SlideShare a Scribd company logo
RIPHAH INTERNATIONAL UNIVERSITY




      RESEARCH
   GAS CRISES AND ITS SOLUTION

          BY: MOEZZA MIR
             12/19/2011
GAS CRISES AND ITS SOLUTION
Pakistan is one of those countries who is caught in different serious energy crisis and gas is one
of the big crisis for Pakistan .This topic includes identification of gas crisis and its solution.

We can divide gas crisis into four factors

   1.   Home Users
   2.   CNG Station
   3.   Industries
   4.   Miss Management



HOME USERS
Home Users is one of big and important factor of gas users who enjoy of the available gas
resource as users .Home Users use gas for cooking, for hot water in various purpose, Heater in
winter

Home Users become part of gas crisis as follow:

Giving new large number of connections in new areas just for political needs. Using of gas
heater rather than warm clothes .Excess usage of gas geezers.




CNG USERS
CNG meets the big fuel necessarily of transport .It is a source of energy competitively cheaper
in price them other sources like pet ,diesel etc .CNG also plays an important part in gas crisis
.Issuance of CNG station licenses unlimited and without policy is on basis of political apprises
.Usually it can be seen in populated areas that CNG stations become a problem of gas
shortage issuance of licenses 7 to 8 even an area of 1 km is worst example of gas corruption
and the important is their location in population .Unlimited import of CNG kits in that case
without considering the gas reserves in hand through this policy users convert every kind of this
vehicle into CNG kit .Never made a vehicle criteria that which class of vehicle is suitable for
CNG it also become part of accidents ratio. Another reason is cheaper cast of CNG
comparatively others energy sources pet, diesel etc
INDUSTRY
Industry convert from other energy sources to CNG rapidly because of cheaper gas prices of
high prices or less sources of other sources .Biggest industry of country convert these factories
into gas quickly. The industries become part of gas crises due to above mention reason. Now
they installed million dollars of CNG machinery .They cannot reverse it back. They are also
playing important role in GDP and they cannot run without gas.




MISS MANAGEMENT:
M.M is a big or one of the biggest factors in gas crises because without considering gas reserves
available in country granted the new n unlimited gas connections to new home users & new
residential areas. Issuing new & unlimited licenses of CNG stations on the other hand ignoring
how much reserves are available & populated areas. Like only IJP road have 17 CNG station
stations in 4KM area. Same criteria is for whole country &worst example of M.M. Issuing license
&grant permission to industry to convert their all infrastructure into gas & They spend millions
of dollars in it .M.M reaches at this stage They never seriously consider to import gas from Iran
and X-USSR countries. Who can provide on cheaper price & after that they need to issue those
licenses?


WHAT TO DO:
Solution can be dividing in four parts.

   1-   Home USERS
   2-   CNG
   3-   INDUSTRY
   4-   MANAGEMENT




HOME USERS:
Give awareness through media and other medium of information to convert gas geezers into
solar & use solar energy more and more. Load shedding from am to 11 am and between 3pm to
6 pm. Use warm clothes rather than gas heaters.& also ensure the availability the warm clothes
in cheap prices . Ban on new gas connections in new areas on urgent basis until a new solution
of availability of gas.
WHAT TO DO IN CNG SECTOR:
Ban on new gas connections for CNG stations on urgent basis until a new solution of availability
of gas. Propose vehicle criteria that which kind of vehicles is suitable for CNG Kits. Urgently calls
a meeting of CNG association representation from all over the Pakistan & after a detail
discussion and mutual understanding propose a suitable load shedding in all country for the
two various days & various timing until new resources identify. Suggest for the change the CNG
compress timing in populated areas between 9 am to 11 am and 3 pm to 6 pm.




What Can Be Done In Industry?
Ban on new gas connections in new industry on urgent basis until a new solution of availability
of gas. Propose & make industry criteria that which one industry & how much gas can consume
in a certain time. Arrange a round table conference of industry holders from all over the
country and after detail discussion & mutual understanding shift industry away from the
populated areas & convert from gas to solar, wind hydral and other sources of industry.




ROLE OF MANAGEMENT:
By the collaboration & consultation of research dep’t management should search &dig new
resources. Get gas from Iran and X-USSR countries to protect industry. Remove miss
management. Remove corruption. Dissolve Sui northern gas pipelines limited and Sui southern
pipelines limited, & make one supervisory dep’t under which small units forms for all over the
Pakistan. Establish a selection board who appoint management team only on basis of merit,
honesty & trust worthy.

More Related Content

PDF
Green Hydrogen - ProColombia
PDF
Third renewable energy auction 2021
PPTX
Honda CNG bikes
PDF
Fuel-Cell-Challenges-GMability
PPT
Renewable Hydrogen and Utilities by Martina Steinkusz
PPTX
Powering the Future with Hydrogen by Catharine Reid
PPT
Houston
DOCX
Ultimate CNG - Press
Green Hydrogen - ProColombia
Third renewable energy auction 2021
Honda CNG bikes
Fuel-Cell-Challenges-GMability
Renewable Hydrogen and Utilities by Martina Steinkusz
Powering the Future with Hydrogen by Catharine Reid
Houston
Ultimate CNG - Press

What's hot (18)

PPT
Energy resources & types
PPT
Energy resources & types
PPT
Houston
PPTX
LAUNCH OF A CNG BIKE
PDF
Piped gas in hyderabad
PPT
Save Gas Save The Planet 1 Hour
PDF
Audrey Schulman MAS2019
 
PDF
EIR Information by Alex Fisch Culver City
PPTX
Cl energy
PPT
Golden
PDF
New base energy news issue 888 dated 19 july 2016
PDF
Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...
PDF
How to Measure Renewable Energy for Mining
PDF
Texas CNG Fleet
PPT
Biomass
PPTX
SUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
Energy resources & types
Energy resources & types
Houston
LAUNCH OF A CNG BIKE
Piped gas in hyderabad
Save Gas Save The Planet 1 Hour
Audrey Schulman MAS2019
 
EIR Information by Alex Fisch Culver City
Cl energy
Golden
New base energy news issue 888 dated 19 july 2016
Building the Infrastructure for Sustainable Energy Transition – Cornwall Ener...
How to Measure Renewable Energy for Mining
Texas CNG Fleet
Biomass
SUMMARY: Feasibility of Maximizing Renewables at LNG Facilities
Ad

Viewers also liked (13)

PDF
Campusdiningbooklet
PDF
Manual de Intruções Frascos par Leite Materno 150 e 250 ml Medela
PPTX
Kits Decoracion Postres
PDF
P1_E1_Internet.pdf
DOCX
Menino jesus
DOCX
Machu picchu joshua
PPS
Verkorte Versie Demo ING2009
DOCX
Dispositivos de entrada y salida
DOCX
春帶彩翡翠
PDF
Read qur'an in aloud voice
PPTX
Government spending
PPTX
Archivo 13 socialismo útopico y socialismo científico
DOC
MATEMÁTICA RECREATIVA.
Campusdiningbooklet
Manual de Intruções Frascos par Leite Materno 150 e 250 ml Medela
Kits Decoracion Postres
P1_E1_Internet.pdf
Menino jesus
Machu picchu joshua
Verkorte Versie Demo ING2009
Dispositivos de entrada y salida
春帶彩翡翠
Read qur'an in aloud voice
Government spending
Archivo 13 socialismo útopico y socialismo científico
MATEMÁTICA RECREATIVA.
Ad

Similar to Gas crises and its solution (20)

PPTX
Pakistan study
DOCX
Cng engine projects
PPTX
Project Planing
PPTX
Compressed Natural Gas
PDF
Domestic Gas Infrastructure
PPTX
Current status of the electric car
PPTX
Natural-gas-in-India.pptx
DOC
Electric vehicle trends
PDF
Alternative Fuel Public Transport Buses
PDF
Compressed Natural Gas- India's Path to Clean Energy
PPTX
Supply chain insights of LPG industry in Bangladesh
PPTX
Energy sector in india 2017 basics and post budget insights arindam (1)
PPTX
The adoption of Electrically Powered Vehicles
PDF
The future for fuel cells
PDF
BP natural gas partner including trinidad china
PDF
International Business Report 2012 - Automotive report
PDF
IBR2012 - Alternative fuels report
PDF
City gas distribution, rating methodology, may 2019
PDF
Xebec Biogas 2010 Presentation
DOCX
Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics
Pakistan study
Cng engine projects
Project Planing
Compressed Natural Gas
Domestic Gas Infrastructure
Current status of the electric car
Natural-gas-in-India.pptx
Electric vehicle trends
Alternative Fuel Public Transport Buses
Compressed Natural Gas- India's Path to Clean Energy
Supply chain insights of LPG industry in Bangladesh
Energy sector in india 2017 basics and post budget insights arindam (1)
The adoption of Electrically Powered Vehicles
The future for fuel cells
BP natural gas partner including trinidad china
International Business Report 2012 - Automotive report
IBR2012 - Alternative fuels report
City gas distribution, rating methodology, may 2019
Xebec Biogas 2010 Presentation
Oil and Gas Company PETRONAS BERHAD Microeconomics and Macroeconomics

More from Moezza A (19)

DOCX
Metro doc
DOCX
Program evaluation survey
DOCX
Mark
DOCX
Program evaluation survey report moiza
DOCX
Gas crises and its solution
DOCX
Moezza case study
DOCX
Project mgmt
DOCX
Process strategy
DOCX
Location strategy
DOCX
Hr & jd
DOCX
DOCX
Case 3 moiza
DOCX
Case 2 moiza
DOCX
Case 1 moiza
PDF
Moezza case study
PPTX
Import & export final
PDF
Troussau fasino reprt
PPTX
Entr final pptx moiza1
PDF
Haseeb project fm new
Metro doc
Program evaluation survey
Mark
Program evaluation survey report moiza
Gas crises and its solution
Moezza case study
Project mgmt
Process strategy
Location strategy
Hr & jd
Case 3 moiza
Case 2 moiza
Case 1 moiza
Moezza case study
Import & export final
Troussau fasino reprt
Entr final pptx moiza1
Haseeb project fm new

Recently uploaded (20)

PDF
Keppel_Proposed Divestment of M1 Limited
PDF
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
PDF
Module 2 - Modern Supervison Challenges - Student Resource.pdf
PDF
How to Get Business Funding for Small Business Fast
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
PDF
How to Get Funding for Your Trucking Business
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PDF
NEW - FEES STRUCTURES (01-july-2024).pdf
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PDF
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
PDF
Charisse Litchman: A Maverick Making Neurological Care More Accessible
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Daniels 2024 Inclusive, Sustainable Development
DOCX
Business Management - unit 1 and 2
Keppel_Proposed Divestment of M1 Limited
Module 3 - Functions of the Supervisor - Part 1 - Student Resource (1).pdf
Module 2 - Modern Supervison Challenges - Student Resource.pdf
How to Get Business Funding for Small Business Fast
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Solara Labs: Empowering Health through Innovative Nutraceutical Solutions
How to Get Funding for Your Trucking Business
Ôn tập tiếng anh trong kinh doanh nâng cao
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
NEW - FEES STRUCTURES (01-july-2024).pdf
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
Nante Industrial Plug Factory: Engineering Quality for Modern Power Applications
Charisse Litchman: A Maverick Making Neurological Care More Accessible
340036916-American-Literature-Literary-Period-Overview.ppt
Daniels 2024 Inclusive, Sustainable Development
Business Management - unit 1 and 2

Gas crises and its solution

  • 1. RIPHAH INTERNATIONAL UNIVERSITY RESEARCH GAS CRISES AND ITS SOLUTION BY: MOEZZA MIR 12/19/2011
  • 2. GAS CRISES AND ITS SOLUTION Pakistan is one of those countries who is caught in different serious energy crisis and gas is one of the big crisis for Pakistan .This topic includes identification of gas crisis and its solution. We can divide gas crisis into four factors 1. Home Users 2. CNG Station 3. Industries 4. Miss Management HOME USERS Home Users is one of big and important factor of gas users who enjoy of the available gas resource as users .Home Users use gas for cooking, for hot water in various purpose, Heater in winter Home Users become part of gas crisis as follow: Giving new large number of connections in new areas just for political needs. Using of gas heater rather than warm clothes .Excess usage of gas geezers. CNG USERS CNG meets the big fuel necessarily of transport .It is a source of energy competitively cheaper in price them other sources like pet ,diesel etc .CNG also plays an important part in gas crisis .Issuance of CNG station licenses unlimited and without policy is on basis of political apprises .Usually it can be seen in populated areas that CNG stations become a problem of gas shortage issuance of licenses 7 to 8 even an area of 1 km is worst example of gas corruption and the important is their location in population .Unlimited import of CNG kits in that case without considering the gas reserves in hand through this policy users convert every kind of this vehicle into CNG kit .Never made a vehicle criteria that which class of vehicle is suitable for CNG it also become part of accidents ratio. Another reason is cheaper cast of CNG comparatively others energy sources pet, diesel etc
  • 3. INDUSTRY Industry convert from other energy sources to CNG rapidly because of cheaper gas prices of high prices or less sources of other sources .Biggest industry of country convert these factories into gas quickly. The industries become part of gas crises due to above mention reason. Now they installed million dollars of CNG machinery .They cannot reverse it back. They are also playing important role in GDP and they cannot run without gas. MISS MANAGEMENT: M.M is a big or one of the biggest factors in gas crises because without considering gas reserves available in country granted the new n unlimited gas connections to new home users & new residential areas. Issuing new & unlimited licenses of CNG stations on the other hand ignoring how much reserves are available & populated areas. Like only IJP road have 17 CNG station stations in 4KM area. Same criteria is for whole country &worst example of M.M. Issuing license &grant permission to industry to convert their all infrastructure into gas & They spend millions of dollars in it .M.M reaches at this stage They never seriously consider to import gas from Iran and X-USSR countries. Who can provide on cheaper price & after that they need to issue those licenses? WHAT TO DO: Solution can be dividing in four parts. 1- Home USERS 2- CNG 3- INDUSTRY 4- MANAGEMENT HOME USERS: Give awareness through media and other medium of information to convert gas geezers into solar & use solar energy more and more. Load shedding from am to 11 am and between 3pm to 6 pm. Use warm clothes rather than gas heaters.& also ensure the availability the warm clothes in cheap prices . Ban on new gas connections in new areas on urgent basis until a new solution of availability of gas.
  • 4. WHAT TO DO IN CNG SECTOR: Ban on new gas connections for CNG stations on urgent basis until a new solution of availability of gas. Propose vehicle criteria that which kind of vehicles is suitable for CNG Kits. Urgently calls a meeting of CNG association representation from all over the Pakistan & after a detail discussion and mutual understanding propose a suitable load shedding in all country for the two various days & various timing until new resources identify. Suggest for the change the CNG compress timing in populated areas between 9 am to 11 am and 3 pm to 6 pm. What Can Be Done In Industry? Ban on new gas connections in new industry on urgent basis until a new solution of availability of gas. Propose & make industry criteria that which one industry & how much gas can consume in a certain time. Arrange a round table conference of industry holders from all over the country and after detail discussion & mutual understanding shift industry away from the populated areas & convert from gas to solar, wind hydral and other sources of industry. ROLE OF MANAGEMENT: By the collaboration & consultation of research dep’t management should search &dig new resources. Get gas from Iran and X-USSR countries to protect industry. Remove miss management. Remove corruption. Dissolve Sui northern gas pipelines limited and Sui southern pipelines limited, & make one supervisory dep’t under which small units forms for all over the Pakistan. Establish a selection board who appoint management team only on basis of merit, honesty & trust worthy.