SlideShare a Scribd company logo
Geotechnical Information for FM78 and Lakeview

1 boring made at 15 feet below surface


               Approximate
                                                                                      Consitency
Description       Depth of                    Material Encountered
                                                                                       /Density
               Stratum (feet)
                                    1 1/2 inches of Asphalt over 4 inches of
     -            0 to 1/2                                                                  -
                                       Crushed Limestone Base Material
                                 Fill - LEAN CLAY (CL); dark brown and brown
 Stratum I        1/2 to 1                                                                Stiff
                                                    mottled

Stratum II          1 to 7                    CLAY (CH); dark brown                Stiff to Very Stiff

                                  CLAY (CH); yellowish brown and gray with
Stratum III        7 to 15                                                         Stiff to Very Stiff
                                               gypsum crystals

Approximately 3 feet of clay should be removed and replaced with select fill

These conditions will satisfy a Condition C Foundation

*Note: Sample was taken less than 1000 feet away. This is the reason for the initial layer of asphalt in the boring sample.


 Subsurface Information
                                                  Existing
                                    Lean Clay                   Clay

    Volumetric Changes              moderate                    high


     Plasticity Index (PI)             26%                   35% to 54%


  In-situ moisture content               3%                   1% to 7%

                                 11 blows for 12"        10 to 25 blows for
         SPT "N" Values
                                   penetration            12" penetration
Foundation Considerations
Shallow Strip Footings
                          Item                                             Description
                   Bearing Stratum                                           Select fill
      Minimum embedment below final grade                          24 inches below final grade
                  Bearing pressures                             Net allowable total load - 2,000 psf
            Approximate total settlement                                       1 inch
   Estimated approximate differential settlement                          1/2 to 3/4 inch
            Allowable passive resistance                            1,000 psf per foot of depth
             Coefficient of sliding friction                                    0.4
                   Uplift Resistance                    Foundation Weight (150 pcf) & Soil Weight (120 pcf)




Pavement Design Information

Flexible Pavement System
                                 Material Thickness (inches)
         Component
                                 Parking Area    Driveway
   Asphalt (Type D HMAC)              1.5             2
   Crushed limestone base              9             10
Moisture conditioned subgrade          6              6



           Parameter                Asphalt
          Reliability (%)             70
      Standard Deviation             0.45
  Initial Serviceability Index        4.2
 Terminal Serviceability Index         2



Design life of 10 years
2,000 ESAL per year in driveway areas
1,000 ESAL per year in parking areas
Porous Paver Information

Purchased from Belgard Company, Aqua-Roc Porous Paver will be used.


                          Material
     Component            Thickness
                             (in.)
   Vehicular Paver           3.15
     #8 Aggregate             2
    #57 Aggregate             6
#2 Subbase Aggregate          6

To be used in parking stalls, as well as parking lot walkways for foot trafic.
This material will support the stormwater runoff design.
Stormwater runoff will flow under the parking lot to a system of pipes, which will direct the water to a nearby
sewer easement.
This material will also give benefit to our LEED certification goals, and also meets ADA requirements
Parking Lot Pricing

Asphalt Paving for Roadways, Assembly Costs

On-site roadway, with 10" thick aggregate base, 2" thick asphalt binder course, rubberized
asphalt interlayer, and 2" thick wear course.


                            Craft@Hrs    Unit    Material    Labor     Equipment       Total
Fine grading and compact
    existing subbase     P5@.066        SY            0.01      2.89           2.69       5.59
  Stone aggregate base,
     Class 2, 10" thick    P5@.02       SY            8.35       2.2           2.05       12.6
 Binder course 2" thick (9
       SY per ton)         P5@.039      SY            11.3      1.71           1.59       14.6
   Rubberized asphalt
       interlayer          P5@.005      SY            1.28      0.22            0.2          1.7
Wear course 2" thick (9 SY
       per ton)            P5@.039      SY            11.8      1.71           1.59       15.1
 Tar emulsion protective
         seal coat          P5@.034 SY                 3.51      1.49           1.39      6.39
Total estimated cost for typical 10' wide roadway, 4" paving over 4" aggregate base
  Cost per SY of roadway P5@.203 SY                   31.24        8.9          8.28     55.98

Asphalt Paving for Parking Areas, Assembly Costs


A vehicular porous paver will be purchased from manufacturer Belgard and used in the parking
                         stall areas, as well as foot traffic walkways.
 For our required dimensions, a purchase price estimate including base aggregates and labor
                         was given to be roughly $7 per square foot.


Cost

Driveway                         Parking Lot
  3076 SY                              24937 SF
 55.98 Cost/SY                               7 Cost/SF
172194 Cost                           174559 Cost

          Total
          Cost        346753.5
All black areas will be made up of asphalt pavement as designed in the previous pages. The grey
sections, including the parking stalls and the walkways, will be made up of the aforementioned porous
paver.

More Related Content

PPT
D jav grounding
PDF
Cement & mixes
PDF
Concrete lab s5 procedure
PDF
អត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅ
PPT
7 b soil properties determination
PDF
Tekcem supra
DOC
Mt lab manual 1
DOCX
Rev 01 dt 01.03.2010 - soil investigation
D jav grounding
Cement & mixes
Concrete lab s5 procedure
អត្ថបទស្រាវជ្រាវទាក់ទងនឹងការសិក្សាលើគ្រឹះជម្រៅ
7 b soil properties determination
Tekcem supra
Mt lab manual 1
Rev 01 dt 01.03.2010 - soil investigation

What's hot (17)

PDF
Proctor Compaction Test
PPT
Compaction and Drain-ability
PPTX
Soil Test and Surveys
DOC
Ex 6 c field density by clod method
PDF
PPTX
Field control of compaction and compaction Equipment
PPTX
Cone Penetration Test
PDF
Bearing ratio capacity of compacted soil
PDF
Cbr test
PPT
Compaction and its effects on soil
PPTX
Soil: Strength and compaction
PPT
7 a soil properties determination
PDF
Min and Max Density of soil
PPTX
FINENESS TEST OF CEMENT (DRY SIEVING)
PPTX
Presentation on Laboratory Tests-Road Construction
Proctor Compaction Test
Compaction and Drain-ability
Soil Test and Surveys
Ex 6 c field density by clod method
Field control of compaction and compaction Equipment
Cone Penetration Test
Bearing ratio capacity of compacted soil
Cbr test
Compaction and its effects on soil
Soil: Strength and compaction
7 a soil properties determination
Min and Max Density of soil
FINENESS TEST OF CEMENT (DRY SIEVING)
Presentation on Laboratory Tests-Road Construction
Ad

Viewers also liked (19)

PPTX
Png atelier slides
PDF
Diag syl
PDF
Transform Magazine Vol1
PDF
Vpectrl3 ram steel - column load summary
PPTX
Montecore-Highlands Tender grilled beef
PDF
Foundation data collection
PPTX
She said yes
PPTX
Apple® i pod
PPTX
Kennismaking Flynth Regio Midden
PPTX
Ayurvrda fundamentals-and-basic-principals- by dr jahir
PPTX
Montecore slide cp version (reviewed by pairat) jan 2013
PDF
Optimum tilt of solar panels
PDF
Foundation data collection
PDF
Beam and column list
PPTX
Montecore slides version 3
PPTX
Montecore snacks co., ltd. highlands jerky 2013
PPTX
Internet và những con số ấn tượng
PPTX
Modern Trade Expert -New client introduction .
PPT
job scheduling
Png atelier slides
Diag syl
Transform Magazine Vol1
Vpectrl3 ram steel - column load summary
Montecore-Highlands Tender grilled beef
Foundation data collection
She said yes
Apple® i pod
Kennismaking Flynth Regio Midden
Ayurvrda fundamentals-and-basic-principals- by dr jahir
Montecore slide cp version (reviewed by pairat) jan 2013
Optimum tilt of solar panels
Foundation data collection
Beam and column list
Montecore slides version 3
Montecore snacks co., ltd. highlands jerky 2013
Internet và những con số ấn tượng
Modern Trade Expert -New client introduction .
job scheduling
Ad

Similar to Geotech and pavement design information (20)

PDF
Hdpe installation practice
PDF
Hdpe installation practice
PPT
D jav grounding
PDF
Porous Pavement in Cold Climates Part 1
PDF
Air pave submittal march 2015
PDF
gr_2016_cir-lam-card_fnl
PDF
Grounding and bonding testing
PDF
Designing with Tile
PPTX
Investigation of behaviour of concrete on adding crumb
PPTX
Presentation on standard penertation test
PPTX
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
PPT
Compaction and Drainability 01
PPTX
Chapter3 road pavement
PPTX
Ppt
PPTX
Sand chimney and sand blanket in Earthen Dam construction
PPT
TL_Cons_present_Kishanpur_20[1].08.09.ppt
DOCX
Characterization of Pavement Materials
PDF
Influence of subgrade condition on rutting in flexible pavements
PPT
Subgrade Stabilization: Materials & Methods
Hdpe installation practice
Hdpe installation practice
D jav grounding
Porous Pavement in Cold Climates Part 1
Air pave submittal march 2015
gr_2016_cir-lam-card_fnl
Grounding and bonding testing
Designing with Tile
Investigation of behaviour of concrete on adding crumb
Presentation on standard penertation test
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
Compaction and Drainability 01
Chapter3 road pavement
Ppt
Sand chimney and sand blanket in Earthen Dam construction
TL_Cons_present_Kishanpur_20[1].08.09.ppt
Characterization of Pavement Materials
Influence of subgrade condition on rutting in flexible pavements
Subgrade Stabilization: Materials & Methods

More from cathexis123 (19)

PDF
Schott poly 220 240 datasheet
DOCX
Pavement design narrative
PDF
Geotech and pavement design information
DOCX
Foundation narrative
PDF
PV System Cost Analysis
PDF
Final PV System cost analysis
PDF
PV System Sizing
PDF
Tx dot use of pfc
PDF
White paper permeablepavement
PDF
Vpectrl3 ram steel - gravity column design summary
PDF
Vpectrl3 ram steel - gravity beam design
PDF
Vpectrl3 ram steel - beam summary
PDF
Vpectrl3 ram foundation - continuous foundation design
PDF
Vpectrl3 ram steel - gravity column design
DOCX
Foundation narrative
DOCX
Pavement design narrative
PDF
PV Option 4- Canadian Solar Max Power data sheet
PDF
PV Option 2- E20 Data Sheet
PDF
PV Optoion 1-Schott Poly 220 240 datasheet
Schott poly 220 240 datasheet
Pavement design narrative
Geotech and pavement design information
Foundation narrative
PV System Cost Analysis
Final PV System cost analysis
PV System Sizing
Tx dot use of pfc
White paper permeablepavement
Vpectrl3 ram steel - gravity column design summary
Vpectrl3 ram steel - gravity beam design
Vpectrl3 ram steel - beam summary
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3 ram steel - gravity column design
Foundation narrative
Pavement design narrative
PV Option 4- Canadian Solar Max Power data sheet
PV Option 2- E20 Data Sheet
PV Optoion 1-Schott Poly 220 240 datasheet

Recently uploaded (20)

PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPT
Lecture 3344;;,,(,(((((((((((((((((((((((
PDF
How to Get Funding for Your Trucking Business
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPTX
Principles of Marketing, Industrial, Consumers,
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Chapter 5_Foreign Exchange Market in .pdf
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
Laughter Yoga Basic Learning Workshop Manual
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
How to Get Business Funding for Small Business Fast
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
Daniels 2024 Inclusive, Sustainable Development
DOCX
Business Management - unit 1 and 2
ICG2025_ICG 6th steering committee 30-8-24.pptx
Lecture 3344;;,,(,(((((((((((((((((((((((
How to Get Funding for Your Trucking Business
Nidhal Samdaie CV - International Business Consultant
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Principles of Marketing, Industrial, Consumers,
Probability Distribution, binomial distribution, poisson distribution
Chapter 5_Foreign Exchange Market in .pdf
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
Laughter Yoga Basic Learning Workshop Manual
unit 1 COST ACCOUNTING AND COST SHEET
Lecture (1)-Introduction.pptx business communication
How to Get Business Funding for Small Business Fast
Belch_12e_PPT_Ch18_Accessible_university.pptx
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Power and position in leadershipDOC-20250808-WA0011..pdf
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Daniels 2024 Inclusive, Sustainable Development
Business Management - unit 1 and 2

Geotech and pavement design information

  • 1. Geotechnical Information for FM78 and Lakeview 1 boring made at 15 feet below surface Approximate Consitency Description Depth of Material Encountered /Density Stratum (feet) 1 1/2 inches of Asphalt over 4 inches of - 0 to 1/2 - Crushed Limestone Base Material Fill - LEAN CLAY (CL); dark brown and brown Stratum I 1/2 to 1 Stiff mottled Stratum II 1 to 7 CLAY (CH); dark brown Stiff to Very Stiff CLAY (CH); yellowish brown and gray with Stratum III 7 to 15 Stiff to Very Stiff gypsum crystals Approximately 3 feet of clay should be removed and replaced with select fill These conditions will satisfy a Condition C Foundation *Note: Sample was taken less than 1000 feet away. This is the reason for the initial layer of asphalt in the boring sample. Subsurface Information Existing Lean Clay Clay Volumetric Changes moderate high Plasticity Index (PI) 26% 35% to 54% In-situ moisture content 3% 1% to 7% 11 blows for 12" 10 to 25 blows for SPT "N" Values penetration 12" penetration
  • 2. Foundation Considerations Shallow Strip Footings Item Description Bearing Stratum Select fill Minimum embedment below final grade 24 inches below final grade Bearing pressures Net allowable total load - 2,000 psf Approximate total settlement 1 inch Estimated approximate differential settlement 1/2 to 3/4 inch Allowable passive resistance 1,000 psf per foot of depth Coefficient of sliding friction 0.4 Uplift Resistance Foundation Weight (150 pcf) & Soil Weight (120 pcf) Pavement Design Information Flexible Pavement System Material Thickness (inches) Component Parking Area Driveway Asphalt (Type D HMAC) 1.5 2 Crushed limestone base 9 10 Moisture conditioned subgrade 6 6 Parameter Asphalt Reliability (%) 70 Standard Deviation 0.45 Initial Serviceability Index 4.2 Terminal Serviceability Index 2 Design life of 10 years 2,000 ESAL per year in driveway areas 1,000 ESAL per year in parking areas
  • 3. Porous Paver Information Purchased from Belgard Company, Aqua-Roc Porous Paver will be used. Material Component Thickness (in.) Vehicular Paver 3.15 #8 Aggregate 2 #57 Aggregate 6 #2 Subbase Aggregate 6 To be used in parking stalls, as well as parking lot walkways for foot trafic. This material will support the stormwater runoff design. Stormwater runoff will flow under the parking lot to a system of pipes, which will direct the water to a nearby sewer easement. This material will also give benefit to our LEED certification goals, and also meets ADA requirements
  • 4. Parking Lot Pricing Asphalt Paving for Roadways, Assembly Costs On-site roadway, with 10" thick aggregate base, 2" thick asphalt binder course, rubberized asphalt interlayer, and 2" thick wear course. Craft@Hrs Unit Material Labor Equipment Total Fine grading and compact existing subbase P5@.066 SY 0.01 2.89 2.69 5.59 Stone aggregate base, Class 2, 10" thick P5@.02 SY 8.35 2.2 2.05 12.6 Binder course 2" thick (9 SY per ton) P5@.039 SY 11.3 1.71 1.59 14.6 Rubberized asphalt interlayer P5@.005 SY 1.28 0.22 0.2 1.7 Wear course 2" thick (9 SY per ton) P5@.039 SY 11.8 1.71 1.59 15.1 Tar emulsion protective seal coat P5@.034 SY 3.51 1.49 1.39 6.39 Total estimated cost for typical 10' wide roadway, 4" paving over 4" aggregate base Cost per SY of roadway P5@.203 SY 31.24 8.9 8.28 55.98 Asphalt Paving for Parking Areas, Assembly Costs A vehicular porous paver will be purchased from manufacturer Belgard and used in the parking stall areas, as well as foot traffic walkways. For our required dimensions, a purchase price estimate including base aggregates and labor was given to be roughly $7 per square foot. Cost Driveway Parking Lot 3076 SY 24937 SF 55.98 Cost/SY 7 Cost/SF 172194 Cost 174559 Cost Total Cost 346753.5
  • 5. All black areas will be made up of asphalt pavement as designed in the previous pages. The grey sections, including the parking stalls and the walkways, will be made up of the aforementioned porous paver.