SlideShare a Scribd company logo
Failure Mode Effect Analysis
Introduction and Example
Dr. Kylash Makenji
• Introduction and Overview
• What is Failure Mode Effect Analysis (FMEA)?
• Who uses FMEA?
• Pre-requisites
• Working through a FMEA, Example
• RPN’s, What to do next
• Team exercise
Contents
Introduction and Overview
What is FMEA?
Who uses FMEA?
• Automotive
– Jaguar Land rover, Ford, BMW, Honda, VW group
– All of the others……
• Aerospace
– Boeing, Airbus, NASA
• Military
– Armed forces, Air and Sea
• Prior to FMEA you need
– A design, process or function
– Bill of materials (BOM)
– A specification, target or objective
– Cross functional team, designer, engineer, manufacturing team………
• Additionally
– Standard operating procedure
– Ability to influence or change
– Team skills and competencies, who does what
Pre-requisites
Working through a FMEA
Document and steps overview
Use FMEA anywhere
Buying some milk
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Log, dates, team members, design numbers and versions
List a design, function or process items
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Record any and all potential
failure modes
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
List the potential effects of the
failure
• How severe is the failure mode to customers?
– 10 = very severe, may kill
– 1 = no effect
Effect SEVERITY of Effect Ranking
Hazardous without warning Very high severity ranking when a potential failure mode affects safe system operation without warning 10
Hazardous with warning Very high severity ranking when a potential failure mode affects safe system operation with warning 9
Very High System inoperable with destructive failure without compromising safety 8
High System inoperable with equipment damage 7
Moderate System inoperable with minor damage 6
Low System inoperable without damage 5
Very Low System operable with significant degradation of performance 4
Minor System operable with some degradation of performance 3
Very Minor System operable with minimal interference 2
None No effect 1
Severity
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
List the causes of failure
• How likely will the fault occur ?
– Use data, explicit and tacit knowledge
– If available, look at warranty and customer data
OCCURRENCE of Failure Failure Prob Ranking
Very High: Failure is almost inevitable >1 in 2 10
1 in 3 9
High: Repeated failures 1 in 8 8
1 in 20 7
Moderate: Occasional failures 1 in 80 6
1 in 400 5
1 in 2,000 4
Low: Relatively few failures 1 in 15,000 3
1 in 150,000 2
Remote: Failure is unlikely <1 in 1,500,000 1
Occurrence
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
If available use warrantee and
customer data
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
What is in place to prevent the
failure occurring
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
What is in place to detect the
failure occurring
• How likely are you to detect the failure through
controls, before your customer does?
Detection Likelihood of DETECTION by Design Control Ranking
Absolute Uncertainty Design control cannot detect potential cause/mechanism and subsequent failure mode 10
Very Remote Very remote chance the design control will detect potential cause/mechanism and subsequent failure mode 9
Remote Remote chance the design control will detect potential cause/mechanism and subsequent failure mode 8
Very Low Very low chance the design control will detect potential cause/mechanism and subsequent failure mode 7
Low Low chance the design control will detect potential cause/mechanism and subsequent failure mode 6
Moderate Moderate chance the design control will detect potential cause/mechanism and subsequent failure mode 5
Moderately High Moderately High chance the design control will detect potential cause/mechanism and subsequent failure mode 4
High High chance the design control will detect potential cause/mechanism and subsequent failure mode 3
Very High Very high chance the design control will detect potential cause/mechanism and subsequent failure mode 2
Almost Certain Design control will detect potential cause/mechanism and subsequent failure mode 1
Detection
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Risk Priority Number, (RPN)
Severity x occurrence x detection = RPN
• Sort the FMEA in descending order
– Create actions to reduce RPN value
– Strive to continually improve
– If you have further data, rework back into FMEA
– Some actions may not reduce the RPN significantly
• Beyond economical feasibility
• Simulate and test to measure the impact to the RPN score
RPN’s, What to do Next?
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
KM – 01/09/15 £120K of
investment
required, unable
to justify given
payback period
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Work with the
highest RPN, and
downwards, striving
to continually
improve
Actions, targets etc
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
KM – 01/09/15 £120K of
investment
required, unable
to justify given
payback period
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Recalculate
new RPN
with action
completed or
to predict
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
KM – 01/09/15 £120K of
investment
required, unable
to justify given
payback period
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36
Some actions
may not be
feasible to put
into place,
technical or
economic
considerations
Action Results
Item / Function
Potential Failure
Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential
Cause(s)/
Mechanism(s) of
Failure
O
c
c
u
r
r
Current Design
Controls - Prevention
Current Design
Controls - Detection
D
e
t
R
P
N
Recommended
Action(s)
Responsibility &
Target
Completion Date
Actions Taken
NewSev
NewOcc
NewDet
NewRPN
Buy milk for
lactose intolerant
child
None available in
store
No breakfast for
the little one
3 Shop runs out of
milk
4 Stock management,
EPOS, monitoring level
of sales,
Review of stock levels,
visual check of shelves
and warehouse
3 36
3 Shop does not
store that variety
10 Store policy Review of stock levels,
visual check of shelves
and warehouse
1 30
I buy the incorrect
one
Child has
breakfast and has
a bad reaction
7 Not in the same
location in the
store
3 Standard stock and
store layout
Clear labelling of the
storage area, team
training
4 84Not all team
members can
read English,
investigate how
to improve
Mgr., xx/xx/xx English test and
training
Incorrect milk in
container,
labelling error
Child has
breakfast and has
a bad reaction
7 Dairy has filled
the incorrect
container
1 Dedicated lactose free
production line
Batch testing of the
milk
2 14
7 Dairy has used
the wrong labels
2 Dedicated lactose free
production line, and
packaging
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 28
Spill milk before I
get home
No breakfast for
the little one
3 Screw on cap not
secure
2 Screw cap fitting is
automated, torque
setting on equipment
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
6 36Investigate
calibrated screw
on and off device
Milk on floor,
danger of
slippage
6 Container too thin
to hold milk, split
in side wall
3 Automated and
established process, in
line wall section
checks
Batch testing of the
milk and packaging,
consignment
acceptance check,
training of staff
2 36Next time if you are doing a similar product or
process use an existing FMEA, develop and
improve
Team Activity
Team 1 – Installing the sliding switch
Team 2 – Connecting the sliding switch
Team 3 – User behaviour, using the sliding switch
Volume Slide
• Specification and details:-
– Moving slide left to right will increase volume
– Calibrated slide
• 50% movement = 50% sound increase
– Steel body construction
– Plastic slide knob
– Held in place by 2 screws, onto the PCB
– 2 black wires to connect it to the PCB
Slide Volume
PLAN VIEW
UNDERSIDE / ELECTRICAL CONNECTION
ELECTRICAL
CONNECTIONS
x2
FIXING LUGS
x2
SLIDER
• Function is part of the design which is intentional as part of the
overall specification
• How is the specification being delivered
– i.e. a volume slide
– What can go wrong with it?
• Function, assembly
Function and potential failure mode
• What can go wrong with function and design of the volume
slide?
• Brainstorm
– Ishikawa diagram
Brainstorm
Ishikawa diagram (fishbone)
EQUIPMENT PROCESS PEOPLE
MATERIALS ENVIRONMENT MANAGEMENT
PROBLEM
POOR SOLDERING
-INCORRECT EQUIPMENT
-TOO HOT / COLD
- NOT CALIBRATED
Item / Function Potential Failure Mode(s)
Potential Effect(s)
of Failure
S
e
v
Potential Cause(s)/
Mechanism(s) of Failure
O
c
c
u
r
r
Current Design Controls - Prevention Current Design Controls - Detection
D
e
t
R
P
N
Scoring overview
SEVERITY OCCURRENCE FAILURE PROBABILITY DETECTION RANKING
Hazardous without warning Very High: Failure is inevitable >1 in 2 Absolute Uncertainty 10
Hazardous with warning 1 in 3 Very Remote 9
Very High High: Repeated failures 1 in 8 Remote 8
High 1 in 20 Very Low 7
Moderate Moderate: Occasional failures 1 in 80 Low 6
Low 1 in 400 Moderate 5
Very Low 1 in 2,000 Moderately High 4
Minor Low: Relatively few failures 1 in 15,000 High 3
Very Minor 1 in 150,000 Very High 2
None Remote: Failure is unlikely <1 in 1,500,000 Almost Certain 1
Any questions?

More Related Content

DOCX
Ranjeet resume (1)
PDF
Chuck cato 2016.1
DOCX
Chuck Cato 2016.2
PPTX
Anitmalarial Presentation by Gifty
PDF
5 costly mistakes of R&D report
PDF
3 data analysis bar graphs may 27
PDF
Example Presentation using org-mode and beamer
PPTX
Illustration (example) mode
Ranjeet resume (1)
Chuck cato 2016.1
Chuck Cato 2016.2
Anitmalarial Presentation by Gifty
5 costly mistakes of R&D report
3 data analysis bar graphs may 27
Example Presentation using org-mode and beamer
Illustration (example) mode

Viewers also liked (20)

PPTX
Failure modes effect analysis
PPT
Statistics for math (English Version)
PPT
FAILURE MODE EFFECT ANALYSIS
PPT
Mean, Median, Mode, And Range
PPT
PPT
Measures Of Central Tendency
PPTX
FMEA - Failure mode and effects analysis
PPTX
FMEA failure-mode-and-effect-analysis_Occupational safety and health
PPTX
FMEA Presentation
PPTX
Mode of address media
PDF
Process fmea
PPT
3.3 Mean, Median, Mode, Formulas
PPTX
FAILURE MODE EFFECT ANALYSIS
PPT
Mean Median Mode
PPTX
Measure OF Central Tendency
PPTX
ADDRESSING MODE
PPTX
FMEA Introduction.ppt
PPTX
Mean, Median, Mode: Measures of Central Tendency
PPTX
La mode enviar (3)
PPTX
Measures of central tendency
Failure modes effect analysis
Statistics for math (English Version)
FAILURE MODE EFFECT ANALYSIS
Mean, Median, Mode, And Range
Measures Of Central Tendency
FMEA - Failure mode and effects analysis
FMEA failure-mode-and-effect-analysis_Occupational safety and health
FMEA Presentation
Mode of address media
Process fmea
3.3 Mean, Median, Mode, Formulas
FAILURE MODE EFFECT ANALYSIS
Mean Median Mode
Measure OF Central Tendency
ADDRESSING MODE
FMEA Introduction.ppt
Mean, Median, Mode: Measures of Central Tendency
La mode enviar (3)
Measures of central tendency
Ad

Similar to Failure Mode Effect Analysis (20)

PPT
FMEA - What is FMEA. Everything about FMEA.
PPT
Corrective action
PDF
How to do Equipment validation and process
PPT
It 381 chap 7
PPT
PDF
FMICA ppt
PPT
Analyze for knwolade for complete 454544dsfsfdfdg445454gdfgdfgfdgfdgd.ppt
PPT
gfdgfggdfg878787gdfgd8778787gdfgfgfdgdfgfd.ppt
PPT
IT 381_Chap hubybybybybybybytggyguh7h7_7.ppt
PPT
FMEA is a team tool There are two different types of FMEAs: Design Process In...
PPT
FMEA análise e odos de falhas e seus efeitos.ppt
PPT
IT 381_Chap_7.ppt
PPT
Failure mode and effect analysis fmea.ppt
PPT
PPT
Failure mode effects analysis, Computer Integrated Manufacturing, Quality fun...
PPT
FMEA presentation for research and development
PPT
IT 381ezerzerzerzerzerzerzerz_Chap_7.pptrgggrereregggggggggg
PPTX
Potential Control Points for Safety in the Dairy Value Chain
PPT
fmea1 pfmea analysis overview introduction .ppt
PPT
Failure mode and effects analysis
FMEA - What is FMEA. Everything about FMEA.
Corrective action
How to do Equipment validation and process
It 381 chap 7
FMICA ppt
Analyze for knwolade for complete 454544dsfsfdfdg445454gdfgdfgfdgfdgd.ppt
gfdgfggdfg878787gdfgd8778787gdfgfgfdgdfgfd.ppt
IT 381_Chap hubybybybybybybytggyguh7h7_7.ppt
FMEA is a team tool There are two different types of FMEAs: Design Process In...
FMEA análise e odos de falhas e seus efeitos.ppt
IT 381_Chap_7.ppt
Failure mode and effect analysis fmea.ppt
Failure mode effects analysis, Computer Integrated Manufacturing, Quality fun...
FMEA presentation for research and development
IT 381ezerzerzerzerzerzerzerz_Chap_7.pptrgggrereregggggggggg
Potential Control Points for Safety in the Dairy Value Chain
fmea1 pfmea analysis overview introduction .ppt
Failure mode and effects analysis
Ad

More from WMG, University of Warwick (20)

PDF
Dr Weisi Guo, University of Warwick
PDF
Mike Waters,Coventry City Council
PDF
Dr Rick Robinson, amey
PDF
Amanda Randle, AQMesh
PDF
Io t #11 introduction and closing slides
PDF
Mythbusting alm for circulation
PDF
Playing with data and industry 4.0
PDF
Applying Lean and Assessing plants
PDF
Introduction to Productivity
PDF
Introduction to Productivity Slides, Skills and Productivity
PDF
Nigel Maris & Tom Screen, Assembled Electronics Solutions Ltd
PDF
Jon Cooper, Autonect
PDF
Jeff Stewart, M2M CloudFactory
PDF
Chunyang Xu, Dekon Company Ltd
PDF
Emma Hockley, Big Bear Plastics, Thermoforming and Materials
PDF
Neil Reynolds, WMG University of Warwick, Innovations in Composite Materials ...
PDF
Graeme Herlihy, Engel UK, MuCell Process
PDF
Polymer Innovation Network "Innovations in Plastic Processing"
PDF
Robert Harrison, WMG - IIoT and Industry 4.0 in Automation Systems Engineering
PDF
Jon Hill InVMA - Real Industrial Case Studies creating Value with IoT
Dr Weisi Guo, University of Warwick
Mike Waters,Coventry City Council
Dr Rick Robinson, amey
Amanda Randle, AQMesh
Io t #11 introduction and closing slides
Mythbusting alm for circulation
Playing with data and industry 4.0
Applying Lean and Assessing plants
Introduction to Productivity
Introduction to Productivity Slides, Skills and Productivity
Nigel Maris & Tom Screen, Assembled Electronics Solutions Ltd
Jon Cooper, Autonect
Jeff Stewart, M2M CloudFactory
Chunyang Xu, Dekon Company Ltd
Emma Hockley, Big Bear Plastics, Thermoforming and Materials
Neil Reynolds, WMG University of Warwick, Innovations in Composite Materials ...
Graeme Herlihy, Engel UK, MuCell Process
Polymer Innovation Network "Innovations in Plastic Processing"
Robert Harrison, WMG - IIoT and Industry 4.0 in Automation Systems Engineering
Jon Hill InVMA - Real Industrial Case Studies creating Value with IoT

Recently uploaded (20)

PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PDF
NewMind AI Weekly Chronicles - August'25-Week II
PDF
Accuracy of neural networks in brain wave diagnosis of schizophrenia
PDF
cuic standard and advanced reporting.pdf
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
gpt5_lecture_notes_comprehensive_20250812015547.pdf
PDF
Unlocking AI with Model Context Protocol (MCP)
PPTX
Tartificialntelligence_presentation.pptx
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PPTX
Spectroscopy.pptx food analysis technology
PDF
A comparative analysis of optical character recognition models for extracting...
PDF
MIND Revenue Release Quarter 2 2025 Press Release
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PPT
Teaching material agriculture food technology
PPTX
1. Introduction to Computer Programming.pptx
PPTX
MYSQL Presentation for SQL database connectivity
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PDF
Machine learning based COVID-19 study performance prediction
PDF
Getting Started with Data Integration: FME Form 101
PDF
Build a system with the filesystem maintained by OSTree @ COSCUP 2025
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
NewMind AI Weekly Chronicles - August'25-Week II
Accuracy of neural networks in brain wave diagnosis of schizophrenia
cuic standard and advanced reporting.pdf
The Rise and Fall of 3GPP – Time for a Sabbatical?
gpt5_lecture_notes_comprehensive_20250812015547.pdf
Unlocking AI with Model Context Protocol (MCP)
Tartificialntelligence_presentation.pptx
Mobile App Security Testing_ A Comprehensive Guide.pdf
Spectroscopy.pptx food analysis technology
A comparative analysis of optical character recognition models for extracting...
MIND Revenue Release Quarter 2 2025 Press Release
Digital-Transformation-Roadmap-for-Companies.pptx
Teaching material agriculture food technology
1. Introduction to Computer Programming.pptx
MYSQL Presentation for SQL database connectivity
20250228 LYD VKU AI Blended-Learning.pptx
Machine learning based COVID-19 study performance prediction
Getting Started with Data Integration: FME Form 101
Build a system with the filesystem maintained by OSTree @ COSCUP 2025

Failure Mode Effect Analysis

  • 1. Failure Mode Effect Analysis Introduction and Example Dr. Kylash Makenji
  • 2. • Introduction and Overview • What is Failure Mode Effect Analysis (FMEA)? • Who uses FMEA? • Pre-requisites • Working through a FMEA, Example • RPN’s, What to do next • Team exercise Contents
  • 5. Who uses FMEA? • Automotive – Jaguar Land rover, Ford, BMW, Honda, VW group – All of the others…… • Aerospace – Boeing, Airbus, NASA • Military – Armed forces, Air and Sea
  • 6. • Prior to FMEA you need – A design, process or function – Bill of materials (BOM) – A specification, target or objective – Cross functional team, designer, engineer, manufacturing team……… • Additionally – Standard operating procedure – Ability to influence or change – Team skills and competencies, who does what Pre-requisites
  • 10. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 Log, dates, team members, design numbers and versions List a design, function or process items
  • 11. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 Record any and all potential failure modes
  • 12. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 List the potential effects of the failure
  • 13. • How severe is the failure mode to customers? – 10 = very severe, may kill – 1 = no effect Effect SEVERITY of Effect Ranking Hazardous without warning Very high severity ranking when a potential failure mode affects safe system operation without warning 10 Hazardous with warning Very high severity ranking when a potential failure mode affects safe system operation with warning 9 Very High System inoperable with destructive failure without compromising safety 8 High System inoperable with equipment damage 7 Moderate System inoperable with minor damage 6 Low System inoperable without damage 5 Very Low System operable with significant degradation of performance 4 Minor System operable with some degradation of performance 3 Very Minor System operable with minimal interference 2 None No effect 1 Severity
  • 14. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36
  • 15. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 List the causes of failure
  • 16. • How likely will the fault occur ? – Use data, explicit and tacit knowledge – If available, look at warranty and customer data OCCURRENCE of Failure Failure Prob Ranking Very High: Failure is almost inevitable >1 in 2 10 1 in 3 9 High: Repeated failures 1 in 8 8 1 in 20 7 Moderate: Occasional failures 1 in 80 6 1 in 400 5 1 in 2,000 4 Low: Relatively few failures 1 in 15,000 3 1 in 150,000 2 Remote: Failure is unlikely <1 in 1,500,000 1 Occurrence
  • 17. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 If available use warrantee and customer data
  • 18. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 What is in place to prevent the failure occurring
  • 19. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 What is in place to detect the failure occurring
  • 20. • How likely are you to detect the failure through controls, before your customer does? Detection Likelihood of DETECTION by Design Control Ranking Absolute Uncertainty Design control cannot detect potential cause/mechanism and subsequent failure mode 10 Very Remote Very remote chance the design control will detect potential cause/mechanism and subsequent failure mode 9 Remote Remote chance the design control will detect potential cause/mechanism and subsequent failure mode 8 Very Low Very low chance the design control will detect potential cause/mechanism and subsequent failure mode 7 Low Low chance the design control will detect potential cause/mechanism and subsequent failure mode 6 Moderate Moderate chance the design control will detect potential cause/mechanism and subsequent failure mode 5 Moderately High Moderately High chance the design control will detect potential cause/mechanism and subsequent failure mode 4 High High chance the design control will detect potential cause/mechanism and subsequent failure mode 3 Very High Very high chance the design control will detect potential cause/mechanism and subsequent failure mode 2 Almost Certain Design control will detect potential cause/mechanism and subsequent failure mode 1 Detection
  • 21. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36
  • 22. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 Risk Priority Number, (RPN) Severity x occurrence x detection = RPN
  • 23. • Sort the FMEA in descending order – Create actions to reduce RPN value – Strive to continually improve – If you have further data, rework back into FMEA – Some actions may not reduce the RPN significantly • Beyond economical feasibility • Simulate and test to measure the impact to the RPN score RPN’s, What to do Next?
  • 24. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36
  • 25. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36
  • 26. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device KM – 01/09/15 £120K of investment required, unable to justify given payback period Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 Work with the highest RPN, and downwards, striving to continually improve Actions, targets etc
  • 27. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device KM – 01/09/15 £120K of investment required, unable to justify given payback period Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 Recalculate new RPN with action completed or to predict
  • 28. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device KM – 01/09/15 £120K of investment required, unable to justify given payback period Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36 Some actions may not be feasible to put into place, technical or economic considerations
  • 29. Action Results Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N Recommended Action(s) Responsibility & Target Completion Date Actions Taken NewSev NewOcc NewDet NewRPN Buy milk for lactose intolerant child None available in store No breakfast for the little one 3 Shop runs out of milk 4 Stock management, EPOS, monitoring level of sales, Review of stock levels, visual check of shelves and warehouse 3 36 3 Shop does not store that variety 10 Store policy Review of stock levels, visual check of shelves and warehouse 1 30 I buy the incorrect one Child has breakfast and has a bad reaction 7 Not in the same location in the store 3 Standard stock and store layout Clear labelling of the storage area, team training 4 84Not all team members can read English, investigate how to improve Mgr., xx/xx/xx English test and training Incorrect milk in container, labelling error Child has breakfast and has a bad reaction 7 Dairy has filled the incorrect container 1 Dedicated lactose free production line Batch testing of the milk 2 14 7 Dairy has used the wrong labels 2 Dedicated lactose free production line, and packaging Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 28 Spill milk before I get home No breakfast for the little one 3 Screw on cap not secure 2 Screw cap fitting is automated, torque setting on equipment Batch testing of the milk and packaging, consignment acceptance check, training of staff 6 36Investigate calibrated screw on and off device Milk on floor, danger of slippage 6 Container too thin to hold milk, split in side wall 3 Automated and established process, in line wall section checks Batch testing of the milk and packaging, consignment acceptance check, training of staff 2 36Next time if you are doing a similar product or process use an existing FMEA, develop and improve
  • 30. Team Activity Team 1 – Installing the sliding switch Team 2 – Connecting the sliding switch Team 3 – User behaviour, using the sliding switch
  • 31. Volume Slide • Specification and details:- – Moving slide left to right will increase volume – Calibrated slide • 50% movement = 50% sound increase – Steel body construction – Plastic slide knob – Held in place by 2 screws, onto the PCB – 2 black wires to connect it to the PCB
  • 32. Slide Volume PLAN VIEW UNDERSIDE / ELECTRICAL CONNECTION ELECTRICAL CONNECTIONS x2 FIXING LUGS x2 SLIDER
  • 33. • Function is part of the design which is intentional as part of the overall specification • How is the specification being delivered – i.e. a volume slide – What can go wrong with it? • Function, assembly Function and potential failure mode
  • 34. • What can go wrong with function and design of the volume slide? • Brainstorm – Ishikawa diagram Brainstorm
  • 35. Ishikawa diagram (fishbone) EQUIPMENT PROCESS PEOPLE MATERIALS ENVIRONMENT MANAGEMENT PROBLEM POOR SOLDERING -INCORRECT EQUIPMENT -TOO HOT / COLD - NOT CALIBRATED
  • 36. Item / Function Potential Failure Mode(s) Potential Effect(s) of Failure S e v Potential Cause(s)/ Mechanism(s) of Failure O c c u r r Current Design Controls - Prevention Current Design Controls - Detection D e t R P N
  • 37. Scoring overview SEVERITY OCCURRENCE FAILURE PROBABILITY DETECTION RANKING Hazardous without warning Very High: Failure is inevitable >1 in 2 Absolute Uncertainty 10 Hazardous with warning 1 in 3 Very Remote 9 Very High High: Repeated failures 1 in 8 Remote 8 High 1 in 20 Very Low 7 Moderate Moderate: Occasional failures 1 in 80 Low 6 Low 1 in 400 Moderate 5 Very Low 1 in 2,000 Moderately High 4 Minor Low: Relatively few failures 1 in 15,000 High 3 Very Minor 1 in 150,000 Very High 2 None Remote: Failure is unlikely <1 in 1,500,000 Almost Certain 1