Between Space & Use
Karen Zellner
DAT-NYC-41
DATA: USE
RmType | Tech |Term | Subject | CourseName
DaysMet | ClassDuration | HoursPerWeek | Enrollment
Building | RmID | SeatCapacity
2239 Courses (after dropping events)
9 semesters
36 Subjects
DATA: USE
Mean Class Size (By Dept.)
DATA: USE
Count of RoomTypes Used (By Semester)
DATA: SPACE
DATA: SPACE
Building | RmID | RmType
DATA: SPACE
Building | RmID | RmType
DATA: SPACE
Building | RmID | RmType
DATA: SPACE
Weekly Room Use In a PerfectWorld
16 HOURS/WK
28 HOURS/WK
45 HOURS/WK
DATA: SPACE
Weekly Room Use Compared toTarget Utilization (By Semester)
MODEL: BINS
1 2 3 4 5 6
A
B
C
D
E
F
G
ROOMSCLASSES
MODEL: BINS
1 2 3 4 5 6
A
B
C
D
E
F
G
FIRST-FIT
OPTIMIZES FOR LEAST NUMBER OF BINS (ROOMS)
BETTER SUITED FOR NEW CONSTRUCTION
MODEL: KNAPSACK
A
B
C
D
E
F
G
ROOMSCLASSES
MODEL: KNAPSACK
A
B
C
D
E
F
G
FIRST-FIT
OPTIMIZES FOR VALUE OF ITEMS (CLASSES)
COMPLICATEDTO SET UP MULTIPLE KNAPSACKS
NOT GENERALIZABLE
MORE IMPORTANTLY : BEYOND MY PYTHON SKILLS
MODEL
Final Approach:
• ‘Room Scenario’ is a combination of the 12 room types that ‘fits’ in the square footage of the existing
buildings
• Exhaustive list was way too many (something like 71! possible arrangements ) so I had to get creative
• Figure out the highest hours used in a semester of a given room type (take top occurrence over 9
semesters)  this is the base requirement
• Given the amount of space ‘left over’ I can figure out the growth potential (say 10% over 6 years)
• Compare the base requirements of rooms to what currently exists. Anything superfluous was converted
to ‘flex’ area I could come up with room combos for this flexible space. ..This was about 3k+ combos to
review.
• Calculate cost of these new spaces.The cost is based on conversion between technical and non-
technical space.
• Make suggestions to the client!
MODEL
Existing
23 rooms
13 Non-Technical
10 Technical
23 to 20 rms : 3Wall Removals 
@ $5k = $15k
3Technical Rms Added 
@ $20k = $60k
Cost of Scenario X = $75k
Required(Now)
11 rooms (14 Free)
7 Non-Technical (5 Free)
4 Technical (6 Free)
Scenario X (Future)
20 rooms
7 Non-Technical
13 Technical
RESULTS
What we have in the buildings…..
What we need in the buildings…..
RESULTS
We only need 51 rooms total to handle the extreme growth…
(but there’s going to be a shortage of 2,470 SF)
RESULTS
RESULTS
RESULTS
RESULTS
NEXT STEPS
Scoring metrics
- Percentage of Seats Filled
- Adjacency of classes per department
Scope of Model
- Extending to additional buildings
- Specific growth by department
Visualization
- Dynamic graphics that update on floor plans
- Integration with BIM (3d database modeling) software

More Related Content

PPTX
How Disruptive Technology Automated Auckland Council's 'Capacity for Growth' ...
PPTX
ARCHITECTURAL STUDY: Site Context & Planning
PPTX
Analytical models of learning curves with variable processing time
PPT
Lift design
PPTX
How Rough Is Your Runway?
PDF
Functions 1
PPTX
Workshop on MATLAB and SIMULINK
PPTX
Effective management of high volume numeric data with histograms
How Disruptive Technology Automated Auckland Council's 'Capacity for Growth' ...
ARCHITECTURAL STUDY: Site Context & Planning
Analytical models of learning curves with variable processing time
Lift design
How Rough Is Your Runway?
Functions 1
Workshop on MATLAB and SIMULINK
Effective management of high volume numeric data with histograms

What's hot (9)

DOC
Paperhanging Clculations
PPTX
Programe evaluation review technique
PPTX
Mobile mapping: Wuppertal, Germany
PPTX
Economics
DOCX
Karnaugh map program Assignment
PDF
How to Get the Most Out of LiDAR Data
PDF
Numerical method of infinite square well
PDF
Acoustical modeling of urban building design
PPT
Spatial data quality in the city of Amsterdam
Paperhanging Clculations
Programe evaluation review technique
Mobile mapping: Wuppertal, Germany
Economics
Karnaugh map program Assignment
How to Get the Most Out of LiDAR Data
Numerical method of infinite square well
Acoustical modeling of urban building design
Spatial data quality in the city of Amsterdam
Ad

Viewers also liked (19)

PPTX
Travajo presentación 1
DOCX
Artikel un 2012
PPTX
Dannysa15 22 02-12
PPT
NSC_meeting_3_7
PPT
NSC_meeting_3_7
PDF
Туребек Серик Рымбекулы
PDF
Assessment Feedback Report
PPTX
Les miss à fort boyard
PDF
MAE - Informe diario 17-12-2015
PDF
Preguntas de sisistemas
DOC
Nobel for Translation080913_RP
PDF
Manual Balay - congelador combi 3 ksb5605
PDF
Modulo 024
PDF
Dilataciones03
DOCX
3 domingo da quaresma
PPTX
Cystic fibrosis
PPTX
صورت کشتی دُم : Puppis
PPTX
Vagus nerve
PDF
ResumeV12
Travajo presentación 1
Artikel un 2012
Dannysa15 22 02-12
NSC_meeting_3_7
NSC_meeting_3_7
Туребек Серик Рымбекулы
Assessment Feedback Report
Les miss à fort boyard
MAE - Informe diario 17-12-2015
Preguntas de sisistemas
Nobel for Translation080913_RP
Manual Balay - congelador combi 3 ksb5605
Modulo 024
Dilataciones03
3 domingo da quaresma
Cystic fibrosis
صورت کشتی دُم : Puppis
Vagus nerve
ResumeV12
Ad

Similar to Final Presentation-DATNYC (20)

PDF
QUILTS: Multidimensional Data Partitioning Framework Based on Query-Aware and...
PDF
Inside3DPrinting_BrentStucker
PDF
Petit Déjeuner Datastax 14-04-15 Courbo Spark : exemple de Machine Learning s...
PPT
A Performance Study of BDD-Based Model Checking
PPTX
CourboSpark: Decision Tree for Time-series on Spark
PDF
PDF
DARPA ERI Summit 2018: The End of Moore’s Law & Faster General Purpose Comput...
PPTX
Spark Summit EU talk by Sameer Agarwal
PPTX
Blinkdb
PPT
computer architecture.
PDF
virtualization
PDF
Products go Green: Worst-Case Energy Consumption in Software Product Lines
PPTX
Exploiting a Synergy between Greedy Approach and NSGA for Scheduling in Compu...
PDF
Silicon valleycodecamp2013
PDF
NTCIR-15 www-3 kasys poster
PDF
Parallel Processing Technique for Time Efficient Matrix Multiplication
PDF
High Performance Computing - A Serverless Story
DOCX
Projects Portfolio
PPTX
Thesis_presentation1
PPTX
SQL Query Optimization: Why Is It So Hard to Get Right?
QUILTS: Multidimensional Data Partitioning Framework Based on Query-Aware and...
Inside3DPrinting_BrentStucker
Petit Déjeuner Datastax 14-04-15 Courbo Spark : exemple de Machine Learning s...
A Performance Study of BDD-Based Model Checking
CourboSpark: Decision Tree for Time-series on Spark
DARPA ERI Summit 2018: The End of Moore’s Law & Faster General Purpose Comput...
Spark Summit EU talk by Sameer Agarwal
Blinkdb
computer architecture.
virtualization
Products go Green: Worst-Case Energy Consumption in Software Product Lines
Exploiting a Synergy between Greedy Approach and NSGA for Scheduling in Compu...
Silicon valleycodecamp2013
NTCIR-15 www-3 kasys poster
Parallel Processing Technique for Time Efficient Matrix Multiplication
High Performance Computing - A Serverless Story
Projects Portfolio
Thesis_presentation1
SQL Query Optimization: Why Is It So Hard to Get Right?

Final Presentation-DATNYC

  • 1. Between Space & Use Karen Zellner DAT-NYC-41
  • 2. DATA: USE RmType | Tech |Term | Subject | CourseName DaysMet | ClassDuration | HoursPerWeek | Enrollment Building | RmID | SeatCapacity 2239 Courses (after dropping events) 9 semesters 36 Subjects
  • 3. DATA: USE Mean Class Size (By Dept.)
  • 4. DATA: USE Count of RoomTypes Used (By Semester)
  • 6. DATA: SPACE Building | RmID | RmType
  • 7. DATA: SPACE Building | RmID | RmType
  • 8. DATA: SPACE Building | RmID | RmType
  • 9. DATA: SPACE Weekly Room Use In a PerfectWorld 16 HOURS/WK 28 HOURS/WK 45 HOURS/WK
  • 10. DATA: SPACE Weekly Room Use Compared toTarget Utilization (By Semester)
  • 11. MODEL: BINS 1 2 3 4 5 6 A B C D E F G ROOMSCLASSES
  • 12. MODEL: BINS 1 2 3 4 5 6 A B C D E F G FIRST-FIT OPTIMIZES FOR LEAST NUMBER OF BINS (ROOMS) BETTER SUITED FOR NEW CONSTRUCTION
  • 14. MODEL: KNAPSACK A B C D E F G FIRST-FIT OPTIMIZES FOR VALUE OF ITEMS (CLASSES) COMPLICATEDTO SET UP MULTIPLE KNAPSACKS NOT GENERALIZABLE MORE IMPORTANTLY : BEYOND MY PYTHON SKILLS
  • 15. MODEL Final Approach: • ‘Room Scenario’ is a combination of the 12 room types that ‘fits’ in the square footage of the existing buildings • Exhaustive list was way too many (something like 71! possible arrangements ) so I had to get creative • Figure out the highest hours used in a semester of a given room type (take top occurrence over 9 semesters)  this is the base requirement • Given the amount of space ‘left over’ I can figure out the growth potential (say 10% over 6 years) • Compare the base requirements of rooms to what currently exists. Anything superfluous was converted to ‘flex’ area I could come up with room combos for this flexible space. ..This was about 3k+ combos to review. • Calculate cost of these new spaces.The cost is based on conversion between technical and non- technical space. • Make suggestions to the client!
  • 16. MODEL Existing 23 rooms 13 Non-Technical 10 Technical 23 to 20 rms : 3Wall Removals  @ $5k = $15k 3Technical Rms Added  @ $20k = $60k Cost of Scenario X = $75k Required(Now) 11 rooms (14 Free) 7 Non-Technical (5 Free) 4 Technical (6 Free) Scenario X (Future) 20 rooms 7 Non-Technical 13 Technical
  • 17. RESULTS What we have in the buildings…..
  • 18. What we need in the buildings….. RESULTS
  • 19. We only need 51 rooms total to handle the extreme growth… (but there’s going to be a shortage of 2,470 SF) RESULTS
  • 23. NEXT STEPS Scoring metrics - Percentage of Seats Filled - Adjacency of classes per department Scope of Model - Extending to additional buildings - Specific growth by department Visualization - Dynamic graphics that update on floor plans - Integration with BIM (3d database modeling) software