SlideShare a Scribd company logo
_____________ D-studio@_ 100831 slide1
4D Virtual Builder
‘Enabling the decision makers with
an visual overview of all steps
the project requires’
Frank Konings, Kliaplan Malysia
‘Effectively plan projects and demonstrate
this to our clients’
Kyp Kyprianou, Bam UK
_____________ D-studio@_ 100831 slide2
 Mechelen-Belgium / Schiedam-Holland
 Software – Services - Consultancy
 Project Data Integration-Centralization
 4D-5D-xD models
 4D solutions since 1999 - CAD expertise since 1984
 Markets:
 AEC (Architectural, Engineering and Construction)
 GIS (Geographical Information System)
 BIM (Building Information Modeling)
 PIM (Product Information Management)
 Main product line: 4D/xD Virtual Builder
 Full project data integration
 No data duplication
 Automated Project workbooks
 Project information sharing on everyones level
 Clients: BAM, PRC/ARCADIS, Eurostation (Station Brugges and Ghent), ERA
Contour, Amsterdam City (IBA), Erasmus and Viecuri hospital, University of
Leuven-Sydney-Liege, Deutsche Bank, Rabobank, Utrecht City (POS),...
The Dimension Studio
_____________ D-studio@_ 100831 slide3
+4D = CAD 2D/3D + Planning
Dynamic link between 2D/3D Objecten (AutoCAD, DesignCad, Sketchup, Microstation)
and Planning
xD = 4D + Attributes
Dynamic link between 2D/3D Objecten, Planning and other project data
(Costs, Functions, Parking spaces, ...)
4D Virtual Builder
_____________ D-studio@_ 100831 slide4
xD Virtual Builder Solution
_____________ D-studio@_ 100831 slide5
Advantages:
 Enhanced Communication:
Understandable communication on planning (internal and external);
 Analyzing:
Visualization of the planning leading to more accurate planning;
 Monitoring:
Close follow up on delays and resource problems;
 Sharing:
All members involved have the same view on the project;
 Reducing Costs:
Less time loss.
‘Effectively plan projects and demonstrate
this to our clients’
Kyp Kyprianou, Bam UK
Advantages
_____________ D-studio@_ 100831 slide6
Strong points:
 Learning Curve:
After basic training, easy and fast usable in every project;
 Direct Linking:
No import or duplication of data. All information remains in the native software;
 Centralized database:
All members involved can access the projects if necessary;
 Customizable:
Software architecture (Framework) ensures easy integration of data from other applications;
 User-friendly:
Several modules depending on the end-user wishes and use (Full-Pro-Lite);
 Flexibility:
Flexible and fast support;
 Automation:
Quickly generate new workbooks (tender document) based on updated information.
 Link with Google Sketchup:
2D/3D modelling made easy
Strong points
_____________ D-studio@_ 100831 slide7
Fields of Application:
 Construction
 Infrastructure
 Move management
 GIS
 Space Management
 ...
Fields of Application
_____________ D-studio@_ 100831 slide8
xD Applications
mgt SIGmgt INFRAmgt ESPACE
mgt CONSTRUCTIONmgt INFRAmgt DEMENAGEMENT
_____________ D-studio@_ 100831 slide9
xD Virtual Builder for Sketchup modules
xD Virtual BuilderxD Virtual Builder
LightLight
xD Virtual BuilderxD Virtual Builder
ProfessionalProfessional
xD Virtual BuilderxD Virtual Builder
UltimateUltimate
xD Virtual BuilderxD Virtual Builder
FullFull
Easy to use and fastEasy to use and fast
No direct link toNo direct link to
databasedatabase
Limited level of detailLimited level of detail
Instant 4D modelInstant 4D model
TimemgtTimemgt
Early project phasesEarly project phases
Easy to use, fastEasy to use, fast
Import/ExportImport/Export
planningdataplanningdata
Limited level of detailLimited level of detail
Instant 4D modelInstant 4D model
TimemgtTimemgt
Costmgt: optionCostmgt: option
Early project phasesEarly project phases
Easy to use, fast,Easy to use, fast,
directdirect
Synchronization withSynchronization with
planning dataplanning data
Unlimited level ofUnlimited level of
detaildetail
4D/xD model4D/xD model
TimemgtTimemgt
Costmgt: in progressCostmgt: in progress
All phasesAll phases
Full solutionFull solution
Direct andDirect and
continuouscontinuous
synchronization withsynchronization with
planningplanning
Unlimited level ofUnlimited level of
detaildetail
Complex 4D/xDComplex 4D/xD
model for all queriesmodel for all queries
TimemgtTimemgt
CostmgtCostmgt
Comparisons, ...Comparisons, ...
All phasesAll phases
_____________ D-studio@_ 100831 slide10
Demo
 Linking objects from Google SketchUp to Asta Powerproject;
 Navigating through time;
 Modify the schedule and reload;
 Showing a Powerpoint slideshow from a model.
Future development – see further
 Progress visualisation;
 Project Dashboard;
 xD-Ultimate with Excel real-time data server.
xD Virtual Builder for Sketchup modules
_____________ D-studio@_ 100831 slide11
xD Dashboard
_____________ D-studio@_ 100831 slide12
VU Amsterdam– september 09
_____________ D-studio@_ 100831 slide13
DELFT OSB – 2009/2010
_____________ D-studio@_ 100831 slide14
COA studies – september 09
_____________ D-studio@_ 100831 slide15
Oosterheem
_____________ D-studio@_ 100831 slide16
VIECURI movement
_____________ D-studio@_ 100831 slide17
Rabo Bank - Utrecht – 2006 – actual state
_____________ D-studio@_ 100831 slide22
… Thank You for your Attention

More Related Content

PDF
Decision Management on Red Hat OpenShift
PDF
Simple Drools Examples
PDF
Cadison project-engineer
PDF
Data science for smart manufacturing at Pirelli
PPTX
Agile DDD Genuin Objects
PDF
BIM-naar-GIS dataverwerking: linken en visualiseren
PDF
AUTOWARE Neutral Facilities: Reconfigurable Robot Workcell
PDF
Resume Rudi Vanden Driessche
Decision Management on Red Hat OpenShift
Simple Drools Examples
Cadison project-engineer
Data science for smart manufacturing at Pirelli
Agile DDD Genuin Objects
BIM-naar-GIS dataverwerking: linken en visualiseren
AUTOWARE Neutral Facilities: Reconfigurable Robot Workcell
Resume Rudi Vanden Driessche

What's hot (6)

PDF
Wayne_Atkinson_Resume_1May16
PDF
Building business applications with DMN and BPMN
PDF
MicroStation Product Datasheet
PPTX
GIS and CAD Integration: The Bentley Perspective
PDF
Cadison project-navigator
PDF
Asta Powerproject: Business Case
Wayne_Atkinson_Resume_1May16
Building business applications with DMN and BPMN
MicroStation Product Datasheet
GIS and CAD Integration: The Bentley Perspective
Cadison project-navigator
Asta Powerproject: Business Case
Ad

Similar to D-studio 4D visualisation for Google SketchUp (20)

PPT
4D VB @ Trimble SketchUp 3D Base Camp 2012
PDF
Construction Supply Chain Management (Group Assignment) - BIM 7D
PDF
Cscm group report
PPTX
Elecosoft 4D BIM for CIOB Guildford
PDF
CADD ARABIA - BROCHURE
PDF
CADD ARABIA - BROCHURE
PDF
Bim ifma besix_web
PPTX
Building Information Modelling ppt.pptx
PDF
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
PDF
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
PPTX
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
PPTX
Building Information Modelling (BIM)
DOCX
CSCM Bim group assignment.docx
PDF
BIM training
PPT
BIM and other softwares
PPTX
Supply Chain
PPTX
Quality 4D BIM Modeling Services by Building Information Modelling
PDF
MTECH Company Profile
PPTX
What is the role of revit 3 d modelling in construction
PDF
BIMLABS Global Profile 2022
4D VB @ Trimble SketchUp 3D Base Camp 2012
Construction Supply Chain Management (Group Assignment) - BIM 7D
Cscm group report
Elecosoft 4D BIM for CIOB Guildford
CADD ARABIA - BROCHURE
CADD ARABIA - BROCHURE
Bim ifma besix_web
Building Information Modelling ppt.pptx
Presenting D-studio projects at IE_NET BIM Conference, Antwerp 16 october 2013
Advantages offered by 3D, 4D, 5D and 6D BIM modeling
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
Building Information Modelling (BIM)
CSCM Bim group assignment.docx
BIM training
BIM and other softwares
Supply Chain
Quality 4D BIM Modeling Services by Building Information Modelling
MTECH Company Profile
What is the role of revit 3 d modelling in construction
BIMLABS Global Profile 2022
Ad

Recently uploaded (20)

PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PPTX
A Presentation on Artificial Intelligence
PPTX
Machine Learning_overview_presentation.pptx
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
Machine learning based COVID-19 study performance prediction
PDF
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
PPTX
Group 1 Presentation -Planning and Decision Making .pptx
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
Getting Started with Data Integration: FME Form 101
PPTX
MYSQL Presentation for SQL database connectivity
PDF
Encapsulation theory and applications.pdf
PPTX
1. Introduction to Computer Programming.pptx
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
Empathic Computing: Creating Shared Understanding
PDF
Network Security Unit 5.pdf for BCA BBA.
PDF
Agricultural_Statistics_at_a_Glance_2022_0.pdf
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PPT
Teaching material agriculture food technology
PDF
Assigned Numbers - 2025 - Bluetooth® Document
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
Dropbox Q2 2025 Financial Results & Investor Presentation
A Presentation on Artificial Intelligence
Machine Learning_overview_presentation.pptx
Accuracy of neural networks in brain wave diagnosis of schizophrenia
Machine learning based COVID-19 study performance prediction
Optimiser vos workloads AI/ML sur Amazon EC2 et AWS Graviton
Group 1 Presentation -Planning and Decision Making .pptx
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Getting Started with Data Integration: FME Form 101
MYSQL Presentation for SQL database connectivity
Encapsulation theory and applications.pdf
1. Introduction to Computer Programming.pptx
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Empathic Computing: Creating Shared Understanding
Network Security Unit 5.pdf for BCA BBA.
Agricultural_Statistics_at_a_Glance_2022_0.pdf
NewMind AI Weekly Chronicles - August'25-Week II
Teaching material agriculture food technology
Assigned Numbers - 2025 - Bluetooth® Document
The Rise and Fall of 3GPP – Time for a Sabbatical?

D-studio 4D visualisation for Google SketchUp

  • 1. _____________ D-studio@_ 100831 slide1 4D Virtual Builder ‘Enabling the decision makers with an visual overview of all steps the project requires’ Frank Konings, Kliaplan Malysia ‘Effectively plan projects and demonstrate this to our clients’ Kyp Kyprianou, Bam UK
  • 2. _____________ D-studio@_ 100831 slide2  Mechelen-Belgium / Schiedam-Holland  Software – Services - Consultancy  Project Data Integration-Centralization  4D-5D-xD models  4D solutions since 1999 - CAD expertise since 1984  Markets:  AEC (Architectural, Engineering and Construction)  GIS (Geographical Information System)  BIM (Building Information Modeling)  PIM (Product Information Management)  Main product line: 4D/xD Virtual Builder  Full project data integration  No data duplication  Automated Project workbooks  Project information sharing on everyones level  Clients: BAM, PRC/ARCADIS, Eurostation (Station Brugges and Ghent), ERA Contour, Amsterdam City (IBA), Erasmus and Viecuri hospital, University of Leuven-Sydney-Liege, Deutsche Bank, Rabobank, Utrecht City (POS),... The Dimension Studio
  • 3. _____________ D-studio@_ 100831 slide3 +4D = CAD 2D/3D + Planning Dynamic link between 2D/3D Objecten (AutoCAD, DesignCad, Sketchup, Microstation) and Planning xD = 4D + Attributes Dynamic link between 2D/3D Objecten, Planning and other project data (Costs, Functions, Parking spaces, ...) 4D Virtual Builder
  • 4. _____________ D-studio@_ 100831 slide4 xD Virtual Builder Solution
  • 5. _____________ D-studio@_ 100831 slide5 Advantages:  Enhanced Communication: Understandable communication on planning (internal and external);  Analyzing: Visualization of the planning leading to more accurate planning;  Monitoring: Close follow up on delays and resource problems;  Sharing: All members involved have the same view on the project;  Reducing Costs: Less time loss. ‘Effectively plan projects and demonstrate this to our clients’ Kyp Kyprianou, Bam UK Advantages
  • 6. _____________ D-studio@_ 100831 slide6 Strong points:  Learning Curve: After basic training, easy and fast usable in every project;  Direct Linking: No import or duplication of data. All information remains in the native software;  Centralized database: All members involved can access the projects if necessary;  Customizable: Software architecture (Framework) ensures easy integration of data from other applications;  User-friendly: Several modules depending on the end-user wishes and use (Full-Pro-Lite);  Flexibility: Flexible and fast support;  Automation: Quickly generate new workbooks (tender document) based on updated information.  Link with Google Sketchup: 2D/3D modelling made easy Strong points
  • 7. _____________ D-studio@_ 100831 slide7 Fields of Application:  Construction  Infrastructure  Move management  GIS  Space Management  ... Fields of Application
  • 8. _____________ D-studio@_ 100831 slide8 xD Applications mgt SIGmgt INFRAmgt ESPACE mgt CONSTRUCTIONmgt INFRAmgt DEMENAGEMENT
  • 9. _____________ D-studio@_ 100831 slide9 xD Virtual Builder for Sketchup modules xD Virtual BuilderxD Virtual Builder LightLight xD Virtual BuilderxD Virtual Builder ProfessionalProfessional xD Virtual BuilderxD Virtual Builder UltimateUltimate xD Virtual BuilderxD Virtual Builder FullFull Easy to use and fastEasy to use and fast No direct link toNo direct link to databasedatabase Limited level of detailLimited level of detail Instant 4D modelInstant 4D model TimemgtTimemgt Early project phasesEarly project phases Easy to use, fastEasy to use, fast Import/ExportImport/Export planningdataplanningdata Limited level of detailLimited level of detail Instant 4D modelInstant 4D model TimemgtTimemgt Costmgt: optionCostmgt: option Early project phasesEarly project phases Easy to use, fast,Easy to use, fast, directdirect Synchronization withSynchronization with planning dataplanning data Unlimited level ofUnlimited level of detaildetail 4D/xD model4D/xD model TimemgtTimemgt Costmgt: in progressCostmgt: in progress All phasesAll phases Full solutionFull solution Direct andDirect and continuouscontinuous synchronization withsynchronization with planningplanning Unlimited level ofUnlimited level of detaildetail Complex 4D/xDComplex 4D/xD model for all queriesmodel for all queries TimemgtTimemgt CostmgtCostmgt Comparisons, ...Comparisons, ... All phasesAll phases
  • 10. _____________ D-studio@_ 100831 slide10 Demo  Linking objects from Google SketchUp to Asta Powerproject;  Navigating through time;  Modify the schedule and reload;  Showing a Powerpoint slideshow from a model. Future development – see further  Progress visualisation;  Project Dashboard;  xD-Ultimate with Excel real-time data server. xD Virtual Builder for Sketchup modules
  • 11. _____________ D-studio@_ 100831 slide11 xD Dashboard
  • 12. _____________ D-studio@_ 100831 slide12 VU Amsterdam– september 09
  • 13. _____________ D-studio@_ 100831 slide13 DELFT OSB – 2009/2010
  • 14. _____________ D-studio@_ 100831 slide14 COA studies – september 09
  • 15. _____________ D-studio@_ 100831 slide15 Oosterheem
  • 16. _____________ D-studio@_ 100831 slide16 VIECURI movement
  • 17. _____________ D-studio@_ 100831 slide17 Rabo Bank - Utrecht – 2006 – actual state
  • 18. _____________ D-studio@_ 100831 slide22 … Thank You for your Attention

Editor's Notes

  • #3: Elevator Pitch on Dstudio and the 4D Virtual Builder
  • #5: Enkel het principe en de volledigheid van de oplossing aangeven. Snel overspingen … voor geïnteresseerden achteraf.
  • #7: Highlight the strongpoints vs other software like Navisworks and Synchro
  • #21: Enkel het principe en de volledigheid van de oplossing aangeven. Snel overspingen … voor geïnteresseerden achteraf.