Presentation Structure
- London Transport Strategy 2000
• Main components
- Buses and the London Bus Initiative
- What else happened
- Considerations for Melbourne
Background – London in 1999
“Congestion and overcrowding on London’s
transport networks is acute.”
- Urgent need for measures to reduce heavy all
day traffic congestion
- Slow and unreliable bus services
- Difficulties for business in servicing and delivery
movements
- Unreliability and gross overcrowding of National
Rail and Underground services
- Growth in the number of people using transport
- London’s population and economy growth
Background – London in 1999
Key issues for outer London include:
- Inadequate public transport options, particularly for non-radial
and off-peak trips
- Heavy and growing traffic congestion on key routes and in
town centres affecting both individuals and businesses
- Pockets of deprivation and regeneration sites which are not
well linked to the main transport networks
Background - The Mayors Transport Strategy
- Creation of ‘Transport for London’ provided a new opportunity
- “Balanced set of priorities needed to facilitate the required
changes in the transport network in the short and medium
term”
- Overcoming backlog of investment in the Underground
- Radical improvements to bus services
- Improving capacity including cross city and orbital rail, a new
Thames crossing
- Increase travel choice
Package of measures proposed
- Overground Rail – Crossrail, East London Line extension,
Thameslink 2000
- Underground – station upgrades e.g. Tottenham Court Road,
Victoria, etc (and Docklands Light Rail extensions)
- Intermediate modes (Tram/BRT) – Cross River Transit, East
London Transit,
- Smartcards and fare changes
- Congestion charging
Role of buses
- Bus system offered potential for rapid (i.e. short term)
improvements
- Could relieve overcrowding on Underground
- Offer an alternative to the car especially in outer London
- Building off the back of Red Routes (Clearways) and Pilot Route
43 project
- Key short term focus was London Bus Initiative
• Improvements on 27 key routes
• £60 million over 2 years
London Bus Initiative – The Strategy
The vision:
- To deliver a ‘step-change’ enhancement of the actual and
perceived quality of London’s bus services
Key objectives were to:
- Promote a change in travel habits to get more people onto
London’s buses
- Make buses more attractive for potential users
- Make buses the first choice mode of transport on LBI routes
- Deliver the above on a ‘whole route’ basis
- Aligned to Mayor’s strategy
London Bus Initiative
What was different?
- Corridor based – not hotspot targets on 27 routes
- Multi-agency approach
• TfL / Councils / Operators / Police
- Reviewed whole trip
- Not just infrastructure focused
London Bus Initiative – Whole route/trip approach
- Whole (Bus) Route
- Whole trip corridor approach
• Door to Door
• Total Journey Quality
- Partnership (multi-agency) approach
based on responsibilities
- NOT just bus priority i.e. bus lanes and
vehicle detection at signals, etc
Origin/Home
Walk to Bus Stop
Wait at Bus Stop
Bus Journey
Board the Bus
Alight from Bus
Walk to Destination
London Bus Initiative – package of measures
London Bus Initiative - KPIs
Targets/KPIs – Multi issue/agency examples:
- Reductions in journey time (10 – 20%)
- Improved reliability (excess wait time)
- Increased coverage of routes with bus lanes (real and virtual)
- Increased patronage
- Reductions in bus stop dwell time
- Bus stop accessibility (50 – 100%)
- Improved customer satisfaction
- Improved bus cleanliness
London Bus Initiative – Package of measures
- Route Traffic Management Strategy
• To review use of carriageway space
• Introduce real and ‘virtual’ bus lanes
- Review of kerbside parking/loading controls
- Extension of hours/days of Red Routes (clearways)
- Detailed Traffic Signal Review
- Bus stop improvements/rationalisation
- Total Route Control Strategy (flagship routes only)
• i.e. Control any aspect likely to cause delay
- Integrated Traffic Management – link and node
- Delivered via Program
Team
- Dedicated LBI
Communications Team
assisted delivery
- Consultation widened to
include bus passengers
London Bus Initiative – other features
London Bus Initiative – What was delivered?
Over LBI 1 – (2+1 years):
- 108 new sections of bus lanes
• 84 extended in length / 40 in hours
- 50 new pedestrian crossings
- Bus Priority added to 306 traffic signals
- 146 physical intersection improvements
• 200 signal timing changes
- 40% of 2,500 route stops made DDA complaint
London Bus Initiative – total spend
Spending breakdown: (2002 GBP – 2013 AUD equivalent)
- Enforcement £11m $24m AUD
- Traffic engineering £28m $60m AUD
- Bus operations £3.5m $8m AUD
- Programme support £9m $20m AUD
- Major projects £8.5m $18.5m AUD
- $130m AUD
London Bus Initiative – Benefits
- Increased bus patronage +21.9% during LBI
• Patronage increase equivalent to $12 million in benefits pa
- Mixed journey time improvements
• Big wins on contra-flow schemes
• More time spent at stops negated some journey time benefits
- Over long term improved reliability
• Reduced operating costs
• Protected buses from worsening
congestion
London Bus Initiative - legacy
- Bus Stops accepted as vital part of trip
- Increased patronage increased time at stops
- Acknowledgement of need to reduce
boarding/alighting time
- Led to:
• Cashless Operation – and Smartcards
• Articulated buses – multi-door entry/exit
London Bus Initiative – other legacy
- Enforcement seen as key to urban arterial operations
- Expansion of decriminalisation (non police enforcement) to
both Borough and Transport for London Road Network
- Transport Operational Command Unit (TOCU)
- Expansion of CCTV enforcement (211 new cameras)
• Bus Lanes
• Parking / Loading / Stopping
• On bus cameras on 600 buses
- Enforcement Strategies now seen as fundamental to Bus
Priority in London
The other schemes…
Many of the other components delivered later…
Project/measure Planned Actual
Congestion charging 2003 2003
East London Line 2006 2010
Crossrail 2012 2016
Thameslink 2000 (1991) 2008 2018
Cross River Transit 2007 Cancelled
Greenwich Waterfront
Transit
2007 Cancelled
London – considerations for Melbourne
- An integrated multi modal strategy can deliver range of
outcomes over time
- Planned dates and actual dates rarely agree
- Package of measures needed across modes – Trams / Buses
and bikes have a role to play
- Need short term / medium / long terms plans to move people
and goods
- One size does not fit all

More Related Content

PPT
An independent view of transport
PDF
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
PPTX
Workshop Innovation in Africa - Manifesto for BRT Lite
PPTX
Estimating residential public transport trip generation rates
PDF
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
PPTX
PPT
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
PDF
MobIWallet - Italian Pilot
An independent view of transport
Webinar: Bus rapid transit system: metro on surface or high performance bus s...
Workshop Innovation in Africa - Manifesto for BRT Lite
Estimating residential public transport trip generation rates
Webinar: The flexibility of the bus is both a strength and a weakness in prov...
Planning and Design of Feeder Services and Short Routes - Salvador Herrera
MobIWallet - Italian Pilot

What's hot (20)

PPTX
The Current Transport Policy Environment
PPT
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
PPT
Webinar: Some Observations on BRT in North America… and Elsewhere
PPT
Bus Rapid Transit (BRT) in Gauteng, S.A.
PPTX
Moving from Bus Rapid Transit to Integrated Public Transport
PPTX
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
PPT
BRT Chennai
PPTX
Tackling future urban mobility demand in singapore
PPTX
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
PDF
BRT in China: A brief review
PPTX
MyCiti presentation by Kylie Hatton
PDF
First – Last Mile_MBPJ_2015
PDF
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
PPT
Brt planning week
PDF
BRT - EDSA (Bus Rapid Transit) System 2018
PPTX
Brts
PPTX
Crossrail 2 - Planning for the Future
PPTX
Straddling bus presented by RK
PDF
Makkah Metro Presentation
The Current Transport Policy Environment
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Webinar: Some Observations on BRT in North America… and Elsewhere
Bus Rapid Transit (BRT) in Gauteng, S.A.
Moving from Bus Rapid Transit to Integrated Public Transport
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
BRT Chennai
Tackling future urban mobility demand in singapore
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
BRT in China: A brief review
MyCiti presentation by Kylie Hatton
First – Last Mile_MBPJ_2015
Mohinder Singh - Gestión Institucional del Sistema de Transporte de Singapur
Brt planning week
BRT - EDSA (Bus Rapid Transit) System 2018
Brts
Crossrail 2 - Planning for the Future
Straddling bus presented by RK
Makkah Metro Presentation
Ad

Viewers also liked (16)

PDF
Tracxn Travel India Startup Landscape - Feb 2015
PDF
Travel purchasefunneldisruption ap2015
PDF
Valoració de l’impacte social i econòmic de la mobilitat
PDF
MobiWallet Italian Pilot
PPTX
All about traveling
PPT
Different ways of travelling
PDF
Tnooz-Fusion FREE webinar: The science behind ancillary merchandising
PDF
Travel vocabulary
PPTX
Unit 4 Planes Trains and Automobiles
PDF
Improving the digital customer journey to drive bookings
PPSX
Make My Trip - Successful Journey!!!!
PDF
ESL Taking a trip flashcards
PDF
Mapping the Journey – Experience Beyond the Screen
PPT
Travel vocabulary
PPTX
Unit 13
PPT
1 tg4 - holidays
Tracxn Travel India Startup Landscape - Feb 2015
Travel purchasefunneldisruption ap2015
Valoració de l’impacte social i econòmic de la mobilitat
MobiWallet Italian Pilot
All about traveling
Different ways of travelling
Tnooz-Fusion FREE webinar: The science behind ancillary merchandising
Travel vocabulary
Unit 4 Planes Trains and Automobiles
Improving the digital customer journey to drive bookings
Make My Trip - Successful Journey!!!!
ESL Taking a trip flashcards
Mapping the Journey – Experience Beyond the Screen
Travel vocabulary
Unit 13
1 tg4 - holidays
Ad

Similar to Doing more with less - LBI (20)

PPT
Transport in london
PDF
TfL's Approach to Developing a Sustainable Transport System
PPTX
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
PDF
10 Nov Future of Transport
PDF
Movement for Liveable London Street Talks - Tom Barry 8th March 2011
PDF
RTPI 2013 David Hytch
PPT
London's Crossrail Scheme - its evolution, governance, financing and challenges
PPTX
180412_Nayi Disha_Delhi Govt_ITDP.pptx
PPT
London bus public transportation
PDF
European Bus Operators' Forum - Mark O'Donovan
PDF
European Bus Operators' Forum - David Sidebottom
PDF
London's Transport: Delivering homes, jobs and growth - Transforming Transp...
PPTX
Transportation System in London (1).pptx
PDF
World Resources Institute Conference | Beijing, China 2016
PPT
Movement for Liveable London Street Talks - Richard Bourn and Richard Hebditc...
KEY
Surrey Bus Rapid Transit Proposal
PPT
NUS Econs Alumni: Public Transport Council (21 Nov 2008)
PDF
Letter from Leon Daniels to Val Shawcross
PPTX
[Urban transportation policy program]city paper presentation hong kong
PDF
Theme 6 BRT vs. LRT moving beyond emotional bias
Transport in london
TfL's Approach to Developing a Sustainable Transport System
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
10 Nov Future of Transport
Movement for Liveable London Street Talks - Tom Barry 8th March 2011
RTPI 2013 David Hytch
London's Crossrail Scheme - its evolution, governance, financing and challenges
180412_Nayi Disha_Delhi Govt_ITDP.pptx
London bus public transportation
European Bus Operators' Forum - Mark O'Donovan
European Bus Operators' Forum - David Sidebottom
London's Transport: Delivering homes, jobs and growth - Transforming Transp...
Transportation System in London (1).pptx
World Resources Institute Conference | Beijing, China 2016
Movement for Liveable London Street Talks - Richard Bourn and Richard Hebditc...
Surrey Bus Rapid Transit Proposal
NUS Econs Alumni: Public Transport Council (21 Nov 2008)
Letter from Leon Daniels to Val Shawcross
[Urban transportation policy program]city paper presentation hong kong
Theme 6 BRT vs. LRT moving beyond emotional bias

Doing more with less - LBI

  • 2. Presentation Structure - London Transport Strategy 2000 • Main components - Buses and the London Bus Initiative - What else happened - Considerations for Melbourne
  • 3. Background – London in 1999 “Congestion and overcrowding on London’s transport networks is acute.” - Urgent need for measures to reduce heavy all day traffic congestion - Slow and unreliable bus services - Difficulties for business in servicing and delivery movements - Unreliability and gross overcrowding of National Rail and Underground services - Growth in the number of people using transport - London’s population and economy growth
  • 4. Background – London in 1999 Key issues for outer London include: - Inadequate public transport options, particularly for non-radial and off-peak trips - Heavy and growing traffic congestion on key routes and in town centres affecting both individuals and businesses - Pockets of deprivation and regeneration sites which are not well linked to the main transport networks
  • 5. Background - The Mayors Transport Strategy - Creation of ‘Transport for London’ provided a new opportunity - “Balanced set of priorities needed to facilitate the required changes in the transport network in the short and medium term” - Overcoming backlog of investment in the Underground - Radical improvements to bus services - Improving capacity including cross city and orbital rail, a new Thames crossing - Increase travel choice
  • 6. Package of measures proposed - Overground Rail – Crossrail, East London Line extension, Thameslink 2000 - Underground – station upgrades e.g. Tottenham Court Road, Victoria, etc (and Docklands Light Rail extensions) - Intermediate modes (Tram/BRT) – Cross River Transit, East London Transit, - Smartcards and fare changes - Congestion charging
  • 7. Role of buses - Bus system offered potential for rapid (i.e. short term) improvements - Could relieve overcrowding on Underground - Offer an alternative to the car especially in outer London - Building off the back of Red Routes (Clearways) and Pilot Route 43 project - Key short term focus was London Bus Initiative • Improvements on 27 key routes • £60 million over 2 years
  • 8. London Bus Initiative – The Strategy The vision: - To deliver a ‘step-change’ enhancement of the actual and perceived quality of London’s bus services Key objectives were to: - Promote a change in travel habits to get more people onto London’s buses - Make buses more attractive for potential users - Make buses the first choice mode of transport on LBI routes - Deliver the above on a ‘whole route’ basis - Aligned to Mayor’s strategy
  • 9. London Bus Initiative What was different? - Corridor based – not hotspot targets on 27 routes - Multi-agency approach • TfL / Councils / Operators / Police - Reviewed whole trip - Not just infrastructure focused
  • 10. London Bus Initiative – Whole route/trip approach - Whole (Bus) Route - Whole trip corridor approach • Door to Door • Total Journey Quality - Partnership (multi-agency) approach based on responsibilities - NOT just bus priority i.e. bus lanes and vehicle detection at signals, etc Origin/Home Walk to Bus Stop Wait at Bus Stop Bus Journey Board the Bus Alight from Bus Walk to Destination
  • 11. London Bus Initiative – package of measures
  • 12. London Bus Initiative - KPIs Targets/KPIs – Multi issue/agency examples: - Reductions in journey time (10 – 20%) - Improved reliability (excess wait time) - Increased coverage of routes with bus lanes (real and virtual) - Increased patronage - Reductions in bus stop dwell time - Bus stop accessibility (50 – 100%) - Improved customer satisfaction - Improved bus cleanliness
  • 13. London Bus Initiative – Package of measures - Route Traffic Management Strategy • To review use of carriageway space • Introduce real and ‘virtual’ bus lanes - Review of kerbside parking/loading controls - Extension of hours/days of Red Routes (clearways) - Detailed Traffic Signal Review - Bus stop improvements/rationalisation - Total Route Control Strategy (flagship routes only) • i.e. Control any aspect likely to cause delay - Integrated Traffic Management – link and node
  • 14. - Delivered via Program Team - Dedicated LBI Communications Team assisted delivery - Consultation widened to include bus passengers London Bus Initiative – other features
  • 15. London Bus Initiative – What was delivered? Over LBI 1 – (2+1 years): - 108 new sections of bus lanes • 84 extended in length / 40 in hours - 50 new pedestrian crossings - Bus Priority added to 306 traffic signals - 146 physical intersection improvements • 200 signal timing changes - 40% of 2,500 route stops made DDA complaint
  • 16. London Bus Initiative – total spend Spending breakdown: (2002 GBP – 2013 AUD equivalent) - Enforcement £11m $24m AUD - Traffic engineering £28m $60m AUD - Bus operations £3.5m $8m AUD - Programme support £9m $20m AUD - Major projects £8.5m $18.5m AUD - $130m AUD
  • 17. London Bus Initiative – Benefits - Increased bus patronage +21.9% during LBI • Patronage increase equivalent to $12 million in benefits pa - Mixed journey time improvements • Big wins on contra-flow schemes • More time spent at stops negated some journey time benefits - Over long term improved reliability • Reduced operating costs • Protected buses from worsening congestion
  • 18. London Bus Initiative - legacy - Bus Stops accepted as vital part of trip - Increased patronage increased time at stops - Acknowledgement of need to reduce boarding/alighting time - Led to: • Cashless Operation – and Smartcards • Articulated buses – multi-door entry/exit
  • 19. London Bus Initiative – other legacy - Enforcement seen as key to urban arterial operations - Expansion of decriminalisation (non police enforcement) to both Borough and Transport for London Road Network - Transport Operational Command Unit (TOCU) - Expansion of CCTV enforcement (211 new cameras) • Bus Lanes • Parking / Loading / Stopping • On bus cameras on 600 buses - Enforcement Strategies now seen as fundamental to Bus Priority in London
  • 20. The other schemes… Many of the other components delivered later… Project/measure Planned Actual Congestion charging 2003 2003 East London Line 2006 2010 Crossrail 2012 2016 Thameslink 2000 (1991) 2008 2018 Cross River Transit 2007 Cancelled Greenwich Waterfront Transit 2007 Cancelled
  • 21. London – considerations for Melbourne - An integrated multi modal strategy can deliver range of outcomes over time - Planned dates and actual dates rarely agree - Package of measures needed across modes – Trams / Buses and bikes have a role to play - Need short term / medium / long terms plans to move people and goods - One size does not fit all