Bluestone Heights
Roy Larick
1) Streams into Sewers
City of Euclid
boundary
Google Earth aerial viewer
Restoring the Pulse
© 2015 Bluestone Heights
Bluestone
Heights
bluestoneheights.org
3) Integrated Planning
4) Eco-Greenways
of Nature in Euclid
2) Initial Green Solutions
5) Euclid Ecology Unit
Overview
In five SlideShares, Restoring the Pulse
presents two goals for stormwater
Integrated Planning in Euclid, Ohio:
• Revive the natural regulation of
stormwater at relatively low cost and
high community benefit.
• Reconnect fragmented natural habitat
areas as a means to build local
biodiversity and natural capital.
LillyCreek
BabbittRun
Creek5
BurkRun
Total storm catchment area: 6,867 acres (10.7 sq mi)
Yellow balloons: 17 CSO regulator points
Pink balloons: 2 SSO regulator points*
Catchment types:
Separated Sewer (newer): 6,447 acres (94%)
Combined Sewer (older): 420 acres ( 6%)
Initial Green Solutions
Restoring the Pulse
Salt
Run
Euclid stormwater profile
Many Euclid residential areas were built with
Combined Sewer systems. In the ‘CSs,’ storm and
sanitary sewage is mixed for treatment.
Each Combined Sewer subsystem drains a small
catchment. Each catchment has an Overflow point
(CSO) at which a regulator dumps storm surges
into an escarpment run sewer.
In this way, CSOs can deliver polluted stormwater
directly to Lake Erie.
Euclid has just two remaining Sanitary Sewer Overflow (SSO) points.
These will be eliminated in 2015, in compliance with the consent
decree.
City of Euclid
boundary
Google Earth aerial viewer
Basic data on Euclid storm sewer catchments :
*
© 2015 Bluestone Heights
Euclid storm sewers
LillyCreek
BabbittRun
Creek5
BurkRun
9 CSOs (108 acres) overflow <4 times/year: ‘non-priority’
8 CSOs (312 acres) overvlow >4 times/year: ‘priority’
The EPA consent decree addresses ‘priority’ CSOs,
those that activate (overflow) four or more times
in a typical year. EPA regulates overflow. We need
to manage catchment runoff.
Euclid has 8 priority catchments draining 312 acres
with total annual overflow of 53.7 million gallons.
In order to meet the EPA mandate, the priority CSO
catchments must be the targets for ‘gray’ and
‘green’ stormwater infrastructure.
We must see the priority CSO catchments as
localized landscapes on which ‘green’ can help
solve the stormwater problem and enhance
neighborhood quality of life.
Yellow balloons: priority CSO overflow points
Red areas: priority CSO catchments
Priority CSO catchments
City of Euclid
boundary
Google Earth aerial viewer
© 2015 Bluestone Heights
Initial Green Solutions
Restoring the Pulse
Salt
Run
Euclid storm sewers
Typical year priority CSO activations (2012 data)
Activation frequency
LillyCreek
BabbittRun
Creek5
BurkRun
20 07
1206
09
08
11
22
CSO 12 06 07 22 09 20 11 08
CSOs 21 & 6: severe
CSOs 07, 22, 09 & 20: significant
CSOs 11 & 08: moderate
Activation frequency classification
Typicalyearfrequency
Euclid priority CSO catchment activations
4
City of Euclid
boundary
Google Earth aerial viewer
© 2015 Bluestone Heights
Initial Green Solutions
Restoring the Pulse
Salt
Run
Euclid storm sewers
Priority catchment runoff volumes & overflow streams
ID acres MG/e MG/y overflow stream
06 75 0.821 15.029 Burk Run
07 42 0.280 3.698 Salt Run
08 15 0.013 0.113 Babbitt Run
09 9 0.037 0.763 Creek 5
11 37 0.012 0.274 Lilly Creek
12 42 0.652 21.855 Salt Run
20 36 0.240 3.966 Burk Run
22 56 0.412 8.013 Green Creek
Totals 312 2.467 53.732
LillyCreek
BabbittRun
Creek5
BurkRun
20 07
1206
09
08
11
22
Euclid priority CSO overflow volumes
MG/e: million gallons per typical event
MG/y: million gallons per typical year
City of Euclid
boundary
Google Earth aerial viewer
© 2015 Bluestone Heights
Initial Green Solutions
Restoring the Pulse
Salt
Run
Euclid storm sewers
In 2011, CT Consultants, Euclid’s engineering firm,
wrote a Long Term Control Plan to address priority
storm events.
Priority catchment overflow would be delivered to
‘gray’ equalization tanks near each catchment.
The stored overflow is later delivered to an upgraded
wastewater treatment plant for processing.
Equalization tank location (red balloons), size and
projected cost were as follows.
LillyCreek
BabbittRun
Creek5
BurkRun
20 07
1206
09
08
11
22
CT priority catchment ‘gray’ solutions
Priority catchment equalization tanks
ID basin location size MG $ M
06/09 Erwine school lot 0.804 6.43
07/12 Bir-Bee-Wal triangle 1.375 8.16
08 Bab-NKPRR-Tungsten 0.009 0.67
11 E 222-Coulter basin 0.012 1.10
20 St. Robert church lot 0.240 4.40
22 NKPRR-E 196-E 204 0.412 6.12
Totals 2.852 26.88
City of Euclid
boundary
Google Earth aerial viewer
© 2015 Bluestone Heights
Initial Green Solutions
Restoring the Pulse
Salt
Run
Euclid storm sewers
In 2013, Strand Associates and Human Nature
(Strand) were hired to identify green stormwater
possibilities within six priority CSO catchments.
The goal was to eliminate or downsize the
equalization tanks.
In five catchments, Strand identified areas in
which new separate storm sewers could direct
runoff to small bio-retention basins. These are
called ‘green sub-catchments’.
Green sub-catchments can infiltrate significant
volumes of stormwater thereby reducing the
need for ‘gray’ infrastructure. As we shall see, the
green sub-catchment solution is cost effective.
Particular features of Strand’s green sub-
catchments are outlined in the following slides
LillyCreek
BabbittRun
Creek5
BurkRun
20 07
1206
09
08
11
22
Strand’s priority green proposals
City of Euclid
boundary
Google Earth aerial viewer
© 2015 Bluestone Heights
Initial Green Solutions
Restoring the Pulse
Salt
Run
Euclid storm sewers
Data legend for the next fives slides:
Typical bioretention basin profile
LillyCreek
BabbittRun
Creek5
BurkRun
20 07
1206
09
08
11
22 acres % c’ment cap MG $ M
11.7 10.6 0.099 1.14
Strand’s green sub-catchment features
Proposed green
sub-catchment size
Green area relative
to total catchment
Biorention basin
capacity (million gallons)
Approximate cost
(million dollars)
Three basic functions
City of Euclid
boundary
Google Earth aerial viewer
© 2015 Bluestone Heights
Initial Green Solutions
Restoring the Pulse
Salt
Run
Euclid storm sewers
Green sub-catchment 07+12*
Blue: storm sewer
Yellow: sani sewer
Red: combined sewer
CSO regulator point
green sub-catchment
bioretention facility
acres % c’ment cap MG $ M
11.7 10.6 0.099 1.14
Initial Green Solutions
Restoring the Pulse
One green sub-catchment
can serve CSOs 07 & 12.
*
© 2015 Bluestone Heights
Green sub-catchment 06
Blue: storm sewer
Yellow: sani sewer
Red: combined sewer
CSO
green sub-catchment
bioretention facility
acres % c’ment cap MG $ M
9.8 13.6 0.155 0.41
Initial Green Solutions
Restoring the Pulse
© 2015 Bluestone Heights
Green sub-catchment 08
Blue: storm sewer
Yellow: sani sewer
Red: combined sewer
CSO regulator point
green sub-catchment
bioretention facility
acres % c’ment cap MG $ M
4.8 30 0.107 0.35
Initial Green Solutions
Restoring the Pulse
© 2015 Bluestone Heights
Green sub-catchment 11
Blue: storm sewer
Yellow: sani sewer
Red: combined sewer
CSO regulator point
green sub-catchment
bioretention facility
acres % c’ment cap MG $ M
9.3 25 0.075 0.89
Initial Green Solutions
Restoring the Pulse
© 2015 Bluestone Heights
Green sub-catchment 22
Blue: storm sewer
Yellow: sani sewer
Red: combined sewer
CSO regulator point
green sub-catchment
bioretention facility
acres % c’ment cap MG $ M
33.5 55 0.528 2.34
Initial Green Solutions
Restoring the Pulse
© 2015 Bluestone Heights
Priority catchment ‘gray’ equalization tanks
ID basin location size MG $ M
06/09 Erwine school lot 0.804 6.43
07/12 Bir-Bee-Wal triangle 1.375 8.16
08 Bab-NKPRR-Tungsten 0.009 0.67
11 E 222-Coulter basin 0.012 1.10
20 St. Robert church lot 0.240 4.40
22 NKPRR-E 196-E 204 0.412 6.12
Totals 2.852 26.88
Green sub-catchment bioretention features
ID acres % c’ment cap MG $ M
06 9.8 13.6 0.155 0.41
07/12 11.7 10.6 0.099 1.14
08 4.8 30 0.107 0.35
11 9.3 25 0.075 0.89
22 33.5 55 0.528 2.34
Totals 69.1 0.964 5.13
5.13/0.964 =
$5.3 M per MG
26.88/2.852 =
$9.6 M per MG
Priority CSO solution comparisons
Strand’s green installations
cost about $5.3 million per
million gallons of captured
runoff, little more than half
that of gray.
Strand estimated that the
five green installations could
save more than $4 million in
reduced equalization basin
size.
Strand has taken a first step
to put green onto CT’s gray
plan. This is a rational step
in building a top notch
green approach.
© 2015 Bluestone Heights
Initial Green Solutions
Restoring the Pulse
Public Presentation
Euclid Public Library
June 10, 2015
City of Euclid
boundary
© 2015 Bluestone Heights
1) Streams into Sewers
Google Earth aerial viewer
Restoring the Pulse
Bluestone
Heights
bluestoneheights.org
3) Integrated Planning
4) Eco-Greenways
of Nature in Euclid
2) Initial Green Solutions
5) Euclid Ecology Unit
Roy Larick
Walk back in time
Look to the Future
Bluestone Heights
© 2015 Bluestone Heights
A production by
bluestoneheights.org
roylarick@gmail.com
Euclid bluestone outcrop
Doan Brook, Cleveland OHR. Larick

More Related Content

PDF
Sangam Shrestha
PPTX
Red Brook Harborview
PDF
Water Use and Conservation - New Hampshire
PPTX
1. CaBA Conference 2017 Welcome - Arlin Rickard
PPTX
8. CaBA Conference 2017 Eurasian Beaver - Alan Puttock
PPT
OWL Summit: New Orleans Spotlight
PDF
Blue and Green Cities The Role of Blue-Green Infrastructure in Managing Urban...
PPT
IWRM Evaluation Result_Singapore
Sangam Shrestha
Red Brook Harborview
Water Use and Conservation - New Hampshire
1. CaBA Conference 2017 Welcome - Arlin Rickard
8. CaBA Conference 2017 Eurasian Beaver - Alan Puttock
OWL Summit: New Orleans Spotlight
Blue and Green Cities The Role of Blue-Green Infrastructure in Managing Urban...
IWRM Evaluation Result_Singapore

What's hot (20)

PDF
Water Reuse Coalition
PPT
INFORM: Adel Hagekhalil
PDF
Economics of crop and land management
PDF
Carlsbad Desalination Project Report o October 2012 Public Workshops - Oct. 2...
PDF
West Falmouth Nitrogen-Reducing Septic System Demonstration Project - May 201...
PPT
Rury 206PM Room B_Integr Hab Restor & Stormwater Treat
PPTX
ICI Presentation Grad**
PDF
Policies Posed to Support Urban Water Reuse, a Chinese Perspective
PPTX
Steve Apfelbaum, "Emulating Nature"
PDF
Greening the Gray - NYWEA 2012
PPT
Nisqually Water Banking Feasibility Study Introduction
PPTX
Steve Davis - Western Lake Erie Basin Nutrient Reductions: Goals And Programs...
PDF
Franklin DPW Water Presentation
PPT
Water extremes in austin texas
PDF
Bryan_Nelson_Water_Panel-AquaFiber
PDF
Cowell Beach Overview 11/14
PPTX
Indian River Lagoon Workshop Presentation - AquaFiber
PPT
Issues Pertinent to Water Resources Planning in the BACOG Area
PDF
Costs of reducing nitrogen loadings hansen
PDF
Modeling of Predictive interaction of Water Parameters in Groundwater
Water Reuse Coalition
INFORM: Adel Hagekhalil
Economics of crop and land management
Carlsbad Desalination Project Report o October 2012 Public Workshops - Oct. 2...
West Falmouth Nitrogen-Reducing Septic System Demonstration Project - May 201...
Rury 206PM Room B_Integr Hab Restor & Stormwater Treat
ICI Presentation Grad**
Policies Posed to Support Urban Water Reuse, a Chinese Perspective
Steve Apfelbaum, "Emulating Nature"
Greening the Gray - NYWEA 2012
Nisqually Water Banking Feasibility Study Introduction
Steve Davis - Western Lake Erie Basin Nutrient Reductions: Goals And Programs...
Franklin DPW Water Presentation
Water extremes in austin texas
Bryan_Nelson_Water_Panel-AquaFiber
Cowell Beach Overview 11/14
Indian River Lagoon Workshop Presentation - AquaFiber
Issues Pertinent to Water Resources Planning in the BACOG Area
Costs of reducing nitrogen loadings hansen
Modeling of Predictive interaction of Water Parameters in Groundwater
Ad

Similar to Euclid Initial Green Solutions (20)

PPTX
Restoring the Pulse handout
PPTX
Euclid Eco-Greenways
PPTX
Euclid Green Integrated Planning
PPTX
Euclid Streams into Sewers
PPT
Stormwater GreenHomeNYC August 2008
PPTX
Louisville MSD
PDF
Highlands Regional Green Infrastructure Workshop Presentation
PPTX
Urban rainwater catchment for master gardeners 3.7.13
PPT
Lid Presentation
PPTX
Green Infrastructure Workshop for Design Professionals
PPT
Green infrastructure on the fair
PDF
Columbus stormwater planters
PDF
Green Infrastructure Stormwater Management Applications in the Pinelands
PDF
Bill Stack
PPTX
Euclid's Green Creek Ravine Preserve
PDF
Green Infrastructure in Omaha 4 22-15
PPTX
Fairhill/MLK pre-construction public meeting 3-25-2015
PDF
Philadelphia Water Department, Green City Clean Waters Program
PPTX
Final presentation
PPT
Green infrastructuresummary final
Restoring the Pulse handout
Euclid Eco-Greenways
Euclid Green Integrated Planning
Euclid Streams into Sewers
Stormwater GreenHomeNYC August 2008
Louisville MSD
Highlands Regional Green Infrastructure Workshop Presentation
Urban rainwater catchment for master gardeners 3.7.13
Lid Presentation
Green Infrastructure Workshop for Design Professionals
Green infrastructure on the fair
Columbus stormwater planters
Green Infrastructure Stormwater Management Applications in the Pinelands
Bill Stack
Euclid's Green Creek Ravine Preserve
Green Infrastructure in Omaha 4 22-15
Fairhill/MLK pre-construction public meeting 3-25-2015
Philadelphia Water Department, Green City Clean Waters Program
Final presentation
Green infrastructuresummary final
Ad

More from Bluestone Heights (20)

PDF
Rocks and Waters walking tours
PDF
Quilliams Creek walk handout
PPTX
Quilliams Creek walking tour
PPTX
Blue Rock, a lost Cleveland place
PPTX
Doan Brook Parks Nature
PPTX
Portage Escarpment Deep History
PPTX
Rockefeller-on-Doan hike handout
PPTX
Dugway Brook W br walk handout
PPTX
Caves & Castles news 2015: genomics
PPTX
Caves & Castles news 2015: archaeology
PDF
Megaliths & Monuments news, 2016
PPTX
Dugway Brook West Br walking tour
PPTX
CH2M Hill: Onondaga Co green stormwater solutions
PPTX
CH2M Hill: Euclid stormwater Integrated Planing
PPTX
Exploring Burk Run Hillandale
PPTX
Doan Brook 'Suburban Gorge' hike
PPTX
Exploring Burk Run Terrace
PPTX
Archaeology at the Alcazar
PPTX
Euclid Creek east branch hike
PPTX
Explore Euclid's Mt. Baldy
Rocks and Waters walking tours
Quilliams Creek walk handout
Quilliams Creek walking tour
Blue Rock, a lost Cleveland place
Doan Brook Parks Nature
Portage Escarpment Deep History
Rockefeller-on-Doan hike handout
Dugway Brook W br walk handout
Caves & Castles news 2015: genomics
Caves & Castles news 2015: archaeology
Megaliths & Monuments news, 2016
Dugway Brook West Br walking tour
CH2M Hill: Onondaga Co green stormwater solutions
CH2M Hill: Euclid stormwater Integrated Planing
Exploring Burk Run Hillandale
Doan Brook 'Suburban Gorge' hike
Exploring Burk Run Terrace
Archaeology at the Alcazar
Euclid Creek east branch hike
Explore Euclid's Mt. Baldy

Recently uploaded (20)

PDF
Lesson_1_Readings.pdfjjjjjjjjjjjjjjjjjjjjjjjjjjjjj
DOCX
Double Membrane Roofs for Biogas Digesters A sealed cover for biogas producti...
PPTX
sustainable_living_climate_action_20250822032315.pptx
PPTX
Microbial-Pathogens-and-Parasites-Their-Impact-on-Plant-Health.pptx
PPTX
Definition, Causes And Effects Of Greenhouse.pptx
DOCX
Aluminum Dome Roofs for Agricultural Digesters A Durable Cover for Structural...
DOCX
Aluminum Dome Roofs for Silo Tanks Provides a Weatherproof Cover for Bulk Mat...
PDF
2025-08-23 Composting at Home 101 without voucher link and video.pdf
PPTX
Psychological Support for Elderly During Health Crises.pptx
PPTX
IMPACTS OF CHEMICAL FERTILIZERS -CHEMPROJ (11).pptx
PDF
Biomass cookstoves: A review of technical aspects
PPTX
he document discusses solid waste management. It defines different types of s...
PPTX
Advances in Integrated Nutrient and Insect-pest Management in Vegetable Crops...
PPTX
Untitled 1.pptxhhhhhhjjjbbbbb bikinis sis son ka s
DOCX
Biogas Balloon for Dairy Farm Plants Provides gas storage for dairy manure..docx
DOCX
Aluminum Dome Roofs for Drinking Water Tanks Shield Water from Debris and Pol...
PPTX
Science and Society 011111111111111111111
PPTX
Pollution, it's Types and Impacts on Global context.pptx
PPTX
APR 05.05.25.pptx gffdtkdtxfxtdytdtdcfcfxr
PPTX
Drought and it's classification in a simplified way
Lesson_1_Readings.pdfjjjjjjjjjjjjjjjjjjjjjjjjjjjjj
Double Membrane Roofs for Biogas Digesters A sealed cover for biogas producti...
sustainable_living_climate_action_20250822032315.pptx
Microbial-Pathogens-and-Parasites-Their-Impact-on-Plant-Health.pptx
Definition, Causes And Effects Of Greenhouse.pptx
Aluminum Dome Roofs for Agricultural Digesters A Durable Cover for Structural...
Aluminum Dome Roofs for Silo Tanks Provides a Weatherproof Cover for Bulk Mat...
2025-08-23 Composting at Home 101 without voucher link and video.pdf
Psychological Support for Elderly During Health Crises.pptx
IMPACTS OF CHEMICAL FERTILIZERS -CHEMPROJ (11).pptx
Biomass cookstoves: A review of technical aspects
he document discusses solid waste management. It defines different types of s...
Advances in Integrated Nutrient and Insect-pest Management in Vegetable Crops...
Untitled 1.pptxhhhhhhjjjbbbbb bikinis sis son ka s
Biogas Balloon for Dairy Farm Plants Provides gas storage for dairy manure..docx
Aluminum Dome Roofs for Drinking Water Tanks Shield Water from Debris and Pol...
Science and Society 011111111111111111111
Pollution, it's Types and Impacts on Global context.pptx
APR 05.05.25.pptx gffdtkdtxfxtdytdtdcfcfxr
Drought and it's classification in a simplified way

Euclid Initial Green Solutions

  • 1. Bluestone Heights Roy Larick 1) Streams into Sewers City of Euclid boundary Google Earth aerial viewer Restoring the Pulse © 2015 Bluestone Heights Bluestone Heights bluestoneheights.org 3) Integrated Planning 4) Eco-Greenways of Nature in Euclid 2) Initial Green Solutions 5) Euclid Ecology Unit Overview In five SlideShares, Restoring the Pulse presents two goals for stormwater Integrated Planning in Euclid, Ohio: • Revive the natural regulation of stormwater at relatively low cost and high community benefit. • Reconnect fragmented natural habitat areas as a means to build local biodiversity and natural capital.
  • 2. LillyCreek BabbittRun Creek5 BurkRun Total storm catchment area: 6,867 acres (10.7 sq mi) Yellow balloons: 17 CSO regulator points Pink balloons: 2 SSO regulator points* Catchment types: Separated Sewer (newer): 6,447 acres (94%) Combined Sewer (older): 420 acres ( 6%) Initial Green Solutions Restoring the Pulse Salt Run Euclid stormwater profile Many Euclid residential areas were built with Combined Sewer systems. In the ‘CSs,’ storm and sanitary sewage is mixed for treatment. Each Combined Sewer subsystem drains a small catchment. Each catchment has an Overflow point (CSO) at which a regulator dumps storm surges into an escarpment run sewer. In this way, CSOs can deliver polluted stormwater directly to Lake Erie. Euclid has just two remaining Sanitary Sewer Overflow (SSO) points. These will be eliminated in 2015, in compliance with the consent decree. City of Euclid boundary Google Earth aerial viewer Basic data on Euclid storm sewer catchments : * © 2015 Bluestone Heights Euclid storm sewers
  • 3. LillyCreek BabbittRun Creek5 BurkRun 9 CSOs (108 acres) overflow <4 times/year: ‘non-priority’ 8 CSOs (312 acres) overvlow >4 times/year: ‘priority’ The EPA consent decree addresses ‘priority’ CSOs, those that activate (overflow) four or more times in a typical year. EPA regulates overflow. We need to manage catchment runoff. Euclid has 8 priority catchments draining 312 acres with total annual overflow of 53.7 million gallons. In order to meet the EPA mandate, the priority CSO catchments must be the targets for ‘gray’ and ‘green’ stormwater infrastructure. We must see the priority CSO catchments as localized landscapes on which ‘green’ can help solve the stormwater problem and enhance neighborhood quality of life. Yellow balloons: priority CSO overflow points Red areas: priority CSO catchments Priority CSO catchments City of Euclid boundary Google Earth aerial viewer © 2015 Bluestone Heights Initial Green Solutions Restoring the Pulse Salt Run Euclid storm sewers
  • 4. Typical year priority CSO activations (2012 data) Activation frequency LillyCreek BabbittRun Creek5 BurkRun 20 07 1206 09 08 11 22 CSO 12 06 07 22 09 20 11 08 CSOs 21 & 6: severe CSOs 07, 22, 09 & 20: significant CSOs 11 & 08: moderate Activation frequency classification Typicalyearfrequency Euclid priority CSO catchment activations 4 City of Euclid boundary Google Earth aerial viewer © 2015 Bluestone Heights Initial Green Solutions Restoring the Pulse Salt Run Euclid storm sewers
  • 5. Priority catchment runoff volumes & overflow streams ID acres MG/e MG/y overflow stream 06 75 0.821 15.029 Burk Run 07 42 0.280 3.698 Salt Run 08 15 0.013 0.113 Babbitt Run 09 9 0.037 0.763 Creek 5 11 37 0.012 0.274 Lilly Creek 12 42 0.652 21.855 Salt Run 20 36 0.240 3.966 Burk Run 22 56 0.412 8.013 Green Creek Totals 312 2.467 53.732 LillyCreek BabbittRun Creek5 BurkRun 20 07 1206 09 08 11 22 Euclid priority CSO overflow volumes MG/e: million gallons per typical event MG/y: million gallons per typical year City of Euclid boundary Google Earth aerial viewer © 2015 Bluestone Heights Initial Green Solutions Restoring the Pulse Salt Run Euclid storm sewers
  • 6. In 2011, CT Consultants, Euclid’s engineering firm, wrote a Long Term Control Plan to address priority storm events. Priority catchment overflow would be delivered to ‘gray’ equalization tanks near each catchment. The stored overflow is later delivered to an upgraded wastewater treatment plant for processing. Equalization tank location (red balloons), size and projected cost were as follows. LillyCreek BabbittRun Creek5 BurkRun 20 07 1206 09 08 11 22 CT priority catchment ‘gray’ solutions Priority catchment equalization tanks ID basin location size MG $ M 06/09 Erwine school lot 0.804 6.43 07/12 Bir-Bee-Wal triangle 1.375 8.16 08 Bab-NKPRR-Tungsten 0.009 0.67 11 E 222-Coulter basin 0.012 1.10 20 St. Robert church lot 0.240 4.40 22 NKPRR-E 196-E 204 0.412 6.12 Totals 2.852 26.88 City of Euclid boundary Google Earth aerial viewer © 2015 Bluestone Heights Initial Green Solutions Restoring the Pulse Salt Run Euclid storm sewers
  • 7. In 2013, Strand Associates and Human Nature (Strand) were hired to identify green stormwater possibilities within six priority CSO catchments. The goal was to eliminate or downsize the equalization tanks. In five catchments, Strand identified areas in which new separate storm sewers could direct runoff to small bio-retention basins. These are called ‘green sub-catchments’. Green sub-catchments can infiltrate significant volumes of stormwater thereby reducing the need for ‘gray’ infrastructure. As we shall see, the green sub-catchment solution is cost effective. Particular features of Strand’s green sub- catchments are outlined in the following slides LillyCreek BabbittRun Creek5 BurkRun 20 07 1206 09 08 11 22 Strand’s priority green proposals City of Euclid boundary Google Earth aerial viewer © 2015 Bluestone Heights Initial Green Solutions Restoring the Pulse Salt Run Euclid storm sewers
  • 8. Data legend for the next fives slides: Typical bioretention basin profile LillyCreek BabbittRun Creek5 BurkRun 20 07 1206 09 08 11 22 acres % c’ment cap MG $ M 11.7 10.6 0.099 1.14 Strand’s green sub-catchment features Proposed green sub-catchment size Green area relative to total catchment Biorention basin capacity (million gallons) Approximate cost (million dollars) Three basic functions City of Euclid boundary Google Earth aerial viewer © 2015 Bluestone Heights Initial Green Solutions Restoring the Pulse Salt Run Euclid storm sewers
  • 9. Green sub-catchment 07+12* Blue: storm sewer Yellow: sani sewer Red: combined sewer CSO regulator point green sub-catchment bioretention facility acres % c’ment cap MG $ M 11.7 10.6 0.099 1.14 Initial Green Solutions Restoring the Pulse One green sub-catchment can serve CSOs 07 & 12. * © 2015 Bluestone Heights
  • 10. Green sub-catchment 06 Blue: storm sewer Yellow: sani sewer Red: combined sewer CSO green sub-catchment bioretention facility acres % c’ment cap MG $ M 9.8 13.6 0.155 0.41 Initial Green Solutions Restoring the Pulse © 2015 Bluestone Heights
  • 11. Green sub-catchment 08 Blue: storm sewer Yellow: sani sewer Red: combined sewer CSO regulator point green sub-catchment bioretention facility acres % c’ment cap MG $ M 4.8 30 0.107 0.35 Initial Green Solutions Restoring the Pulse © 2015 Bluestone Heights
  • 12. Green sub-catchment 11 Blue: storm sewer Yellow: sani sewer Red: combined sewer CSO regulator point green sub-catchment bioretention facility acres % c’ment cap MG $ M 9.3 25 0.075 0.89 Initial Green Solutions Restoring the Pulse © 2015 Bluestone Heights
  • 13. Green sub-catchment 22 Blue: storm sewer Yellow: sani sewer Red: combined sewer CSO regulator point green sub-catchment bioretention facility acres % c’ment cap MG $ M 33.5 55 0.528 2.34 Initial Green Solutions Restoring the Pulse © 2015 Bluestone Heights
  • 14. Priority catchment ‘gray’ equalization tanks ID basin location size MG $ M 06/09 Erwine school lot 0.804 6.43 07/12 Bir-Bee-Wal triangle 1.375 8.16 08 Bab-NKPRR-Tungsten 0.009 0.67 11 E 222-Coulter basin 0.012 1.10 20 St. Robert church lot 0.240 4.40 22 NKPRR-E 196-E 204 0.412 6.12 Totals 2.852 26.88 Green sub-catchment bioretention features ID acres % c’ment cap MG $ M 06 9.8 13.6 0.155 0.41 07/12 11.7 10.6 0.099 1.14 08 4.8 30 0.107 0.35 11 9.3 25 0.075 0.89 22 33.5 55 0.528 2.34 Totals 69.1 0.964 5.13 5.13/0.964 = $5.3 M per MG 26.88/2.852 = $9.6 M per MG Priority CSO solution comparisons Strand’s green installations cost about $5.3 million per million gallons of captured runoff, little more than half that of gray. Strand estimated that the five green installations could save more than $4 million in reduced equalization basin size. Strand has taken a first step to put green onto CT’s gray plan. This is a rational step in building a top notch green approach. © 2015 Bluestone Heights Initial Green Solutions Restoring the Pulse
  • 15. Public Presentation Euclid Public Library June 10, 2015 City of Euclid boundary © 2015 Bluestone Heights 1) Streams into Sewers Google Earth aerial viewer Restoring the Pulse Bluestone Heights bluestoneheights.org 3) Integrated Planning 4) Eco-Greenways of Nature in Euclid 2) Initial Green Solutions 5) Euclid Ecology Unit
  • 16. Roy Larick Walk back in time Look to the Future Bluestone Heights © 2015 Bluestone Heights A production by bluestoneheights.org roylarick@gmail.com Euclid bluestone outcrop Doan Brook, Cleveland OHR. Larick