Business Analysis
Training
Enterprise Analysis
Page 2Classification: Restricted
Agenda
• Enterprise Analysis
• What is Enterprise Analysis
• Why Enterprise Analysis
• Different Architectures
• Enterprise Analysis Activities
• Techniques Used to Define a Business Need
• Techniques Used to assess Capability Gaps
• Techniques Used to Determine Solution Approach
• Techniques Used to Define Solution Scope
• Techniques Used to Define a Business Case
• SWOT Analysis
• GAP Analysis
• Feasibility Study
• Root Cause Analysis
Page 3Classification: Restricted
The BABOK describes Business Analysis areas of knowledge, their associated
activities and tasks and the skills necessary to be effective in their execution.
Page 4Classification: Restricted
What is Enterprise Analysis?
Describes the Business Analysis activities necessary to identify a business
need, problem, or opportunity, define the nature of a solution that satisfies
the identified need and justify the investment necessary to deliver the
solution. Enterprise Analysis Outputs create context to requirements analysis.
Page 5Classification: Restricted
Provides context to requirements analysis
and solution identification
Often serves as the starting point for
initiating a new project
Business requirements are identified and
documented through enterprise analysis
activities
Why Enterprise Analysis?
Page 6Classification: Restricted
Different Architectures
The Enterprise Architecture consists of five architectures which in total
comprise
• Business Architecture
• Information Architecture
• Application Architecture
• Technology Architecture
• Security Architecture
Page 7Classification: Restricted
7
Page 8Classification: Restricted
Enterprise Analysis
Page 9Classification: Restricted
Techniques Used to Define a Business Need
Page 10Classification: Restricted
Techniques Used to assess Capability Gaps
Page 11Classification: Restricted
Techniques Used to Determine Solution Approach
Page 12Classification: Restricted
Techniques Used to Define Solution Scope
Page 13Classification: Restricted
Techniques Used to Define a Business Case
Page 14Classification: Restricted
SWOT Analysis
Strengths: characteristics of the business, or project team that give it
an advantage over others
Weaknesses (or Limitations): are characteristics that place the team at
a disadvantage relative to others
Opportunities: external chances to improve performance (e.g. make
greater profits) in the environment
Threats: external elements in the environment that could cause
trouble for the business or project.
Page 15Classification: Restricted
SWOT Analysis
Page 16Classification: Restricted
SWOT Analysis
Page 17Classification: Restricted
17
Page 18Classification: Restricted
How to Conduct SWOT Analysis
Analyze the Internal & External Environment
Page 19Classification: Restricted
GAP ANALYSIS
Page 20Classification: Restricted
Gap analysis is a technique to identify the area of improvement in any process
ranging from Business to technology. The areas of improvement doesn’t
necessarily mean any new enhancement, it is either about finding a gap
between what is expected and what is really done.
What is Gap Analysis?
Page 21Classification: Restricted
Page 22Classification: Restricted
Page 23Classification: Restricted
Page 24Classification: Restricted
Page 25Classification: Restricted
Feasibility Study
Page 26Classification: Restricted
What is Feasibility Study?
An analysis and evaluation of a proposed project to determine if it (1) is
technically feasible, (2) is feasible within the estimated cost, and (3) will be
profitable.
• Feasibility study is used to determine the viability of an idea
• The objective of such a study is to ensure a project is legally and
technically feasible and economically justifiable
• It tells us whether a project is worth the investment
• It is also called as Feasibility Analysis
Page 27Classification: Restricted
Why do a feasibility study
• IT IS ALL ABOUT MAKING AN INFORMED CHOICE
• It is an analysis of the viability of an idea through a disciplined and
documented process.
• A feasibility study is a management-oriented activity & should tell
management:
• Whether the project can be done
• What are alternative solutions?
• What are the criteria for choosing among them?
• Is there a preferred alternative?
• After a feasibility study, management makes a go/no-go decision.
• A feasibility study:
• Gives focus to the project and outline alternatives
• Enhances the probability of success by addressing and mitigating factors
early on that could affect the project
• Provides quality information for decision making
• Helps to increase investment in the company
• Helps in securing funding from lending institutions and other monetary
sources
Page 28Classification: Restricted
What to Study What to Conclude
• Things to be studied during the feasibility study phase:
• The present organizational system (users, policies, functions,
objectives,...)
• Problems with the present system (inconsistencies, inadequacies in
functionality, performance,...)
• Objectives and other requirements for the new system (what needs to
change?)
• Constraints, including nonfunctional requirements on the system
(preliminary pass)
• Possible alternatives (the current system [status quo] is always one of
those)
• Advantages and disadvantages of the alternatives
• Things to conclude:
• Feasibility of the project and the preferred alternative
Page 29Classification: Restricted
What defines a feasibility study
➢ A feasible business venture is one where
the business will generate adequate cash flow and profits,
the business will withstand the risks it will encounter,
the business will remain viable in the long-term, and
the business will meet the goals of the founders.
Page 30Classification: Restricted
Types of Feasibility - TRELOS
➢T - Technology and System Feasibility
“Can it be built?”
• Technological feasibility is carried out to determine whether the
company has the capability, in terms of required technology, software,
hardware, personnel and expertise, to handle the completion of the
project
➢R - Risk Feasibility
➢E - Economic Feasibility
“Will it make economic sense if it works and is built?”
“ Will it generate PROFITS?”
• Cost-based study: It is important to identify cost and benefit factors eg.
Development costs and Operational costs. This is an analysis of the
costs to be incurred in the system and the benefits derivable out of the
system.
• Time-based study: This is an analysis of the time required to achieve a
return on investments. The future value of a project is also a factor.
Page 31Classification: Restricted
Types of Feasibility - TRELOS Cont’d…
➢ L – Legal Feasibility
• It includes study concerning contracts, liability, violations, and legal other
traps frequently unknown to the technical staff.
• Determines whether the proposed system conflicts with legal
requirements, e.g. a data processing system must comply with the local
Data Protection Acts.
➢ O – Operational Feasibility
“Will it work?”
• Operational feasibility is mainly concerned with issues like whether the
system will be used if it is developed and implemented.
➢ S – Schedule Feasibility
• A project will fail if it takes too long to be completed before it is useful.
• Schedule feasibility is a measure of how reasonable the project timetable
is.
Page 32Classification: Restricted
Economic Feasibility
• The bottom line in many projects is economic feasibility.
• As soon as specific requirements and solutions have been identified, the analyst
can weigh the costs and benefits of each alternative. This is called a cost-benefit
analysis
• The purpose of a cost/benefit analysis is to answer questions such as:
• Is the project justified (because benefits outweigh costs)?
• Can the project be done, within given cost constraints?
• What is the minimal cost to attain a certain system?
• What is the preferred alternative, among candidate solutions?
• Examples of things to consider:
• Hardware/software selection
• How to convince management to develop the new system
• Selection among alternative financing arrangements (rent/lease/purchase)
• Difficulties -- discovering and assessing benefits and costs; they can both be
intangible, hidden and/or hard to estimate, it's also hard to rank multi-criteria
alternative
BENEFIT COST
Page 33Classification: Restricted
Types of Benefits
• Benefits may be classified into one of the following categories:
• Monetary -- when $-values can be calculated
• Tangible (Quantified) -- when benefits can be quantified, but $-values can't be
calculated
• Intangible -- when neither of the above applies
• Examples of particular benefits:
• Cost reductions
• Error reductions
• Increased throughput
• Improved time management
▪ How to identify benefits?
• By organizational level (operational, lower/middle/upper management)
• By department (production, purchasing, sales,...)
Page 34Classification: Restricted
Types of Costs
• Project-related costs
• Development and purchasing costs:
• who builds the system (internally or contracted out)?
• software used (buy or build)?
• hardware (what to buy, buy/lease)?
• facilities (site, communications, power,...)
• Installation and conversion costs:
• installing the system, training of personnel, file conversion,....
• Operational costs (on-going)
• Maintenance: hardware (maintenance, lease, materials,...), software
(maintenance fees and contracts), facilities
• Personnel: operation, maintenance
Page 35Classification: Restricted
Return on Investment (ROI)
• ROI is a percentage that shows what return you make by investing in
something.
ROI = (Benefit – Cost) ÷ Cost
• Example: A company invests in a project that costs $200,000. The benefit of
doing the project saves the company $230,000 in the first year alone. In this
case, the ROI = (230,000-200,000)/200,000 = 15%.
• So for ROI, Bigger is better.
Page 36Classification: Restricted
Operational Feasibility
The PIECES framework can help in identifying problems to be solved, and their
urgency:
Performance -- Does current mode of operation provide adequate
throughput and response time?
Information -- Does current mode provide end users and managers with timely,
pertinent, accurate and usefully formatted information?
Economy -- Does current mode of operation provide cost-effective
information services to the business? Could there be a reduction in costs and/or
an increase in benefits?
Control -- Does current mode of operation offer effective controls to
protect against fraud and to guarantee accuracy and security of data and
information?
Efficiency -- Does current mode of operation make maximum use of
available resources, including people, time, flow of forms,...?
Services – Does current mode of operation provide reliable service? Is it flexible
and expandable?
Page 37Classification: Restricted
Schedule Feasibility
• We may have the technology, but that doesn't mean we have the skills required
to properly apply that technology - The learning curve of the team members will
impact the schedule.
• Given our technical expertise, are the project deadlines reasonable? Determine
whether the deadlines are mandatory or desirable? If the deadlines are
desirable rather than mandatory, the analyst can propose alternative
schedules.
• It is preferable (unless the deadline is absolutely mandatory) to deliver a
properly functioning information system two months late than to deliver an
error-prone, useless information system on time! Missed schedules are bad, but
inadequate systems are worse
Page 38Classification: Restricted
Feasibility Analysis Matrix
• How do we compare alternatives when there are multiple selection criteria
and none of the alternatives is superior across the board? - Use a Feasibility
Analysis Matrix!
• In a feasibility analysis matrix:
• The columns correspond to the candidate solutions
• Some rows correspond to the feasibility criteria
• The cells contain the feasibility assessment notes for each candidate.
• Each row can be assigned a rank or score for each criterion (e.g., for
operational feasibility, candidates can be ranked 1, 2, 3, etc.).
• After ranking or scoring all candidates on each criterion, a final ranking or
score is recorded in the last row
Page 39Classification: Restricted
Example of a Feasibility Matrix
Feasibility Criteria Wt. Candidate 1 Candidate 2 Candidate 3
Operational Feasibility
Functionality. A description of to what degree the
candidate would benefit the organization and how well
the system would work.
Political. A description of how well received this solution
would be from both user management, user, and
organization perspective.
30%
Score: Score: Score:
Technical Feasibility
Technology. An assessment of the maturity, availability
(or ability to acquire), and desirability of the computer
technology needed to support this candidate.
Expertise. An assessment to the technical expertise
needed to develop, operate, and maintain the candidate
system.
30%
Score: Score: Score:
Economic Feasibility
Cost to develop:
Payback period (discounted):
Net present value:
Detailed calculations:
30%
Score: Score: Score:
Schedule Feasibility
An assessment of how long the solution will take to
design and implement.
10%
Score: Score: Score:
Ranking: 100%
Page 40Classification: Restricted
Root Cause Analysis
Page 41Classification: Restricted
• Root cause analysis (RCA) is a method of problem solving used for
identifying the root causes of faults or problems.
• The Root Cause Analysis process is also known as the “Ishikawa
Diagram” or “Fishbone Diagram.”
Page 42Classification: Restricted
Page 43Classification: Restricted
Root Cause Analysis
Page 44Classification: Restricted
Topic to be covered in next session
• Requirements Engineering
• Project Scope
• Landscape of Requirements
• Properties of Requirements
• Types of Requirements
• Stakeholder
• Requirements Elicitation
• Techniques
Page 45Classification: Restricted
Thank you

More Related Content

PPSX
Enterprise Analysis
PPSX
Enterprise Analysis
PPSX
Enterprise Analysis
PPSX
Requirements Management
PPSX
Introduction to Business Analysis
PPSX
Business Analysis Question and Answers
PPSX
Resume/Interview Preparation
PPSX
Agile User Stories
Enterprise Analysis
Enterprise Analysis
Enterprise Analysis
Requirements Management
Introduction to Business Analysis
Business Analysis Question and Answers
Resume/Interview Preparation
Agile User Stories

What's hot (10)

PPSX
Enterprise Analysis
PPSX
Business Aanalysis Resume/Interview preparation
PPSX
Enterprise Analysis
PPSX
Introduction to Business Analysis
PPSX
Step by Step Guide to Learn SDLC
PPSX
Developing A Business Case
PPSX
Requirement Management
PPSX
SDLC
PPSX
Introduction to Business Analysis
PPSX
Introduction to Business Analysis
Enterprise Analysis
Business Aanalysis Resume/Interview preparation
Enterprise Analysis
Introduction to Business Analysis
Step by Step Guide to Learn SDLC
Developing A Business Case
Requirement Management
SDLC
Introduction to Business Analysis
Introduction to Business Analysis
Ad

Similar to Enterprise Analysis (20)

PPSX
Enterprise Analysis
PPSX
GAP Analysis
PPTX
project management
DOCX
Feasibility of a project
PPTX
Feasibility report
PPTX
Banglka.pptx
PPTX
Blue Green Pink Creative Project Management Presentation.pptx
PPTX
Project feasibility study report
PDF
projectfeasibilitystudyreport-180220160621.pdf
PPTX
The Strategic Business Analyst: Aligning Projects with Organizational Goals
PPT
Feasibility Study.ppt
PPTX
system development life cycle
PPT
Feasibility Study
PPTX
Feasibility Study
PPTX
Analyzing the Business Case for System Analysis and Design
DOCX
SYSTEM ANALYSIS AND DESIGN
PPTX
Project Feasibility.pptx
PPT
Feasibility-Studies.ppt
PPTX
FEASIBILITY-STUDY1-SHS-GRADE-12-GAS.pptx
PPTX
L2 PM Project Feasibility study.pptx
Enterprise Analysis
GAP Analysis
project management
Feasibility of a project
Feasibility report
Banglka.pptx
Blue Green Pink Creative Project Management Presentation.pptx
Project feasibility study report
projectfeasibilitystudyreport-180220160621.pdf
The Strategic Business Analyst: Aligning Projects with Organizational Goals
Feasibility Study.ppt
system development life cycle
Feasibility Study
Feasibility Study
Analyzing the Business Case for System Analysis and Design
SYSTEM ANALYSIS AND DESIGN
Project Feasibility.pptx
Feasibility-Studies.ppt
FEASIBILITY-STUDY1-SHS-GRADE-12-GAS.pptx
L2 PM Project Feasibility study.pptx
Ad

More from Shwetha-BA (11)

PPSX
Requirement Elicitation Techniques
PPSX
Role of BA in Testing
PPSX
Workflow Diagram
PPSX
Software Development Life Cycle – SDLC
PPSX
Introduction to OOA and UML
PPS
Solution Evaluation (BA Role)
PPSX
Requirements Management
PPSX
Introduction to OOA and UML - Part 2
PPSX
Introduction to OOA and UML - Part 1
PPSX
Requirement Elicitation Techniques
PPSX
Software Development Life Cycle - SDLC
Requirement Elicitation Techniques
Role of BA in Testing
Workflow Diagram
Software Development Life Cycle – SDLC
Introduction to OOA and UML
Solution Evaluation (BA Role)
Requirements Management
Introduction to OOA and UML - Part 2
Introduction to OOA and UML - Part 1
Requirement Elicitation Techniques
Software Development Life Cycle - SDLC

Recently uploaded (20)

PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Encapsulation theory and applications.pdf
PDF
Building Integrated photovoltaic BIPV_UPV.pdf
PDF
Univ-Connecticut-ChatGPT-Presentaion.pdf
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PDF
Machine learning based COVID-19 study performance prediction
PPTX
SOPHOS-XG Firewall Administrator PPT.pptx
PPT
Teaching material agriculture food technology
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
PDF
A comparative analysis of optical character recognition models for extracting...
PPTX
Machine Learning_overview_presentation.pptx
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PPTX
Spectroscopy.pptx food analysis technology
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PDF
August Patch Tuesday
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
Per capita expenditure prediction using model stacking based on satellite ima...
Encapsulation_ Review paper, used for researhc scholars
Encapsulation theory and applications.pdf
Building Integrated photovoltaic BIPV_UPV.pdf
Univ-Connecticut-ChatGPT-Presentaion.pdf
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Machine learning based COVID-19 study performance prediction
SOPHOS-XG Firewall Administrator PPT.pptx
Teaching material agriculture food technology
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
A comparative analysis of optical character recognition models for extracting...
Machine Learning_overview_presentation.pptx
Accuracy of neural networks in brain wave diagnosis of schizophrenia
Spectral efficient network and resource selection model in 5G networks
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Spectroscopy.pptx food analysis technology
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
August Patch Tuesday
Reach Out and Touch Someone: Haptics and Empathic Computing
Mobile App Security Testing_ A Comprehensive Guide.pdf

Enterprise Analysis

  • 2. Page 2Classification: Restricted Agenda • Enterprise Analysis • What is Enterprise Analysis • Why Enterprise Analysis • Different Architectures • Enterprise Analysis Activities • Techniques Used to Define a Business Need • Techniques Used to assess Capability Gaps • Techniques Used to Determine Solution Approach • Techniques Used to Define Solution Scope • Techniques Used to Define a Business Case • SWOT Analysis • GAP Analysis • Feasibility Study • Root Cause Analysis
  • 3. Page 3Classification: Restricted The BABOK describes Business Analysis areas of knowledge, their associated activities and tasks and the skills necessary to be effective in their execution.
  • 4. Page 4Classification: Restricted What is Enterprise Analysis? Describes the Business Analysis activities necessary to identify a business need, problem, or opportunity, define the nature of a solution that satisfies the identified need and justify the investment necessary to deliver the solution. Enterprise Analysis Outputs create context to requirements analysis.
  • 5. Page 5Classification: Restricted Provides context to requirements analysis and solution identification Often serves as the starting point for initiating a new project Business requirements are identified and documented through enterprise analysis activities Why Enterprise Analysis?
  • 6. Page 6Classification: Restricted Different Architectures The Enterprise Architecture consists of five architectures which in total comprise • Business Architecture • Information Architecture • Application Architecture • Technology Architecture • Security Architecture
  • 9. Page 9Classification: Restricted Techniques Used to Define a Business Need
  • 10. Page 10Classification: Restricted Techniques Used to assess Capability Gaps
  • 11. Page 11Classification: Restricted Techniques Used to Determine Solution Approach
  • 12. Page 12Classification: Restricted Techniques Used to Define Solution Scope
  • 13. Page 13Classification: Restricted Techniques Used to Define a Business Case
  • 14. Page 14Classification: Restricted SWOT Analysis Strengths: characteristics of the business, or project team that give it an advantage over others Weaknesses (or Limitations): are characteristics that place the team at a disadvantage relative to others Opportunities: external chances to improve performance (e.g. make greater profits) in the environment Threats: external elements in the environment that could cause trouble for the business or project.
  • 18. Page 18Classification: Restricted How to Conduct SWOT Analysis Analyze the Internal & External Environment
  • 20. Page 20Classification: Restricted Gap analysis is a technique to identify the area of improvement in any process ranging from Business to technology. The areas of improvement doesn’t necessarily mean any new enhancement, it is either about finding a gap between what is expected and what is really done. What is Gap Analysis?
  • 26. Page 26Classification: Restricted What is Feasibility Study? An analysis and evaluation of a proposed project to determine if it (1) is technically feasible, (2) is feasible within the estimated cost, and (3) will be profitable. • Feasibility study is used to determine the viability of an idea • The objective of such a study is to ensure a project is legally and technically feasible and economically justifiable • It tells us whether a project is worth the investment • It is also called as Feasibility Analysis
  • 27. Page 27Classification: Restricted Why do a feasibility study • IT IS ALL ABOUT MAKING AN INFORMED CHOICE • It is an analysis of the viability of an idea through a disciplined and documented process. • A feasibility study is a management-oriented activity & should tell management: • Whether the project can be done • What are alternative solutions? • What are the criteria for choosing among them? • Is there a preferred alternative? • After a feasibility study, management makes a go/no-go decision. • A feasibility study: • Gives focus to the project and outline alternatives • Enhances the probability of success by addressing and mitigating factors early on that could affect the project • Provides quality information for decision making • Helps to increase investment in the company • Helps in securing funding from lending institutions and other monetary sources
  • 28. Page 28Classification: Restricted What to Study What to Conclude • Things to be studied during the feasibility study phase: • The present organizational system (users, policies, functions, objectives,...) • Problems with the present system (inconsistencies, inadequacies in functionality, performance,...) • Objectives and other requirements for the new system (what needs to change?) • Constraints, including nonfunctional requirements on the system (preliminary pass) • Possible alternatives (the current system [status quo] is always one of those) • Advantages and disadvantages of the alternatives • Things to conclude: • Feasibility of the project and the preferred alternative
  • 29. Page 29Classification: Restricted What defines a feasibility study ➢ A feasible business venture is one where the business will generate adequate cash flow and profits, the business will withstand the risks it will encounter, the business will remain viable in the long-term, and the business will meet the goals of the founders.
  • 30. Page 30Classification: Restricted Types of Feasibility - TRELOS ➢T - Technology and System Feasibility “Can it be built?” • Technological feasibility is carried out to determine whether the company has the capability, in terms of required technology, software, hardware, personnel and expertise, to handle the completion of the project ➢R - Risk Feasibility ➢E - Economic Feasibility “Will it make economic sense if it works and is built?” “ Will it generate PROFITS?” • Cost-based study: It is important to identify cost and benefit factors eg. Development costs and Operational costs. This is an analysis of the costs to be incurred in the system and the benefits derivable out of the system. • Time-based study: This is an analysis of the time required to achieve a return on investments. The future value of a project is also a factor.
  • 31. Page 31Classification: Restricted Types of Feasibility - TRELOS Cont’d… ➢ L – Legal Feasibility • It includes study concerning contracts, liability, violations, and legal other traps frequently unknown to the technical staff. • Determines whether the proposed system conflicts with legal requirements, e.g. a data processing system must comply with the local Data Protection Acts. ➢ O – Operational Feasibility “Will it work?” • Operational feasibility is mainly concerned with issues like whether the system will be used if it is developed and implemented. ➢ S – Schedule Feasibility • A project will fail if it takes too long to be completed before it is useful. • Schedule feasibility is a measure of how reasonable the project timetable is.
  • 32. Page 32Classification: Restricted Economic Feasibility • The bottom line in many projects is economic feasibility. • As soon as specific requirements and solutions have been identified, the analyst can weigh the costs and benefits of each alternative. This is called a cost-benefit analysis • The purpose of a cost/benefit analysis is to answer questions such as: • Is the project justified (because benefits outweigh costs)? • Can the project be done, within given cost constraints? • What is the minimal cost to attain a certain system? • What is the preferred alternative, among candidate solutions? • Examples of things to consider: • Hardware/software selection • How to convince management to develop the new system • Selection among alternative financing arrangements (rent/lease/purchase) • Difficulties -- discovering and assessing benefits and costs; they can both be intangible, hidden and/or hard to estimate, it's also hard to rank multi-criteria alternative BENEFIT COST
  • 33. Page 33Classification: Restricted Types of Benefits • Benefits may be classified into one of the following categories: • Monetary -- when $-values can be calculated • Tangible (Quantified) -- when benefits can be quantified, but $-values can't be calculated • Intangible -- when neither of the above applies • Examples of particular benefits: • Cost reductions • Error reductions • Increased throughput • Improved time management ▪ How to identify benefits? • By organizational level (operational, lower/middle/upper management) • By department (production, purchasing, sales,...)
  • 34. Page 34Classification: Restricted Types of Costs • Project-related costs • Development and purchasing costs: • who builds the system (internally or contracted out)? • software used (buy or build)? • hardware (what to buy, buy/lease)? • facilities (site, communications, power,...) • Installation and conversion costs: • installing the system, training of personnel, file conversion,.... • Operational costs (on-going) • Maintenance: hardware (maintenance, lease, materials,...), software (maintenance fees and contracts), facilities • Personnel: operation, maintenance
  • 35. Page 35Classification: Restricted Return on Investment (ROI) • ROI is a percentage that shows what return you make by investing in something. ROI = (Benefit – Cost) ÷ Cost • Example: A company invests in a project that costs $200,000. The benefit of doing the project saves the company $230,000 in the first year alone. In this case, the ROI = (230,000-200,000)/200,000 = 15%. • So for ROI, Bigger is better.
  • 36. Page 36Classification: Restricted Operational Feasibility The PIECES framework can help in identifying problems to be solved, and their urgency: Performance -- Does current mode of operation provide adequate throughput and response time? Information -- Does current mode provide end users and managers with timely, pertinent, accurate and usefully formatted information? Economy -- Does current mode of operation provide cost-effective information services to the business? Could there be a reduction in costs and/or an increase in benefits? Control -- Does current mode of operation offer effective controls to protect against fraud and to guarantee accuracy and security of data and information? Efficiency -- Does current mode of operation make maximum use of available resources, including people, time, flow of forms,...? Services – Does current mode of operation provide reliable service? Is it flexible and expandable?
  • 37. Page 37Classification: Restricted Schedule Feasibility • We may have the technology, but that doesn't mean we have the skills required to properly apply that technology - The learning curve of the team members will impact the schedule. • Given our technical expertise, are the project deadlines reasonable? Determine whether the deadlines are mandatory or desirable? If the deadlines are desirable rather than mandatory, the analyst can propose alternative schedules. • It is preferable (unless the deadline is absolutely mandatory) to deliver a properly functioning information system two months late than to deliver an error-prone, useless information system on time! Missed schedules are bad, but inadequate systems are worse
  • 38. Page 38Classification: Restricted Feasibility Analysis Matrix • How do we compare alternatives when there are multiple selection criteria and none of the alternatives is superior across the board? - Use a Feasibility Analysis Matrix! • In a feasibility analysis matrix: • The columns correspond to the candidate solutions • Some rows correspond to the feasibility criteria • The cells contain the feasibility assessment notes for each candidate. • Each row can be assigned a rank or score for each criterion (e.g., for operational feasibility, candidates can be ranked 1, 2, 3, etc.). • After ranking or scoring all candidates on each criterion, a final ranking or score is recorded in the last row
  • 39. Page 39Classification: Restricted Example of a Feasibility Matrix Feasibility Criteria Wt. Candidate 1 Candidate 2 Candidate 3 Operational Feasibility Functionality. A description of to what degree the candidate would benefit the organization and how well the system would work. Political. A description of how well received this solution would be from both user management, user, and organization perspective. 30% Score: Score: Score: Technical Feasibility Technology. An assessment of the maturity, availability (or ability to acquire), and desirability of the computer technology needed to support this candidate. Expertise. An assessment to the technical expertise needed to develop, operate, and maintain the candidate system. 30% Score: Score: Score: Economic Feasibility Cost to develop: Payback period (discounted): Net present value: Detailed calculations: 30% Score: Score: Score: Schedule Feasibility An assessment of how long the solution will take to design and implement. 10% Score: Score: Score: Ranking: 100%
  • 41. Page 41Classification: Restricted • Root cause analysis (RCA) is a method of problem solving used for identifying the root causes of faults or problems. • The Root Cause Analysis process is also known as the “Ishikawa Diagram” or “Fishbone Diagram.”
  • 44. Page 44Classification: Restricted Topic to be covered in next session • Requirements Engineering • Project Scope • Landscape of Requirements • Properties of Requirements • Types of Requirements • Stakeholder • Requirements Elicitation • Techniques