Hydraulic Fracturing 101
Hydraulic Fracturing 101
Gas Well Process
•Basically six steps
involved:
1. Seismic exploration
2. Site preparation
3. Drilling the well
4. Completing the well
5. Finishing the site
6. Marketing the gas
Seismic Exploration
Site Preparation
– Prior to drilling, pad site is
prepared as needed
– Drilling multiple wells from a
single pad site reduces the
number of pad sites needed
– With fewer pad sites, overall
environmental footprint is
reduced
Drilling the well
Rockwood, Fort Worth
Drilling the Well
– Average depth is 1.5 miles
below surface
– Horizontal laterals can reach
beneath schools, neighborhoods
and businesses with minimal
surface disruption
– Horizontal drilling reduces
industry’s surface footprint by
90%
– Computer-driven,
state-of-the-art technology
1.5 miles below surface
3,500 feet average lateral length
8,000 ft
Average vertical
depth
Wellbore Integrity
• 7 layers of protection isolate our well bore
from its surroundings, preventing any
exposure of chemicals, gas, or produced
water with the environment
1. Conductor casing
2. Cement, sealing conductor casing in place
3. Surface casing
4. Cement, sealing surface casing in place
5. Production casing
6. Cement, sealing production casing in place
7. Tubing
•The surface casing is drilled to a
minimum depth of between 50 to 100 feet
below the Trinity aquifer
Completing the Well
– “Frac’ing” or “fracing” or
“fracking” is the next step
– Fracking is the process to
stimulate the natural gas to
flow out of the hard shale
– Fracking uses water mixed
with sand and additives
pumped under high
pressure
– The water “fractures” the
rock like a windshield
cracks when hit by a stone
– Sand holds the cracks open
Illustration of hydraulic fracturing or “fracing”
10
Fracking
– Fracking occurs
sometime
after drilling
– Process usually takes
5 – 7 days per well
– Fracking typically takes
place during daytime
hours and generally
only on weekdays (due
to sound level
ordinances)
Equipment used in hydraulic fracturing
Fresh Water Ponds
– Used to hold large volumes of fresh
water for “fracking” and other onsite
needs
– Potential to serve more than one drill
site
– Can be reclaimed or given to landowner
Fresh Water Ponds
Novikoff Frac Pond, Fort Worth
Finishing the Well
– Well head, meters,
pumps and safety
equipment
– Production equipment
installed and painted
– Quietly produces
odorless natural gas for
decades (the odor is
added before the gas
comes into homes)
Finishing the Site
– Well site is finished
and landscaped
– Install appropriate
permanent fencing
specs per city code
– Energy company
returns regularly to:
• Maintain equipment
• Monitor production rate
• Remove produced
water
Finished Well Site
– Rigs are temporary
– Finished well sites
blend into urban
areas
– Landscaped
according to city
ordinances
4th Street Model, Fort Worth4th Street Model, Fort Worth
Typical Finished Well Site
Completed Well Site
Hidden Creek, BurlesonHidden Creek, Burleson
Poly, Fort Worth
Completed Well Site
Poly, Fort Worth
Marketing the Gas
– Process to take natural
gas from the well site to
market
– Pipelines installed
• Gathering lines are
the “streets”
• Transmission lines are
the “highways
– Similar to gas lines that
currently bring natural
gas
to your homes and
offices
Gas Transportation – From Wellhead to Homes
Upstream
Midstream
Hydraulic Fracturing 101

More Related Content

PDF
Life Cycle of Oil & Gas Wells
PDF
Shale gas presentation
PPT
introduction to completions and workovers (2)
PPTX
Workover job ppe
KEY
Exploring Tight Gas Reservoir Using Intelligent Well Technology
PPTX
Drilling fluids
PPTX
Kick t1
PPTX
Final Presentation (2)
Life Cycle of Oil & Gas Wells
Shale gas presentation
introduction to completions and workovers (2)
Workover job ppe
Exploring Tight Gas Reservoir Using Intelligent Well Technology
Drilling fluids
Kick t1
Final Presentation (2)

What's hot (19)

PDF
Petroleum well completion overview
PPTX
Drilling fluids
PPTX
Fundamentals of Petroleum Engineering Module 6
PDF
Development of Tight Gas Fields
PPTX
Trenchless technologies comparing thrust boring with horizontal directional ...
PDF
Halliburton cementing presentation
PDF
Hydraulic Fracturing: Importance to the Industry
PDF
PDF
Well control
PPSX
Water coning in oil wells and DWS technology
PDF
Drilling fluid - Chapter 2
PPTX
Well work over
PPTX
Innovative stimulation am ar_10.10
PPT
1 introduction drillingfluids
DOCX
Open Hole Completion Design
PPTX
Drilling Fluids
PDF
Mine dewatering technology data sheet
PPTX
Drilling fluids
PPTX
Offshore Riser Design
Petroleum well completion overview
Drilling fluids
Fundamentals of Petroleum Engineering Module 6
Development of Tight Gas Fields
Trenchless technologies comparing thrust boring with horizontal directional ...
Halliburton cementing presentation
Hydraulic Fracturing: Importance to the Industry
Well control
Water coning in oil wells and DWS technology
Drilling fluid - Chapter 2
Well work over
Innovative stimulation am ar_10.10
1 introduction drillingfluids
Open Hole Completion Design
Drilling Fluids
Mine dewatering technology data sheet
Drilling fluids
Offshore Riser Design
Ad

Viewers also liked (6)

PPTX
Hydraulic Fracturing in Michigan: Integrated Assessment
PPTX
Hydraulic fracturing
PPTX
Hydraulic fracturing
PPSX
Hydraulic Fracturing Presentation
PPTX
Fracking Presentation
PPTX
Basic Hydraulic Fracturing
Hydraulic Fracturing in Michigan: Integrated Assessment
Hydraulic fracturing
Hydraulic fracturing
Hydraulic Fracturing Presentation
Fracking Presentation
Basic Hydraulic Fracturing
Ad

Similar to Hydraulic Fracturing 101 (20)

PDF
Ehoh6614 group6 hydraulic fracturing presentation
PPTX
fracking
PPT
Natural gas and drinking water
PDF
Api en hydraulic fracturing ppt - ars1
PPTX
Hydraulic Fracturing- A method to enhance the permeabilty of the reservoir
PDF
Southwestern Energy Presentation - Hydraulic Fracturing
PDF
June 2014 hf operations (handout-na student summit)
PPTX
Fracking Pros and Cons
PDF
HYDRAULIC FRACTURING: DRILLING DOWN TO THE FACTS
ODP
Fracking
PPTX
Hydraulic fracturing bb
PPT
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
PDF
APES 6.5 Presentation Fossil Fuels .pdf
DOCX
Research Paper Annotated Bibliography
PDF
Examples from frac presentation: intro
PDF
Microsoft powerpoint managing environmental risk in investing in shale plays
PDF
Fact Sheet Hydraulic Fracturing
PDF
Fracking Dries Out Water Supply in Texas
PPTX
Hydraulic Fracturing and Marcellus Shale Gas 11 22 2011
Ehoh6614 group6 hydraulic fracturing presentation
fracking
Natural gas and drinking water
Api en hydraulic fracturing ppt - ars1
Hydraulic Fracturing- A method to enhance the permeabilty of the reservoir
Southwestern Energy Presentation - Hydraulic Fracturing
June 2014 hf operations (handout-na student summit)
Fracking Pros and Cons
HYDRAULIC FRACTURING: DRILLING DOWN TO THE FACTS
Fracking
Hydraulic fracturing bb
1.5 "Environmental Concern and QA/QC in Shale Gas Drilling and Fracturing" - ...
APES 6.5 Presentation Fossil Fuels .pdf
Research Paper Annotated Bibliography
Examples from frac presentation: intro
Microsoft powerpoint managing environmental risk in investing in shale plays
Fact Sheet Hydraulic Fracturing
Fracking Dries Out Water Supply in Texas
Hydraulic Fracturing and Marcellus Shale Gas 11 22 2011

Recently uploaded (20)

PDF
HVAC Specification 2024 according to central public works department
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PPTX
Introduction to pro and eukaryotes and differences.pptx
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
My India Quiz Book_20210205121199924.pdf
PPTX
20th Century Theater, Methods, History.pptx
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PDF
Complications of Minimal Access-Surgery.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
International_Financial_Reporting_Standa.pdf
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
HVAC Specification 2024 according to central public works department
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Introduction to pro and eukaryotes and differences.pptx
Share_Module_2_Power_conflict_and_negotiation.pptx
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
FORM 1 BIOLOGY MIND MAPS and their schemes
AI-driven educational solutions for real-life interventions in the Philippine...
My India Quiz Book_20210205121199924.pdf
20th Century Theater, Methods, History.pptx
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
Complications of Minimal Access-Surgery.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
B.Sc. DS Unit 2 Software Engineering.pptx
International_Financial_Reporting_Standa.pdf
TNA_Presentation-1-Final(SAVE)) (1).pptx
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Cambridge-Practice-Tests-for-IELTS-12.docx

Hydraulic Fracturing 101

  • 3. Gas Well Process •Basically six steps involved: 1. Seismic exploration 2. Site preparation 3. Drilling the well 4. Completing the well 5. Finishing the site 6. Marketing the gas
  • 5. Site Preparation – Prior to drilling, pad site is prepared as needed – Drilling multiple wells from a single pad site reduces the number of pad sites needed – With fewer pad sites, overall environmental footprint is reduced
  • 7. Drilling the Well – Average depth is 1.5 miles below surface – Horizontal laterals can reach beneath schools, neighborhoods and businesses with minimal surface disruption – Horizontal drilling reduces industry’s surface footprint by 90% – Computer-driven, state-of-the-art technology 1.5 miles below surface 3,500 feet average lateral length 8,000 ft Average vertical depth
  • 8. Wellbore Integrity • 7 layers of protection isolate our well bore from its surroundings, preventing any exposure of chemicals, gas, or produced water with the environment 1. Conductor casing 2. Cement, sealing conductor casing in place 3. Surface casing 4. Cement, sealing surface casing in place 5. Production casing 6. Cement, sealing production casing in place 7. Tubing •The surface casing is drilled to a minimum depth of between 50 to 100 feet below the Trinity aquifer
  • 9. Completing the Well – “Frac’ing” or “fracing” or “fracking” is the next step – Fracking is the process to stimulate the natural gas to flow out of the hard shale – Fracking uses water mixed with sand and additives pumped under high pressure – The water “fractures” the rock like a windshield cracks when hit by a stone – Sand holds the cracks open Illustration of hydraulic fracturing or “fracing”
  • 10. 10
  • 11. Fracking – Fracking occurs sometime after drilling – Process usually takes 5 – 7 days per well – Fracking typically takes place during daytime hours and generally only on weekdays (due to sound level ordinances) Equipment used in hydraulic fracturing
  • 12. Fresh Water Ponds – Used to hold large volumes of fresh water for “fracking” and other onsite needs – Potential to serve more than one drill site – Can be reclaimed or given to landowner
  • 13. Fresh Water Ponds Novikoff Frac Pond, Fort Worth
  • 14. Finishing the Well – Well head, meters, pumps and safety equipment – Production equipment installed and painted – Quietly produces odorless natural gas for decades (the odor is added before the gas comes into homes)
  • 15. Finishing the Site – Well site is finished and landscaped – Install appropriate permanent fencing specs per city code – Energy company returns regularly to: • Maintain equipment • Monitor production rate • Remove produced water
  • 16. Finished Well Site – Rigs are temporary – Finished well sites blend into urban areas – Landscaped according to city ordinances
  • 17. 4th Street Model, Fort Worth4th Street Model, Fort Worth Typical Finished Well Site
  • 18. Completed Well Site Hidden Creek, BurlesonHidden Creek, Burleson
  • 19. Poly, Fort Worth Completed Well Site Poly, Fort Worth
  • 20. Marketing the Gas – Process to take natural gas from the well site to market – Pipelines installed • Gathering lines are the “streets” • Transmission lines are the “highways – Similar to gas lines that currently bring natural gas to your homes and offices
  • 21. Gas Transportation – From Wellhead to Homes Upstream Midstream