Solar Power Purchase Services
Gensol	Engineering	Pvt	Ltd
The Document
Feasibility	of	a	Solar	PV	
Project	for	Third	Party	
Sale	in	Maharashtra
Open	Access	in	Maharashtra
Enabling Policy in Maharashtra
Maharashtra Electricity Regulatory Commission
(Distribution Open Access) Regulations, 2014.
3.1 Subject to the provisions of these Regulations, a consumer having contract
demand of 1 MW and above and where the minimum power to be made
available for Open Access at any time is 1 MW and above, shall be eligible for
seeking Open Access to the distribution system of such Distribution Licensee for
obtaining supply of electricity from a Generating Company or Captive Power
Plant or from a Licensee other than such Distribution Licensee or through the
Power Exchange :
Provided that the necessary conditionality mentioned in Regulation 3.1 about
minimum power to be made available for Open Access at any time is 1 MW and
above, for being eligible for seeking Open Access shall not be applicable for
Open Access getting supply from a Renewable Energy generating plant
identified as ‘Non firm power’ under MERC (Terms and conditions for
determination of RE Tariff) Regulations, 2010, as amended from time to time
Consumer Categories and Tariffs
Consumer	Category
Tariff	
(Rs./kWh
)
Source
HT	II	- Commercial	Express	Feeder 11.40 ANNEXURE	II
Revenue	from	revised	Tariffs	effective	from	1	April,	2017
http://www.mercindia.org.in/pdf/Order%2058%2042/Order-
48%20of%202016-03112016.pdf
HT	II	- Commercial	Non-express	Feeder 11.40
HT	I	- (Industrial	Express	Feeder)	 7.07
HT	I	- (Industrial	Non-express	Feeder)	 7.07
Calculation of Open Access Charges: HT II - Commercial Non-Express
Feeder
Units Notations Charges/losses kWh
Price	@	Generator	Bus Rs/kWh A 5.00
Consumer	category HT	II	- Commercial	Non-Express	 Feeder
Select	Voltage	Level kV 33
Group	Captive/third	party	 Thiry	party
Energy	injected	into	transmission	system	 kWh B 1,600,000
Transmission	Charge Rs/kWh C 0.71
Transmission	Losses % D 3.89% 62240
Energy	injected	into	distribution	 system	 kWh E 1,537,760
Wheeling	charges Rs/kWh F 0.09
Wheeling	losses % G 6% 92266
Cross	subsidy	surcharge Rs/kWh CSS 0.68
Additional	 surcharge Rs/kWh AS 1.11
Units	Injected	at	Buyer's	Bus kWh H 1,445,494
Open	access	charges Rs /	kWh 3.85
Calculation of Open Access Charges: HT II - Commercial Express
Feeder
Units Notations Charges/losses kWh
Price	@	Generator	Bus Rs/kWh A 5.00
Consumer	category HT	II	- Commercial	Express	Feeder
Select	Voltage	Level kV 33
Group	Captive/third	party	 Thiry	party
Energy	injected	into	transmission	system	 kWh B 1,600,000
Transmission	Charge Rs/kWh C 0.71
Transmission	Losses % D 3.89% 62240
Energy	injected	into	distribution	 system	 kWh E 1,537,760
Wheeling	charges Rs/kWh F 0.09
Wheeling	losses % G 6% 92266
Cross	subsidy	surcharge Rs/kWh CSS 0.71
Additional	 surcharge Rs/kWh AS 1.11
Units	Injected	at	Buyer's	Bus kWh H 1,445,494
Open	access	charges Rs /	kWh 3.88
Calculation of Open Access Charges: HT II - Industrial Non Express
Feeder
Units Notations Charges/losses kWh
Price	@	Generator	Bus Rs/kWh A 5.00
Consumer	category HT	II	- Industrial	Non	Express	Feeder
Select	Voltage	Level kV 33
Group	Captive/third	party	 Thiry	party
Energy	injected	into	transmission	system	 kWh B 1,600,000
Transmission	Charge Rs/kWh C 0.71
Transmission	Losses % D 3.89% 62240
Energy	injected	into	distribution	 system	 kWh E 1,537,760
Wheeling	charges Rs/kWh F 0.09
Wheeling	losses % G 6% 92266
Cross	subsidy	surcharge Rs/kWh CSS 0.44
Additional	 surcharge Rs/kWh AS 1.11
Units	Injected	at	Buyer's	Bus kWh H 1,445,494
Open	access	charges Rs /	kWh 3.60
Calculation of Open Access Charges: HT II - Industrial Express Feeder
Units Notations Charges/losses kWh
Price	@	Generator	Bus Rs/kWh A 5.00
Consumer	category HT	II	- Industrial	Express	Feeder
Select	Voltage	Level kV 33
Group	Captive/third	party	 Thiry	party
Energy	injected	into	transmission	system	 kWh B 1,600,000
Transmission	Charge Rs/kWh C 0.71
Transmission	Losses % D 3.89% 62240
Energy	injected	into	distribution	 system	 kWh E 1,537,760
Wheeling	charges Rs/kWh F 0.09
Wheeling	losses % G 6% 92266
Cross	subsidy	surcharge Rs/kWh CSS 0.48
Additional	 surcharge Rs/kWh AS 1.11
Units	Injected	at	Buyer's	Bus kWh H 1,445,494
Open	access	charges Rs /	kWh 3.64
Financial	Feasibility	of	Solar	PV	Projects
Project Economics of a 10 MW Project
DASHBOARD
AD Benefet Availed NO
Project Execution Mode PMC
Area required per MW (acres) 4.5
Land cost per acre 0.045
Land Cost (Rs in Cr) 2.025
Permitting and commissioning costs (Rs in Cr) 0.02
EPC Cost per MWp (Rs in Cr) 3.8
EPC Cost (Rs in Cr) 38.20
USD/INR 66
AC Capacity (MW) 10
DC Overloading 20.0%
DC Capacity (MW) 12.00
Generation (MWh) 21000
Total transmission losses 0.10%
Generation net of transmission losses (MWh) 20979
PLF 23.97%
Interest rate 11.25%
Refinancing after 1 year of COD No
Debt 70%
Equity 30%
Tariff 4.5000
Equity IRR 18.05%
PIRR 13.28%
Possible Solar Tariffs for Consumer Categories
Consumer	Category
Grid	Tariff	
(Rs./kWh)
Open	Access	
Charges	
(Rs./kWh)
Ceiling	of	Possible	
Solar	Tariff
(Rs./kWh)
HT	II	- Commercial	Express	Feeder 11.4 3.88 7.52
HT	II	- Commercial	Non-express	Feeder 11.4 3.85 7.55
HT	I	- (Industrial	Express	Feeder)	 7.07 3.64 3.43
HT	I	- (Industrial	Non-express	Feeder)	 7.07 3.60 3.47
Savings for Consumer Categories at Rs 4.5/kWh of Solar Tariff
Consumer	Category
Final	Landed		
Tariff	(Rs./kWh)
a	=	b	+	c
Open	Access	
Charges	
(Rs./kWh)
b
Solar	Tariff
(Rs./kWh)
c
Cumulative
Savings	for	
25	years	
(Rs in	Cr)
NPV	of	
Savings	
@10%	
discount	
rate
(Rs in	Cr)
HT	II	- Commercial	Express	
Feeder
8.38 3.88 4.5 459.93 119.13
HT	II	- Commercial	Non-
express	Feeder
8.35 3.85 4.5 462.08 119.83
HT	I	- (Industrial	Express	
Feeder)	
8.14 3.64 4.5 N.A N.A
HT	I	- (Industrial	Non-
express	Feeder)	
8.10 3.60 4.5 N.A N.A
Cross Subsidy Surcharges
EHV	Consumers HT	Consumers HT	Consumers
(66kV	&	above) (33kV) (22/11	kV)
Industry
HT	I	- (Industrial	
Express	Feeder)	
1.9 1.9 1.9
HT	I	- (Industrial	
Non-express	
Feeder)	
1.77 1.77 1.77
Commercial
HT	II	- Commercial	
Express	Feeder
2.85 2.85 2.85
HT	II	- Commercial	
Non-express	
Feeder
2.71 2.71 2.71
Table	8-36:	http://www.mercindia.org.in/pdf/Order%2058%2042/Order-48%20of%202016-03112016.pdf
Sources
Transmission	Charge
Table	8-35:	
http://www.mercindia.org.in/pdf/Order%2058%2042/Order-
48%20of%202016-03112016.pdf
Transmission	Losses
Table	3-10:	
http://www.mercindia.org.in/pdf/Order%2058%2042/Order-
48%20of%202016-03112016.pdf
Wheeling	charges Table	8-27/8-14:	
http://www.mercindia.org.in/pdf/Order%2058%2042/Order-
48%20of%202016-03112016.pdfWheeling	losses
Cross	subsidy	surcharge
CSS	-->Table	8-36:	
http://www.mercindia.org.in/pdf/Order%2058%2042/Order-
48%20of%202016-03112016.pdf
CSS	for	renewable	energy	is	25%	of	applicable	to	conventional	
sources:
http://www.mercindia.org.in/pdf/Order%2058%2042/DOA%20Regul
ations%202015%20-16092015.pdf
Additional	surcharge
Table	8-45:	
http://www.mercindia.org.in/pdf/Order%2058%2042/Order-
48%20of%202016-03112016.pdf

More Related Content

PDF
IPP Utility Scale Solar PV Project Development Roadmap
PDF
Presentation by MNRE on Solar Parks
PDF
Developing Solar Projects
PDF
Economics of Solar Park
PDF
A Report on solar power plant installation
DOCX
Financial Feasibility of Solar Power Plant in India
PPTX
Grid connected Solar Rooftop
PDF
Technical Risks in Solar PV Projects 18.03.18
IPP Utility Scale Solar PV Project Development Roadmap
Presentation by MNRE on Solar Parks
Developing Solar Projects
Economics of Solar Park
A Report on solar power plant installation
Financial Feasibility of Solar Power Plant in India
Grid connected Solar Rooftop
Technical Risks in Solar PV Projects 18.03.18

What's hot (20)

PPTX
Open access ppt
PPTX
Guide to Solar Project Implementation
PPTX
OPEN ACCESS REGULATION
PPTX
Indian electricity market and power exchanges
DOCX
10 mw solar power plant
PDF
Gensol Permits Procurement Services
PDF
Photovoltaic Training - Session 4 - Plant Maintenance
PDF
Distribution open access Maharashtra
PPTX
NPTI 15th batch Indian electricity grid code (IEGC)
PDF
Indian Regulatory Framework Of Power Sector
PDF
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
PDF
Comparison of Solar-Wind Hybrid Policies-07.02.2019
PPTX
Designing Solar PV Systems ( Utility Scale)
PPTX
The power purchase agreement (ppa) presentation
PDF
Energy Storage Solutions - Technology Deployment Analysis
PPTX
Solar energy(Renewable source)
PPTX
2. Solar Power Plant- O&M Issues
PDF
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
PDF
Open access
PPSX
ABT-UI & Deviation Settlement Mechanism (DSM)
Open access ppt
Guide to Solar Project Implementation
OPEN ACCESS REGULATION
Indian electricity market and power exchanges
10 mw solar power plant
Gensol Permits Procurement Services
Photovoltaic Training - Session 4 - Plant Maintenance
Distribution open access Maharashtra
NPTI 15th batch Indian electricity grid code (IEGC)
Indian Regulatory Framework Of Power Sector
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Comparison of Solar-Wind Hybrid Policies-07.02.2019
Designing Solar PV Systems ( Utility Scale)
The power purchase agreement (ppa) presentation
Energy Storage Solutions - Technology Deployment Analysis
Solar energy(Renewable source)
2. Solar Power Plant- O&M Issues
1. Paper on Floating Solar Photovoltaic System An Emerging Technology
Open access
ABT-UI & Deviation Settlement Mechanism (DSM)
Ad

Similar to Feasibility of Solar Project with Open Access in Maharashtra (20)

PDF
Competitive Bidding in the Power Sector : Is It Working?
PDF
SAR100_Course.pdf SAR100_Course.pptx Risk Management & Mitigation
PDF
Government Solar and Net Metering Policies
PPTX
Project Proposal on 10 MW Solar PV Power Plant
PDF
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
DOCX
Open access in india
PPSX
Solar power plant Opportunity and Costing
PPTX
Renewable energy.pptx my presentation
PDF
Wind Force Newsletter May, Edition, 2012
PDF
Gensol's Consulting Credentials - 24.01.17
PPTX
Country report
PDF
Iraq's electricity tariff reform
PDF
Abhishek_Gawde_RMBM_Solar_Maharashtra
PPTX
Renewable energy in India: Present Status and Policy
PDF
Indian power sector
PPTX
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
PPTX
Risk Management & Mitigation Risk Management & Mitigation
PDF
Solar Storage Analyses by Team NU for Argonne Energy Storage Conference
PPTX
Right to electricity act : A hypothetical study
PDF
Open access financial modelling feasibility
Competitive Bidding in the Power Sector : Is It Working?
SAR100_Course.pdf SAR100_Course.pptx Risk Management & Mitigation
Government Solar and Net Metering Policies
Project Proposal on 10 MW Solar PV Power Plant
Projectproposalon10mwsolarpvpowerplant 160312085340 (2)
Open access in india
Solar power plant Opportunity and Costing
Renewable energy.pptx my presentation
Wind Force Newsletter May, Edition, 2012
Gensol's Consulting Credentials - 24.01.17
Country report
Iraq's electricity tariff reform
Abhishek_Gawde_RMBM_Solar_Maharashtra
Renewable energy in India: Present Status and Policy
Indian power sector
ENERGY STORAGE MARKET LANDSCAPE REPORT.pptx
Risk Management & Mitigation Risk Management & Mitigation
Solar Storage Analyses by Team NU for Argonne Energy Storage Conference
Right to electricity act : A hypothetical study
Open access financial modelling feasibility
Ad

More from Gensol Engineering Limited (20)

PDF
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
PDF
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
PDF
Gensol Engineering Limited - Investor Deck_26.09.2019
PDF
Electric Vehicles - Tax Benefits & Incentives_20.09.19
PDF
Phases of Construction & Erection for Wind Power Project_03 09 2019
PDF
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
PDF
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
PDF
List of Solar PV Tenders Floated in India - 11.03.2019
PDF
List of successful bidders 11.03.2019
PDF
Module Price Trend Analysis
PDF
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
PDF
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
PDF
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
PDF
Emerging Opportunities - Wind Solar Hybrid System
PDF
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
PDF
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
PDF
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
PDF
Gensol's Lender Engineer Credentials - 20.03.18
PDF
Basics of Solar PV O&M - Solarig Gensol
PDF
Floating Solar PV - An Introduction
Factors Enhancing Bifacial Gain in India & Middle East_06.03.2020
Ground measured data vs meteo data sets:57 locations in India_01.01.2020
Gensol Engineering Limited - Investor Deck_26.09.2019
Electric Vehicles - Tax Benefits & Incentives_20.09.19
Phases of Construction & Erection for Wind Power Project_03 09 2019
Highlights on 1200MW RE Tender with Assured Peak Power Supply_26 08 2019
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
List of Solar PV Tenders Floated in India - 11.03.2019
List of successful bidders 11.03.2019
Module Price Trend Analysis
Tamil Nadu (TN) Solar Policy 2019 Highlights_07.02.2019
Indian Solar Rooftop PV - A Bright Investment (21.08.18)
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Emerging Opportunities - Wind Solar Hybrid System
Wind Turbine Generator (WTG) Audit Checklist by Gensol - 16.06.18
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Quality Inspection for Solar Modules - Raw Material, Manufacturing & Lab Test...
Gensol's Lender Engineer Credentials - 20.03.18
Basics of Solar PV O&M - Solarig Gensol
Floating Solar PV - An Introduction

Recently uploaded (20)

PDF
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PPTX
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PPTX
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
Booking.com The Global AI Sentiment Report 2025
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
How to Get Funding for Your Trucking Business
PPTX
operations management : demand supply ch
PDF
Building a Smart Pet Ecosystem: A Full Introduction to Zhejiang Beijing Techn...
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
Family Law: The Role of Communication in Mediation (www.kiu.ac.ug)
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
Slide gioi thieu VietinBank Quy 2 - 2025
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Negotiation and Persuasion Skills: A Shrewd Person's Perspective
Lecture 3344;;,,(,(((((((((((((((((((((((
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
TRAINNING, DEVELOPMENT AND APPRAISAL.pptx
Tata consultancy services case study shri Sharda college, basrur
Keppel_Proposed Divestment of M1 Limited
Booking.com The Global AI Sentiment Report 2025
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
How to Get Funding for Your Trucking Business
operations management : demand supply ch
Building a Smart Pet Ecosystem: A Full Introduction to Zhejiang Beijing Techn...
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Daniels 2024 Inclusive, Sustainable Development
Ôn tập tiếng anh trong kinh doanh nâng cao
NEW - FEES STRUCTURES (01-july-2024).pdf
Solaris Resources Presentation - Corporate August 2025.pdf

Feasibility of Solar Project with Open Access in Maharashtra

  • 1. Solar Power Purchase Services Gensol Engineering Pvt Ltd
  • 4. Enabling Policy in Maharashtra Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014. 3.1 Subject to the provisions of these Regulations, a consumer having contract demand of 1 MW and above and where the minimum power to be made available for Open Access at any time is 1 MW and above, shall be eligible for seeking Open Access to the distribution system of such Distribution Licensee for obtaining supply of electricity from a Generating Company or Captive Power Plant or from a Licensee other than such Distribution Licensee or through the Power Exchange : Provided that the necessary conditionality mentioned in Regulation 3.1 about minimum power to be made available for Open Access at any time is 1 MW and above, for being eligible for seeking Open Access shall not be applicable for Open Access getting supply from a Renewable Energy generating plant identified as ‘Non firm power’ under MERC (Terms and conditions for determination of RE Tariff) Regulations, 2010, as amended from time to time
  • 5. Consumer Categories and Tariffs Consumer Category Tariff (Rs./kWh ) Source HT II - Commercial Express Feeder 11.40 ANNEXURE II Revenue from revised Tariffs effective from 1 April, 2017 http://www.mercindia.org.in/pdf/Order%2058%2042/Order- 48%20of%202016-03112016.pdf HT II - Commercial Non-express Feeder 11.40 HT I - (Industrial Express Feeder) 7.07 HT I - (Industrial Non-express Feeder) 7.07
  • 6. Calculation of Open Access Charges: HT II - Commercial Non-Express Feeder Units Notations Charges/losses kWh Price @ Generator Bus Rs/kWh A 5.00 Consumer category HT II - Commercial Non-Express Feeder Select Voltage Level kV 33 Group Captive/third party Thiry party Energy injected into transmission system kWh B 1,600,000 Transmission Charge Rs/kWh C 0.71 Transmission Losses % D 3.89% 62240 Energy injected into distribution system kWh E 1,537,760 Wheeling charges Rs/kWh F 0.09 Wheeling losses % G 6% 92266 Cross subsidy surcharge Rs/kWh CSS 0.68 Additional surcharge Rs/kWh AS 1.11 Units Injected at Buyer's Bus kWh H 1,445,494 Open access charges Rs / kWh 3.85
  • 7. Calculation of Open Access Charges: HT II - Commercial Express Feeder Units Notations Charges/losses kWh Price @ Generator Bus Rs/kWh A 5.00 Consumer category HT II - Commercial Express Feeder Select Voltage Level kV 33 Group Captive/third party Thiry party Energy injected into transmission system kWh B 1,600,000 Transmission Charge Rs/kWh C 0.71 Transmission Losses % D 3.89% 62240 Energy injected into distribution system kWh E 1,537,760 Wheeling charges Rs/kWh F 0.09 Wheeling losses % G 6% 92266 Cross subsidy surcharge Rs/kWh CSS 0.71 Additional surcharge Rs/kWh AS 1.11 Units Injected at Buyer's Bus kWh H 1,445,494 Open access charges Rs / kWh 3.88
  • 8. Calculation of Open Access Charges: HT II - Industrial Non Express Feeder Units Notations Charges/losses kWh Price @ Generator Bus Rs/kWh A 5.00 Consumer category HT II - Industrial Non Express Feeder Select Voltage Level kV 33 Group Captive/third party Thiry party Energy injected into transmission system kWh B 1,600,000 Transmission Charge Rs/kWh C 0.71 Transmission Losses % D 3.89% 62240 Energy injected into distribution system kWh E 1,537,760 Wheeling charges Rs/kWh F 0.09 Wheeling losses % G 6% 92266 Cross subsidy surcharge Rs/kWh CSS 0.44 Additional surcharge Rs/kWh AS 1.11 Units Injected at Buyer's Bus kWh H 1,445,494 Open access charges Rs / kWh 3.60
  • 9. Calculation of Open Access Charges: HT II - Industrial Express Feeder Units Notations Charges/losses kWh Price @ Generator Bus Rs/kWh A 5.00 Consumer category HT II - Industrial Express Feeder Select Voltage Level kV 33 Group Captive/third party Thiry party Energy injected into transmission system kWh B 1,600,000 Transmission Charge Rs/kWh C 0.71 Transmission Losses % D 3.89% 62240 Energy injected into distribution system kWh E 1,537,760 Wheeling charges Rs/kWh F 0.09 Wheeling losses % G 6% 92266 Cross subsidy surcharge Rs/kWh CSS 0.48 Additional surcharge Rs/kWh AS 1.11 Units Injected at Buyer's Bus kWh H 1,445,494 Open access charges Rs / kWh 3.64
  • 11. Project Economics of a 10 MW Project DASHBOARD AD Benefet Availed NO Project Execution Mode PMC Area required per MW (acres) 4.5 Land cost per acre 0.045 Land Cost (Rs in Cr) 2.025 Permitting and commissioning costs (Rs in Cr) 0.02 EPC Cost per MWp (Rs in Cr) 3.8 EPC Cost (Rs in Cr) 38.20 USD/INR 66 AC Capacity (MW) 10 DC Overloading 20.0% DC Capacity (MW) 12.00 Generation (MWh) 21000 Total transmission losses 0.10% Generation net of transmission losses (MWh) 20979 PLF 23.97% Interest rate 11.25% Refinancing after 1 year of COD No Debt 70% Equity 30% Tariff 4.5000 Equity IRR 18.05% PIRR 13.28%
  • 12. Possible Solar Tariffs for Consumer Categories Consumer Category Grid Tariff (Rs./kWh) Open Access Charges (Rs./kWh) Ceiling of Possible Solar Tariff (Rs./kWh) HT II - Commercial Express Feeder 11.4 3.88 7.52 HT II - Commercial Non-express Feeder 11.4 3.85 7.55 HT I - (Industrial Express Feeder) 7.07 3.64 3.43 HT I - (Industrial Non-express Feeder) 7.07 3.60 3.47
  • 13. Savings for Consumer Categories at Rs 4.5/kWh of Solar Tariff Consumer Category Final Landed Tariff (Rs./kWh) a = b + c Open Access Charges (Rs./kWh) b Solar Tariff (Rs./kWh) c Cumulative Savings for 25 years (Rs in Cr) NPV of Savings @10% discount rate (Rs in Cr) HT II - Commercial Express Feeder 8.38 3.88 4.5 459.93 119.13 HT II - Commercial Non- express Feeder 8.35 3.85 4.5 462.08 119.83 HT I - (Industrial Express Feeder) 8.14 3.64 4.5 N.A N.A HT I - (Industrial Non- express Feeder) 8.10 3.60 4.5 N.A N.A
  • 14. Cross Subsidy Surcharges EHV Consumers HT Consumers HT Consumers (66kV & above) (33kV) (22/11 kV) Industry HT I - (Industrial Express Feeder) 1.9 1.9 1.9 HT I - (Industrial Non-express Feeder) 1.77 1.77 1.77 Commercial HT II - Commercial Express Feeder 2.85 2.85 2.85 HT II - Commercial Non-express Feeder 2.71 2.71 2.71 Table 8-36: http://www.mercindia.org.in/pdf/Order%2058%2042/Order-48%20of%202016-03112016.pdf
  • 15. Sources Transmission Charge Table 8-35: http://www.mercindia.org.in/pdf/Order%2058%2042/Order- 48%20of%202016-03112016.pdf Transmission Losses Table 3-10: http://www.mercindia.org.in/pdf/Order%2058%2042/Order- 48%20of%202016-03112016.pdf Wheeling charges Table 8-27/8-14: http://www.mercindia.org.in/pdf/Order%2058%2042/Order- 48%20of%202016-03112016.pdfWheeling losses Cross subsidy surcharge CSS -->Table 8-36: http://www.mercindia.org.in/pdf/Order%2058%2042/Order- 48%20of%202016-03112016.pdf CSS for renewable energy is 25% of applicable to conventional sources: http://www.mercindia.org.in/pdf/Order%2058%2042/DOA%20Regul ations%202015%20-16092015.pdf Additional surcharge Table 8-45: http://www.mercindia.org.in/pdf/Order%2058%2042/Order- 48%20of%202016-03112016.pdf