Six Sigma DMAIC
Maryam Rehmat | Process Engineer.
Arooj Un Nisa
| Process Engineer.

Boutique product development company

It is amazing what you can accomplish when you have a client-centric team to deliver outstanding products.
Process Improvement begins with ‘‘Thinking
Big’’ and ‘‘Starting Small’’
If it can’t be thought, it can’t be done.

Six Sigma-Process Improvement Approach
 Six Sigma Introduction
 DMAIC

 Key activities in DMAIC phases
 Simobo-Case study
Maryam Rehmat Process Engg.
Six Sigma –Process Improvement Approach

Introduction to Six Sigma

What is Six Sigma?
Six Sigma is a proven, data-driven suite of improvement
methodologies based on a common philosophy
supported by measurement and tools for process and
product Improvement.
Maryam Rehmat Process Engg.
Philosophy Behind
Six sigma philosophy states that defects can be eliminated by reducing
variations.

Reduced variations mean:

•

Improved Customer satisfaction

•

Reduced operating costs

•

Increased profitability
Maryam Rehmat Process Engg.
Sigma Level

It is, where a process or product performance falls when compared to
customer specification.

Table of levels with DPMO

Maryam Rehmat Process Engg.
Primary Goals of Six Sigma
The quest to reduce variation consists of two primary goals to be
achieved in the following sequence:

1. Reduce Spread: Increase process precision or reduce variation

2. Center the process: Increase process accuracy

Maryam Rehmat Process Engg.
Improvement Methodologies
Six Sigma

DMAIC

DFSS

LSS

 DMAIC: for process improvement by reducing process variation
and defects.
 Design for Six Sigma: for designing new processes and products
 Lean Six Sigma: for improving process efficiency and speed.
Maryam Rehmat Process Engg.
What is DMAIC?
A problem solving method that is a roadmap which can be used for any
projects or quality improvements that needs to be made.

Maryam Rehmat Process Engg.
Why DMAIC?

This methodology should be used when a product or process is in
existence at your company but is not meeting customer specification or

is not performing adequately.

Maryam Rehmat Process Engg.
Question arises:

Why is DMAIC suitable for our environment?
Because:

We have processes BUT don’t know how are we doing with’em
So, We want to know,
Are we meeting our customer specifications?
If YES then to what extent ?
Where do our processes lay?

Maryam Rehmat Process Engg.
What are DMAIC phases ?

Maryam Rehmat Process Engg.
D- DEFINE THE PROBLEM.
The Define Phase is the first phase of the Six Sigma improvement
process. In this phase, the leaders of the project create a Project
Charter, create a high-level view of the process, and begin to
understand the needs of the customers of the process.

Maryam Rehmat Process Engg.
MEASURE- MAP OUT THE CURRENT
PROBLEM
In the Measure Phase, the team focuses on data collection. They have
two goals:
• Determine the start point or baseline of the process and
• Find clues to understand the root cause of the problem in the process.

Maryam Rehmat Process Engg.
ANALYSE-IDENTIFY THE CAUSE OF THE
PROBLEM
In the Analyze Phase, data collected during the Measure Phase is
reviewed.
Both the data and the process are analysed, in an effort to narrow down
and verify the root causes of waste and defects.

Maryam Rehmat Process Engg.
IMPROVE- IMPLEMENT AND VERIFY THE
SOLUTION
In the Improve Phase, the team moves on to solution development.
A structured improvement effort can lead to innovative and elegant
solutions.

Maryam Rehmat Process Engg.
CONTROL- MAINTAIN THE SOLUTION
In the Control Phase, the team begins to document exactly how they
want to sustain improvements by passing process improvement
infrastructure on to the employees who work within the process.

Maryam Rehmat Process Engg.
DMAIC Overview and Simobo

Case Study Demonstration

Arooj Un Nisa Process Engg.
D
Key activities in the Define phase are:
Define the problem statement or improvement opportunity in a way that
effectively
articulates why the Six Sigma project is necessary and why it is
necessary right now.


Develop the project charter.



Map the current process.



Gather the voice of the customer (VOC).



Form the project team.

Arooj Un Nisa Process Engg.
M
Key activities in the Measure phase are:


Identify the measurements to collect



Develop and execute the measurements collection plan



Develop and validate the measurement system



Identify baseline performance measurements DPMO and sigma
level

Arooj Un Nisa Process Engg.
A
Key activities in the Analyze phase are:


Stratify data to identify the underlying problem(s).



Identify root causes.



Validate root causes.

Arooj Un Nisa Process Engg.
I
Key activities in the Improve phase include the following:


Identify potential solutions.



Evaluate and select potential solutions.

Arooj Un Nisa Process Engg.
C
Key activities in Control phase include the following:


Pilot potential solutions (if needed).



Evaluate pilot results (if applicable).



Develop the control plan.



Develop the change implementation plan.



Develop procedures, standards, and training material.



Deliver training.



Communicate improvements.



Implement improvements.
Arooj Un Nisa Process Engg.
Define Phase Activities performed on Simobo

PROJECT CHARTER
TITLE

Managing and Enhancing Quality of our Product Simobo by reducing the number
of support issues and non-conformities.

BUSINESS CASE

The IT industries have a lot of work in their domain but the satisfied customers
are achieved only by High Quality Products
This can only be achieved by
o Increased Quality Service Time
o Reducing Cost (Development and Maintenance)

PROBLEM STATEMENT

Confiz Solutions is committed to provide cost effective and efficient solutions to
their customers. This can be achieved by Enhancing Quality of Simobo by reducing
the number of support issues and non-conformities

OBJECTIVES

Reduction in Number of Support Issues and Defects

METRICES

Correctness, which is measured by Defect Density
Defect Density = (number of Defects/size of product in LOC ) * 100

SCOPE

Development and maintenance of Simobo.

PROJECT SCHEDULE

o
o
o
o
o

Define Phase
Measure Phase
Analyze Phase
Improve Phase
Control Phase

PROJECT MEMBERS

o
o

Maryam Rehmat
Arooj Un Nisa
DMAIC-Six sigma process Improvement Approach
SIPOC
Supplier

input

process

output

customer








1. Domain Ramp up
2. Requirement
Analysis
3. Insight to Design
specifications
4. UI Testing
5. Functional testing
6. Integration testing
7. Defect logging
8. Defect verification
9. Defect closing
10. Defect responding








Development team
Design team
QA team
I.T team





Client
Requirements
Design
specifications
PSD’S
Code

Defects/Bugs
Build Status Report
Features

Developer
I.T team
KPI’S AND KPO’S
KEY PROCESS INPUTS

KEY PROCESS OUTPUTS

Qualification

Defect Density

Experience

Bugs

LOC

Arooj Un Nisa Process Engg.
MEASURE PHASE-PARETO CHART

Arooj Un Nisa Process Engg.
CAUSE AND EFFECT DIAGRAM

Arooj Un Nisa Process Engg.
HISTOGRAM

Arooj Un Nisa Process Engg.
PROBABILITY PLOT

Arooj Un Nisa Process Engg.
CURRENT SIGMA LEVEL

Arooj Un Nisa Process Engg.
Process Capability

Arooj Un Nisa Process Engg.
ANALYSE PHASE
TESTING OF HYPOTHESIS
Our company is facing some support issues and we want to decrease
these support issues to 5% so for this we have to hypothesize:
Null Hypothesis:
Support issues are >=5%.
Alternate hypothesis:
Support issues are< 5%.

Arooj Un Nisa Process Engg.
IMPROVE PHASE DESIGN OF EXPERIMENTS

Arooj Un Nisa Process Engg.
Arooj Un Nisa Process Engg.
Arooj Un Nisa Process Engg.
CONTROL PHASE FMEA (Failure Mode and Effect Analysis)
Potential Failure Effect

SEV

Potential Causes

OCC

Current Controls

DET

RPN

Actions recommended

Resp.

Missing features

Poor quality app

10

Wrong time estimates

1

Increased no of resources

0

0

Add cushion time in estimates,
Start domain ramp up at requirement elicitation
phase

Usman

Missing requirements

Design is not according to
requirements

6

Negligence,
No Requirement
documentation

1

Increased no of resources

0

0

Involve QA at this stage
Document requirements properly

Aymen

No traceability of
requirements

Cosmetic defects in App

9

PSD’s not
provided/overlooked

1

Requirements mapped manually

0

0

Make sure to provide PSD’s in domain ramp up

Aymen

Incomplete elements
exploration

Poor user interface with low
usability

8

Negligence
Test scenarios missing

2

Reviews by mentors

1

16

Trainings

Aymen

Incomplete Requirement
Analysis

Non confirming products

10

Time bounds
Neglecting
Requirements/feature

1

Increased resources
Reviews by mentors

2

20

Prepare Requirement traceability matrix

Aymen

Incomplete product

Customer dis-satisfaction

10

Incomplete domain ramp
up/feature exploration

2

Increased resources

3

60

Prepare Sanity checklist

Aymen

Defects not logged/
Ambiguous Description

Incomplete fixation

5

Lack of
training/communication
issues

1

Unit testing
Increase resources

0

0

Comm. Skills Training

Aymen

Ripple effect/ regression
testing missing

Bugs in App

8

Negligence
No time for Halo testing

1

Cross check by other resource
Increased resources

0

0

Correct estimates for testing of a sprint/build

Aymen

Closed without verification

defective product

9

Time bounds
Negligence

1

Verification by Pm

0

0

Review after build or sprint

Aymen

Reopened without verification

Development overhead
resource wastage

6

Incomplete testing
Misunderstanding

1

Verification by Pm and Unit testing
by Dev.

0

0

Review after build

Aymen

Defect
Reopening

Defect
closing

Defect
Verification

Defect logging

Integration
Testing

Functional
Testing

UI Testing

Insight to
Design
Specificatio
ns

Requirement
Analysis

Domain
Ramp up

Process
Step

Potential Failure Mode
Arooj Un Nisa Process Engg.
Arooj Un Nisa Process Engg.
Little Cast-Sigma Level

Defects

284

Opportunities

Total Units

7

8445

DPU

0.033629366

DPO

DPMO

Yeild

0.0048042

4804.195 0.9951958

Sigma Level

4.089612921

Arooj Un Nisa Process Engg.
Thank You !

More Related Content

PDF
Lean six sigma black belt project by iftakhar
PDF
Six Sigma DMAIC Case Study
PPTX
DMAIC Methodolgy
PPT
Six sigma green belt project template
PPTX
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
PDF
Six sigma-black-belt-project-sample
PDF
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
PPT
Dmaic
Lean six sigma black belt project by iftakhar
Six Sigma DMAIC Case Study
DMAIC Methodolgy
Six sigma green belt project template
six sigma DMAIC approach for reducing quality defects of camshaft binding pro...
Six sigma-black-belt-project-sample
How A Single Black Belt Project Jump Starts a Successful Lean Six Sigma Effort
Dmaic

What's hot (20)

PPTX
Kaizen
PDF
Lean Six Sigma: DMAIC In-Depth
PPT
Lean Manufacturing and Principles
PDF
Lean Six Sigma methodology
PDF
Kaizen training
PPT
Six Sigma and Its Implementation
PPTX
Six Sigma Green Belt
PPTX
Lean 6 sigma
PPTX
SIX SIGMA Green Belt Training
PPTX
Six Sigma Yellow Belt
PPT
Spc training
PPTX
Lean manufacturing
PDF
Kaizen Ppt
PPT
Lean Manufacturing Training
PDF
Seven QC Tools Training; Quiz
PDF
Introduction to Lean Six Sigma
PPTX
Lean Manufacturing PowerPoint Presentation Sample
PPTX
Lean six sigma Yellow Belt Complete training
PPTX
PPTX
Kaizen
Kaizen
Lean Six Sigma: DMAIC In-Depth
Lean Manufacturing and Principles
Lean Six Sigma methodology
Kaizen training
Six Sigma and Its Implementation
Six Sigma Green Belt
Lean 6 sigma
SIX SIGMA Green Belt Training
Six Sigma Yellow Belt
Spc training
Lean manufacturing
Kaizen Ppt
Lean Manufacturing Training
Seven QC Tools Training; Quiz
Introduction to Lean Six Sigma
Lean Manufacturing PowerPoint Presentation Sample
Lean six sigma Yellow Belt Complete training
Kaizen
Ad

Similar to DMAIC-Six sigma process Improvement Approach (20)

PDF
What Is Six Sigma? An Introduction for Technical Writers
PDF
PPT
Six sigma awareness
PPT
Overview Six sigma by D&H Engineers
PPT
QM-029-Six Sigma Overview
PPTX
Six sigma
PPT
Basic Six Sigma Presentation
PPT
Six Sigma For Managers
PPTX
Six-Sigma Concept in Quality management.pptx
PPTX
Six Sigma Presentation on Yellow beltions
PPT
Six sigma for beginners
PPTX
Lean Six Sigma Overview (presentation version)
PPTX
Six Sigma
PPTX
Understand dmaic
PDF
Improving Pharmacy Quality Using Six Sigma
PPTX
Lean Six Sigma Overview (print version)
PPT
yellow belt training
PPT
Six Sigma For Managers
PPT
Six Sigma For Managers 185
What Is Six Sigma? An Introduction for Technical Writers
Six sigma awareness
Overview Six sigma by D&H Engineers
QM-029-Six Sigma Overview
Six sigma
Basic Six Sigma Presentation
Six Sigma For Managers
Six-Sigma Concept in Quality management.pptx
Six Sigma Presentation on Yellow beltions
Six sigma for beginners
Lean Six Sigma Overview (presentation version)
Six Sigma
Understand dmaic
Improving Pharmacy Quality Using Six Sigma
Lean Six Sigma Overview (print version)
yellow belt training
Six Sigma For Managers
Six Sigma For Managers 185
Ad

More from Confiz (20)

PDF
Agile training workshop
PDF
Web services with laravel
PDF
What is UFT? HP's unified functional testing.
PDF
Software testing methods, levels and types
PDF
Sqa, test scenarios and test cases
PDF
Solid principles of oo design
PPTX
Entity framework code first
PDF
Security testing presentation
PDF
Ts seo t ech session
PDF
Learning as a creative professional
PDF
Learning as a creative professional
PDF
Ts archiving
PDF
Advance text rendering in i os
PDF
Ts threading
PDF
Ts android supporting multiple screen
PDF
Ts drupal6 module development v0.2
PDF
Photoshop manners
PDF
Monkey talk
PDF
An insight to microsoft platform
PDF
Ts branching over the top
Agile training workshop
Web services with laravel
What is UFT? HP's unified functional testing.
Software testing methods, levels and types
Sqa, test scenarios and test cases
Solid principles of oo design
Entity framework code first
Security testing presentation
Ts seo t ech session
Learning as a creative professional
Learning as a creative professional
Ts archiving
Advance text rendering in i os
Ts threading
Ts android supporting multiple screen
Ts drupal6 module development v0.2
Photoshop manners
Monkey talk
An insight to microsoft platform
Ts branching over the top

Recently uploaded (20)

PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
HR Introduction Slide (1).pptx on hr intro
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PPT
Chapter four Project-Preparation material
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
DOCX
Business Management - unit 1 and 2
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
Leading with Vision_ How Mohit Bansal Is Shaping Chandigarh’s Real Estate Ren...
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PPTX
Starting the business from scratch using well proven technique
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PPTX
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive
Nidhal Samdaie CV - International Business Consultant
Reconciliation AND MEMORANDUM RECONCILATION
HR Introduction Slide (1).pptx on hr intro
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
340036916-American-Literature-Literary-Period-Overview.ppt
Chapter four Project-Preparation material
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Business Management - unit 1 and 2
Unit 1 Cost Accounting - Cost sheet
COST SHEET- Tender and Quotation unit 2.pdf
Laughter Yoga Basic Learning Workshop Manual
Leading with Vision_ How Mohit Bansal Is Shaping Chandigarh’s Real Estate Ren...
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
Starting the business from scratch using well proven technique
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
The Marketing Journey - Tracey Phillips - Marketing Matters 7-2025.pptx
Euro SEO Services 1st 3 General Updates.docx
Dr. Enrique Segura Ense Group - A Self-Made Entrepreneur And Executive

DMAIC-Six sigma process Improvement Approach

  • 1. Boutique product development company It is amazing what you can accomplish when you have a client-centric team to deliver outstanding products.
  • 2. Six Sigma DMAIC Maryam Rehmat | Process Engineer. Arooj Un Nisa | Process Engineer. Boutique product development company It is amazing what you can accomplish when you have a client-centric team to deliver outstanding products.
  • 3. Process Improvement begins with ‘‘Thinking Big’’ and ‘‘Starting Small’’ If it can’t be thought, it can’t be done. Six Sigma-Process Improvement Approach  Six Sigma Introduction  DMAIC  Key activities in DMAIC phases  Simobo-Case study Maryam Rehmat Process Engg.
  • 4. Six Sigma –Process Improvement Approach Introduction to Six Sigma What is Six Sigma? Six Sigma is a proven, data-driven suite of improvement methodologies based on a common philosophy supported by measurement and tools for process and product Improvement. Maryam Rehmat Process Engg.
  • 5. Philosophy Behind Six sigma philosophy states that defects can be eliminated by reducing variations. Reduced variations mean: • Improved Customer satisfaction • Reduced operating costs • Increased profitability Maryam Rehmat Process Engg.
  • 6. Sigma Level It is, where a process or product performance falls when compared to customer specification. Table of levels with DPMO Maryam Rehmat Process Engg.
  • 7. Primary Goals of Six Sigma The quest to reduce variation consists of two primary goals to be achieved in the following sequence: 1. Reduce Spread: Increase process precision or reduce variation 2. Center the process: Increase process accuracy Maryam Rehmat Process Engg.
  • 8. Improvement Methodologies Six Sigma DMAIC DFSS LSS  DMAIC: for process improvement by reducing process variation and defects.  Design for Six Sigma: for designing new processes and products  Lean Six Sigma: for improving process efficiency and speed. Maryam Rehmat Process Engg.
  • 9. What is DMAIC? A problem solving method that is a roadmap which can be used for any projects or quality improvements that needs to be made. Maryam Rehmat Process Engg.
  • 10. Why DMAIC? This methodology should be used when a product or process is in existence at your company but is not meeting customer specification or is not performing adequately. Maryam Rehmat Process Engg.
  • 11. Question arises: Why is DMAIC suitable for our environment? Because: We have processes BUT don’t know how are we doing with’em So, We want to know, Are we meeting our customer specifications? If YES then to what extent ? Where do our processes lay? Maryam Rehmat Process Engg.
  • 12. What are DMAIC phases ? Maryam Rehmat Process Engg.
  • 13. D- DEFINE THE PROBLEM. The Define Phase is the first phase of the Six Sigma improvement process. In this phase, the leaders of the project create a Project Charter, create a high-level view of the process, and begin to understand the needs of the customers of the process. Maryam Rehmat Process Engg.
  • 14. MEASURE- MAP OUT THE CURRENT PROBLEM In the Measure Phase, the team focuses on data collection. They have two goals: • Determine the start point or baseline of the process and • Find clues to understand the root cause of the problem in the process. Maryam Rehmat Process Engg.
  • 15. ANALYSE-IDENTIFY THE CAUSE OF THE PROBLEM In the Analyze Phase, data collected during the Measure Phase is reviewed. Both the data and the process are analysed, in an effort to narrow down and verify the root causes of waste and defects. Maryam Rehmat Process Engg.
  • 16. IMPROVE- IMPLEMENT AND VERIFY THE SOLUTION In the Improve Phase, the team moves on to solution development. A structured improvement effort can lead to innovative and elegant solutions. Maryam Rehmat Process Engg.
  • 17. CONTROL- MAINTAIN THE SOLUTION In the Control Phase, the team begins to document exactly how they want to sustain improvements by passing process improvement infrastructure on to the employees who work within the process. Maryam Rehmat Process Engg.
  • 18. DMAIC Overview and Simobo Case Study Demonstration Arooj Un Nisa Process Engg.
  • 19. D Key activities in the Define phase are: Define the problem statement or improvement opportunity in a way that effectively articulates why the Six Sigma project is necessary and why it is necessary right now.  Develop the project charter.  Map the current process.  Gather the voice of the customer (VOC).  Form the project team. Arooj Un Nisa Process Engg.
  • 20. M Key activities in the Measure phase are:  Identify the measurements to collect  Develop and execute the measurements collection plan  Develop and validate the measurement system  Identify baseline performance measurements DPMO and sigma level Arooj Un Nisa Process Engg.
  • 21. A Key activities in the Analyze phase are:  Stratify data to identify the underlying problem(s).  Identify root causes.  Validate root causes. Arooj Un Nisa Process Engg.
  • 22. I Key activities in the Improve phase include the following:  Identify potential solutions.  Evaluate and select potential solutions. Arooj Un Nisa Process Engg.
  • 23. C Key activities in Control phase include the following:  Pilot potential solutions (if needed).  Evaluate pilot results (if applicable).  Develop the control plan.  Develop the change implementation plan.  Develop procedures, standards, and training material.  Deliver training.  Communicate improvements.  Implement improvements. Arooj Un Nisa Process Engg.
  • 24. Define Phase Activities performed on Simobo PROJECT CHARTER TITLE Managing and Enhancing Quality of our Product Simobo by reducing the number of support issues and non-conformities. BUSINESS CASE The IT industries have a lot of work in their domain but the satisfied customers are achieved only by High Quality Products This can only be achieved by o Increased Quality Service Time o Reducing Cost (Development and Maintenance) PROBLEM STATEMENT Confiz Solutions is committed to provide cost effective and efficient solutions to their customers. This can be achieved by Enhancing Quality of Simobo by reducing the number of support issues and non-conformities OBJECTIVES Reduction in Number of Support Issues and Defects METRICES Correctness, which is measured by Defect Density Defect Density = (number of Defects/size of product in LOC ) * 100 SCOPE Development and maintenance of Simobo. PROJECT SCHEDULE o o o o o Define Phase Measure Phase Analyze Phase Improve Phase Control Phase PROJECT MEMBERS o o Maryam Rehmat Arooj Un Nisa
  • 26. SIPOC Supplier input process output customer      1. Domain Ramp up 2. Requirement Analysis 3. Insight to Design specifications 4. UI Testing 5. Functional testing 6. Integration testing 7. Defect logging 8. Defect verification 9. Defect closing 10. Defect responding      Development team Design team QA team I.T team    Client Requirements Design specifications PSD’S Code Defects/Bugs Build Status Report Features Developer I.T team
  • 27. KPI’S AND KPO’S KEY PROCESS INPUTS KEY PROCESS OUTPUTS Qualification Defect Density Experience Bugs LOC Arooj Un Nisa Process Engg.
  • 28. MEASURE PHASE-PARETO CHART Arooj Un Nisa Process Engg.
  • 29. CAUSE AND EFFECT DIAGRAM Arooj Un Nisa Process Engg.
  • 30. HISTOGRAM Arooj Un Nisa Process Engg.
  • 31. PROBABILITY PLOT Arooj Un Nisa Process Engg.
  • 32. CURRENT SIGMA LEVEL Arooj Un Nisa Process Engg.
  • 33. Process Capability Arooj Un Nisa Process Engg.
  • 34. ANALYSE PHASE TESTING OF HYPOTHESIS Our company is facing some support issues and we want to decrease these support issues to 5% so for this we have to hypothesize: Null Hypothesis: Support issues are >=5%. Alternate hypothesis: Support issues are< 5%. Arooj Un Nisa Process Engg.
  • 35. IMPROVE PHASE DESIGN OF EXPERIMENTS Arooj Un Nisa Process Engg.
  • 36. Arooj Un Nisa Process Engg.
  • 37. Arooj Un Nisa Process Engg.
  • 38. CONTROL PHASE FMEA (Failure Mode and Effect Analysis) Potential Failure Effect SEV Potential Causes OCC Current Controls DET RPN Actions recommended Resp. Missing features Poor quality app 10 Wrong time estimates 1 Increased no of resources 0 0 Add cushion time in estimates, Start domain ramp up at requirement elicitation phase Usman Missing requirements Design is not according to requirements 6 Negligence, No Requirement documentation 1 Increased no of resources 0 0 Involve QA at this stage Document requirements properly Aymen No traceability of requirements Cosmetic defects in App 9 PSD’s not provided/overlooked 1 Requirements mapped manually 0 0 Make sure to provide PSD’s in domain ramp up Aymen Incomplete elements exploration Poor user interface with low usability 8 Negligence Test scenarios missing 2 Reviews by mentors 1 16 Trainings Aymen Incomplete Requirement Analysis Non confirming products 10 Time bounds Neglecting Requirements/feature 1 Increased resources Reviews by mentors 2 20 Prepare Requirement traceability matrix Aymen Incomplete product Customer dis-satisfaction 10 Incomplete domain ramp up/feature exploration 2 Increased resources 3 60 Prepare Sanity checklist Aymen Defects not logged/ Ambiguous Description Incomplete fixation 5 Lack of training/communication issues 1 Unit testing Increase resources 0 0 Comm. Skills Training Aymen Ripple effect/ regression testing missing Bugs in App 8 Negligence No time for Halo testing 1 Cross check by other resource Increased resources 0 0 Correct estimates for testing of a sprint/build Aymen Closed without verification defective product 9 Time bounds Negligence 1 Verification by Pm 0 0 Review after build or sprint Aymen Reopened without verification Development overhead resource wastage 6 Incomplete testing Misunderstanding 1 Verification by Pm and Unit testing by Dev. 0 0 Review after build Aymen Defect Reopening Defect closing Defect Verification Defect logging Integration Testing Functional Testing UI Testing Insight to Design Specificatio ns Requirement Analysis Domain Ramp up Process Step Potential Failure Mode
  • 39. Arooj Un Nisa Process Engg.
  • 40. Arooj Un Nisa Process Engg.
  • 41. Little Cast-Sigma Level Defects 284 Opportunities Total Units 7 8445 DPU 0.033629366 DPO DPMO Yeild 0.0048042 4804.195 0.9951958 Sigma Level 4.089612921 Arooj Un Nisa Process Engg.