DOCUMENT FOR HANDING OVER THE BUILDING
tl khfhz rig
W;=re m<d;a iNdj
ALL RIGHT RESERVED TEMPLATE FILE,
Mr.PATHMANATHAN NIROJAN,
JAFFNA, SRI LANKA.
CONTRACTORM/ S ABIE CONSTRUCTION, WARD NO-4, MULLIYAWALAI,
MULLAITIVU.
CILENTMINISTRY OF EDUCATION, CULTURAL AFFAIRS, SPORTS &
YOUTH AFFAIRS, NORTHERN PROVINCE.
EMPLOYERDEPARTMENT OF BUILDINGS( N. P)
BEACH ROAD, KURUNAGAR, JAFFNA.
IMPLEMENT
AGENCY
EXECUTIVE ENGINEER’S OFFICE
DEPARTMENT OF BUILDINGS( N. P) , MULLAITIVU.
MU/MULLAITIVU
HINDU TAMIL
SCHOOL,
MULLAITIVU.
LOCATION:
CONSTRUCTION OF
PRIMARY LEARNING
RESOURCE CENTRE
(DOUBLE STOREY)
[ PROJECT ]
CONTENTS
0 1
A) DESCRIPTION OF PROJECT
B) HANDING OVER SYNOPSIS
C) COMPLETION CERTIFICATE
D) SITE PHOTOS
E) AS BUILT DRAWING
 BUILDING DRAWING
I. GROUND FLOOR PLAN
II. UPPER FLOOR PLAN
III. FRONT ELEVATION
IV. REAR ELEVATION
V. SIDE ELEVATION
VI. SECTIONAL ELEVATION
 ELECTRICAL LAYOUT
VII. SLAB CONDUIT LAYOUT
VIII. GROUND FLOOR ELECTRICAL LAYOUT
IX. UPPER FLOOR ELECTRICAL LAYOUT
PAGE NO
…… 02 - 02
…… 03 - 05
…… 06 - 06
…… 07 – 10
…… 11 – 11
…… 12
…… 13
…… 14
…… 15
…… 16
…… 17
…… 18
…… 19
…… 20
0 2
DESCRIPTION OF PROJECT














SIGNATURE OF THE TECHNICAL OFFICER
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
SIGNATURE OF THE EXECUTIVE ENGINEER
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
Reading Room
01 1200 mm long fluorescent lamp NO 02
02 600x600 mm reflector Model fluorescent lamp NO 04
03 KDK Ceiling Fan NO 02
04 13Amp Socket outlet NO 02
05 5Amp Socket outlet NO 01
06 Distribution Box NO 01
07 Alpha Door Lock NO 01
08 Door Closer NO 01
09 Door Handle NO 02
Principal Room
01 600x600 mm reflector Model fluorescent lamp NO 04
02 KDK Ceiling Fan NO 02
03 13Amp Socket outlet NO 02
04 5Amp Socket outlet NO 01
05 Alpha Door Lock NO 01
06 Door Closer NO 01
07 Door Handle NO 02
Open Verandah
01 1200 mm long fluorescent lamp NO 02
Activity Room
01 1200 mm long fluorescent lamp NO 02
02 600x600 mm reflector Model fluorescent lamp NO 04
03 KDK Ceiling Fan NO 02
04 13Amp Socket outlet NO 02
05 5Amp Socket outlet NO 01
06 Alpha Door Lock NO 01
07 Door Closer NO 01
08 Door Handle NO 02
0 3
HANDING OVER SYNOPSIS





The above service has been completed satisfactorily and handed over to client department with the
following removable articles please
LIST OF INVENTORY ITEMS GROUND FLOOR - INTERNAL
Store Room
01 Energy Server Lamp NO 01
02 Alpha Door Lock NO 01
03 Door Handle NO 02
Open Hall
01 1200 mm long fluorescent lamp NO 15
02 600x600 mm Reflector Model fluorescent lamp NO 12
03 KDK Ceiling Fan NO 06
04 13Amp Socket outlet NO 08
05 5Amp Socket outlet NO 04
06 Distribution Box NO 01
07 Alpha Door Lock NO 03
08 Door Closer NO 03
09 Door Handle NO 06
Open Verandah
01 Energy Server Lamp (Two way) NO 01
02 1200 mm long fluorescent lamp NO 02
01 Water tight lamp NO 08
02 Earth Rod(Copper) NO 01
03 Service Bracket NO 01
0 4
HANDING OVER SYNOPSIS CONTINUE …
LIST OF INVENTORY ITEMS UPPER FLOOR - INTERNAL
LIST OF INVENTORY ITEMS - EXTERNAL
SIGNATURE OF THE TECHNICAL OFFICER
[ IMPLEMENT AGENCY ]
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
SIGNATURE OF THE TECHNICAL OFFICER
ELECTRICAL [ IMPLEMENT AGENCY ]
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
SIGNATURE OF THE TECHNICAL OFFICER
[ CLIENT ]
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
SIGNATURE OF THE DEPARTMENT CHIEF
[ CLIENT ]
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
S.No DESCRIPTION OF ITEMS QTY
01 600x600 mm reflector Model fluorescent lamp 24
02 1200 mm long fluorescent lamp 19
03 Energy Server Lamp 01
04 KDK Ceiling Fan 12
05 13Amp Socket outlet 14
06 5Amp Socket outlet 07
07 12 way Distribution Box 02
08 Water tight lamp 08
09 Earth rod (Copper) 01
10 Service Bracket 01
11 Alpha Door Lock 07
12 Door Closer 06
13 Door Handle 14
0 5
HANDING OVER SYNOPSIS SUMMARY





The above service has been completed satisfactorily and handed over to client department with the
following removable articles please
HANDING OVER PROPRIETOR [ CONTRACTOR ]
SIGNATURE & DATE…
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
OFFICER TAKEN OVER [ IMPLEMENT AGENCY ]
SIGNATURE & DATE…
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
OFFICER HANDING OVER [ IMPLEMENT AGENCY ]
SIGNATURE & DATE…
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
OFFICER TAKEN OVER [ CLIENT ]
SIGNATURE & DATE…
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
SIGNATURE OF EXECUTIVE ENGINEER
MR.X.XXXXXXXXXXX
OFFICIALSTAMP
0 6
COMPLETION CERTIFICATE
SIGNATURE OF THE CHIEF ENGINEER
CHIEF ENGINEER’S OFFICE,
DEPARTMENT OF BUILDING (N.P),
KILINOCHCHI.
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
SIGNATURE OF THE EXECUTIVE ENGINEER
EXECUTIVE ENGINEER’S OFFICE,
DEPARTMENT OF BUILDING (N.P),
MULLAITIVU.
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
TECHNICAL OFFICER,
EXECUTIVE ENGINEER’S OFFICE,
DEPARTMENT OF BUILDING (N.P),
MULLAITIVU.
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
PRINCIPAL,
MU/MULLAITIVU H.T.S
MULLAITIVU.
MR.X.XXXXXXXXXXX
OFFICIAL STAMP
OFFICER HANDED OVER OFFICER TAKEN OVER
The work has been Completed Satisfactorily and handed over to Client
 OBSERVATION ( IF ANY) OF THE CLIENT / REPRESENTATIVE
0 7
SITE PHOTOS
0 8
0 9
10
11
AS BUILT DRAWING
 BUILDING DRAWING
 GROUND FLOOR PLAN
 UPPER FLOOR PLAN
 FRONT ELEVATION
 REAR ELEVATION
 SIDE ELEVATION
 SECTIONAL ELEVATION
 ELECTRICAL LAYOUT
 SLAB CONDUIT LAYOUT
 GROUND FLOOR ELECTRICAL LAYOUT
 UPPER FLOOR ELECTRICAL LAYOUT
12
13
14
15
16
17
18
19
20
…THANK YOU
2 1
PREPARED BY : MR. P. NIROJAN
TECHNICAL OFFICER,
EXECUTIVE ENGINEER’ S OFFICE
DEPARTMENT OF BUILDINGS
NORTHERN PROVIENCE,
MULLAITIVU.

More Related Content

PDF
Civil finishing engineer(2)
PDF
MGI Light Gauge Steel Framing - Corporate brochure
PDF
civil engineer resume-Lushya Raj
PDF
Key Components of Cost Estimation in construction
PPTX
Payments in the construction industry
PPTX
Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...
PPTX
BAR BENDING SCHEDULE.pptx
PDF
Unit iii cash flow
Civil finishing engineer(2)
MGI Light Gauge Steel Framing - Corporate brochure
civil engineer resume-Lushya Raj
Key Components of Cost Estimation in construction
Payments in the construction industry
Summer Internship Presentation on "CONSTRUCTION OF PERMANENT CAMPUS FOR INDIA...
BAR BENDING SCHEDULE.pptx
Unit iii cash flow

What's hot (20)

PDF
Problems on lamis theorem.pdf
DOCX
Traditional procurement method
PDF
Site Survey Report
XLSX
Stadium lighting boq
DOCX
PREFABRICATION AND MODULAR COORDINATION
PPTX
Construction contract
PDF
CIVIL SITE ENGINEER
PPT
Reinforcement detailing
PDF
Industrial case study report (Final)
PPT
PPTX
Prefabrication system
PPTX
Module 4 flexural stresses- theory of bending
PDF
Bungalow
DOCX
General notes to BSR BUILDING SCHEDULE OF RATES
PDF
Contract - Construction Contracts and Specification
PPTX
Preliminary estimate
DOCX
Contract document
PPTX
A Case Study based on FIDIC and PAM Form 2006
PPT
Chapter 13 breakeven analysis
Problems on lamis theorem.pdf
Traditional procurement method
Site Survey Report
Stadium lighting boq
PREFABRICATION AND MODULAR COORDINATION
Construction contract
CIVIL SITE ENGINEER
Reinforcement detailing
Industrial case study report (Final)
Prefabrication system
Module 4 flexural stresses- theory of bending
Bungalow
General notes to BSR BUILDING SCHEDULE OF RATES
Contract - Construction Contracts and Specification
Preliminary estimate
Contract document
A Case Study based on FIDIC and PAM Form 2006
Chapter 13 breakeven analysis
Ad

Similar to Document for Handing over the building (20)

PDF
PDF
Merkinch Welfare Hall Technical Details
PDF
Dick Smith
PDF
LED luminaires for sports and large area lighting - Daou Lighting
PDF
Airtightness and insulation with solar study
PDF
Farmers PDC Chino CA
PDF
02 QUALITY CONTROL TEST REPORTS FORMATS
PDF
Andrea Gino - Portfolio (Low Res)
PDF
20161020_SH_Portfolio
PPTX
PRESENTATION ON OFFICE BLOCK ( LOCATION : CHANDIGARH )
PDF
ARCO Capabilities-Food-Jan 2023.pdf
PDF
Masters s
PDF
Medialine Holdings Multi Family Residential
PDF
KOM Presentation STN-N Conductor_rev 2
PDF
Zoltun Illustration Portfolio
PDF
Passivhaus Archive Hereford
PDF
Drawings.pdf
PDF
Brosur Steel Sheet Pile.pdf
DOCX
Frylinck John No CV 2015
PDF
Fire safery plan of Ysuf ahmead by Bangladesh
Merkinch Welfare Hall Technical Details
Dick Smith
LED luminaires for sports and large area lighting - Daou Lighting
Airtightness and insulation with solar study
Farmers PDC Chino CA
02 QUALITY CONTROL TEST REPORTS FORMATS
Andrea Gino - Portfolio (Low Res)
20161020_SH_Portfolio
PRESENTATION ON OFFICE BLOCK ( LOCATION : CHANDIGARH )
ARCO Capabilities-Food-Jan 2023.pdf
Masters s
Medialine Holdings Multi Family Residential
KOM Presentation STN-N Conductor_rev 2
Zoltun Illustration Portfolio
Passivhaus Archive Hereford
Drawings.pdf
Brosur Steel Sheet Pile.pdf
Frylinck John No CV 2015
Fire safery plan of Ysuf ahmead by Bangladesh
Ad

More from Vj NiroSh (20)

PDF
BSR - 2021 - Mullaitivu - District
PDF
BSR - 2021 - Kiliinochchi - District
PDF
Irranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopy
PDF
Vechile shed Sample Drawing
PDF
CONCRETE BASICS A Guide to Concrete Practice
PDF
Palimentory control in Tamil
PDF
BSR - 2020 With OH&P
PDF
Schedule of Rates - 2020 All Department
PDF
Auto CAD - 2D
PDF
Adobe Photoshop- in Tamil
PDF
ATI Final Report
PDF
Windows XP in தமிழ்
PDF
Builders of Quantity
PDF
General notes to building schedule of rates
PDF
AutoCAD - 3D Notes
PDF
Industrial Training Report
PDF
SBD - 3 - ICTAD
PDF
Scope of consultancy services - ICTAD - consul
PDF
Contract payment and variation
PDF
மாநகர வீடமைப்பு விதிகள்
BSR - 2021 - Mullaitivu - District
BSR - 2021 - Kiliinochchi - District
Irranaitivu R.C.T.M.S-Drawing file (Ori)_NoCopy
Vechile shed Sample Drawing
CONCRETE BASICS A Guide to Concrete Practice
Palimentory control in Tamil
BSR - 2020 With OH&P
Schedule of Rates - 2020 All Department
Auto CAD - 2D
Adobe Photoshop- in Tamil
ATI Final Report
Windows XP in தமிழ்
Builders of Quantity
General notes to building schedule of rates
AutoCAD - 3D Notes
Industrial Training Report
SBD - 3 - ICTAD
Scope of consultancy services - ICTAD - consul
Contract payment and variation
மாநகர வீடமைப்பு விதிகள்

Recently uploaded (20)

PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PDF
MLpara ingenieira CIVIL, meca Y AMBIENTAL
PPTX
Petroleum Refining & Petrochemicals.pptx
PDF
Abrasive, erosive and cavitation wear.pdf
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
Soil Improvement Techniques Note - Rabbi
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PPTX
mechattonicsand iotwith sensor and actuator
PPTX
ai_satellite_crop_management_20250815030350.pptx
PDF
Computer organization and architecuture Digital Notes....pdf
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
PPTX
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPTX
Building constraction Conveyance of water.pptx
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
MLpara ingenieira CIVIL, meca Y AMBIENTAL
Petroleum Refining & Petrochemicals.pptx
Abrasive, erosive and cavitation wear.pdf
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Soil Improvement Techniques Note - Rabbi
Management Information system : MIS-e-Business Systems.pptx
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
August -2025_Top10 Read_Articles_ijait.pdf
mechattonicsand iotwith sensor and actuator
ai_satellite_crop_management_20250815030350.pptx
Computer organization and architecuture Digital Notes....pdf
distributed database system" (DDBS) is often used to refer to both the distri...
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
ASME PCC-02 TRAINING -DESKTOP-NLE5HNP.pptx
A Brief Introduction to IoT- Smart Objects: The "Things" in IoT
Exploratory_Data_Analysis_Fundamentals.pdf
Building constraction Conveyance of water.pptx

Document for Handing over the building

  • 1. DOCUMENT FOR HANDING OVER THE BUILDING tl khfhz rig W;=re m<d;a iNdj ALL RIGHT RESERVED TEMPLATE FILE, Mr.PATHMANATHAN NIROJAN, JAFFNA, SRI LANKA. CONTRACTORM/ S ABIE CONSTRUCTION, WARD NO-4, MULLIYAWALAI, MULLAITIVU. CILENTMINISTRY OF EDUCATION, CULTURAL AFFAIRS, SPORTS & YOUTH AFFAIRS, NORTHERN PROVINCE. EMPLOYERDEPARTMENT OF BUILDINGS( N. P) BEACH ROAD, KURUNAGAR, JAFFNA. IMPLEMENT AGENCY EXECUTIVE ENGINEER’S OFFICE DEPARTMENT OF BUILDINGS( N. P) , MULLAITIVU. MU/MULLAITIVU HINDU TAMIL SCHOOL, MULLAITIVU. LOCATION: CONSTRUCTION OF PRIMARY LEARNING RESOURCE CENTRE (DOUBLE STOREY) [ PROJECT ]
  • 2. CONTENTS 0 1 A) DESCRIPTION OF PROJECT B) HANDING OVER SYNOPSIS C) COMPLETION CERTIFICATE D) SITE PHOTOS E) AS BUILT DRAWING  BUILDING DRAWING I. GROUND FLOOR PLAN II. UPPER FLOOR PLAN III. FRONT ELEVATION IV. REAR ELEVATION V. SIDE ELEVATION VI. SECTIONAL ELEVATION  ELECTRICAL LAYOUT VII. SLAB CONDUIT LAYOUT VIII. GROUND FLOOR ELECTRICAL LAYOUT IX. UPPER FLOOR ELECTRICAL LAYOUT PAGE NO …… 02 - 02 …… 03 - 05 …… 06 - 06 …… 07 – 10 …… 11 – 11 …… 12 …… 13 …… 14 …… 15 …… 16 …… 17 …… 18 …… 19 …… 20
  • 3. 0 2 DESCRIPTION OF PROJECT               SIGNATURE OF THE TECHNICAL OFFICER MR.X.XXXXXXXXXXX OFFICIAL STAMP SIGNATURE OF THE EXECUTIVE ENGINEER MR.X.XXXXXXXXXXX OFFICIAL STAMP
  • 4. Reading Room 01 1200 mm long fluorescent lamp NO 02 02 600x600 mm reflector Model fluorescent lamp NO 04 03 KDK Ceiling Fan NO 02 04 13Amp Socket outlet NO 02 05 5Amp Socket outlet NO 01 06 Distribution Box NO 01 07 Alpha Door Lock NO 01 08 Door Closer NO 01 09 Door Handle NO 02 Principal Room 01 600x600 mm reflector Model fluorescent lamp NO 04 02 KDK Ceiling Fan NO 02 03 13Amp Socket outlet NO 02 04 5Amp Socket outlet NO 01 05 Alpha Door Lock NO 01 06 Door Closer NO 01 07 Door Handle NO 02 Open Verandah 01 1200 mm long fluorescent lamp NO 02 Activity Room 01 1200 mm long fluorescent lamp NO 02 02 600x600 mm reflector Model fluorescent lamp NO 04 03 KDK Ceiling Fan NO 02 04 13Amp Socket outlet NO 02 05 5Amp Socket outlet NO 01 06 Alpha Door Lock NO 01 07 Door Closer NO 01 08 Door Handle NO 02 0 3 HANDING OVER SYNOPSIS      The above service has been completed satisfactorily and handed over to client department with the following removable articles please LIST OF INVENTORY ITEMS GROUND FLOOR - INTERNAL
  • 5. Store Room 01 Energy Server Lamp NO 01 02 Alpha Door Lock NO 01 03 Door Handle NO 02 Open Hall 01 1200 mm long fluorescent lamp NO 15 02 600x600 mm Reflector Model fluorescent lamp NO 12 03 KDK Ceiling Fan NO 06 04 13Amp Socket outlet NO 08 05 5Amp Socket outlet NO 04 06 Distribution Box NO 01 07 Alpha Door Lock NO 03 08 Door Closer NO 03 09 Door Handle NO 06 Open Verandah 01 Energy Server Lamp (Two way) NO 01 02 1200 mm long fluorescent lamp NO 02 01 Water tight lamp NO 08 02 Earth Rod(Copper) NO 01 03 Service Bracket NO 01 0 4 HANDING OVER SYNOPSIS CONTINUE … LIST OF INVENTORY ITEMS UPPER FLOOR - INTERNAL LIST OF INVENTORY ITEMS - EXTERNAL SIGNATURE OF THE TECHNICAL OFFICER [ IMPLEMENT AGENCY ] MR.X.XXXXXXXXXXX OFFICIAL STAMP SIGNATURE OF THE TECHNICAL OFFICER ELECTRICAL [ IMPLEMENT AGENCY ] MR.X.XXXXXXXXXXX OFFICIAL STAMP SIGNATURE OF THE TECHNICAL OFFICER [ CLIENT ] MR.X.XXXXXXXXXXX OFFICIAL STAMP SIGNATURE OF THE DEPARTMENT CHIEF [ CLIENT ] MR.X.XXXXXXXXXXX OFFICIAL STAMP
  • 6. S.No DESCRIPTION OF ITEMS QTY 01 600x600 mm reflector Model fluorescent lamp 24 02 1200 mm long fluorescent lamp 19 03 Energy Server Lamp 01 04 KDK Ceiling Fan 12 05 13Amp Socket outlet 14 06 5Amp Socket outlet 07 07 12 way Distribution Box 02 08 Water tight lamp 08 09 Earth rod (Copper) 01 10 Service Bracket 01 11 Alpha Door Lock 07 12 Door Closer 06 13 Door Handle 14 0 5 HANDING OVER SYNOPSIS SUMMARY      The above service has been completed satisfactorily and handed over to client department with the following removable articles please HANDING OVER PROPRIETOR [ CONTRACTOR ] SIGNATURE & DATE… MR.X.XXXXXXXXXXX OFFICIAL STAMP OFFICER TAKEN OVER [ IMPLEMENT AGENCY ] SIGNATURE & DATE… MR.X.XXXXXXXXXXX OFFICIAL STAMP OFFICER HANDING OVER [ IMPLEMENT AGENCY ] SIGNATURE & DATE… MR.X.XXXXXXXXXXX OFFICIAL STAMP OFFICER TAKEN OVER [ CLIENT ] SIGNATURE & DATE… MR.X.XXXXXXXXXXX OFFICIAL STAMP SIGNATURE OF EXECUTIVE ENGINEER MR.X.XXXXXXXXXXX OFFICIALSTAMP
  • 7. 0 6 COMPLETION CERTIFICATE SIGNATURE OF THE CHIEF ENGINEER CHIEF ENGINEER’S OFFICE, DEPARTMENT OF BUILDING (N.P), KILINOCHCHI. MR.X.XXXXXXXXXXX OFFICIAL STAMP SIGNATURE OF THE EXECUTIVE ENGINEER EXECUTIVE ENGINEER’S OFFICE, DEPARTMENT OF BUILDING (N.P), MULLAITIVU. MR.X.XXXXXXXXXXX OFFICIAL STAMP TECHNICAL OFFICER, EXECUTIVE ENGINEER’S OFFICE, DEPARTMENT OF BUILDING (N.P), MULLAITIVU. MR.X.XXXXXXXXXXX OFFICIAL STAMP PRINCIPAL, MU/MULLAITIVU H.T.S MULLAITIVU. MR.X.XXXXXXXXXXX OFFICIAL STAMP OFFICER HANDED OVER OFFICER TAKEN OVER The work has been Completed Satisfactorily and handed over to Client  OBSERVATION ( IF ANY) OF THE CLIENT / REPRESENTATIVE
  • 9. 0 8
  • 10. 0 9
  • 11. 10
  • 12. 11 AS BUILT DRAWING  BUILDING DRAWING  GROUND FLOOR PLAN  UPPER FLOOR PLAN  FRONT ELEVATION  REAR ELEVATION  SIDE ELEVATION  SECTIONAL ELEVATION  ELECTRICAL LAYOUT  SLAB CONDUIT LAYOUT  GROUND FLOOR ELECTRICAL LAYOUT  UPPER FLOOR ELECTRICAL LAYOUT
  • 13. 12
  • 14. 13
  • 15. 14
  • 16. 15
  • 17. 16
  • 18. 17
  • 19. 18
  • 20. 19
  • 21. 20
  • 22. …THANK YOU 2 1 PREPARED BY : MR. P. NIROJAN TECHNICAL OFFICER, EXECUTIVE ENGINEER’ S OFFICE DEPARTMENT OF BUILDINGS NORTHERN PROVIENCE, MULLAITIVU.