1
Introduction to Construction
Final project
The Project Brief
Food and beverage
FNBE APRIL INTAKE 2014
Mok Po YI 0318207
Tay Jit Ying
2
Content
1.Introduction 3
2.Site analysis 4-6
3.Site specification 7-9
4.Concept 10-13
5.Visual 14
6.Zoning 15
7.Elements 16-17
8.Benefits & Disadvantages 18
9.Main ideas 19-20
10. Costing 21
11. Authorities forms
12. Conclusion
3
Introduction
In this Introductionto Construction Industry Final
Project, we worked as a group of two to propose a project
that serves either as Recreation area, Study Enhancement
Area, Rest area, Food and beverage (dining area) or
Commercial area (exclude food and beverage) which is not
bigger than 30m X 30m area in the TaylorLakeside Campus
itself. This proposal shouldbenefit both the client and the
surrounding community. Besides some main content, we
could also add in information such as some basic information
of the authority and cost planningdocument. After making
several analysisaroundthe campus, we finallycame out with
the idea of creating a food and beverage area just located
beside the sport complex at TaylorLakeside Campus.
4
Site Analysis
This is our original site
Our site
5
Our site is located at the abandoned golf courtin frontof the Futsal, tennis and
basketball courtin Taylor’s University LakesideCampus. According to what we
had observed, the rectangular artificial golf court has been left bare as no one
is using it and it is locked for such a long time. Therefore, the spaces are
wasted. The golf court is covered with fakecarpet grass and it is an open area
without a roof on top as well as the site is surrounded with net. Our site
includes the golf court and also a little part of the red brick pathway. Its area is
approximately 35mx 13m. We had observed that our site has no washroom
and seats for people to watch the matches provided. Besides, there is also no
food stall to sell food for people in our site. The sporting area is far fromthe
campus and there is a big car park in between. We decided to choosethis site
as it has great potential to turn into a successfulcafeteria in the sporting area
Tennis
court Futsal
court
Futsal
court
Basketball
court
Red brick pathway
Golf court
Our site
Drain
Roof
N
6
Sunlight-Since there is no rooftop to cover so that the sunlight is throughout
the day.
Wind direction- The wind blows fromthe south westand it is strong.
Human circulation- People can walk following the red arrow forma big U
shapeas the end of the pathway is locked so that people cannot walk inside.
Car circulation- The car can drivelike that and that part is car park lots so
it is quite convenient for people to drive in and there is parking available.
Wind direction
Human
circulation
Car
circulation
7
Site specification
Looking North
It is facing Taylor’sUniversity campus buildingand also a big
area of car park.
8
Looking East
We can see the little part of car park in this sight. There is
staircase on a slope with grass connected the tar road lead to
the way to exit Taylor’s University with the car park and
basketballcourt.
Looking South
There is a slope and tar road connected the road as described
as above. We can see the Futsal, basketballand tennis court
as well in our view. The new high rise condominiumcan be
seen as well.
9
Looking West
The tenniscourt will be seen at first and then the little part of
lake scenery can be seen and also there are residential
condominiumat far far away can be seen.
10
Concept
The main reason we decided
to propose a diningarea is
because after we had noticed
that there is a lack of resting
place for the students who are
waiting for their next game or
after their games, we would like
to builda dining area for them to rest, enjoy a light meal and
have some leisure activities while they are waiting for their
turn.
Moreover, locker are also provided in the cafeteria itself
so that students’ belongingscan be keep in a safe place and
the problems of losing their belongingscould be lessen by
leapsand bounds.
In the cafeteria itself, there will be two shower rooms
for both male and female toilet respectively so that students
could clean themselves after their game instead of going
home with their sweaty bodies.
11
Understanding of Cafeteria
To understand more about how to builda Food and
beverage (dining area), we had done some research to
improve the knowledge and idea we already had.
A cafeteria is a type of food service locationin which
there is little or no waiting staff table service, whether a
restaurant or within an institutionsuch as a large office
buildingor school.
Instead of table service, there are food-serving
counters/stalls, either in a line or allowingarbitrary walking
paths. Customers take the food they require as they walk
along, placing it on a tray. In addition,there are often
stations where customers order food and wait while it is
prepared, particularlyfor items such as hamburgers or tacos
which must be served hot and can be quickly prepared.
12
Theme of Cafeteria
Before we startoff with the planning, we look through some different
types of theme of cafeteria to have a better view and inspiration of our
proposal.
1. Sport
Provides sportnews and live actions such as football matches and Olympic
matches for the students who visited the café as the cafeteria will be built just
beside the sportcomplex. Italso sells healthy food and beverages for the
student. Besides, it also creates a comfortable atmospherefor students to
discuss abouttheir favourite sports teamthere.
2. Galaxy
Although Galaxy Themed Café looks stylish but it is not suitable to be build in
the schoolcampus. Italso doesn’tmatch the surrounding and the costfor
decoration will be higher.
13
3. Normal
Normal looks boring and it didn’tattract much attention from the students to
visit the cafeteria after their games. They will also be bored while enjoying
their food there.
After consider among our team, we decided to choosethe Sport theme for our
cafeteria as it benefits the most among these three choices.
Sport themed cafeteria
14
Visual
Kitchen&
counter area
Entertainment
area
This is the bubblediagram of our
purposed plan of the cafeteria
Walking pathway
Washroom
area
Dinning
area
Dinning
area
Tv
area
Walking
pathway
This is the plan of our cafeteria.
35m
13m
15
Zoning of Cafeteria
Outdoor dining area For students tohave their meal and enjoy sport
matches.
Long table For students towatchfutsal/tennis/basketball
matches througha transparent glass.
Entertainment Area For students toenjoy themselveswithsome mini
game.
Washroom For students tokeeptheir belongings, pass urine
and clean themselvesup.
Kitchen Place for the preparationof food and sell.
Outdoor Dining Area
Indoor DiningArea
Entertainment Area
Kitchen Counter
Bathroom Locker
N
16
Elements in the cafeteria
Pasta Cooker Dishwasher
Kitchen
Buildin. refrg Coffee Maker
Broiler/Grill
DeepFryer
Oven2 shelves
Table
Cashier
17
Human
Circulation
Darts
GameWii Video Game
Soccer Table Pool Table
Dining Area with TV
Locker
18
Benefits of the cafeteria
 It is beside the sports complex and the parking lots
 It often visited by sport lovers
 Provide place for students to rest and relax
 Good place to have a meal after sport
 Provide space for some mini game
 Provide activities like keeping up with sport news and live
actions.
 Provide facilities such as lockers and washroom for people
 It created a business opportunityfor people to sell food
over there.
Disadvantages of the cafeteria
 It is quite far from the campus buildings
 Some activities like watching footballmatches might
disturb the students who are having sport such as making
too much noise.
 It may create some pollution suchas people simply throw
rubbish.
 It may face some safety problem such as robbing because
it is far from the security room.
19
Main Idea
The counter will look
like this. There will be
a see through
refrigerator beside
the counter. Food is
self serviced.
The bathroom providedfor those
people who finished theirsports.
There is a door purposely made for
those people to go into the
bathroom easily from the sporting
area.
The lockers are placed
outside the washrooms.
People need to pay rental for
the lockers if they need to
use them.
20
The indoordiningarea might be
like this as the wall will be glass
wall so that people inside can
watch the sports matches
through the glass wall while
having their meal.
The entertainment area will
includepool tables, dart, wii
player and etc. People can play
mini games after their meal.
We purposely choose round
table because it can make
people gather and sit in a
round shape to make more
interactions.
Since the sunlight is through out for whole day and there is
nothing to cover so we will build a roof for outdoordining
area to block the sunlight for the customers.
21
Costing
No. Description Unit Qty Rate Total
1 Demolish fee
-remove carpet grass,
pole, net and red brick
pathway.
8950 8950
2 Wall (3m height )
-glass
-concrete
m2
m2
31
37
200
180
6200
6660
3 Kitchen set Nos 1 39000 39000
4 Furniture set
-round table and chairset
-cushion sets
-long table and tall chairs
set
Nos
Nos
Nos
8
2
1
770
605
1408
6160
1210
1408
5 Washroom set Nos 2 24000 48000
6 Lockers Nos 25 150 3750
7 LED tv set Nos 1 14500 14500
8 Counter Nos 1 6700 6700
9 Roof m2
455 150 68250
10 Piping - - 3990
11 Electric settings - - - 4300
12 Drainage - - - 560
total 219638
5% Premilinaries 10981.9
10% Contigencies 21963.8
Total 252583.7
22
Authorities form
23
24
Conclusion
The cafeteria is such a comfortable place for people to
relaxing and having meal. People can spend their time in here
but not always at the ZYNOPZ commercial block. We made
more choices for people. People can play sport games over
there instead of going to gym which need to pay since the
sporting area is free of charge. When people come the
sporting area, we made more income for the cafeteria. Thisis
why we purposed this cafeteria for Taylorians.

More Related Content

DOCX
Ici final project real
DOCX
Ici final project
PDF
ICI Final
PDF
5 Things to Know About Provident Park Square
PDF
Provident Equinox | Flats for Sale on Mysore Road-Nice Junction, Bangalore
DOCX
ICI final project report
PPTX
#myhomemylife | Flats for Sale on Mysore Road-Nice Junction, Bangalore
DOCX
ICI Proposal
Ici final project real
Ici final project
ICI Final
5 Things to Know About Provident Park Square
Provident Equinox | Flats for Sale on Mysore Road-Nice Junction, Bangalore
ICI final project report
#myhomemylife | Flats for Sale on Mysore Road-Nice Junction, Bangalore
ICI Proposal

Viewers also liked (17)

PDF
Accounting assignment
DOCX
Mazen el halaby cvf
DOCX
Psycho journal 1
DOCX
Final
PDF
Cnc final layout
PPTX
ANIVERSÁRIO DE RAFAEL ARIANI MENDES
DOC
Fp part a - report template
PDF
Cinefondation
PPTX
Finalized presentation slides (1)
PPTX
FNBE Oral presentation
PDF
Pazopoulos Zafolia
PPTX
bakhtiari
PPTX
Epc slides 2
DOCX
ENBE final project - individual report
PPTX
Cone
DOC
Dina Omar Shaaban Mohammed
PDF
Itd project 1
Accounting assignment
Mazen el halaby cvf
Psycho journal 1
Final
Cnc final layout
ANIVERSÁRIO DE RAFAEL ARIANI MENDES
Fp part a - report template
Cinefondation
Finalized presentation slides (1)
FNBE Oral presentation
Pazopoulos Zafolia
bakhtiari
Epc slides 2
ENBE final project - individual report
Cone
Dina Omar Shaaban Mohammed
Itd project 1
Ad

Similar to Ici final project document (20)

DOCX
Ici final project
DOCX
ICI - Final Project - Brief Report
DOCX
Introduction to construction industry
DOCX
Ici final
DOCX
ICI Final
DOCX
ICI final report
DOCX
ICI final project report
DOCX
Icireport 141218132721-conversion-gate01
DOCX
icireport-141218132721-conversion-gate01.docx
PDF
Final Project ICI
PDF
Final project (1)
PDF
Ici final project
PDF
ICI Project 3
PDF
Ici final
PDF
Ici final
PDF
PDF
DOCX
ici final project
PDF
Sanghvi eco city Phase 2- www.ongoingproperties.com
PDF
Interior Design Portfolio
Ici final project
ICI - Final Project - Brief Report
Introduction to construction industry
Ici final
ICI Final
ICI final report
ICI final project report
Icireport 141218132721-conversion-gate01
icireport-141218132721-conversion-gate01.docx
Final Project ICI
Final project (1)
Ici final project
ICI Project 3
Ici final
Ici final
ici final project
Sanghvi eco city Phase 2- www.ongoingproperties.com
Interior Design Portfolio
Ad

More from Momo Poyi (20)

PDF
M2 project assignment aug 2015
PDF
M2 project assignment aug 2015
PDF
Assignment 1
PDF
Assignment 2
DOCX
Technical site visit report
PDF
Individual site report brief
PDF
Cnc final layout
PPTX
Epc slides
DOCX
Psy journal 2
DOCX
Psycho journal 1
DOC
Cfs exercise 1
DOC
Trial balance exercise 1
DOCX
Maths report
PPTX
Cnc layout
DOCX
Assignment 2 research report
DOC
Fnbe september 2014 assignment 2
DOCX
Eng2
DOCX
Constructed landscape final project real
DOCX
Magazine pg 2
DOCX
Magazine pg4
M2 project assignment aug 2015
M2 project assignment aug 2015
Assignment 1
Assignment 2
Technical site visit report
Individual site report brief
Cnc final layout
Epc slides
Psy journal 2
Psycho journal 1
Cfs exercise 1
Trial balance exercise 1
Maths report
Cnc layout
Assignment 2 research report
Fnbe september 2014 assignment 2
Eng2
Constructed landscape final project real
Magazine pg 2
Magazine pg4

Recently uploaded (20)

PDF
Empowerment Technology for Senior High School Guide
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PPTX
Virtual and Augmented Reality in Current Scenario
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
HVAC Specification 2024 according to central public works department
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
20th Century Theater, Methods, History.pptx
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
Empowerment Technology for Senior High School Guide
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
Virtual and Augmented Reality in Current Scenario
AI-driven educational solutions for real-life interventions in the Philippine...
LDMMIA Reiki Yoga Finals Review Spring Summer
HVAC Specification 2024 according to central public works department
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Weekly quiz Compilation Jan -July 25.pdf
Introduction to pro and eukaryotes and differences.pptx
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
Share_Module_2_Power_conflict_and_negotiation.pptx
Environmental Education MCQ BD2EE - Share Source.pdf
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
20th Century Theater, Methods, History.pptx
Cambridge-Practice-Tests-for-IELTS-12.docx
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
What if we spent less time fighting change, and more time building what’s rig...

Ici final project document

  • 1. 1 Introduction to Construction Final project The Project Brief Food and beverage FNBE APRIL INTAKE 2014 Mok Po YI 0318207 Tay Jit Ying
  • 2. 2 Content 1.Introduction 3 2.Site analysis 4-6 3.Site specification 7-9 4.Concept 10-13 5.Visual 14 6.Zoning 15 7.Elements 16-17 8.Benefits & Disadvantages 18 9.Main ideas 19-20 10. Costing 21 11. Authorities forms 12. Conclusion
  • 3. 3 Introduction In this Introductionto Construction Industry Final Project, we worked as a group of two to propose a project that serves either as Recreation area, Study Enhancement Area, Rest area, Food and beverage (dining area) or Commercial area (exclude food and beverage) which is not bigger than 30m X 30m area in the TaylorLakeside Campus itself. This proposal shouldbenefit both the client and the surrounding community. Besides some main content, we could also add in information such as some basic information of the authority and cost planningdocument. After making several analysisaroundthe campus, we finallycame out with the idea of creating a food and beverage area just located beside the sport complex at TaylorLakeside Campus.
  • 4. 4 Site Analysis This is our original site Our site
  • 5. 5 Our site is located at the abandoned golf courtin frontof the Futsal, tennis and basketball courtin Taylor’s University LakesideCampus. According to what we had observed, the rectangular artificial golf court has been left bare as no one is using it and it is locked for such a long time. Therefore, the spaces are wasted. The golf court is covered with fakecarpet grass and it is an open area without a roof on top as well as the site is surrounded with net. Our site includes the golf court and also a little part of the red brick pathway. Its area is approximately 35mx 13m. We had observed that our site has no washroom and seats for people to watch the matches provided. Besides, there is also no food stall to sell food for people in our site. The sporting area is far fromthe campus and there is a big car park in between. We decided to choosethis site as it has great potential to turn into a successfulcafeteria in the sporting area Tennis court Futsal court Futsal court Basketball court Red brick pathway Golf court Our site Drain Roof N
  • 6. 6 Sunlight-Since there is no rooftop to cover so that the sunlight is throughout the day. Wind direction- The wind blows fromthe south westand it is strong. Human circulation- People can walk following the red arrow forma big U shapeas the end of the pathway is locked so that people cannot walk inside. Car circulation- The car can drivelike that and that part is car park lots so it is quite convenient for people to drive in and there is parking available. Wind direction Human circulation Car circulation
  • 7. 7 Site specification Looking North It is facing Taylor’sUniversity campus buildingand also a big area of car park.
  • 8. 8 Looking East We can see the little part of car park in this sight. There is staircase on a slope with grass connected the tar road lead to the way to exit Taylor’s University with the car park and basketballcourt. Looking South There is a slope and tar road connected the road as described as above. We can see the Futsal, basketballand tennis court as well in our view. The new high rise condominiumcan be seen as well.
  • 9. 9 Looking West The tenniscourt will be seen at first and then the little part of lake scenery can be seen and also there are residential condominiumat far far away can be seen.
  • 10. 10 Concept The main reason we decided to propose a diningarea is because after we had noticed that there is a lack of resting place for the students who are waiting for their next game or after their games, we would like to builda dining area for them to rest, enjoy a light meal and have some leisure activities while they are waiting for their turn. Moreover, locker are also provided in the cafeteria itself so that students’ belongingscan be keep in a safe place and the problems of losing their belongingscould be lessen by leapsand bounds. In the cafeteria itself, there will be two shower rooms for both male and female toilet respectively so that students could clean themselves after their game instead of going home with their sweaty bodies.
  • 11. 11 Understanding of Cafeteria To understand more about how to builda Food and beverage (dining area), we had done some research to improve the knowledge and idea we already had. A cafeteria is a type of food service locationin which there is little or no waiting staff table service, whether a restaurant or within an institutionsuch as a large office buildingor school. Instead of table service, there are food-serving counters/stalls, either in a line or allowingarbitrary walking paths. Customers take the food they require as they walk along, placing it on a tray. In addition,there are often stations where customers order food and wait while it is prepared, particularlyfor items such as hamburgers or tacos which must be served hot and can be quickly prepared.
  • 12. 12 Theme of Cafeteria Before we startoff with the planning, we look through some different types of theme of cafeteria to have a better view and inspiration of our proposal. 1. Sport Provides sportnews and live actions such as football matches and Olympic matches for the students who visited the café as the cafeteria will be built just beside the sportcomplex. Italso sells healthy food and beverages for the student. Besides, it also creates a comfortable atmospherefor students to discuss abouttheir favourite sports teamthere. 2. Galaxy Although Galaxy Themed Café looks stylish but it is not suitable to be build in the schoolcampus. Italso doesn’tmatch the surrounding and the costfor decoration will be higher.
  • 13. 13 3. Normal Normal looks boring and it didn’tattract much attention from the students to visit the cafeteria after their games. They will also be bored while enjoying their food there. After consider among our team, we decided to choosethe Sport theme for our cafeteria as it benefits the most among these three choices. Sport themed cafeteria
  • 14. 14 Visual Kitchen& counter area Entertainment area This is the bubblediagram of our purposed plan of the cafeteria Walking pathway Washroom area Dinning area Dinning area Tv area Walking pathway This is the plan of our cafeteria. 35m 13m
  • 15. 15 Zoning of Cafeteria Outdoor dining area For students tohave their meal and enjoy sport matches. Long table For students towatchfutsal/tennis/basketball matches througha transparent glass. Entertainment Area For students toenjoy themselveswithsome mini game. Washroom For students tokeeptheir belongings, pass urine and clean themselvesup. Kitchen Place for the preparationof food and sell. Outdoor Dining Area Indoor DiningArea Entertainment Area Kitchen Counter Bathroom Locker N
  • 16. 16 Elements in the cafeteria Pasta Cooker Dishwasher Kitchen Buildin. refrg Coffee Maker Broiler/Grill DeepFryer Oven2 shelves Table Cashier
  • 17. 17 Human Circulation Darts GameWii Video Game Soccer Table Pool Table Dining Area with TV Locker
  • 18. 18 Benefits of the cafeteria  It is beside the sports complex and the parking lots  It often visited by sport lovers  Provide place for students to rest and relax  Good place to have a meal after sport  Provide space for some mini game  Provide activities like keeping up with sport news and live actions.  Provide facilities such as lockers and washroom for people  It created a business opportunityfor people to sell food over there. Disadvantages of the cafeteria  It is quite far from the campus buildings  Some activities like watching footballmatches might disturb the students who are having sport such as making too much noise.  It may create some pollution suchas people simply throw rubbish.  It may face some safety problem such as robbing because it is far from the security room.
  • 19. 19 Main Idea The counter will look like this. There will be a see through refrigerator beside the counter. Food is self serviced. The bathroom providedfor those people who finished theirsports. There is a door purposely made for those people to go into the bathroom easily from the sporting area. The lockers are placed outside the washrooms. People need to pay rental for the lockers if they need to use them.
  • 20. 20 The indoordiningarea might be like this as the wall will be glass wall so that people inside can watch the sports matches through the glass wall while having their meal. The entertainment area will includepool tables, dart, wii player and etc. People can play mini games after their meal. We purposely choose round table because it can make people gather and sit in a round shape to make more interactions. Since the sunlight is through out for whole day and there is nothing to cover so we will build a roof for outdoordining area to block the sunlight for the customers.
  • 21. 21 Costing No. Description Unit Qty Rate Total 1 Demolish fee -remove carpet grass, pole, net and red brick pathway. 8950 8950 2 Wall (3m height ) -glass -concrete m2 m2 31 37 200 180 6200 6660 3 Kitchen set Nos 1 39000 39000 4 Furniture set -round table and chairset -cushion sets -long table and tall chairs set Nos Nos Nos 8 2 1 770 605 1408 6160 1210 1408 5 Washroom set Nos 2 24000 48000 6 Lockers Nos 25 150 3750 7 LED tv set Nos 1 14500 14500 8 Counter Nos 1 6700 6700 9 Roof m2 455 150 68250 10 Piping - - 3990 11 Electric settings - - - 4300 12 Drainage - - - 560 total 219638 5% Premilinaries 10981.9 10% Contigencies 21963.8 Total 252583.7
  • 23. 23
  • 24. 24 Conclusion The cafeteria is such a comfortable place for people to relaxing and having meal. People can spend their time in here but not always at the ZYNOPZ commercial block. We made more choices for people. People can play sport games over there instead of going to gym which need to pay since the sporting area is free of charge. When people come the sporting area, we made more income for the cafeteria. Thisis why we purposed this cafeteria for Taylorians.