QCS 2014 Section 05: Concrete Page 1
Part 12: Joints
12 JOINTS....................................................................................................................2
12.1 GENERAL ...............................................................................................................2
12.1.1 Scope 2
12.1.2 References 2
12.1.3 Submittals 2
12.1.4 Quality Assurance 3
12.1.5 Definitions 3
12.2 CONSTRUCTION JOINTS......................................................................................4
12.2.1 General 4
12.2.2 Construction Joints in Water Retaining Structures 4
12.3 MOVEMENT JOINTS ..............................................................................................5
12.3.1 General 5
12.3.2 Joint Filler 6
12.3.3 Joint Sealants 6
12.4 SLIP BEARINGS .....................................................................................................7
12.4.1 General 7
12.5 WATERSTOPS .......................................................................................................7
12.5.1 General 7
12.5.2 Waterstops 7
12.5.3 Butyl Rubber Waterstops 8
12.5.4 Water Swelling Gaskets 8
Q
a
t
a
r
C
o
n
s
t
r
u
c
t
i
o
n
S
p
e
c
i
f
i
c
a
t
i
o
n
s
2
0
1
4
QCS 2014 Section 05: Concrete Page 2
Part 12: Joints
12 JOINTS
12.1 GENERAL
12.1.1 Scope
1 This part deals with movement and construction joints, slip bearings, waterstops and
associated sealants and filler materials.
2 Related Sections and Parts are as follows:
This Section
Part 1............... General
Part 10,............ Curing
Part 15,............ Hot Weather Concreting
Part 16,............ Miscellaneous
12.1.2 References
ASTM D1751..............Standard Specification for Preformed Expansion Joint Filler for
Concrete Paving and Structural Construction (Non-extruding and
Resilient Bituminous Types)
ASTM D2240..............Standard Test Method for Rubber Property—Durometer Hardness
ASTM D3575..............Standard Test Methods for Flexible Cellular Materials Made From
Olefin Polymers
BS 903........................Physical testing of rubber
BS 2571......................General purpose flexible PVC compounds for moulding and extrusion
BS 2782,.....................Methods of testing plastics
BS 6093,.....................Design of joints and joining in building construction
BS 7164,.....................Chemical tests for raw and vulcanized rubber
BS EN 1992-3 ............Eurocode 2. Design of concrete structures. Liquid retaining and
containing structures
BS EN ISO 7214 ........Cellular plastics. Polyethylene. Methods of test
CRD-C572..................Corps of Engineers Specifications for Polyvinylchloride Waterstop
ISO 9001 ....................Quality management systems. Requirements
12.1.3 Submittals
1 The Contractor shall submit for approval by the Engineer as soon as practicable after
acceptance of his Tender and not less than three weeks before commencement of
concreting, drawings showing his proposals for the position of construction joints having due
regard to any that may be shown on the Contract Drawings.
Q
a
t
a
r
C
o
n
s
t
r
u
c
t
i
o
n
S
p
e
c
i
f
i
c
a
t
i
o
n
s
2
0
1
4
QCS 2014 Section 05: Concrete Page 3
Part 12: Joints
2 For slide bearings the Contractor shall provide at least three samples of the proposed
material, together with the manufacturer's technical specifications and recommendations in
respect of application and performance.
3 For slip joints the Contractor shall provide at least three samples of materials proposed,
together with manufacturer's technical specifications and recommendations in respect of
application and performance.
4 For waterstops the Contractor shall provide at least three samples of proposed types,
including prefabricated joints and junctions, if applicable. If joints are to be made up on site,
provide worked samples, including samples for each make of waterstop, where samples
from different manufacturers are provided.
5 The Contractor must supply a certificate of compliance for the joint sealant, stating that it
meets the requirements of the specification. The Contractor shall also supply the
Manufacturer’s technical and installation data for the proposed material. The Contractor shall
provide details of previous installations of the product, with the client name, structure name,
type of joint and value of contract.
6 The Contractor shall prepare shop drawings that show the layout of the waterstops, specials
and joints.
12.1.4 Quality Assurance
1 The joint sealant, including primers and debonding materials shall be compatible with each
other and shall be supplied from a manufacturer operating the ISO 9001 or 9002 Quality
Assurance Scheme.
12.1.5 Definitions
1 Construction Joint: The surface where two successive placements of concrete meet, across
which it is desirable to develop and maintain bond between the two concrete placements, and
through which any reinforcement which may be present is not interrupted.
2 Contraction Joint: Formed, sawed, or tooled groove in a concrete structure to create a
weakened plane and regulate the location of cracking resulting from the dimensional change
of different parts of the structure. (See also Isolation Joint.)
3 Expansion Joint: A separation between adjoining parts of a concrete structure which is
provided to allow small relative movements such as those caused by thermal changes to
occur independently.
4 Isolation Joint: A separation between adjoining parts of a concrete structure provided to
isolate and element and thus allow independent movement.
5 Joints Fillers: Materials that are used to fill space within movement joints during construction.
They may provide support to a sealant applied subsequently.
Q
a
t
a
r
C
o
n
s
t
r
u
c
t
i
o
n
S
p
e
c
i
f
i
c
a
t
i
o
n
s
2
0
1
4
QCS 2014 Section 05: Concrete Page 4
Part 12: Joints
12.2 CONSTRUCTION JOINTS
12.2.1 General
1 Where construction joints are required in slabs or beams (designed by Direct Design Method
DDM) they shall be located within the middle third of their spans, and at one-third to one-
quarter of span in slabs and beams subject to a maximum spacing of approximately 9
metres. Where slabs are supported by beams then the beams and slabs shall be constructed
in one operation.
2 In all cases vertical stop boards of a form to be approved by the Engineer shall be provided
by at the end of each section of work which is to be concreted in one operation and the
concrete shall be thoroughly compacted against these stop boards.
3 Where slabs, beams and walls incorporate construction joints, panels shall generally be
constructed consecutively. Where this is not possible a gap not exceeding one metre shall be
formed between adjacent panels. This gap shall not be concreted until a minimum interval of
7 d has expired since the casting of the most recent panel.
4 The size of bays for reinforced floors, walls and roofs shall be as shown on the drawings but
in no event shall they exceed 7.5 m in either direction and 6 m when unreinforced or with
nominal reinforcement.
5 Horizontal construction joints in walls will only be permitted when the wall is continuous with
the floor slab. Walls shall be keyed on cast kickers 150 mm high or on the tops of walls
meeting the soffits of suspended members.
6 Construction joints in monolithic structures shall be aligned with each other whenever
practicable.
7 Before placing new concrete against concrete which has already set the latter shall be
treated to expose the aggregate over the full section and leave a sound irregular surface.
This shall be done while the concrete is still fresh by means of water spray and light brushing
or other means approved by the Engineer.
8 Immediately before the new concrete is placed all foreign matter shall be cleaned away and
the surface moistened.
9 If during the course of the Contract it should become apparent that the Contractor’s methods
of forming construction joints are not proving effective the Engineer may order the Contractor
to execute at the Contractor’s expense such preventative measures as the Engineer may
consider necessary to ensure the watertightness of the construction joints in further work.
12.2.2 Construction Joints in Water Retaining Structures
1 The floor may be designed as fully restrained against shrinkage and thermal contraction and
should be cast directly onto the blinding concrete.
2 In large structures, the floor shall be designed as a series of continuous strips with transverse
induced contraction joints provided to ensure that cracking occurs in predetermined
positions. Longitudinal joints between the strips should form contraction joints.
Q
a
t
a
r
C
o
n
s
t
r
u
c
t
i
o
n
S
p
e
c
i
f
i
c
a
t
i
o
n
s
2
0
1
4
QCS 2014 Section 05: Concrete Page 5
Part 12: Joints
3 Waterstops shall be incorporated into construction joints, crack induced joints, contraction
joints and expansion joints in water retaining structures. The Contractor shall ensure that all
such joints are watertight and any joints which may leak or weep shall be rectified by the
Contractor to the Engineer’s satisfaction.
4 The spacing of construction joints, crack induced joints, contraction joints and expansion
joints in water retaining structures shall be shown on the design drawings.
5 Where the positions or type of joints are not indicated on the drawings, the spacing of
construction joints or crack induced joints in water retaining structures shall not exceed 5 m.
6 Where the positions or type of joints are not indicated on the drawings in the ground floor
slab, construction joints, crack induced joints, contraction joints and expansion joints shall be
incorporated into the works as appropriate. for slabs on grade, construction joints or crack
induced joints should be provided at areas where differences in subgrade and slab support
may cause cracks. The slab shall be cast in strips not more than 15 metres wide across the
width of the building. Within each strip for both directions, crack induced joints shall be
provided at areas where cracks are expected and not more than 5.0 metre spacing, and
construction or contraction joints shall be provided at not more than 15.0m spacing.
7 Construction or contraction joints shall be provided between adjacent strips.
8 Waterstops of a type acceptable to the Engineer shall be embedded in the concrete. The
waterstop should be made of a high quality material, which must retain its resilience through
the service life of the structure for the double function of movement and sealing. The surface
of waterstops should be carefully rounded to ensure tightness of the joint even under heavy
water pressure. To ensure a good tightness with or without movement of the joints, the
waterstop should be provided with anchor parts. The cross-section of the waterstops should
be determined in accordance with the presumed maximum water pressure and joint
movements. The complete works of fixed and welded connections must be carried out
strictly in accordance with the manufacturer’s instructions.
9 Engineer’s acceptance shall be obtained by the Contractor, prior to start of work, on the
casting sequence and the layout of joints.
12.3 MOVEMENT JOINTS
12.3.1 General
1 Movement joints for expansion and contraction shall be constructed in accordance with the
details and to the dimension shown on the Drawings or where otherwise ordered by the
Engineer and shall be formed of the elements specified.
2 Movement Joints in Water Retaining Structures shall be in accordance with the details and to
the dimension shown on the Drawings and EN 1992-3.
3 The Contractor shall pay particular attention to the effects of climatic extremes on any
material which he may desire to use on any movement joint and shall submit for approval by
the Engineer his proposals for the proper storage, handling and use of the said materials
having due regard for any recommendations made by the manufacturer in this connection.
Q
a
t
a
r
C
o
n
s
t
r
u
c
t
i
o
n
S
p
e
c
i
f
i
c
a
t
i
o
n
s
2
0
1
4
QCS 2014 Section 05: Concrete Page 6
Part 12: Joints
12.3.2 Joint Filler
1 Joint fillers shall conform to the requirements of BS 6093 or ASTM D1751 or equivalent if
they are bituminous type or to the requirements of ASTM D3575 or BS EN ISO 7214 or
equivalent if they are polymer foam type.
2 The joint filler shall be fixed to the required dimensions of the joint cross-section and shall
provide a firm base for the joint sealer.
3 When required between two concrete surfaces as a resilient movement joint, the filler shall
be an approved granulated cork bound with insoluble synthetic resin.
4 When required between blockwork and concrete as a low density movement joint filler or for
building details it shall be an approved bitumen impregnated fibreboard or preformed closed
cell polyethylene.
12.3.3 Joint Sealants
1 All joints to be sealed shall be formed and the groove grit blasted to remove all traces of
deleterious materials such as form oil or curing compounds and also to remove any surface
laitance from the sides of the joint. The joint shall be dry prior the application of priming.
Where the use of grit blasting is not possible the Contractor may propose alternative
methods subject to the approval of the Engineer.
2 The back of the joint shall receive a debonding tape or polyethylene foam backer cord in
order to provide the correct depth to width ratio and prevent three sided adhesion.
3 The areas adjacent to the joint shall be protected using masking tape.
4 The sides of the joint shall be primed with the relevant primer as recommended by the
sealant manufacturer and the sealant material applied in accordance with the manufacturers
instructions.
5 The sealant material shall be a non-biodegradable multicomponent pitch polyurethane
elastomeric joint sealant, carefully selected as appropriate for the specific climatic and
environmental exposure conditions expected. Alternative types of sealant will be considered,
including epoxy-polyurethane, rubber bitumen and acrylic, subject to the requirements of the
specification and the approval of the Engineer.
6 Where the joint sealant is to be in contact with a protective coating the Contractor shall
satisfy the Engineer that the sealant and protective coating are compatible
7 Sealants shall exhibit the following properties:
(a) Movement accommodation factor 25 %
(b) Shore ‘A’ hardness 20 - 25
(c) Solids content 100 %
(d) Service temperature range 0
o
C to 90
o
C
(e) Chemical resistance to Sewage, Sabkha, Mineral acids and Alkalis
(f) Width to depth ratio 2:1
Q
a
t
a
r
C
o
n
s
t
r
u
c
t
i
o
n
S
p
e
c
i
f
i
c
a
t
i
o
n
s
2
0
1
4
QCS 2014 Section 05: Concrete Page 7
Part 12: Joints
8 Where shown on the Drawings sealants shall also be suitable for use with potable water.
9 All surface preparation, priming, mixing and application shall be carried out in strict
accordance with the manufacturer’s instructions.
10 The sealant shall have a proven track record of no less than ten years under similar local
conditions.
12.4 SLIP BEARINGS
12.4.1 General
1 Slip bearings shall be preformed low friction bearing strips to form a thin sliding joint.
2 They shall be extruded from specially formulated polyethylene to form a durable lamina
resistant to sewage, mineral acids and alkalis, solvents and weathering.
3 Slip bearings shall be applied in two layers with the bottom layer bonded to the substrate with
a high quality solvent borne adhesive based on polychloroprene rubber. The substrate shall
be clean and free from deleterious materials such as form oil or curing compounds and
surface laitance. The surface shall be level and even along the full length of the joint
4 The applied loads for slip bearings shall not exceed 0.7 MPa.
5 Operating temperatures shall be up to 80 C
6 The coefficient of friction shall not exceed 0.15
12.5 WATERSTOPS
12.5.1 General
1 Waterstops and associated materials shall be by a manufacturer with a minimum of ten years
experience in the field of engineering waterproof products.
2 PVC waterstops shall be suitable for storage, handling, installation and service within a range
of 15 C to 65 C.
12.5.2 Waterstops
1 The waterstop shall be a high performance system forming a continuous network as shown
on the Drawings.
2 Site jointing is to be limited to butt joints and shall be performed strictly in accordance with
the manufacturer’s instructions.
3 Centrally placed waterstops shall employ centre bulbs/shutter stop with ribs on the web
sections.
4 Externally placed waterstops shall have ribs on either side of the centre of the waterstop. The
water bar used at the location of expansion joints shall have a bulb in the centre to
accommodate the movements.
Q
a
t
a
r
C
o
n
s
t
r
u
c
t
i
o
n
S
p
e
c
i
f
i
c
a
t
i
o
n
s
2
0
1
4
QCS 2014 Section 05: Concrete Page 8
Part 12: Joints
5 Waterstops shall have a minimum thickness of 3 mm.
6 The minimum test performance data for PVC waterstops shall be as follows:
Tensile strength >12 MPa
Elongation at break 300 %
Hardness Shore ‘A’ 80 to 90
7 The materials shall be tested in accordance with BS 2571 or BS 2782 or CRD–C572 or
ASTM D2240.
12.5.3 Butyl Rubber Waterstops
1 Butyl rubber waterstops shall have the properties stated in Table 12.1 when tested in
accordance with BS 903.
Table 12.1
Properties Requirements of Butyl Rubber Waterstops
BS 903 Property Requirements
Part A1 Density 1100 kg/m
3
(± 5 %)
Part A26 Handness 60-70 IRHD
Part A2 Tensile Strength Not less than 17.5 N/mm
2
Part A2 Elongation at break point Not less than 450 %
Part A/6 Water Absosption (48 hours immersion) Not exceeding 5 %
2 Butyl rubber waterstops shall be suitable for storage, handling, installation and service within
a temperature of 0 °C to 40 °C
12.5.4 Water Swelling Gaskets
1 Where active sealing is required for critical areas, waterstops shall be hydrophilic polymer
modified chloroprene rubber strips. The rubber strips shall conform to the following properties
as applicable:
(a) Water pressure resistance : 5 Bar (50 m)
(b) Expansion in contact with water : 2 x original SRE
(c) : Reversible
(d) Application Temperatures : - 30 to + 70 °C
2 The selected rubber strips shall be available for three exposures:
(a) Fresh Water
(b) Seawater
(c) Chemicals (if the condition demands or upon the Engineer’s request)
The supplier shall furnish references upon request of the Engineer.
END OF PART

More Related Content

PDF
Yee s2&s2
PPTX
Type of structural joints
DOC
02725 sewer manholes
DOC
Concreting of super structure
PDF
Spec u kon fsi 2021
DOCX
vacation work report 2
PPTX
Post tensioning
DOC
Precast Concrete Specifications.doc
Yee s2&s2
Type of structural joints
02725 sewer manholes
Concreting of super structure
Spec u kon fsi 2021
vacation work report 2
Post tensioning
Precast Concrete Specifications.doc

Similar to Engineering quality version 2014 for construction projects (20)

PDF
07 - Method Statement for Plastering Works.pdf
PDF
KEYSTONE-GRSW retaining_walls.pdf
PPTX
Concrete repair
DOCX
Site report 1
PDF
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
PPTX
Dda training presentation
PDF
ACI-117-90 Standard Specifications for Tolerances for Concrete Construction a...
PDF
PDF
Performance Mixes MnDOT Specification Report - Aggregate and Ready Mix Associ...
PDF
abermain.firestation
PDF
Lecture on construction loading by Dr. McCullouch
PDF
Lecture-on-construction-loading-by-dr-mccullouch
PDF
Construction Loading Lecture by Dr. McCullouch
PDF
lecture-on-construction-loading-by-dr-mccullouch
DOC
Column & beam
PDF
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
DOC
Concrete method rev02
PDF
Mvma installation guide 3rd edition
PDF
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
PPTX
PPT for Internship in CIVIL Engineering.pptx
07 - Method Statement for Plastering Works.pdf
KEYSTONE-GRSW retaining_walls.pdf
Concrete repair
Site report 1
Glen-Gery’s Brickwork Techniques Seminar Series : The Basics of Brickwork Det...
Dda training presentation
ACI-117-90 Standard Specifications for Tolerances for Concrete Construction a...
Performance Mixes MnDOT Specification Report - Aggregate and Ready Mix Associ...
abermain.firestation
Lecture on construction loading by Dr. McCullouch
Lecture-on-construction-loading-by-dr-mccullouch
Construction Loading Lecture by Dr. McCullouch
lecture-on-construction-loading-by-dr-mccullouch
Column & beam
GROUP PROJECT: PROPOSAL FOR THE FINISHED/ EXISTING BUILDING CONSTRUCTION (CAS...
Concrete method rev02
Mvma installation guide 3rd edition
REVIEW OF THE ROLE OF JOINTS USAGE IN BRIDGE STRUCTURES
PPT for Internship in CIVIL Engineering.pptx
Ad

Recently uploaded (20)

PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
Lecture Notes Electrical Wiring System Components
PDF
PPT on Performance Review to get promotions
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PDF
Well-logging-methods_new................
PPTX
Current and future trends in Computer Vision.pptx
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
Artificial Intelligence
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
Sustainable Sites - Green Building Construction
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
Geodesy 1.pptx...............................................
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPT
Mechanical Engineering MATERIALS Selection
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
Model Code of Practice - Construction Work - 21102022 .pdf
Lecture Notes Electrical Wiring System Components
PPT on Performance Review to get promotions
UNIT 4 Total Quality Management .pptx
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Well-logging-methods_new................
Current and future trends in Computer Vision.pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Artificial Intelligence
Embodied AI: Ushering in the Next Era of Intelligent Systems
Sustainable Sites - Green Building Construction
bas. eng. economics group 4 presentation 1.pptx
Geodesy 1.pptx...............................................
CYBER-CRIMES AND SECURITY A guide to understanding
Mechanical Engineering MATERIALS Selection
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
Foundation to blockchain - A guide to Blockchain Tech
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Ad

Engineering quality version 2014 for construction projects

  • 1. Q a t a r C o n s t r u c t i o n S p e c i f i c a t i o n s 2 0 1 4 QCS 2014 Section 05: Concrete Page 1 Part 12: Joints 12 JOINTS....................................................................................................................2 12.1 GENERAL ...............................................................................................................2 12.1.1 Scope 2 12.1.2 References 2 12.1.3 Submittals 2 12.1.4 Quality Assurance 3 12.1.5 Definitions 3 12.2 CONSTRUCTION JOINTS......................................................................................4 12.2.1 General 4 12.2.2 Construction Joints in Water Retaining Structures 4 12.3 MOVEMENT JOINTS ..............................................................................................5 12.3.1 General 5 12.3.2 Joint Filler 6 12.3.3 Joint Sealants 6 12.4 SLIP BEARINGS .....................................................................................................7 12.4.1 General 7 12.5 WATERSTOPS .......................................................................................................7 12.5.1 General 7 12.5.2 Waterstops 7 12.5.3 Butyl Rubber Waterstops 8 12.5.4 Water Swelling Gaskets 8
  • 2. Q a t a r C o n s t r u c t i o n S p e c i f i c a t i o n s 2 0 1 4 QCS 2014 Section 05: Concrete Page 2 Part 12: Joints 12 JOINTS 12.1 GENERAL 12.1.1 Scope 1 This part deals with movement and construction joints, slip bearings, waterstops and associated sealants and filler materials. 2 Related Sections and Parts are as follows: This Section Part 1............... General Part 10,............ Curing Part 15,............ Hot Weather Concreting Part 16,............ Miscellaneous 12.1.2 References ASTM D1751..............Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types) ASTM D2240..............Standard Test Method for Rubber Property—Durometer Hardness ASTM D3575..............Standard Test Methods for Flexible Cellular Materials Made From Olefin Polymers BS 903........................Physical testing of rubber BS 2571......................General purpose flexible PVC compounds for moulding and extrusion BS 2782,.....................Methods of testing plastics BS 6093,.....................Design of joints and joining in building construction BS 7164,.....................Chemical tests for raw and vulcanized rubber BS EN 1992-3 ............Eurocode 2. Design of concrete structures. Liquid retaining and containing structures BS EN ISO 7214 ........Cellular plastics. Polyethylene. Methods of test CRD-C572..................Corps of Engineers Specifications for Polyvinylchloride Waterstop ISO 9001 ....................Quality management systems. Requirements 12.1.3 Submittals 1 The Contractor shall submit for approval by the Engineer as soon as practicable after acceptance of his Tender and not less than three weeks before commencement of concreting, drawings showing his proposals for the position of construction joints having due regard to any that may be shown on the Contract Drawings.
  • 3. Q a t a r C o n s t r u c t i o n S p e c i f i c a t i o n s 2 0 1 4 QCS 2014 Section 05: Concrete Page 3 Part 12: Joints 2 For slide bearings the Contractor shall provide at least three samples of the proposed material, together with the manufacturer's technical specifications and recommendations in respect of application and performance. 3 For slip joints the Contractor shall provide at least three samples of materials proposed, together with manufacturer's technical specifications and recommendations in respect of application and performance. 4 For waterstops the Contractor shall provide at least three samples of proposed types, including prefabricated joints and junctions, if applicable. If joints are to be made up on site, provide worked samples, including samples for each make of waterstop, where samples from different manufacturers are provided. 5 The Contractor must supply a certificate of compliance for the joint sealant, stating that it meets the requirements of the specification. The Contractor shall also supply the Manufacturer’s technical and installation data for the proposed material. The Contractor shall provide details of previous installations of the product, with the client name, structure name, type of joint and value of contract. 6 The Contractor shall prepare shop drawings that show the layout of the waterstops, specials and joints. 12.1.4 Quality Assurance 1 The joint sealant, including primers and debonding materials shall be compatible with each other and shall be supplied from a manufacturer operating the ISO 9001 or 9002 Quality Assurance Scheme. 12.1.5 Definitions 1 Construction Joint: The surface where two successive placements of concrete meet, across which it is desirable to develop and maintain bond between the two concrete placements, and through which any reinforcement which may be present is not interrupted. 2 Contraction Joint: Formed, sawed, or tooled groove in a concrete structure to create a weakened plane and regulate the location of cracking resulting from the dimensional change of different parts of the structure. (See also Isolation Joint.) 3 Expansion Joint: A separation between adjoining parts of a concrete structure which is provided to allow small relative movements such as those caused by thermal changes to occur independently. 4 Isolation Joint: A separation between adjoining parts of a concrete structure provided to isolate and element and thus allow independent movement. 5 Joints Fillers: Materials that are used to fill space within movement joints during construction. They may provide support to a sealant applied subsequently.
  • 4. Q a t a r C o n s t r u c t i o n S p e c i f i c a t i o n s 2 0 1 4 QCS 2014 Section 05: Concrete Page 4 Part 12: Joints 12.2 CONSTRUCTION JOINTS 12.2.1 General 1 Where construction joints are required in slabs or beams (designed by Direct Design Method DDM) they shall be located within the middle third of their spans, and at one-third to one- quarter of span in slabs and beams subject to a maximum spacing of approximately 9 metres. Where slabs are supported by beams then the beams and slabs shall be constructed in one operation. 2 In all cases vertical stop boards of a form to be approved by the Engineer shall be provided by at the end of each section of work which is to be concreted in one operation and the concrete shall be thoroughly compacted against these stop boards. 3 Where slabs, beams and walls incorporate construction joints, panels shall generally be constructed consecutively. Where this is not possible a gap not exceeding one metre shall be formed between adjacent panels. This gap shall not be concreted until a minimum interval of 7 d has expired since the casting of the most recent panel. 4 The size of bays for reinforced floors, walls and roofs shall be as shown on the drawings but in no event shall they exceed 7.5 m in either direction and 6 m when unreinforced or with nominal reinforcement. 5 Horizontal construction joints in walls will only be permitted when the wall is continuous with the floor slab. Walls shall be keyed on cast kickers 150 mm high or on the tops of walls meeting the soffits of suspended members. 6 Construction joints in monolithic structures shall be aligned with each other whenever practicable. 7 Before placing new concrete against concrete which has already set the latter shall be treated to expose the aggregate over the full section and leave a sound irregular surface. This shall be done while the concrete is still fresh by means of water spray and light brushing or other means approved by the Engineer. 8 Immediately before the new concrete is placed all foreign matter shall be cleaned away and the surface moistened. 9 If during the course of the Contract it should become apparent that the Contractor’s methods of forming construction joints are not proving effective the Engineer may order the Contractor to execute at the Contractor’s expense such preventative measures as the Engineer may consider necessary to ensure the watertightness of the construction joints in further work. 12.2.2 Construction Joints in Water Retaining Structures 1 The floor may be designed as fully restrained against shrinkage and thermal contraction and should be cast directly onto the blinding concrete. 2 In large structures, the floor shall be designed as a series of continuous strips with transverse induced contraction joints provided to ensure that cracking occurs in predetermined positions. Longitudinal joints between the strips should form contraction joints.
  • 5. Q a t a r C o n s t r u c t i o n S p e c i f i c a t i o n s 2 0 1 4 QCS 2014 Section 05: Concrete Page 5 Part 12: Joints 3 Waterstops shall be incorporated into construction joints, crack induced joints, contraction joints and expansion joints in water retaining structures. The Contractor shall ensure that all such joints are watertight and any joints which may leak or weep shall be rectified by the Contractor to the Engineer’s satisfaction. 4 The spacing of construction joints, crack induced joints, contraction joints and expansion joints in water retaining structures shall be shown on the design drawings. 5 Where the positions or type of joints are not indicated on the drawings, the spacing of construction joints or crack induced joints in water retaining structures shall not exceed 5 m. 6 Where the positions or type of joints are not indicated on the drawings in the ground floor slab, construction joints, crack induced joints, contraction joints and expansion joints shall be incorporated into the works as appropriate. for slabs on grade, construction joints or crack induced joints should be provided at areas where differences in subgrade and slab support may cause cracks. The slab shall be cast in strips not more than 15 metres wide across the width of the building. Within each strip for both directions, crack induced joints shall be provided at areas where cracks are expected and not more than 5.0 metre spacing, and construction or contraction joints shall be provided at not more than 15.0m spacing. 7 Construction or contraction joints shall be provided between adjacent strips. 8 Waterstops of a type acceptable to the Engineer shall be embedded in the concrete. The waterstop should be made of a high quality material, which must retain its resilience through the service life of the structure for the double function of movement and sealing. The surface of waterstops should be carefully rounded to ensure tightness of the joint even under heavy water pressure. To ensure a good tightness with or without movement of the joints, the waterstop should be provided with anchor parts. The cross-section of the waterstops should be determined in accordance with the presumed maximum water pressure and joint movements. The complete works of fixed and welded connections must be carried out strictly in accordance with the manufacturer’s instructions. 9 Engineer’s acceptance shall be obtained by the Contractor, prior to start of work, on the casting sequence and the layout of joints. 12.3 MOVEMENT JOINTS 12.3.1 General 1 Movement joints for expansion and contraction shall be constructed in accordance with the details and to the dimension shown on the Drawings or where otherwise ordered by the Engineer and shall be formed of the elements specified. 2 Movement Joints in Water Retaining Structures shall be in accordance with the details and to the dimension shown on the Drawings and EN 1992-3. 3 The Contractor shall pay particular attention to the effects of climatic extremes on any material which he may desire to use on any movement joint and shall submit for approval by the Engineer his proposals for the proper storage, handling and use of the said materials having due regard for any recommendations made by the manufacturer in this connection.
  • 6. Q a t a r C o n s t r u c t i o n S p e c i f i c a t i o n s 2 0 1 4 QCS 2014 Section 05: Concrete Page 6 Part 12: Joints 12.3.2 Joint Filler 1 Joint fillers shall conform to the requirements of BS 6093 or ASTM D1751 or equivalent if they are bituminous type or to the requirements of ASTM D3575 or BS EN ISO 7214 or equivalent if they are polymer foam type. 2 The joint filler shall be fixed to the required dimensions of the joint cross-section and shall provide a firm base for the joint sealer. 3 When required between two concrete surfaces as a resilient movement joint, the filler shall be an approved granulated cork bound with insoluble synthetic resin. 4 When required between blockwork and concrete as a low density movement joint filler or for building details it shall be an approved bitumen impregnated fibreboard or preformed closed cell polyethylene. 12.3.3 Joint Sealants 1 All joints to be sealed shall be formed and the groove grit blasted to remove all traces of deleterious materials such as form oil or curing compounds and also to remove any surface laitance from the sides of the joint. The joint shall be dry prior the application of priming. Where the use of grit blasting is not possible the Contractor may propose alternative methods subject to the approval of the Engineer. 2 The back of the joint shall receive a debonding tape or polyethylene foam backer cord in order to provide the correct depth to width ratio and prevent three sided adhesion. 3 The areas adjacent to the joint shall be protected using masking tape. 4 The sides of the joint shall be primed with the relevant primer as recommended by the sealant manufacturer and the sealant material applied in accordance with the manufacturers instructions. 5 The sealant material shall be a non-biodegradable multicomponent pitch polyurethane elastomeric joint sealant, carefully selected as appropriate for the specific climatic and environmental exposure conditions expected. Alternative types of sealant will be considered, including epoxy-polyurethane, rubber bitumen and acrylic, subject to the requirements of the specification and the approval of the Engineer. 6 Where the joint sealant is to be in contact with a protective coating the Contractor shall satisfy the Engineer that the sealant and protective coating are compatible 7 Sealants shall exhibit the following properties: (a) Movement accommodation factor 25 % (b) Shore ‘A’ hardness 20 - 25 (c) Solids content 100 % (d) Service temperature range 0 o C to 90 o C (e) Chemical resistance to Sewage, Sabkha, Mineral acids and Alkalis (f) Width to depth ratio 2:1
  • 7. Q a t a r C o n s t r u c t i o n S p e c i f i c a t i o n s 2 0 1 4 QCS 2014 Section 05: Concrete Page 7 Part 12: Joints 8 Where shown on the Drawings sealants shall also be suitable for use with potable water. 9 All surface preparation, priming, mixing and application shall be carried out in strict accordance with the manufacturer’s instructions. 10 The sealant shall have a proven track record of no less than ten years under similar local conditions. 12.4 SLIP BEARINGS 12.4.1 General 1 Slip bearings shall be preformed low friction bearing strips to form a thin sliding joint. 2 They shall be extruded from specially formulated polyethylene to form a durable lamina resistant to sewage, mineral acids and alkalis, solvents and weathering. 3 Slip bearings shall be applied in two layers with the bottom layer bonded to the substrate with a high quality solvent borne adhesive based on polychloroprene rubber. The substrate shall be clean and free from deleterious materials such as form oil or curing compounds and surface laitance. The surface shall be level and even along the full length of the joint 4 The applied loads for slip bearings shall not exceed 0.7 MPa. 5 Operating temperatures shall be up to 80 C 6 The coefficient of friction shall not exceed 0.15 12.5 WATERSTOPS 12.5.1 General 1 Waterstops and associated materials shall be by a manufacturer with a minimum of ten years experience in the field of engineering waterproof products. 2 PVC waterstops shall be suitable for storage, handling, installation and service within a range of 15 C to 65 C. 12.5.2 Waterstops 1 The waterstop shall be a high performance system forming a continuous network as shown on the Drawings. 2 Site jointing is to be limited to butt joints and shall be performed strictly in accordance with the manufacturer’s instructions. 3 Centrally placed waterstops shall employ centre bulbs/shutter stop with ribs on the web sections. 4 Externally placed waterstops shall have ribs on either side of the centre of the waterstop. The water bar used at the location of expansion joints shall have a bulb in the centre to accommodate the movements.
  • 8. Q a t a r C o n s t r u c t i o n S p e c i f i c a t i o n s 2 0 1 4 QCS 2014 Section 05: Concrete Page 8 Part 12: Joints 5 Waterstops shall have a minimum thickness of 3 mm. 6 The minimum test performance data for PVC waterstops shall be as follows: Tensile strength >12 MPa Elongation at break 300 % Hardness Shore ‘A’ 80 to 90 7 The materials shall be tested in accordance with BS 2571 or BS 2782 or CRD–C572 or ASTM D2240. 12.5.3 Butyl Rubber Waterstops 1 Butyl rubber waterstops shall have the properties stated in Table 12.1 when tested in accordance with BS 903. Table 12.1 Properties Requirements of Butyl Rubber Waterstops BS 903 Property Requirements Part A1 Density 1100 kg/m 3 (± 5 %) Part A26 Handness 60-70 IRHD Part A2 Tensile Strength Not less than 17.5 N/mm 2 Part A2 Elongation at break point Not less than 450 % Part A/6 Water Absosption (48 hours immersion) Not exceeding 5 % 2 Butyl rubber waterstops shall be suitable for storage, handling, installation and service within a temperature of 0 °C to 40 °C 12.5.4 Water Swelling Gaskets 1 Where active sealing is required for critical areas, waterstops shall be hydrophilic polymer modified chloroprene rubber strips. The rubber strips shall conform to the following properties as applicable: (a) Water pressure resistance : 5 Bar (50 m) (b) Expansion in contact with water : 2 x original SRE (c) : Reversible (d) Application Temperatures : - 30 to + 70 °C 2 The selected rubber strips shall be available for three exposures: (a) Fresh Water (b) Seawater (c) Chemicals (if the condition demands or upon the Engineer’s request) The supplier shall furnish references upon request of the Engineer. END OF PART