ABSTRACT OF QUANTITIES
1- CALCULATIONS

1.   Excavation in Medium soil

     Quantity from BOQ item No. 1                =   1024.52 cft

     Output of one labourer working 8 hrs        =   75 cft



     04 labourers are required for 3 ½ days to
       excavate 1050 cft earth.
2.      PCC (1:4:8)
        Quantity of BOQ item No.3 (Foundations)       =   146.27 cft
        Quantity of BOQ item No.11 (Floors)           =   142.07 cft
                                       Total          =   288.34 cft
        Dry material for 100 cft of cement concrete   =   154 cft

Note:
        Materials
        (i) Cement=154x1x288.34/(100x13)              =   34.15cft
        (ii) Sand=154x4x288.34/(100x13)               =   136.62 cft
        (iii) Coarse aggregate
                       =154x8x288.34/(100x13)         =   273.25 cft
3.     Ist Class Burnt brick work in foundation
       in cement sand mortar (1:6)
       Quantity of BOQ item No.4                  =   484.21 cft

Note: Bricks for 100 cft of brick work            =   1350 Nos.
       Dry mortar for 100 cft of brik work        =   30 cft

       Material
       (i) Bricks=1350x484.21/100                 =   6537 Nos.
       (ii) Cement=30x1x484.21/(7x100)            =   20.75 cft
       (iii) Sand=30x6x484.21/(7x100)             =   124.51cft
4.     1 ½” thick PCC (1:2:4) in DPC including
       two coats of hot bitumen & 2 sheets of
       Polythene.
       Quantity of BOQ item No.5=55.50x0.125            =   6.93 cft

Note: (i) Dry material for 100 cft of cement concrete   =   154 cft
       (ii) Bitumen for 100 sft of DPC (first coat)     =   15 Kg
       (iii) Bitumen for 100 sft of DPC (second coat)   =   10 Kg

       Material
       (i) Cement=154x1x6.93/(100x7)                    =   1.52 cft
       (ii) Sand=154x2x6.93/(100x7)                     =   3.04 cft
       (iii) Coarse aggregate=154x4x6.93/(100x7)        =   6.09 cft
       (iv) Bitumen =25x55.50/100                       =   13.87 Kg
       (v) Polythene Sheet (2 x 55.5)                   =   111.0 sft
5.      Ist Class Burnt brick work in Super
        structure in cement sand mortar (1:4)


        Quantity of BOQ item No.6                  =   743.17 cft

Note:   (i) Bricks for 100 cft of brick work       =   1350 Nos.

        (ii) Dry mortar for 100 cft of brik work   =   30 cft

        Material

        (i) Bricks=1350x743.17/100                 =   10033 Nos.

        (ii) Cement=30x1x743.17/(5x100)            =   44.59 cft

        (iii) Sand=30x4x747.13/(5x100)             =   178.36 cft
6.      Reinforced cement concrete (1:2:4)
        Quantity of BOQ item No.7            =   226.39 cft

Note:   Dry material for 100 cft of cement =     154 cft
        concrete

        Materials
        (i) Cement=154x1x226.39/(100x7)      =   49.80 cft
        (ii) Sand=154x2x226.39/(100x7)       =   99.61 cft
        (iii) Coarse aggregate
                       =154x4x226.39/(100x7) =   199.22 cft
        (iv) Mild steel round bars           =   1529 lbs
                                             =   693.55 Kg
(Note: 1 Kg = 0.454 lbs)
7.      Roof insulation
        Quantity of BOQ item No.9                       =   430.72 sft

Note:   (i) Brick tiles for 100 sft roof insulation     =   360 Nos.
        (ii) Dry mortar for 100 sft                     =   9.00 cft
        (iii) Bitumen for 100 sft of DPC (first coat)   =   15 Kg
        (iv) Bitumen for 100 sft of DPC
        (second coat)                                   =   10 Kg
        Material
        (i) 1 ½” thick brick tiles                      =   1551 Nos.
        (ii) Cement=9x1x430.72/(4x100)                  =   9.69 cft
        (iii) Sand=9x4x430.72/(4x100)                   =   29.07 cft
        (iv) Bitumen =430.72/100                        =   107.68 Kg
        (v) Mud /Earth filling=430.72x0.42              =   180.90 cft
        (Vi) Polythene sheet (2 x 430.72)               =   862 sft
8.      Sand under floors
        Quantity of BOQ item No.10               =   213.11 cft
        Material
        Sand                                     =   213.11 cft
9.      1 ½” thick cement concrete (1:2:4) in
        floors
        Quantity of BOQ item No.12=457.80x0.125 =    57.23 cft



Note:   (i) 1 ½” = 0.125 ft                     =    154 cft
        (ii) Dry material for 100 cft of cement
        concrete
        Materials
        (i) Cement=154x1x57.23/(100x7)           =   12.59 cft
        (ii) Sand=154x2x57.23/(100x7)            =   25.18 cft
        (iii) Coarse aggregate
                          =154x4x57.23/(100x7)   =   50.36 cft
10.     1/2” thick cement plaster in cement sand
        mortar (1:3)
        Quantity of BOQ item No.13                          =   3197.07 sft

Note:   Dry mortar for 100 sft of ½” thick cement plaster   =   6 cft

        Material
        (i) Cement=6x1x 3197.07/(4x100)                     =   47.96 cft
        (ii) Sand=6x3x 3197.07/(4x100)                      =   143.87 cft

11.     Wood work in door, windows ventilators
        Quantity of BOQ item No.14 (i) Doors                =   56.00 sft
        Quantity of BOQ item No.14 (ii) Windows             =   63.00 sft



Note:   (i) Timber for 100 sft of Panelled Doors            =   13 cft
        (ii) Timber for 100 sft   of Glazed windows and
        Ventilators                                         =   8 cft


        Material
        (i) Timber for doors =13x56/100                     =   7.28 cft
        (ii) Timber   for   windows   and    Ventilators    =   5.04 cft
        =8x63/100
                                            Total           =   13.32 cft
12.    White wash / Distemper
       Quantity of BOQ item No.16                 =   1872.9 sft
Note: Lime for 100 sft of white wash (one coat)   =   1.00 Kg

       Material
       Lime for three coats=1x3x1872.9/100        =   56.24 Kg


13.    Weather Shield
       Quantity of BOQ item No.17                 =   1143.45 sft


14.    Earth filling under floors
       Quantity of BOQ item No.2                  =   230.87 cft

       Material
       Earth for filling                          =   230.87 cft
2- SUMMARY
S.No.   Description of material               Quantity

1.      Cement                                220.68 cft or
        (From 2,3,4,5,6,7,9,10)               177 Bags
2.      Sand                                  740.26 cft
        (From 2,3,4,5,6,7,9,10)
3.      Coarse aggregate                      528.92 cft
        (From 2,4,6,9)
4.      Mild steel round bars (item No: 6)    693.55 Kg
5       Burnt bricks 1st class                16570 Nos.
        (From 3,5)
6       1/2” thick Brick tiles (item No: 7)   1551 Nos.
7       Bitumen                               121.55 Kg
        (From 4,7)
8       Polythene sheet                       973 sft
        (From 4,7)
9.      Timber                                13.32 cft
        (item No: 11)
10.     Lime                                  56.24 Kg
        (item No: 12)

11.     Mud/Earth filling                     411.77 cft
        (From 7,13)

More Related Content

DOCX
Analysis of rates for labour and material
PPTX
detailed specification for cement concrete
PDF
DOC
Estimating calculation
PDF
Wblff (1)
PDF
Long wall and short wall method 1
PPTX
Summer training ppt on cc road construction
PPTX
Brickwork and plastering
Analysis of rates for labour and material
detailed specification for cement concrete
Estimating calculation
Wblff (1)
Long wall and short wall method 1
Summer training ppt on cc road construction
Brickwork and plastering

What's hot (20)

PPT
Analysis of rates
PDF
EQS - RATE ANALYSIS.pdf
PPTX
Schedule of Rates
PPTX
5#rate analysis problems
PPTX
Sheet pile presentation
PPT
Rate Analysis Site Meeting
PPTX
Casting yard
PPTX
Steel formwork
PDF
BBS Preparation
PPTX
CONSTRUCTION OF CEMENT CONCRETE ROAD
PPTX
Rate analysis and costing - Estimation, Costing and Valuation Engineering
PDF
Ready Mix Concrete: Economic and Qualitative Growth for Construction Industry
DOC
Column & beam
DOCX
Construction of Brick Wall
PPT
Formwork
PPTX
Different Types of Formwork Syetem Used within Indian Construction Industry
PPT
Rates Analysis For Calculating Material and Labour for building works
PPTX
type of aggregate
DOC
Estimating calculation
PDF
Bridge construction methodology
Analysis of rates
EQS - RATE ANALYSIS.pdf
Schedule of Rates
5#rate analysis problems
Sheet pile presentation
Rate Analysis Site Meeting
Casting yard
Steel formwork
BBS Preparation
CONSTRUCTION OF CEMENT CONCRETE ROAD
Rate analysis and costing - Estimation, Costing and Valuation Engineering
Ready Mix Concrete: Economic and Qualitative Growth for Construction Industry
Column & beam
Construction of Brick Wall
Formwork
Different Types of Formwork Syetem Used within Indian Construction Industry
Rates Analysis For Calculating Material and Labour for building works
type of aggregate
Estimating calculation
Bridge construction methodology
Ad

Viewers also liked (20)

DOC
36296898 brickwork-calculating-quantities-of-brick
PPTX
Estimation and quantity surveying
PDF
Formula for calculate no. of cement bag by atish
PDF
Material required for different items of civil building works
DOCX
General notes to BSR BUILDING SCHEDULE OF RATES
PDF
SMM7 Bill of Quantities
PDF
ANALYSS OF RATES-VOLUME-I
PPTX
Bar bending schedule(by akhil)
PDF
Engineering formula sheet
PDF
Estimating and-costing book
PPT
Brick masonry
PPT
Quotations And Attributions
PPTX
Fd calculator ppt
PDF
How to measure or calculate cost of brick construction
PPT
Excel 2007- Enter Formulas
PDF
Schedule of Rates
PPT
Introducing quotations
PDF
45010341 planning-estimate
DOCX
Brick masonry
PDF
36296898 brickwork-calculating-quantities-of-brick
Estimation and quantity surveying
Formula for calculate no. of cement bag by atish
Material required for different items of civil building works
General notes to BSR BUILDING SCHEDULE OF RATES
SMM7 Bill of Quantities
ANALYSS OF RATES-VOLUME-I
Bar bending schedule(by akhil)
Engineering formula sheet
Estimating and-costing book
Brick masonry
Quotations And Attributions
Fd calculator ppt
How to measure or calculate cost of brick construction
Excel 2007- Enter Formulas
Schedule of Rates
Introducing quotations
45010341 planning-estimate
Brick masonry
Ad

Similar to Estimation (13)

PDF
Materials%20required%20for%20different%20items%20of%20work
PPTX
QUANTITY SURVEYING PORTFOLIO.pptx
PDF
Quantity notes by engineer saqb imran
PDF
Quantity notes by engineer saqib imran
PDF
Estimation and costing pdf
PDF
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
PPT
Ratesanalysis for Material and Labor
PPTX
Soil Enginnering.pptx
PDF
PARAMETRIC STUDY ON ECO-FRIENDLY CEMENT MORTAR USING CARBON BLACK POWDER
PPTX
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
PDF
Quality Control of material Test book.pdf
PPTX
SELECTION-AND-COMPUTATION-OF-MATERIALS.pptx
PPTX
New Microsoft PowerPoint Presentation.pptx
Materials%20required%20for%20different%20items%20of%20work
QUANTITY SURVEYING PORTFOLIO.pptx
Quantity notes by engineer saqb imran
Quantity notes by engineer saqib imran
Estimation and costing pdf
Farm Survey Assignment, Avin Kharel (16, IAAS Lamjung Campus)..pdf
Ratesanalysis for Material and Labor
Soil Enginnering.pptx
PARAMETRIC STUDY ON ECO-FRIENDLY CEMENT MORTAR USING CARBON BLACK POWDER
REPLACEMENT OF BRICKS WITH PLASTIC BOTTLE IN MANARYSO NEW Monit.pptx
Quality Control of material Test book.pdf
SELECTION-AND-COMPUTATION-OF-MATERIALS.pptx
New Microsoft PowerPoint Presentation.pptx

More from ALI HYDER GADHI (12)

PDF
National Fund for Mohenjodaro , its status, functions and detail of deposits
PPTX
Conservation methods 13 2-2013
PPT
General Contract Conditions as incorporated by SPPRA /PPPRA
PPTX
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
PPT
Urban renewal, conservation & regeneration of arabic cities
PPT
Conservation and revitalization of historic buildings
PPT
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
PPTX
Emergency Measures adopted before monsoon, during and after rainfall at World...
PPT
History of Conservation and Preservation of Cultural Property
PPTX
2nd day presentation mohanlal
PPT
Group a workshop on c h
ODP
Conservation terminologies for site and monuments
National Fund for Mohenjodaro , its status, functions and detail of deposits
Conservation methods 13 2-2013
General Contract Conditions as incorporated by SPPRA /PPPRA
Monsoon Preparations Survey for Archaeological Ruins Mohenjodaro
Urban renewal, conservation & regeneration of arabic cities
Conservation and revitalization of historic buildings
Mohen jo Daro Indus valley by ALI HYDER GADHI BALOCH
Emergency Measures adopted before monsoon, during and after rainfall at World...
History of Conservation and Preservation of Cultural Property
2nd day presentation mohanlal
Group a workshop on c h
Conservation terminologies for site and monuments

Recently uploaded (20)

PDF
533158074-Saudi-Arabia-Companies-List-Contact.pdf
PDF
Comments on Clouds that Assimilate Parts I&II.pdf
PPTX
Market and Demand Analysis.pptx for Management students
PPT
Retail Management and Retail Markets and Concepts
PDF
Business Communication for MBA Students.
PDF
Immigration Law and Communication: Challenges and Solutions {www.kiu.ac.ug)
PPTX
IMM.pptx marketing communication givguhfh thfyu
PPTX
33ABJFA6556B1ZP researhchzfrsdfasdfsadzd
PDF
Cross-Cultural Leadership Practices in Education (www.kiu.ac.ug)
PPTX
Chapter 2 strategic Presentation (6).pptx
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
PPTX
df0ee68f89e1a869be4bff9b80a7 business 79f0.pptx
PPTX
IMM marketing mix of four ps give fjcb jjb
PDF
HQ #118 / 'Building Resilience While Climbing the Event Mountain
DOCX
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
PPTX
Transportation in Logistics management.pptx
PDF
Chapter 2 - AI chatbots and prompt engineering.pdf
PDF
Second Hand Fashion Call to Action March 2025
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
533158074-Saudi-Arabia-Companies-List-Contact.pdf
Comments on Clouds that Assimilate Parts I&II.pdf
Market and Demand Analysis.pptx for Management students
Retail Management and Retail Markets and Concepts
Business Communication for MBA Students.
Immigration Law and Communication: Challenges and Solutions {www.kiu.ac.ug)
IMM.pptx marketing communication givguhfh thfyu
33ABJFA6556B1ZP researhchzfrsdfasdfsadzd
Cross-Cultural Leadership Practices in Education (www.kiu.ac.ug)
Chapter 2 strategic Presentation (6).pptx
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
df0ee68f89e1a869be4bff9b80a7 business 79f0.pptx
IMM marketing mix of four ps give fjcb jjb
HQ #118 / 'Building Resilience While Climbing the Event Mountain
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
Transportation in Logistics management.pptx
Chapter 2 - AI chatbots and prompt engineering.pdf
Second Hand Fashion Call to Action March 2025
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx

Estimation

  • 2. 1- CALCULATIONS 1. Excavation in Medium soil Quantity from BOQ item No. 1 = 1024.52 cft Output of one labourer working 8 hrs = 75 cft 04 labourers are required for 3 ½ days to excavate 1050 cft earth.
  • 3. 2. PCC (1:4:8) Quantity of BOQ item No.3 (Foundations) = 146.27 cft Quantity of BOQ item No.11 (Floors) = 142.07 cft Total = 288.34 cft Dry material for 100 cft of cement concrete = 154 cft Note: Materials (i) Cement=154x1x288.34/(100x13) = 34.15cft (ii) Sand=154x4x288.34/(100x13) = 136.62 cft (iii) Coarse aggregate =154x8x288.34/(100x13) = 273.25 cft
  • 4. 3. Ist Class Burnt brick work in foundation in cement sand mortar (1:6) Quantity of BOQ item No.4 = 484.21 cft Note: Bricks for 100 cft of brick work = 1350 Nos. Dry mortar for 100 cft of brik work = 30 cft Material (i) Bricks=1350x484.21/100 = 6537 Nos. (ii) Cement=30x1x484.21/(7x100) = 20.75 cft (iii) Sand=30x6x484.21/(7x100) = 124.51cft
  • 5. 4. 1 ½” thick PCC (1:2:4) in DPC including two coats of hot bitumen & 2 sheets of Polythene. Quantity of BOQ item No.5=55.50x0.125 = 6.93 cft Note: (i) Dry material for 100 cft of cement concrete = 154 cft (ii) Bitumen for 100 sft of DPC (first coat) = 15 Kg (iii) Bitumen for 100 sft of DPC (second coat) = 10 Kg Material (i) Cement=154x1x6.93/(100x7) = 1.52 cft (ii) Sand=154x2x6.93/(100x7) = 3.04 cft (iii) Coarse aggregate=154x4x6.93/(100x7) = 6.09 cft (iv) Bitumen =25x55.50/100 = 13.87 Kg (v) Polythene Sheet (2 x 55.5) = 111.0 sft
  • 6. 5. Ist Class Burnt brick work in Super structure in cement sand mortar (1:4) Quantity of BOQ item No.6 = 743.17 cft Note: (i) Bricks for 100 cft of brick work = 1350 Nos. (ii) Dry mortar for 100 cft of brik work = 30 cft Material (i) Bricks=1350x743.17/100 = 10033 Nos. (ii) Cement=30x1x743.17/(5x100) = 44.59 cft (iii) Sand=30x4x747.13/(5x100) = 178.36 cft
  • 7. 6. Reinforced cement concrete (1:2:4) Quantity of BOQ item No.7 = 226.39 cft Note: Dry material for 100 cft of cement = 154 cft concrete Materials (i) Cement=154x1x226.39/(100x7) = 49.80 cft (ii) Sand=154x2x226.39/(100x7) = 99.61 cft (iii) Coarse aggregate =154x4x226.39/(100x7) = 199.22 cft (iv) Mild steel round bars = 1529 lbs = 693.55 Kg (Note: 1 Kg = 0.454 lbs)
  • 8. 7. Roof insulation Quantity of BOQ item No.9 = 430.72 sft Note: (i) Brick tiles for 100 sft roof insulation = 360 Nos. (ii) Dry mortar for 100 sft = 9.00 cft (iii) Bitumen for 100 sft of DPC (first coat) = 15 Kg (iv) Bitumen for 100 sft of DPC (second coat) = 10 Kg Material (i) 1 ½” thick brick tiles = 1551 Nos. (ii) Cement=9x1x430.72/(4x100) = 9.69 cft (iii) Sand=9x4x430.72/(4x100) = 29.07 cft (iv) Bitumen =430.72/100 = 107.68 Kg (v) Mud /Earth filling=430.72x0.42 = 180.90 cft (Vi) Polythene sheet (2 x 430.72) = 862 sft
  • 9. 8. Sand under floors Quantity of BOQ item No.10 = 213.11 cft Material Sand = 213.11 cft 9. 1 ½” thick cement concrete (1:2:4) in floors Quantity of BOQ item No.12=457.80x0.125 = 57.23 cft Note: (i) 1 ½” = 0.125 ft = 154 cft (ii) Dry material for 100 cft of cement concrete Materials (i) Cement=154x1x57.23/(100x7) = 12.59 cft (ii) Sand=154x2x57.23/(100x7) = 25.18 cft (iii) Coarse aggregate =154x4x57.23/(100x7) = 50.36 cft
  • 10. 10. 1/2” thick cement plaster in cement sand mortar (1:3) Quantity of BOQ item No.13 = 3197.07 sft Note: Dry mortar for 100 sft of ½” thick cement plaster = 6 cft Material (i) Cement=6x1x 3197.07/(4x100) = 47.96 cft (ii) Sand=6x3x 3197.07/(4x100) = 143.87 cft 11. Wood work in door, windows ventilators Quantity of BOQ item No.14 (i) Doors = 56.00 sft Quantity of BOQ item No.14 (ii) Windows = 63.00 sft Note: (i) Timber for 100 sft of Panelled Doors = 13 cft (ii) Timber for 100 sft of Glazed windows and Ventilators = 8 cft Material (i) Timber for doors =13x56/100 = 7.28 cft (ii) Timber for windows and Ventilators = 5.04 cft =8x63/100 Total = 13.32 cft
  • 11. 12. White wash / Distemper Quantity of BOQ item No.16 = 1872.9 sft Note: Lime for 100 sft of white wash (one coat) = 1.00 Kg Material Lime for three coats=1x3x1872.9/100 = 56.24 Kg 13. Weather Shield Quantity of BOQ item No.17 = 1143.45 sft 14. Earth filling under floors Quantity of BOQ item No.2 = 230.87 cft Material Earth for filling = 230.87 cft
  • 12. 2- SUMMARY S.No. Description of material Quantity 1. Cement 220.68 cft or (From 2,3,4,5,6,7,9,10) 177 Bags 2. Sand 740.26 cft (From 2,3,4,5,6,7,9,10) 3. Coarse aggregate 528.92 cft (From 2,4,6,9) 4. Mild steel round bars (item No: 6) 693.55 Kg 5 Burnt bricks 1st class 16570 Nos. (From 3,5) 6 1/2” thick Brick tiles (item No: 7) 1551 Nos. 7 Bitumen 121.55 Kg (From 4,7) 8 Polythene sheet 973 sft (From 4,7) 9. Timber 13.32 cft (item No: 11) 10. Lime 56.24 Kg (item No: 12) 11. Mud/Earth filling 411.77 cft (From 7,13)