SlideShare a Scribd company logo
2
Most read
3
Most read
4
Most read
RaetsMarine Insurance B.V.




                                            Draft Survey calculation sheet
               Date                      /                                    Initial   Final
                 1a               Draft forward
                 1b               Draft aft mean
         1c = 1a + 1b / 2    Draft fore & aft mean
                 2a             Draft midship PS
                 2b             Draft midship SB
         2c = 2a + 2b / 2     Draft midship mean
          3 = 1c + 2c / 2    Draft mean for means
                  4        Draft corr. for deformation
           5 (at draft 4)  Displacement at sg 1.025
                                Trim bow / stern
                                   Trim in cm
                                        LCF
                                       LBP
                                    TPC (t/cm)
                                    MTCT Diff
                                     Density
                  6             Trim correction 1
                  7             Trim correction 2
                  8          Correction for Density
                             Consumable weights
                                       HFO
                                        GO
                                       LUB
                                   Fresh water
                                      Ballast
                                Constant/Others
                  9          Total known weights
        10 = 5 + 6 + 7 - 8 Corrected displacement
                 11                 Light ship
        12 = 10 – 9 – 11       Cargo weight total


         Cargo loaded/discharged =


                                                     Our contact details:
                                                         RaetsMarine
                                         Contact: Jeroen Ebbeling/Robbert Beekman
                                                  Fascinatio Boulevard 622
                                         2909 VA Capelle A/D IJssel, The Netherlands
                                                Telephone: .. +31-10-24 25 000
                                               Faxnumber: . +31-10-24 25 088
                                            E-mail: j.ebbeling@raetsmarine.com
                                            E-mail: r.beekman@raetsmarine.com

Draft Survey Calculation Sheet, 2010.1        www.raetsmarine.com                        1 of 6
RaetsMarine Insurance B.V.




Draft surveys are made in order to determine the quantity of cargo loaded, carried and
discharged. This is done by measuring the vessels draft and calculating its
displacement prior to loading a cargo and after loading of this cargo, taking variables
such as weight lightship, ballast water, fuel and stores into account.

In order to obtain a reasonable accuracy in this draft survey calculation corrections to
the draft readings and it initial corresponding stability values and parameters must be
made.

General definitions;

Displacement of a vessel is the actual total weight of a vessel. It is expressed in metric tons, and is
calculated by multiplying the volume of the hull below the waterline (the volume of water it is displacing) by
the density of the water. The density will depend on whether the vessel is in fresh or salt water, or is in the
tropics, where the temperature of the water is warmer and hence less dense.

Deadweight of a vessel (often abbreviated as DWT for deadweight tons) is the displacement at any loaded
condition minus the lightship weight. It includes the crew, passengers, cargo, fuel, water, and stores. Like
displacement, it is often expressed in long tons or in metric tons.

Lightship measures the actual weight of the ship with no fuel, passengers, cargo, water, etc. on board. This
weight will be mentioned in the stability booklets.

Gross tonnage or Gross Register Tonnage is the total internal volume of a vessel, with some exemptions
for non-productive spaces such as crew quarters. There are therefore different gross tonnage measurements
(Suez/Panama).

Tonnage measurements are now governed since 1994 by an IMO Convention (International Convention on
Tonnage Measurement of Ships, 1969 (London-Rules)), which applies to all ships built after July 1982. In
accordance with the Convention, the correct term to use now is GT, which is a function of the moulded
volume of all enclosed spaces of the ship.

Net Weight or Net Register Tonnage is the volume of cargo the vessel can carry; in other words its the
Gross Tonnage minus the volume of spaces that do not hold any cargo (e.g. engine room, bridge, crew
spaces, depending which country is making calculations (Suez/Panama)).

During a draft survey the vessels draft is measured. The draft is measured at 6 points, 2 x bow (P/S), 2 x
midships (P/S) and 2 x at the stern (P/S). The draft readings are averaged out in the mean draft. Via
calculations this draft reading leads us to the vessels present apparent displacement at the time of our
survey via on board, ship’s specific, hydrostatic tables and stability curves.

The water density at the time of the draft survey is also determined by means of a density meter. A very
common instrument for the direct measurement of the density of a liquid is the hydrometer, a floater. The
density of the water in which the vessel is surveyed directly influences the draft/dept of the vessel.
Considering that the hydrostatic tables and stability curves are pre-calculated for displacements of a vessel
in water with a standard density of 1.025 t/m³ (salt water), corrections to the determined draft must be made
in order to be able to find the correct displacement of the vessel. Make sure at the time of measuring the
density the density meter is free floating.

Displacement correction In order to find the correct displacement we will correct the displacement straight
away, instead of correcting the drafts at first. We will use the hydrostatic tables with the mean draft as entry
value. These calculations are called the trim corrections. Likewise we will also make a correction for water
density but again a tonnage correction and not a draft correction.




Draft Survey Calculation Sheet, 2010.1   www.raetsmarine.com                                     2 of 6
RaetsMarine Insurance B.V.




First trim correction,

It is necessary to correct the fore & aft drafts to the true draft at the perpendiculars.

This can be achieved either by calculation or draft correction tables if available. The main calculations must
be accomplished with the drafts at the fore & aft perpendiculars and at the amidships point of the hull.

Note that draft marks are not always placed on the perpendiculars, so the true draft of the vessel does not
always correspond with the drafts found during the survey. The hydrostatic tables are mostly based on the
length between perpendiculars and not to the length between the draft marks on the hull.

                                         TRIM(cm) x TPC x LCF
1st Trim Correction              =       --------------------------------
                                                        LBP

Please note that the LCF is the distance between the midship point and the position of the LCF.

This correction is either added or subtracted to the displacement depending whether the LCF is forward or
aft of the mid point, or the trim is by the head or stern. Always draw a sketch to ensure you apply this trim
correction the correct way.


Second trim correction

This is a little more difficult to grasp. It is because there is in fact a second movement of the LCF caused
because of the irregular hull shape of the vessel in trimmed condition. The position of the LCF in the ship’s
hydrostatic tables are given for a ship on even keel only, but if the ship is trimmed the waterline has
changed, causing a second movement to the LCF. The second trim correction is always positive and fairly
small, for example with a loaded Panamax at a one metre trim the correction should only be approximately
12 tonnes, with a two metre trim approximately 50 tonnes.

This second trim correction is calculated by the following formula:


                                         Trim²(m) x ΔMTCT x 50
2nd Trim Correction:                     --------------------------------------------
                                                        LBP

In this formula the ΔMTCT is the difference of MTCT values over a range of draft 50 cm above and 50 cm
below the corrected mean draft.

This second trim correction is always added to the displacement.

The second trim correction, sometimes called the Nemoto correction, is intended to correct for the movement
of the LCF with the change of trim. It was deduced by Mr Nemoto after observing a bulk carrier being built.
The theory on which the second trim correction is based only holds true for small changes of trim so it is not
strictly true for large trims. Please note that the second trim correction is rather small for small trims, and
rarely exceeding 30 tonnes for large vessels. It is often ignored but for completeness sake the second trim
correction should always be calculated.

Density correction If the vessel is in a dock water density then she is sitting differently in the water than she
would be if in sea water so we are reading a different displacement from the hydrostatic tables which are
derived for salt water only. The following formula is simply the dock water formula converted to a tonnage
figure, not a millimetre value.

                                         (1.025 – dock density) x Displacement
Draft Survey Calculation Sheet, 2010.1    www.raetsmarine.com                                    3 of 6
RaetsMarine Insurance B.V.




Density Correction:                      ---------------------------------------------------
                                                                 1.025

And of course this is subtracted from the displacement if the dock water density is below 1.025 t/m³
It is worth mentioning at this point that although we always consider the density of salt water to be 1.025 t/m³,
if you were to take a reading in Mediterranean Sea ports you would probably find it to be around the 1.030
t/m³ to 1.033 t/m³ mark!

Please note that the ship’s standard hydrometer is not an accurate instrument when it comes to using it to
determine tonnage for a draft survey. It makes no allowance for the temperature of the water which will
change the density as temperature changes.

Corrected displacement When the true displacement of the vessel is known it only requires the subtraction
of all the known weights on board and the subtraction of the ships light displacement. What remains is either
the vessels ‘constant’ if in an empty condition or the cargo weight if in a loaded condition.

The reason for two draft surveys is at first to find the vessels constant and then include this in the known
weights when calculating the actual cargo on board after loading.

When taking a draft survey upon discharge the cargo weight plus constant are found in the initial survey and
the constant in the final survey, subtract the constant from the initial figure and you have the weight of cargo
discharged.



                                         TRIM(cm) x LCF x TPC
1st Trim Correction:                     --------------------------------
                                                       LBP

                                                  x            x
                                 =       ------------------------------             =          tonnes
                                                      LBP


                                              2
                                         Trim (m) x MTCT Diff x 50
2nd Trim Correction:                     -----------------------------------
                                                        LBP

                                                  x           x 50
                                 =       ----------------------------------- =                 tonnes (always add)
                                                       LBP



                                         (1.025 – dock density) x Displacement
Density Correction:                      ---------------------------------------------------
                                                                1.025

                                                  x
                                 =       --------------------                       =          tonnes
                                                1.025




Draft Survey Calculation Sheet, 2010.1    www.raetsmarine.com                                           4 of 6
RaetsMarine Insurance B.V.




Many commercial ships have a symbol called a Load mark painted on each side of the ship. This symbol,
also called an International load line, or Plimsoll mark, marks the level to which the ship can be safely
loaded. As cargo is brought on board, the ship floats lower and the symbol descends farther into the water.
Before these symbols were made compulsory, many ships were lost due to overloading. Sometimes they
were deliberately overloaded in the hope of collecting insurance money. Ships carrying emigrants from
Europe to America were also lost. The British social reformer and politician Samuel Plimsoll advocated
improved safety standards, particularly at sea, and the mark bears his name in his honor.

The letters on the Load line marks have the following meanings:

     •     TF - Tropical Fresh Water

     •     F - Fresh Water

     •     T - Tropical Seawater

     •     S - Summer Seawater

     •     W - Winter Seawater

     •     WNA - Winter North Atlantic




Letters may also appear to the sides of the mark indicating the classification society that has surveyed the
vessel's load line. The initials used include AB for the American Bureau of Shipping, LR for Lloyd's Register,
and NV for Det Norske Veritas.

These season and zone marks are used to ensure adequate reserve buoyancy for the intended area of
operation. Ships encounter rougher conditions in winter as opposed to summer, and in the North Atlantic as
opposed to tropical waters, for example. A copy of a zone-chart must be on board in order to assure that the
vessel is not overloaded.

Fresh water marks make allowance for the fact that the ship will float deeper in fresh water.




Draft Survey Calculation Sheet, 2010.1   www.raetsmarine.com                                    5 of 6
RaetsMarine Insurance B.V.




Draft Survey Calculation Sheet, 2010.1   www.raetsmarine.com   6 of 6

More Related Content

PPTX
Final draft survey
PDF
Active management of vessel stability
PPT
Ship Loads and stresses
PDF
PDF
PPSX
Coupled motions in turning and sea trials
PDF
Shipboard-Organization-Kyle-and-Jorald.pdf
DOC
Ship handling
Final draft survey
Active management of vessel stability
Ship Loads and stresses
Coupled motions in turning and sea trials
Shipboard-Organization-Kyle-and-Jorald.pdf
Ship handling

What's hot (20)

PPT
Chemical tankers
PPTX
Classification societes. presentation
PDF
UNECE - Draught survey code
PDF
Small angle stability longitudinal
PPT
2 classification societies
PPTX
International convention on load lines 1968 group 2
PDF
Cargo Securing Manual
PPT
GMDSS
PPT
Basic stability 1
PDF
MANEUVERING & COLLISION AVOIDANCE
RTF
Dry docking operations
PPT
Gmdss lrg
PDF
Ship dry docking
PPT
Ship Ballast Water Management.ppt
DOC
PDF
Marpol annex ii a practical guide
PPTX
MARPOL ANNEXURES AND IMPACT
PDF
Deck machinery
PPT
Taking over a navigational watch lrg
Chemical tankers
Classification societes. presentation
UNECE - Draught survey code
Small angle stability longitudinal
2 classification societies
International convention on load lines 1968 group 2
Cargo Securing Manual
GMDSS
Basic stability 1
MANEUVERING & COLLISION AVOIDANCE
Dry docking operations
Gmdss lrg
Ship dry docking
Ship Ballast Water Management.ppt
Marpol annex ii a practical guide
MARPOL ANNEXURES AND IMPACT
Deck machinery
Taking over a navigational watch lrg
Ad

Viewers also liked (20)

PPTX
6 draft survey
PDF
Gemi̇ stabi̇li̇tesi̇ teoman akın pdf
PPTX
Stability of ships
PDF
Dökmeci Gemiler Yükleme -Tahliye rehberi
PPTX
[7] trim
DOCX
Draft survey
PDF
Yuzme denge kosulu_gm_stati̇k stabi̇li̇te
PDF
Maritime Security and Security Responsibilities
PDF
Ship Construction - Rudder Theory
PDF
Snubber circuits
PPSX
Propeller Drawing (Holst Method)
PPT
Components operational amplifiers
PPSX
Displacement and weight of Ship
PPT
Components the diode
PPTX
Lect 9 ship propellers (new)
PPT
Components transistors
PDF
Small angle stability
PPT
Equipment for controlling ship's movements
PDF
Propeller making process finnscrew
PPTX
Shaft alignment
6 draft survey
Gemi̇ stabi̇li̇tesi̇ teoman akın pdf
Stability of ships
Dökmeci Gemiler Yükleme -Tahliye rehberi
[7] trim
Draft survey
Yuzme denge kosulu_gm_stati̇k stabi̇li̇te
Maritime Security and Security Responsibilities
Ship Construction - Rudder Theory
Snubber circuits
Propeller Drawing (Holst Method)
Components operational amplifiers
Displacement and weight of Ship
Components the diode
Lect 9 ship propellers (new)
Components transistors
Small angle stability
Equipment for controlling ship's movements
Propeller making process finnscrew
Shaft alignment
Ad

Similar to Draft survey calculation_sheet_2010.1 (20)

PPTX
DNS SHIP CONST & STAB. PPT.pptx very knowledgeable
PPTX
Draft Survey.pptx
PPTX
LO1.6 maritime dadasdasdasdasddasdasd.pptx
PDF
Hydrostatics and stability
PDF
Hydrostatics 1 n 2
PDF
Linea de carga - Diseños de barcos ship desing
PPTX
Watertaxi 2-2nd Project Presentation-BUET
PDF
Ballast Calculation Techniques using Extrapolation
PPT
PPSX
offshore support vessel design
PDF
Trawler report
PPTX
NAVAL ARCHITECTURE- GEOMETRY OF SHIP
PDF
Ship Construction by Jayan Pillai
PPTX
Displacemnt
PPTX
Stability of Fishing Vessels – 3 day training of trainers course
 
PDF
INTACT STABILITY BOOKLET
PPTX
Ship resistance in confined water
PPTX
Ship resistance in confined water
PDF
6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf
PDF
Hull form geometry
DNS SHIP CONST & STAB. PPT.pptx very knowledgeable
Draft Survey.pptx
LO1.6 maritime dadasdasdasdasddasdasd.pptx
Hydrostatics and stability
Hydrostatics 1 n 2
Linea de carga - Diseños de barcos ship desing
Watertaxi 2-2nd Project Presentation-BUET
Ballast Calculation Techniques using Extrapolation
offshore support vessel design
Trawler report
NAVAL ARCHITECTURE- GEOMETRY OF SHIP
Ship Construction by Jayan Pillai
Displacemnt
Stability of Fishing Vessels – 3 day training of trainers course
 
INTACT STABILITY BOOKLET
Ship resistance in confined water
Ship resistance in confined water
6-Speaker-3-Capt-Albert-Lanting Weather Dependent Lashing.pdf
Hull form geometry

Draft survey calculation_sheet_2010.1

  • 1. RaetsMarine Insurance B.V. Draft Survey calculation sheet Date / Initial Final 1a Draft forward 1b Draft aft mean 1c = 1a + 1b / 2 Draft fore & aft mean 2a Draft midship PS 2b Draft midship SB 2c = 2a + 2b / 2 Draft midship mean 3 = 1c + 2c / 2 Draft mean for means 4 Draft corr. for deformation 5 (at draft 4) Displacement at sg 1.025 Trim bow / stern Trim in cm LCF LBP TPC (t/cm) MTCT Diff Density 6 Trim correction 1 7 Trim correction 2 8 Correction for Density Consumable weights HFO GO LUB Fresh water Ballast Constant/Others 9 Total known weights 10 = 5 + 6 + 7 - 8 Corrected displacement 11 Light ship 12 = 10 – 9 – 11 Cargo weight total Cargo loaded/discharged = Our contact details: RaetsMarine Contact: Jeroen Ebbeling/Robbert Beekman Fascinatio Boulevard 622 2909 VA Capelle A/D IJssel, The Netherlands Telephone: .. +31-10-24 25 000 Faxnumber: . +31-10-24 25 088 E-mail: j.ebbeling@raetsmarine.com E-mail: r.beekman@raetsmarine.com Draft Survey Calculation Sheet, 2010.1 www.raetsmarine.com 1 of 6
  • 2. RaetsMarine Insurance B.V. Draft surveys are made in order to determine the quantity of cargo loaded, carried and discharged. This is done by measuring the vessels draft and calculating its displacement prior to loading a cargo and after loading of this cargo, taking variables such as weight lightship, ballast water, fuel and stores into account. In order to obtain a reasonable accuracy in this draft survey calculation corrections to the draft readings and it initial corresponding stability values and parameters must be made. General definitions; Displacement of a vessel is the actual total weight of a vessel. It is expressed in metric tons, and is calculated by multiplying the volume of the hull below the waterline (the volume of water it is displacing) by the density of the water. The density will depend on whether the vessel is in fresh or salt water, or is in the tropics, where the temperature of the water is warmer and hence less dense. Deadweight of a vessel (often abbreviated as DWT for deadweight tons) is the displacement at any loaded condition minus the lightship weight. It includes the crew, passengers, cargo, fuel, water, and stores. Like displacement, it is often expressed in long tons or in metric tons. Lightship measures the actual weight of the ship with no fuel, passengers, cargo, water, etc. on board. This weight will be mentioned in the stability booklets. Gross tonnage or Gross Register Tonnage is the total internal volume of a vessel, with some exemptions for non-productive spaces such as crew quarters. There are therefore different gross tonnage measurements (Suez/Panama). Tonnage measurements are now governed since 1994 by an IMO Convention (International Convention on Tonnage Measurement of Ships, 1969 (London-Rules)), which applies to all ships built after July 1982. In accordance with the Convention, the correct term to use now is GT, which is a function of the moulded volume of all enclosed spaces of the ship. Net Weight or Net Register Tonnage is the volume of cargo the vessel can carry; in other words its the Gross Tonnage minus the volume of spaces that do not hold any cargo (e.g. engine room, bridge, crew spaces, depending which country is making calculations (Suez/Panama)). During a draft survey the vessels draft is measured. The draft is measured at 6 points, 2 x bow (P/S), 2 x midships (P/S) and 2 x at the stern (P/S). The draft readings are averaged out in the mean draft. Via calculations this draft reading leads us to the vessels present apparent displacement at the time of our survey via on board, ship’s specific, hydrostatic tables and stability curves. The water density at the time of the draft survey is also determined by means of a density meter. A very common instrument for the direct measurement of the density of a liquid is the hydrometer, a floater. The density of the water in which the vessel is surveyed directly influences the draft/dept of the vessel. Considering that the hydrostatic tables and stability curves are pre-calculated for displacements of a vessel in water with a standard density of 1.025 t/m³ (salt water), corrections to the determined draft must be made in order to be able to find the correct displacement of the vessel. Make sure at the time of measuring the density the density meter is free floating. Displacement correction In order to find the correct displacement we will correct the displacement straight away, instead of correcting the drafts at first. We will use the hydrostatic tables with the mean draft as entry value. These calculations are called the trim corrections. Likewise we will also make a correction for water density but again a tonnage correction and not a draft correction. Draft Survey Calculation Sheet, 2010.1 www.raetsmarine.com 2 of 6
  • 3. RaetsMarine Insurance B.V. First trim correction, It is necessary to correct the fore & aft drafts to the true draft at the perpendiculars. This can be achieved either by calculation or draft correction tables if available. The main calculations must be accomplished with the drafts at the fore & aft perpendiculars and at the amidships point of the hull. Note that draft marks are not always placed on the perpendiculars, so the true draft of the vessel does not always correspond with the drafts found during the survey. The hydrostatic tables are mostly based on the length between perpendiculars and not to the length between the draft marks on the hull. TRIM(cm) x TPC x LCF 1st Trim Correction = -------------------------------- LBP Please note that the LCF is the distance between the midship point and the position of the LCF. This correction is either added or subtracted to the displacement depending whether the LCF is forward or aft of the mid point, or the trim is by the head or stern. Always draw a sketch to ensure you apply this trim correction the correct way. Second trim correction This is a little more difficult to grasp. It is because there is in fact a second movement of the LCF caused because of the irregular hull shape of the vessel in trimmed condition. The position of the LCF in the ship’s hydrostatic tables are given for a ship on even keel only, but if the ship is trimmed the waterline has changed, causing a second movement to the LCF. The second trim correction is always positive and fairly small, for example with a loaded Panamax at a one metre trim the correction should only be approximately 12 tonnes, with a two metre trim approximately 50 tonnes. This second trim correction is calculated by the following formula: Trim²(m) x ΔMTCT x 50 2nd Trim Correction: -------------------------------------------- LBP In this formula the ΔMTCT is the difference of MTCT values over a range of draft 50 cm above and 50 cm below the corrected mean draft. This second trim correction is always added to the displacement. The second trim correction, sometimes called the Nemoto correction, is intended to correct for the movement of the LCF with the change of trim. It was deduced by Mr Nemoto after observing a bulk carrier being built. The theory on which the second trim correction is based only holds true for small changes of trim so it is not strictly true for large trims. Please note that the second trim correction is rather small for small trims, and rarely exceeding 30 tonnes for large vessels. It is often ignored but for completeness sake the second trim correction should always be calculated. Density correction If the vessel is in a dock water density then she is sitting differently in the water than she would be if in sea water so we are reading a different displacement from the hydrostatic tables which are derived for salt water only. The following formula is simply the dock water formula converted to a tonnage figure, not a millimetre value. (1.025 – dock density) x Displacement Draft Survey Calculation Sheet, 2010.1 www.raetsmarine.com 3 of 6
  • 4. RaetsMarine Insurance B.V. Density Correction: --------------------------------------------------- 1.025 And of course this is subtracted from the displacement if the dock water density is below 1.025 t/m³ It is worth mentioning at this point that although we always consider the density of salt water to be 1.025 t/m³, if you were to take a reading in Mediterranean Sea ports you would probably find it to be around the 1.030 t/m³ to 1.033 t/m³ mark! Please note that the ship’s standard hydrometer is not an accurate instrument when it comes to using it to determine tonnage for a draft survey. It makes no allowance for the temperature of the water which will change the density as temperature changes. Corrected displacement When the true displacement of the vessel is known it only requires the subtraction of all the known weights on board and the subtraction of the ships light displacement. What remains is either the vessels ‘constant’ if in an empty condition or the cargo weight if in a loaded condition. The reason for two draft surveys is at first to find the vessels constant and then include this in the known weights when calculating the actual cargo on board after loading. When taking a draft survey upon discharge the cargo weight plus constant are found in the initial survey and the constant in the final survey, subtract the constant from the initial figure and you have the weight of cargo discharged. TRIM(cm) x LCF x TPC 1st Trim Correction: -------------------------------- LBP x x = ------------------------------ = tonnes LBP 2 Trim (m) x MTCT Diff x 50 2nd Trim Correction: ----------------------------------- LBP x x 50 = ----------------------------------- = tonnes (always add) LBP (1.025 – dock density) x Displacement Density Correction: --------------------------------------------------- 1.025 x = -------------------- = tonnes 1.025 Draft Survey Calculation Sheet, 2010.1 www.raetsmarine.com 4 of 6
  • 5. RaetsMarine Insurance B.V. Many commercial ships have a symbol called a Load mark painted on each side of the ship. This symbol, also called an International load line, or Plimsoll mark, marks the level to which the ship can be safely loaded. As cargo is brought on board, the ship floats lower and the symbol descends farther into the water. Before these symbols were made compulsory, many ships were lost due to overloading. Sometimes they were deliberately overloaded in the hope of collecting insurance money. Ships carrying emigrants from Europe to America were also lost. The British social reformer and politician Samuel Plimsoll advocated improved safety standards, particularly at sea, and the mark bears his name in his honor. The letters on the Load line marks have the following meanings: • TF - Tropical Fresh Water • F - Fresh Water • T - Tropical Seawater • S - Summer Seawater • W - Winter Seawater • WNA - Winter North Atlantic Letters may also appear to the sides of the mark indicating the classification society that has surveyed the vessel's load line. The initials used include AB for the American Bureau of Shipping, LR for Lloyd's Register, and NV for Det Norske Veritas. These season and zone marks are used to ensure adequate reserve buoyancy for the intended area of operation. Ships encounter rougher conditions in winter as opposed to summer, and in the North Atlantic as opposed to tropical waters, for example. A copy of a zone-chart must be on board in order to assure that the vessel is not overloaded. Fresh water marks make allowance for the fact that the ship will float deeper in fresh water. Draft Survey Calculation Sheet, 2010.1 www.raetsmarine.com 5 of 6
  • 6. RaetsMarine Insurance B.V. Draft Survey Calculation Sheet, 2010.1 www.raetsmarine.com 6 of 6