The Challenge
The booming construction industry in Mongolia has resulted in several
environmental issues, a key one, is the production of massive amounts of
C&D waste. An associated issue is the poor management of that waste. It
is estimated that construction waste accounted for 20-25% of all overall
solid waste produced in Mongolia. C&D waste is thus one of the largest
waste streams in Mongolia.In Ulaanbaatar, much of this construction
waste is dumped illegally.Construction companies do not have any proper
inventory systems to classify the different types of waste, or waste-
separation arrangements. Most of the professionals and workers in the
sector lack awareness on the waste issue and the 3Rs approach.
The municipality of Ulaanbaatar is planning to demolish a considerable
number of old buildings. However, there are no certified companies in
Mongolia with experience in the demolition process and the demolition
regulations do not refer to the waste management issue or provide
guidelines on waste recovery, and sorting and segregation arrangements
including for hazardous waste.
The recycling sector in Mongolia is growing . However, there is a lack of
knowledge and no standards for high-grade material recovery.
Furthermore, the SMEs in this sector face obstacles in marketing their
products and in their access to finance.
The Objectives
The action will support SMEs working in the construction sector to
increase their use of environmentally-friendly technologies and practices
(Introducing technical innovations in recycling of C&D waste tailored to
the Mongolian context), and to become more resource-efficient, to
develop cleaner production and to adopt the 3Rs approach (Greening the
waste supply chain from the design to the demolition phase). The action
will support access to finance for SMEs involved in 3R activities and
assist them to partner with other SMEs and financial institutions in order
to enhance their position in the market. Furthermore, the action will build
on existing political initiatives to strengthen the legal framework related
to C&D waste management and 3Rs approach.
SWITCH-ASIA
“Improving resource-efficiency and cleaner production in the
Mongolian construction sector through materials recovery”
project
EuropeAid
MONGOLIA
Lead Partner
Caritas Czech Republic
(Czech Republic)
Partners
TU DELFT
(Nederland)
Mongolian National
Recycling Association
(Mongolia)
Mongolian University of
Science and Technology,
School of Civil Engineer and
Architecture
(Mongolia)
Economic Policy and
Competitiveness Research
Center
(Mongolia)
Contact details
Mr.Thibault Chapoy
thibault.chapoy@caritas.cz
+976 9597 5509
EUROPEAN
COMMISSION
EuropeAid
The way forward
 Conduct study of C&D waste management practices, design
training materials, conduct training for different target groups,
develop university curriculum for C&D waste management
(Design of a Massive online open course).
 A certification system of Competence for Demolition Operatives
will be established based on the “Smart Demolition” training
materials
 A study based on the mass flow analysis of C&D waste materials
in Mongolia has been carried out
 Conduct research on construction waste recycling applications,
develop the standards and introduce the findings and products to
the targeted SMEs.
 A set of standards has been approved and a list of recommended
additions to the Mongolian standards regulatory framework has
been made
 A R&D plan on recycling applications has been introduced by
MUST university to business entities
 Marketing and awareness-raising activities on products made of
C&D waste, to support sustainable consumption.
 Facilitate access to finance for recycling SMEs.
 Advocacy activities to improve the legal framework and
overcome obstacles faced by SMEs.
Illegal disposal site in Ulaanbaatar
Associates
Construction Development
Center
(Mongolia)
Mongolian Agency of
Standardisation and
Metrology
(Mongolia)
Mongolian Bankers
Association/European Bank
of Reconstruction and
Development
(Mongolia)
National Integrated Centre
for Construction
Development
(Mongolia)
Tuul River Basin Authority
(Mongolia)
EUROPEAN
COMMISSION
Project Duration:3/2016 – 2/2020 (48 month)
Total Budget:€ 1,562,500 (EU contribution: 80%)

More Related Content

PPT
africa re:load 2 Nguyen - German Development Cooperation: innovation and gree...
PDF
The International Trading system and the Circular Economy
PDF
GGSD 2019 Forum - Parallel Session B - Scene Setting presentation
PPTX
HCF 2019 Panel 4: Mark Blainey
PPTX
HCF 2019 Panel 2: Maggie Saykali
PDF
Green Talks LIVE | International Trade and the Circular Economy
PPTX
HCF 2019 Keynote: The role of chemicals in the circulary economy
PPTX
HCF 2019 Panel 1: Matti Vainio
africa re:load 2 Nguyen - German Development Cooperation: innovation and gree...
The International Trading system and the Circular Economy
GGSD 2019 Forum - Parallel Session B - Scene Setting presentation
HCF 2019 Panel 4: Mark Blainey
HCF 2019 Panel 2: Maggie Saykali
Green Talks LIVE | International Trade and the Circular Economy
HCF 2019 Keynote: The role of chemicals in the circulary economy
HCF 2019 Panel 1: Matti Vainio

What's hot (20)

PDF
Industrial Biotechnology, the Bioeconomy and the Role of EU Funding
PDF
Setting Science-based Targets for Apparel, Textiles and Footwear Sectors
PPTX
The Local Innovation Systems Project at MIT
PDF
Oecd digital innovation project outcomes
PPTX
HCF 2019 Panel 1: Frida Hök
PPTX
HCF 2018 Panel 4: Steve Russell
PPTX
The recycling of plastic materials in community waste in Europe - The best pr...
PPTX
Trade and circular economy - Romain Pardo
PDF
Panel 3 garth hickle (minnesota, usa)
PPTX
THE EMERGING PHENOMENON OF SUSTAINABLE ENTREPRENEURSHIP & USER INNOVATION
PPT
1 rumpf
PDF
Advanced Manufacturing by Global Vision
PDF
Ippc6 tatrai hungary 3rd day
PPT
T&C Trade Challenges
PPTX
HCF 2018 Panel 4: Jane Bremmer
PDF
NEW_InnoNet_leaflet_final
PDF
OECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - Lim
PDF
Advanced manufacturig and SMEs
PDF
Scenarios for Sustainable Lifestyles in 2050: Assessing Short- and Long-Term ...
PDF
2015 02-11-eco-innovate-in-lighting-09 & 10 barriers cyc led
Industrial Biotechnology, the Bioeconomy and the Role of EU Funding
Setting Science-based Targets for Apparel, Textiles and Footwear Sectors
The Local Innovation Systems Project at MIT
Oecd digital innovation project outcomes
HCF 2019 Panel 1: Frida Hök
HCF 2018 Panel 4: Steve Russell
The recycling of plastic materials in community waste in Europe - The best pr...
Trade and circular economy - Romain Pardo
Panel 3 garth hickle (minnesota, usa)
THE EMERGING PHENOMENON OF SUSTAINABLE ENTREPRENEURSHIP & USER INNOVATION
1 rumpf
Advanced Manufacturing by Global Vision
Ippc6 tatrai hungary 3rd day
T&C Trade Challenges
HCF 2018 Panel 4: Jane Bremmer
NEW_InnoNet_leaflet_final
OECD Workshop on Regional Trade Agreements and the Environment Session 2.1 - Lim
Advanced manufacturig and SMEs
Scenarios for Sustainable Lifestyles in 2050: Assessing Short- and Long-Term ...
2015 02-11-eco-innovate-in-lighting-09 & 10 barriers cyc led
Ad

Similar to Factsheet for Project (Currently working project) (20)

PDF
Pathways to Zero Waste in India (by Ashish Chaturvedi Research Fellow Green T...
PPTX
Cleantech01032015 a
PDF
SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...
PDF
Beyond Textbooks Digital Learning Resources as Systemic Innovation in the Nor...
PDF
Plastic Waste Management Market.pdf
PDF
Solid Waste Management System: Public-Private Partnership, the Best System fo...
PPTX
Horizon 2020 Information & Brokerage Event: Circular Economy and Plastics
 
PDF
waste delegation in Morroco waste collection
PDF
Circularity Indicators_Project Overview_May2015
PPT
Social Capital and Industrial Districts. Approaching the issue
PDF
The H2020 Dimension of the Waste
PDF
Flyer Academy on the Green Economy.PDF
PPTX
Company-Driven Sustainability Innovation Integrating Users and Entrepreneurs
PDF
Urban Waste Management Course With Government Certification
PDF
A Study Of Plastic Recycling Supply Chain 2010 A Study Of Plastic Recycling S...
PPTX
ADI DAYS - Pier Luigi Franceschini
PDF
Sustainable Consumption and Production and Carbon Labeling
PDF
Material Value Chains (ARVI) factsheet by CLIC Innovation
PPTX
Hugues Labar, Presentation TCI2018 European Conference Sofia
PPTX
Municipal Solid Waste: Is it Garbage or Gold?
Pathways to Zero Waste in India (by Ashish Chaturvedi Research Fellow Green T...
Cleantech01032015 a
SUSTAINABLE PLASTIC WASTE MANAGEMENT- A CASE STUDY OF THANE MUNICIPAL CORPORA...
Beyond Textbooks Digital Learning Resources as Systemic Innovation in the Nor...
Plastic Waste Management Market.pdf
Solid Waste Management System: Public-Private Partnership, the Best System fo...
Horizon 2020 Information & Brokerage Event: Circular Economy and Plastics
 
waste delegation in Morroco waste collection
Circularity Indicators_Project Overview_May2015
Social Capital and Industrial Districts. Approaching the issue
The H2020 Dimension of the Waste
Flyer Academy on the Green Economy.PDF
Company-Driven Sustainability Innovation Integrating Users and Entrepreneurs
Urban Waste Management Course With Government Certification
A Study Of Plastic Recycling Supply Chain 2010 A Study Of Plastic Recycling S...
ADI DAYS - Pier Luigi Franceschini
Sustainable Consumption and Production and Carbon Labeling
Material Value Chains (ARVI) factsheet by CLIC Innovation
Hugues Labar, Presentation TCI2018 European Conference Sofia
Municipal Solid Waste: Is it Garbage or Gold?
Ad

Factsheet for Project (Currently working project)

  • 1. The Challenge The booming construction industry in Mongolia has resulted in several environmental issues, a key one, is the production of massive amounts of C&D waste. An associated issue is the poor management of that waste. It is estimated that construction waste accounted for 20-25% of all overall solid waste produced in Mongolia. C&D waste is thus one of the largest waste streams in Mongolia.In Ulaanbaatar, much of this construction waste is dumped illegally.Construction companies do not have any proper inventory systems to classify the different types of waste, or waste- separation arrangements. Most of the professionals and workers in the sector lack awareness on the waste issue and the 3Rs approach. The municipality of Ulaanbaatar is planning to demolish a considerable number of old buildings. However, there are no certified companies in Mongolia with experience in the demolition process and the demolition regulations do not refer to the waste management issue or provide guidelines on waste recovery, and sorting and segregation arrangements including for hazardous waste. The recycling sector in Mongolia is growing . However, there is a lack of knowledge and no standards for high-grade material recovery. Furthermore, the SMEs in this sector face obstacles in marketing their products and in their access to finance. The Objectives The action will support SMEs working in the construction sector to increase their use of environmentally-friendly technologies and practices (Introducing technical innovations in recycling of C&D waste tailored to the Mongolian context), and to become more resource-efficient, to develop cleaner production and to adopt the 3Rs approach (Greening the waste supply chain from the design to the demolition phase). The action will support access to finance for SMEs involved in 3R activities and assist them to partner with other SMEs and financial institutions in order to enhance their position in the market. Furthermore, the action will build on existing political initiatives to strengthen the legal framework related to C&D waste management and 3Rs approach. SWITCH-ASIA “Improving resource-efficiency and cleaner production in the Mongolian construction sector through materials recovery” project EuropeAid MONGOLIA Lead Partner Caritas Czech Republic (Czech Republic) Partners TU DELFT (Nederland) Mongolian National Recycling Association (Mongolia) Mongolian University of Science and Technology, School of Civil Engineer and Architecture (Mongolia) Economic Policy and Competitiveness Research Center (Mongolia) Contact details Mr.Thibault Chapoy thibault.chapoy@caritas.cz +976 9597 5509 EUROPEAN COMMISSION EuropeAid
  • 2. The way forward  Conduct study of C&D waste management practices, design training materials, conduct training for different target groups, develop university curriculum for C&D waste management (Design of a Massive online open course).  A certification system of Competence for Demolition Operatives will be established based on the “Smart Demolition” training materials  A study based on the mass flow analysis of C&D waste materials in Mongolia has been carried out  Conduct research on construction waste recycling applications, develop the standards and introduce the findings and products to the targeted SMEs.  A set of standards has been approved and a list of recommended additions to the Mongolian standards regulatory framework has been made  A R&D plan on recycling applications has been introduced by MUST university to business entities  Marketing and awareness-raising activities on products made of C&D waste, to support sustainable consumption.  Facilitate access to finance for recycling SMEs.  Advocacy activities to improve the legal framework and overcome obstacles faced by SMEs. Illegal disposal site in Ulaanbaatar Associates Construction Development Center (Mongolia) Mongolian Agency of Standardisation and Metrology (Mongolia) Mongolian Bankers Association/European Bank of Reconstruction and Development (Mongolia) National Integrated Centre for Construction Development (Mongolia) Tuul River Basin Authority (Mongolia) EUROPEAN COMMISSION Project Duration:3/2016 – 2/2020 (48 month) Total Budget:€ 1,562,500 (EU contribution: 80%)