SlideShare a Scribd company logo
By
FIVE POINT SOLUTIONS
TOOLS ARE US
(HIRE TRACKING
SYSTEM)
Team Leader
Peter Kropp
Standards Managers
Jaya Swami
Evan Panopoulos
Testing Manager
Fraser Hannell
Admin Manager
Joe Smith
Five Point Solutions Slide Presentation
Primary roles:
 Interview Summary Report
 Project plan
 Work breakdown structure
 Allocate Programming Tasks
 Edited and finalised SRS
 Coding for Main Form and Hire Form
 Assistance with Testing Procedures/Test Plan
 Progress Report
 Slide Presentation
 The system request - The Problem !!
 The planning and methods used to solve this
problem
 ……… and The Solution !!
 Design of the GUI Application
 Demonstration of the System
 The Online Help facility
 Conclusion and questions
The Interview
On the 26th July 2010, the project team (Five Point
Solutions) interviewed the client ‘Tools Are Us’, as a
means to gather information as to what is required with
the upgraded system.
Interview Summary Report
- The Interview
- System Request
- The Report
Five Point Solutions was asked to build a system that
would:
 Track the availability and scheduling of equipment (tools,
machinery, vehicles, etc) that customers have hired
 Allow the adding, editing and deleting of customers and
equipment available for hire
 Access to an online help facility
 To be able to generate reports
 Planning
 Analysis
 Design
 Implementation
 Support/Closing
The System Methodology Report outlines how the System
Development Life Cycle (SDLC), a systematic and orderly
approach, will be used for the implementation of the new
system. It comprises of the following phases:
Hire Tracking System
PROJECT PLAN
(Five Point Solutions)
Author : Peter Kropp
The project plan will describe, in detail, how Five Point
Solutions will meet the requirements of the new Hire
Tracking System, as proposed by Tools Are Us.
The basis of this project plan is to fully document the
development of the system, phase by phase, that will be based
on the standards of the System Development Life Cycle
(SDLC).
GANTT CHART – PROJECT OUTLINE
(Work Breakdown Structure)
Jaya Swami
(Standards Manager)
Primary roles:
 Prioritising System Requirements
 Creation of Events List
 Development of Modeled Events
 Coding for Login Form and Reserve Form (and
assistance with other forms)
 Assistance with Testing Procedures
 Disaster Recovery Plan
The Hire Tracking System will:
 allow the user to track the hiring of equipment items to
customers
 allow the user to reserve equipment items for the customer, if
unavailable at a particular time.
 allow a user with admin rights (only) to Add, Edit and Delete
customer details, equipment item details and category details.
1. Customer registers details
2. Customer enquires to availability of equipment item.
3. If unavailable, equipment item is reserved.
4. If available, equipment item is hired.
5. Equipment item is returned.
6. Customer pays a fee, if an item is returned late
4. If available, equipment item is hired
[Tools Are Us]
Disaster Recovery
Plan
by
[Jaya Swami]
19/10/2010
The Disaster Recovery Plan (DRP) is a plan that was
developed and its intended purpose is to be used in the
event of a disaster (e.g. Fire) at Tool Are Us.
Evan Panopoulos
(Standards Manager)
Primary roles:
 Context Flow Diagram (CFD)
 Data Flow Diagram (DFD)
 Coding for Categories Form
 Online Help Facility
Five Point Solutions Slide Presentation
Five Point Solutions Slide Presentation
Fraser Hannell
(Testing Manager)
Primary roles:
 Entity Relationship Diagram (ERD)
 Database development
 Data Dictionary/Data Elements
 Coding for Equipment Form
 Technical Manual
 Testing Plan/Testing Procedures
The Entity Relationship (ER) Diagram is represented as follows.
Example: Customer’s Table -
FieldField TypeType Form AttributeForm Attribute
CustomerID Numeric (7 Numeric) Text Box
Staff Boolean(Yes/No) Check Box
LastName Text(40 Alphabetical) Text Box
FirstName Text(40 Alphabetical) Text Box
Address Text (40 Alphanumeric) Text Box
Suburb Text(40 Alphabetical) Text Box
State Text(3 Alphabetical) Text Box
PostCode Text(4 Numeric) Text Box
HomeNumber Text(8 Numeric) Text Box
MobileNumber Text(10 Numeric) Text Box
Email Text(40 Alphanumeric) Text Box
Example – Customer Form:
Five Point Solutions Slide Presentation
A document created which describes the
technical aspects of the system.
Consists of:
 Testing Plan
 Testing Data
 Test Reports
Test data for Customer Form:
Joe Smith
(Admin Manager)
Primary roles:
 System Methodology Report
 SRS (with contributions from team members)
 Assistance with Data Dictionary/Data Elements
 Design of GUI Application
 Coding of Customer Form
 System Reports (using Crystal Reports)
 User Manual
 Assistance with Slide Presentation
The Software Requirement Specification (SRS)
document outlines the requirements for the
implementation of a Hire Tracking System for
‘Tools Are Us’.
Documents to the User how to navigate through
the new/upgraded system.
Main Menu Navigation
of
Hire Tracking System
Five Point Solutions Slide Presentation

More Related Content

PDF
Use Cases & User Stories: An Overview
PDF
UAT-5 W's and H.
PPTX
#1 formal methods – introduction for software engineering
PPT
Formal Method for Avionics Software Verification
PPS
Formal Methods
PPSX
Test Case Design and Technique
PPT
Requirement verification & validation
PPT
SECh1920
Use Cases & User Stories: An Overview
UAT-5 W's and H.
#1 formal methods – introduction for software engineering
Formal Method for Avionics Software Verification
Formal Methods
Test Case Design and Technique
Requirement verification & validation
SECh1920

What's hot (18)

PPT
Chapter no 4 inception phase
PDF
V model (software engineering)
PDF
Using formal methods in Industrial Software Development
PDF
9-Software Verification and Validation (Object Oriented Software Engineering ...
PPTX
Toolbox of techniques for Architecture Reviews
DOCX
Mi0033 software engineering...
PPTX
Introduction to formal methods
PPT
Black box and white box testing
PPT
Dynamic Testing
PDF
Assessment 2 descriptor
PPTX
Black box testing
PPT
White box testing
PPT
Decision Support Analyss for Software Effort Estimation by Analogy
PPTX
SEKE 11 presentation
PPTX
System development life_cycle
PPT
Testcase
PPT
Test-Driven Development Introduction
PPSX
Defect Life Cycle
Chapter no 4 inception phase
V model (software engineering)
Using formal methods in Industrial Software Development
9-Software Verification and Validation (Object Oriented Software Engineering ...
Toolbox of techniques for Architecture Reviews
Mi0033 software engineering...
Introduction to formal methods
Black box and white box testing
Dynamic Testing
Assessment 2 descriptor
Black box testing
White box testing
Decision Support Analyss for Software Effort Estimation by Analogy
SEKE 11 presentation
System development life_cycle
Testcase
Test-Driven Development Introduction
Defect Life Cycle
Ad

Similar to Five Point Solutions Slide Presentation (20)

PDF
Online resume builder management system project report.pdf
DOCX
· Choose an information system for an individual project.  During .docx
PDF
Job portal
PDF
J A V A A B S E C A R E E R A N D C O N S U L T A N C Y S E R V I C E S
PPT
System development chapter six power point
DOC
Atish_Gaikwad_Dot_Net_9_4_Years_Exp
DOCX
Resume (3)
DOC
Project scheduler doc
PPTX
sdlc.pptx
DOC
Muruga logeswaran CV-Senior .Net Developer
PDF
auto-mobile-service-station.pdf
DOC
Prateek_Srivastava
PDF
5 job adda doc 2
DOCX
5 job adda doc 2
DOC
Ramakrishna_Profile
PDF
3263270 human-resource-management-systems-hrms
PPTX
Moosa anas 11999051010
PDF
Online job placement system project report.pdf
DOCX
Resume (2)(2)
DOCX
System Proposal TemplateCSC 545 System Design When preparing a.docx
Online resume builder management system project report.pdf
· Choose an information system for an individual project.  During .docx
Job portal
J A V A A B S E C A R E E R A N D C O N S U L T A N C Y S E R V I C E S
System development chapter six power point
Atish_Gaikwad_Dot_Net_9_4_Years_Exp
Resume (3)
Project scheduler doc
sdlc.pptx
Muruga logeswaran CV-Senior .Net Developer
auto-mobile-service-station.pdf
Prateek_Srivastava
5 job adda doc 2
5 job adda doc 2
Ramakrishna_Profile
3263270 human-resource-management-systems-hrms
Moosa anas 11999051010
Online job placement system project report.pdf
Resume (2)(2)
System Proposal TemplateCSC 545 System Design When preparing a.docx
Ad

Five Point Solutions Slide Presentation

  • 1. By FIVE POINT SOLUTIONS TOOLS ARE US (HIRE TRACKING SYSTEM)
  • 2. Team Leader Peter Kropp Standards Managers Jaya Swami Evan Panopoulos Testing Manager Fraser Hannell Admin Manager Joe Smith
  • 4. Primary roles:  Interview Summary Report  Project plan  Work breakdown structure  Allocate Programming Tasks  Edited and finalised SRS  Coding for Main Form and Hire Form  Assistance with Testing Procedures/Test Plan  Progress Report  Slide Presentation
  • 5.  The system request - The Problem !!  The planning and methods used to solve this problem  ……… and The Solution !!  Design of the GUI Application  Demonstration of the System  The Online Help facility  Conclusion and questions
  • 6. The Interview On the 26th July 2010, the project team (Five Point Solutions) interviewed the client ‘Tools Are Us’, as a means to gather information as to what is required with the upgraded system. Interview Summary Report - The Interview - System Request - The Report
  • 7. Five Point Solutions was asked to build a system that would:  Track the availability and scheduling of equipment (tools, machinery, vehicles, etc) that customers have hired  Allow the adding, editing and deleting of customers and equipment available for hire  Access to an online help facility  To be able to generate reports
  • 8.  Planning  Analysis  Design  Implementation  Support/Closing The System Methodology Report outlines how the System Development Life Cycle (SDLC), a systematic and orderly approach, will be used for the implementation of the new system. It comprises of the following phases:
  • 9. Hire Tracking System PROJECT PLAN (Five Point Solutions) Author : Peter Kropp The project plan will describe, in detail, how Five Point Solutions will meet the requirements of the new Hire Tracking System, as proposed by Tools Are Us. The basis of this project plan is to fully document the development of the system, phase by phase, that will be based on the standards of the System Development Life Cycle (SDLC).
  • 10. GANTT CHART – PROJECT OUTLINE (Work Breakdown Structure)
  • 12. Primary roles:  Prioritising System Requirements  Creation of Events List  Development of Modeled Events  Coding for Login Form and Reserve Form (and assistance with other forms)  Assistance with Testing Procedures  Disaster Recovery Plan
  • 13. The Hire Tracking System will:  allow the user to track the hiring of equipment items to customers  allow the user to reserve equipment items for the customer, if unavailable at a particular time.  allow a user with admin rights (only) to Add, Edit and Delete customer details, equipment item details and category details.
  • 14. 1. Customer registers details 2. Customer enquires to availability of equipment item. 3. If unavailable, equipment item is reserved. 4. If available, equipment item is hired. 5. Equipment item is returned. 6. Customer pays a fee, if an item is returned late
  • 15. 4. If available, equipment item is hired
  • 16. [Tools Are Us] Disaster Recovery Plan by [Jaya Swami] 19/10/2010 The Disaster Recovery Plan (DRP) is a plan that was developed and its intended purpose is to be used in the event of a disaster (e.g. Fire) at Tool Are Us.
  • 18. Primary roles:  Context Flow Diagram (CFD)  Data Flow Diagram (DFD)  Coding for Categories Form  Online Help Facility
  • 22. Primary roles:  Entity Relationship Diagram (ERD)  Database development  Data Dictionary/Data Elements  Coding for Equipment Form  Technical Manual  Testing Plan/Testing Procedures
  • 23. The Entity Relationship (ER) Diagram is represented as follows.
  • 24. Example: Customer’s Table - FieldField TypeType Form AttributeForm Attribute CustomerID Numeric (7 Numeric) Text Box Staff Boolean(Yes/No) Check Box LastName Text(40 Alphabetical) Text Box FirstName Text(40 Alphabetical) Text Box Address Text (40 Alphanumeric) Text Box Suburb Text(40 Alphabetical) Text Box State Text(3 Alphabetical) Text Box PostCode Text(4 Numeric) Text Box HomeNumber Text(8 Numeric) Text Box MobileNumber Text(10 Numeric) Text Box Email Text(40 Alphanumeric) Text Box
  • 27. A document created which describes the technical aspects of the system.
  • 28. Consists of:  Testing Plan  Testing Data  Test Reports
  • 29. Test data for Customer Form:
  • 31. Primary roles:  System Methodology Report  SRS (with contributions from team members)  Assistance with Data Dictionary/Data Elements  Design of GUI Application  Coding of Customer Form  System Reports (using Crystal Reports)  User Manual  Assistance with Slide Presentation
  • 32. The Software Requirement Specification (SRS) document outlines the requirements for the implementation of a Hire Tracking System for ‘Tools Are Us’.
  • 33. Documents to the User how to navigate through the new/upgraded system.