stages based on cost, schedule, resource and manpower factors. Scope - Risk Report: The scope statement or mission statement may be assessed for risks at the beginning of a project. For example, it could be the impact of a particular project on the community. Cost Evaluation Risk Report: Cost or funds are at constant risk in a project. It has to be maintained and controlled with as little deviation as possible from the forecasted values. Risks related to cost are in the cost evaluation risk reports. Schedule Evaluation Risk Report: Time is luxury that a project cannot afford. It is imperative that time schedules are met with as little delay as possible. Time delays can impact the progress of a project and put it at risk. Such risks are documented in the schedule evaluation risk report. Technical Evaluation Risk Report: Risks related to resources, manpower and departments fall under this category. Risks arising due to quality constraints and those which are due to design errors and poor planning also fall under this group. 6.3. Risk Mitigation A systematic reduction in the extent of exposure to a risk and/or the likelihood of its occurrence is called risk mitigation. It is also called risk reduction. A solution to mitigate the risk is developed and modeled to determine the level of reduced risk versus the cost to implement. If the solution provides an acceptable level of reduction in risk 715 | P a g e
  • 5. Rajendra Ganpatrao Sabale, Dr. A.R Dani / International Journal of Engineering Research and Applications (IJERA) ISSN: 2248-9622 www.ijera.com Vol. 2, Issue 4, June-July 2012, pp.712-716 for the associated cost, then it is considered successful and the process is complete. The RMP can be thought of as a spiral model that allows a user to complete the process and then review the results. If the risk mitigation process was successful, then the process stops at the end of the post-mitigation task. If the risk or cost is not acceptable, then the entire process is repeated to determine if it can be improved. Best practices require that the known and perceived risk be analyzed according to the degree and likelihood of the adverse results that are anticipated to take place. Thereafter, all such risks analyzed shall be documented according to their levels of priority in a form known as the risk mitigation plan. After which, the development and integration of the corresponding risk mitigation strategies follows, and shall be referenced against the previously prepared risk management plan. A risk mitigation plan shall serve as the checklist of the anticipated risks, accordance with degree of their probability, as High, Medium or Low. Some project managers, however, deem it more appropriate to categorize the risks as most Likely, Likely or Unlikely. There are different kinds of risk assessment reports. As risk assessment follows risk identification, a lot of these documents will be based on the risk identification reports. Documentation is done in a systematic way and can be from different inputs. Some of them are discussed below. 7. Good Security Practice The risk assessment process is usually repeated at least every 3 years. However, risk management should be conducted and integrated in the SDLC for IT systems, not because it is required by law or regulation, but because it is a good practice and supports the organization‘s business objectives. There should be a specific schedule for assessing and mitigating mission risks, but the Periodically performed process should also be flexible enough to allow changes where warranted, such as major changes to the IT system and processing environment due to changes resulting from policies and new technologies. 8. Keys for Success A successful risk management program will rely on (1) Senior management‘s commitment. (2) The full support and participation of the IT team (3) The competence of the risk assessment team, which must have the expertise to apply the risk assessment methodology to a specific site and system, identify mission risks, and provide cost-effective safeguards that meet the needs of the organization. (4) The awareness and cooperation of members of the user community, who must follow procedures and comply with the implemented controls to safeguard the mission of their organization. (5) An ongoing evaluation and assessment of the IT-related mission risks. Reference : (1) Risk Management guide by National Institute of Standard Technology. (2) IT security and risk management by Verizon Business. (3) A graphical approach to risk identification, motivated by Empirical. 716 | P a g e