PROF. Medhat Kamal Abdullah
Civil Engineering Dept., Faculty of Engineering,
Helwan University, Cairo, Egypt
2
TEMPORARY SUPPORT OF EXISTING BRIDGES USING
WATER-STRUCTURE INTERACTION
PROF. Medhat Kamal Abdullah
Civil Engineering Dept., Faculty of Engineering, Helwan University, Cairo, Egypt
Assessment, Upgrading and Refurbishment of Infrastructures
IABSE Conference, Rotterdam, May 6 - 8, 2013
INTRODUCTION
• Due to rapid development in Egypt, there are many
heavy equipment need to be transported to new
factories, power stations,…etc.
• We have many existing bridges through the route of
transportation
• We have Many accidents due to overloading
• Bridge overload and lateral impact forces from
trucks, barges/ships, and trains constitute 20% of the
total bridge failures in the UNITED STATES.
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
4
5
6
7
8
►►Designed for 90 Ton trucks
A- TEMPORARY SUPPORT ACROSS ROADS:
• If the bridges cross roads, a shoring system may
be installed to support the bridge whether
permanent or temporary
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
9
10
TEMPORARY SUPPORT
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
1
TEMPORARY SUPPORTING SYSTEM
2
IS THIS THE PRESSURE WE CONSIDERED ON THE SLABS
3
INSPECTION OF TEMPORARY WORKS
4
IS THIS THE WEIGHT WE CONSIDERED IN THE STUDY??
5
IS THIS THE LOADING SYSTEM WE CONSIDERED IN THE STUDY??
6
IS THIS THE LOADING SYSTEM WE CONSIDERED IN THE STUDY??
CROSSING SMALL CULVERTS
PERMANENT STRENGTHENING
9
B- Bridges Crossing Water Way:
• If the bridges exists over water path, the
conventional support used for road bridges is
difficult to be used especially in deep water
• In this case, a new technique using water-
structure interaction is used to carry the
additional abnormal loads of special equipment
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
10
• WATER CONCEPT
1
I- CONCEPT
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
3
JACKS
UPLIFT
4
JACKS
UPLIFT
5
CONCEPT
• Jacks over barges are used to push up the bridge
deck imposing reversal forces against the expected
loads from the heavy packages
• Uplift forces are created to impose reversal forces on
the bridge to decrease or eliminate the effect of the
expected heavy packages.
• The process of temporarily coupling the bridge deck
with barges supported by the water uplift, results in a
combined rigid structure that has an effective
combined rigidity much higher than the original
bridge rigidity.
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
6
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
7
8
EXPERIMENTAL VERIFICATION
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
9
ANALYTICAL MODEL
New technique to temporarily support existing bridges crossing water ways
Dr. Medhat K. Abdullah, Faculty of engineering, Helwan university, Egypt
10
B.M due to DEAD LOAD
B.M due to Jacking forces
B.M due to D.L + Jacking F
MOMENT DUE TO LIVE LOAD ONLY
Max 145
Total B.M LESS THAN DEAD LOAD B.M.
BRIEF DETAILS
18.7500
18.7500
11.12.08 # 4 BRIDGE PONTOON 4隻、BEAM/JACK設置作業中 (1)
11.12.08 # 4 BRIDGE PONTTON内 BEAM/JACK設置作業(2)
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
11.12.08 # 4 BRIDE PONTOON内 BEAM/JACK設置作業中 (3)
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
10
Case A1 B1 C1 D1 E1 A2 B2 C2 D2 E2
RAJ -1.7 -1.0 -0.8 -0.9 -1.1 -3.3 -3.8 -2.7 -2.3 -2.3
AR -4.6 -3.8 -3.5 -3.8 - 4.6
AL -1.0 -0.5 -0.3 -0.4 -0.6 -1.3 -0.9 -0.3 0.5 -0.8
OHAL -0.9 -0.5 -0.3 -0.4 -0.6 -1.4 -1. -0.3 0.5 -0.9
RAU -1.6 -1.0 -0.7 -0.9 -1.0 -3.2 -3.7 -2.7 -2.3 -2.3
30AU -1.6 -1.0 -0.7 -0.9 -1.0 -3.2 -3.7 -2.7 -2.3 -2.3
%
Recovery
95 100 88 100 91 97 97 100 100 100
TEST RESULTS
A- DEFLECTION OF THE BRIDGE DECK
• The strains in the slab during loading is Almost zero
• The recovery after unloading is 100%.
• The strains in the beam are also negligible during
the loading case.
• If Young’s modulus of the concrete is considered
250T/cm2, the maximum stress in the slab is 2 Kg/
cm2 and the maximum stress in the beams is 8 Kg/
cm2 which is negligible.
B- Strains of the deck
C- Deflection of the pontoon
• The vertical sinking depth of the
pontoon during jacking up the
deck was monitoring along the
pontoon length at points 1, 2
and 3.
• The readings were uniform with
maximum sinking depth was
40.6 cm after jacking up with 90
Ton.
• The pontoon moved downward
for 3mm during the loading step
of the trailer.
13
DEFLECTION SAAFAN
LEVEL BEFORE (m) 9.913
LEVEL DURING (m) 9.911
LEVEL AFTER (m) 9.913
MAXIMUM DEFLECTION
(mm)
2
II- CASE STUDY AL KHATATBA BRIDGE
14
15
The statical system of the bridge
II- CASE STUDY
16
Configuration of the Load of Gas Turbine (G.T.)
DIFFERENCE IN THE STRAINING ACTIONS BETWEEN GT and 70 ton
18
Sec
70-ton
truck
(m.t)
G.T.
(m.t)
Increase in
Bending
moment
1 60 134 223%
2 -65 -251 386%
3 50 105 210%
4 70 163 233%
5 -66 -304 461%
6 -123 -362 294%
7 68 158 232%
8 85 209 246%
Sec
70-ton
truck
(TON)
G.T.
(TON)
Increase in
Shear force
1 24 42 175%
2 28 68 243%
3 28 66 236%
4 25 41 164%
5 25 44 176%
6 32 76 238%
7 35 91 260%
8 26 51 196%
19
LOCATION OF TEMPORARY SUPPORTS
20
B.M DUE TO DL
Figure 14: final results of SUM1 and SUM2 for the bending moment
B.M DUE TO J.F.
1
2
3
4
5
6
DEFLECTION AT MONITORING POINTS
7
mm
0
5
10
Time sec
8
Dynamic Load Test
9
Mode No.
Fundamental Frequencies (HZ)
Mode
shape
Test No. 1 Test No. 2 Test No. 3 Calculated
01 0.88 0.91 0.91 0.93 1st Bending
As a result of the above mentioned monitoring steps,
the bridge has been proven to be undamaged
by the abnormal load of the GT.
Figure 21: Power spectrum,
Test 02
Figure 20: Response Time
Record
10
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
13
14
ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study
16
1
2
PROJECTS:
• North Giza PS
• Banha PS
• Al Atf PS
• Damanhour PS
• Al Seiof PS
• Al Mahmoudia PS
3
4
Acknowledgement
The author is greatly appreciating the contribution of each of the following participants
who participated in this work to make it a great achievement in the field of bridges
and transportation:
• The General Authority of Roads, Bridges and Land Transport, GARBLT, The
Owner of the bridges.
• Egytrans, The carrier of the package and the main sponsor of the project
• Team of , INFRA Engineering Consultants, The main Consultant of the project
• MITSUBISHI, The main contractor of the power plant
• Lift Slab, The main contractor of the upgrading and isolation works
• Civil Engineering Dept., Faculty of Engineering, Cairo University
• Civil Engineering Dept., Faculty of Engineering, Helwan University
• The Institute of Building researches, Ministry of Irrigation
5
6
‫شكرا‬
7
THANK YOU FOR YOUR KIND ATTENTION
8
9
10
11
12
13
14
15
OFFICE WORK
• COLLECTING DRAWINGS
• ANALYSIS OF SITE INSPECTION
• ANALYSIS OF SITE TESTS ( CORE-SOIL…etc.)
• Dynamic Characteristics of the bridges ( frequency)
• COMPLETE ANALYSIS FOR BOTH LD 1 AND LD2:
► SLABS ( Solid slabs – Hollow slabs – Slabs on beams)
► BEAMS / BOX SECTION
► BEARINGS ( IF ANY, NEOPRANE/ POT))
► WALLS and/or COLUMNS
► FOUNDATIONS ( SHALLOW – DEEP)
► ANALYSIS OF BRIDGES WITH TEMPORARY SUPPORTS (IF ANY)
SUMMARY OF RESULTS FOR EACH BRIDGE AND CHOICE OF
THE APPROPRIATE TRAILER
16
VISUAL INSPECTION
A- TOP of BRIDGE:
• EXPANTION JOINTS
• ASPHALT CREEP or PUMBS ON THE ROUTE
• FEELING THE VIBRATIONS OF THE BRIDGES
• DISTANCES BETWEEN BRIDGES
• LOCATIONS BETWEEN BRIDGES SUITABLE FOR
UNEXPECTED CIRCUMSTANCES
• LEVELS OF DIFFERENT MAIN POINTS OF THE
BRIDGES!!!!
17
B- BOTTOM OF BRIDGES
• BEARINGS ( lateral and vertical deformations, effects of burns,
general conditions)
• SLABS ( cracks- damage by high cars- Conditions of rebars -
deformations – effect of fires- honeycomb)
• BEAMS
• R/C beams ( deflection, cracks, rebars exposure, fire
attacks…etc.)
• STEEL beams ( deformation, connections, bolts… etc.)
• COLUMNS ( collision, cracks, fire, previous repair, ..etc.)
• WALLS
• CONNECTIONS BETWEEN COLUMNS/WALLS AND FOUNDATIONS
• SETTELEMENT OF FOUNDATIONS
18
19
20
1
BR. NO. NAME STATION (Km) No.Of. SPANS SPANS LENGTH (m) FOUND. NOTES
BR-1 U.P. NO.(1) 0.00 1 8.5 S B
BR-2 AL-SALAM BR. 0.60 3 25 + 25 + 25 S+D B-M-M-B
BR-3 AL-SAIL BR. 1.20 5 32 + 22.5 , 28 + 22 + 28 D B-M-B-M-M-B
BR-4 U.P. NO.(3) 1.80 1 7.5 S M
BR-5 AL-SHORAFABR. 2.40 2 14 + 14 D B
BR-6 AL-GABALAWYABR. 2.80 3 8.5 + 15 + 8.5 S B
BR-7 AL-TAWFIEKYAU.P. 3.10 1 7.5 D M
BR-8 AL-TAWFIEKYABR. 3.40 1 21 D M
BR-9 BELBIES-1 BR. 3.70 1 31 D B
BR-10 AL-QUALAG BR. 4.10 3 7 + 9 + 7 S B
BR-11 U.P. NO.(1) 4.40 1 7.5 D M
BR-12 U.P. NO.(2) 4.90 1 6.5 S M
BR-13 U.P. NO.(3) 5.30 1 7.5 S M
BR-14 BELBIES-2 BR. 5.80 3 14.5 + 24 + 12.5 D B
BR-15 U.P. NO.(4) 7.20 1 7 S M
BR-16 AL-MARG BR. 7.60 13 5*40 + 2*42 + 2*75 + 4*40 D B
BR-17 AL-KORDIYABR. 8.80 1 15.5 S B
BR-18 AL-KHOUSSOUS BR. 9.20 3 18 + 33 + 18 D B
BR-19 U.P. NO.(5) 9.80 1 7.5 S M
BR-20 U.P. NO.(6) 10.20 1 8 S M
BR-21 U.P. NO.(7) 10.60 1 7.5 D M
S: SHALLOW FOUNDATIONS
LIST OF BRIDGES :
B: ON BEARINGS
M: MONOLITHIC
D: DEEP FOUNDATIONS
2
DAMAGE OF BOTTOM SLABS CONNECTIONBETWEEN COLUMNS
AND FOUNDATIONS
3
CONDITION OF REINFORCEMENT
4
CONNECTIONBETWEEN COLUMNS AND FOUNDATIONS
5
‫المرج‬ ‫كوبرى‬ ‫لركائز‬ ‫الحرجة‬ ‫الحالة‬
7/4/2005
CONDITION OF BEARINGS
6
CONDITION OF COVERED BEARINGS
7
DIFFERENT SITE TESTS BEFORE DECISIONS
• CORE TEST
• CHMIDT HAMMER
• BOLTS
• WELDS
• BORE HOLES
• PLATE BEARING TESTS
• DYNAMIC TEST
8
ASPHALT THICKNESS !!!!!!
9
Core Test
10
SMPL1
SMPL2
SMPL3
AVRG
f1
f2
f2*
f3
f4
Fc+ve
Fc-ve
BR1
365
207
217
212
283
318
110
325
110
45
---
BR2
194
179
178
184
245
274
78
282
100
45
65
BR3
209
192
176
192
256
271
100
295
100
75
85
BR4
424
405
450
426
568
623
195
654
195
45
45
BR19
241
235
241
239
319
362
125
366
125
45
45
BR20
188
235
188
204
272
289
100
312
100
45
45
BR21
241
289
241
257
343
371
120
394
120
45
45
Fc +ve = max. compression stresses in concrete at +ve B.M. sections
Fc -ve = max. compression stresses in concrete at -ve B.M. sections
B
R
I
D
G
E
N
O
core samples fromsuperstructure
f1 = average / 0.75, f2 = min / 0.65, f2* = allowable comp. stress based on f1,f2
f3 = min of (f1 , f2) * 1.15 due to secondary loads.
f4 = allowable compression strength in concrete based on f3
11
SMPL1
SMPL2
SMPL3
AVRG
f1*
f2**
BR1
198
161
159
173
230
265
BR2
264
281
225
257
342
394
BR3
---
---
---
---
---
---
BR4
292
274
292
286
381
439
BR5
265
249
246
253
338
388
BR6
281
252
281
271
362
416
BR7
322
248
276
282
376
432
BR8
451
386
357
398
531
610
BR9
252
180
252
228
304
350
BR10
314
256
314
295
393
452
BR11
---
---
---
---
---
---
BR12
---
---
---
---
---
---
BR13
314
314
366
331
442
508
BR14
325
162
195
179
238
274
BR15
366
366
314
349
465
535
BR16
---
---
---
---
---
---
BR17
314
314
366
331
442
508
BR18
262
205
149
205
274
315
BR19
314
314
366
331
442
508
BR20
---
---
---
---
---
---
BR21
---
---
---
---
---
---
B
R
I
D
G
E
N
CORE SAMPLES FROM COLUMNS AND WALLS
12
CHECK BOLTS AND
NUTS:
SOME BOLTS AND NUTS ARE MISSING
!!!!
13
BORE HOLES
14
DIFFERENT SITE TESTS DURING
PREPARATIONS
• BORE HOLES
• PLATE BEARING TESTS
• ULTRA SONIC TESTS ON NEW PILES
• CUBE STRENGTH FOR NEW CONCRETE
15
STRENGTHENING AND
UPGRADING OF EXISTING
BRIDGES
16
CLEANING
17
REPAIR OF COLUMNS AND WALLS AT FOUNDATION LEVEL

More Related Content

PPT
The Akashi-Kaikyo Suspension Bridge
PPTX
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
PPTX
Cable stayed bridge
PPTX
Smart Transportation System For Minor Project presentation
PDF
Design of Floating Bridge Cross Over
PPTX
PROJECT
PDF
PPTX
bridges overview.pptx
The Akashi-Kaikyo Suspension Bridge
6. BRIDGE ENGINEERING (RBT) 2160603 GTU
Cable stayed bridge
Smart Transportation System For Minor Project presentation
Design of Floating Bridge Cross Over
PROJECT
bridges overview.pptx

Similar to ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study (20)

PPTX
suspension bridge ppt
PDF
Suspension Bridges VS Cable-Stayed Bridges
PPT
Millau sky bridge (Tallest bridge)
PPTX
Rion antirion bridge
PPTX
Cable stayed ppt acp
PDF
Bridge Lecture Slide by Micotol
PPT
THE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
PPTX
Construction Of A Viaduct/Bridge: An Overview
PPTX
Transport enggineering
PPT
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendra
PPTX
Ppt bridges & types
PDF
BUILDING STRUCTURE ASSIGNMENT 1
PDF
MECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGE
PPTX
Bridge components
PPTX
Submerged floating tunnel
PPT
introductiontobridges07-08-090507223401-phpapp02.ppt
DOCX
Submerged Floating Tunnel by Shantanu Patil
PDF
Ppt report on offshore Platform Designs
PPT
Submerged floating tunnel ppt
PDF
Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....
suspension bridge ppt
Suspension Bridges VS Cable-Stayed Bridges
Millau sky bridge (Tallest bridge)
Rion antirion bridge
Cable stayed ppt acp
Bridge Lecture Slide by Micotol
THE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
Construction Of A Viaduct/Bridge: An Overview
Transport enggineering
Presentation on rating & strengthening of bridges @ jntu hyd by raghavendra
Ppt bridges & types
BUILDING STRUCTURE ASSIGNMENT 1
MECHANIZED CONSTRUCTION TECHNIQUES FOR URBAN ROAD BRIDGE
Bridge components
Submerged floating tunnel
introductiontobridges07-08-090507223401-phpapp02.ppt
Submerged Floating Tunnel by Shantanu Patil
Ppt report on offshore Platform Designs
Submerged floating tunnel ppt
Ch2 Design Loads on Bridges (Steel Bridges تصميم الكباري المعدنية & Prof. Dr....
Ad

More from Egyptian Engineers Association (20)

PDF
المحاضرة رقم 209 دكتور / يسرا الدسوقي عنوان المحاضرة Data Driven Management
PDF
المحاضرة رقم 208 مهندس / محمد ماجد حجازي عنوان المحاضرة Performance Measur...
PDF
مبادرة #تواصل_تطوير المحاضرة رقم 205 م / محمود السعود استشاري إدارة مكاتب الم...
PDF
تواصل_تطوير المحاضرة رقم 203 مستشار / محمد خليفة عنوان المحاضرة Establish an...
PDF
مبادرة #تواصل_تطوير المحاضرة رقم 200 أ. د/ هانىء محمود النقراشي عضو المجلس ال...
PDF
تواصل_تطوير المحاضرة رقم 199 مهندس / محمود الديب عنوان المحاضرة Enterprise A...
PDF
#تواصل_تطوير المحاضرة رقم 197 مهندس / محمد الشامي عنوان المحاضرة أمن المعلوم...
PDF
تواصل_تطوير المحاضرة رقم 195 مهندس / أحمد أمين عنوان المحاضرة "The Era of Fr...
PDF
تواصل_تطوير المحاضرة رقم 194 دكتور / هشام ندا المدير الدولي لقسم الكباري بشرك...
PDF
تواصل_تطوير المحاضرة رقم 193 المهندس / أكرم النجار استشاري إدارة المشاريع عنو...
PDF
تواصل_تطوير المحاضرة رقم 191 المهندس / تامر فودة عنوان المحاضرة " Supply Cha...
PDF
تواصل_تطوير المحاضرة رقم 190 المهندس / أشرف نصير عنوان المحاضرة "إستراتيجيات...
PDF
المحاضرة رقم 189 المهندس / محمد العربي بعنوان "Digital Disruption Act- From...
PDF
#تواصل_تطوير المحاضرة رقم 188 الاستاذ الدكتور / أكرم حسن استاذ واستشاري إدارة...
PDF
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
PDF
تواصل_تطوير المحاضرة رقم 185 دكتور / هبة محروس علي بعنوان "Between Environme...
PDF
#تواصل_تطوير المحاضرة رقم 184 دكتور / شيماء محمد الشرقاوي بعنوان "مبادرة الت...
PDF
المحاضرة رقم 183 الاستاذ الدكتور / طارق عطية بعنوان "اعتماد المتحف المصري ا...
PDF
المحاضرة رقم 182 الدكتور / أسامة أبوالمكارم مستشار التغيير والابداع المؤسسي ...
PDF
المحاضرة رقم 180 الدكتور / أسامة أبوالمكارم مستشار التغيير والابداع المؤسسي ...
المحاضرة رقم 209 دكتور / يسرا الدسوقي عنوان المحاضرة Data Driven Management
المحاضرة رقم 208 مهندس / محمد ماجد حجازي عنوان المحاضرة Performance Measur...
مبادرة #تواصل_تطوير المحاضرة رقم 205 م / محمود السعود استشاري إدارة مكاتب الم...
تواصل_تطوير المحاضرة رقم 203 مستشار / محمد خليفة عنوان المحاضرة Establish an...
مبادرة #تواصل_تطوير المحاضرة رقم 200 أ. د/ هانىء محمود النقراشي عضو المجلس ال...
تواصل_تطوير المحاضرة رقم 199 مهندس / محمود الديب عنوان المحاضرة Enterprise A...
#تواصل_تطوير المحاضرة رقم 197 مهندس / محمد الشامي عنوان المحاضرة أمن المعلوم...
تواصل_تطوير المحاضرة رقم 195 مهندس / أحمد أمين عنوان المحاضرة "The Era of Fr...
تواصل_تطوير المحاضرة رقم 194 دكتور / هشام ندا المدير الدولي لقسم الكباري بشرك...
تواصل_تطوير المحاضرة رقم 193 المهندس / أكرم النجار استشاري إدارة المشاريع عنو...
تواصل_تطوير المحاضرة رقم 191 المهندس / تامر فودة عنوان المحاضرة " Supply Cha...
تواصل_تطوير المحاضرة رقم 190 المهندس / أشرف نصير عنوان المحاضرة "إستراتيجيات...
المحاضرة رقم 189 المهندس / محمد العربي بعنوان "Digital Disruption Act- From...
#تواصل_تطوير المحاضرة رقم 188 الاستاذ الدكتور / أكرم حسن استاذ واستشاري إدارة...
ilovepdf_ المحاضرة رقم 186 دكتور / اشرف حمدان بمشاركة الاستاذة /سارة سالم عنو...
تواصل_تطوير المحاضرة رقم 185 دكتور / هبة محروس علي بعنوان "Between Environme...
#تواصل_تطوير المحاضرة رقم 184 دكتور / شيماء محمد الشرقاوي بعنوان "مبادرة الت...
المحاضرة رقم 183 الاستاذ الدكتور / طارق عطية بعنوان "اعتماد المتحف المصري ا...
المحاضرة رقم 182 الدكتور / أسامة أبوالمكارم مستشار التغيير والابداع المؤسسي ...
المحاضرة رقم 180 الدكتور / أسامة أبوالمكارم مستشار التغيير والابداع المؤسسي ...
Ad

Recently uploaded (20)

PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPT
Mechanical Engineering MATERIALS Selection
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PDF
Embodied AI: Ushering in the Next Era of Intelligent Systems
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
PPT on Performance Review to get promotions
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PPTX
additive manufacturing of ss316l using mig welding
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
Automation-in-Manufacturing-Chapter-Introduction.pdf
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
Safety Seminar civil to be ensured for safe working.
III.4.1.2_The_Space_Environment.p pdffdf
Mechanical Engineering MATERIALS Selection
CYBER-CRIMES AND SECURITY A guide to understanding
Embodied AI: Ushering in the Next Era of Intelligent Systems
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPT on Performance Review to get promotions
Fundamentals of safety and accident prevention -final (1).pptx
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Foundation to blockchain - A guide to Blockchain Tech
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
R24 SURVEYING LAB MANUAL for civil enggi
Operating System & Kernel Study Guide-1 - converted.pdf
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
additive manufacturing of ss316l using mig welding
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems

ilovepdf_#تواصل_تطوير المحاضرة رقم 187 أستاذ دكتور / مدحت كمال عبدالله عنوان المحاضرة: تدعيم كباري باستخدام التفاعل المشترك للمياه - جسم الكوبري وعرض حالة عملية Temporary Support Of Existing Bridges Using Water-Structure Interaction including case study