INNOVATION, CHANGE & STRATEGY
IKHSAN Muhammad Ridhwan
Construction Industry Master Plan (CIMP) was established on the 2006.
It was a 10 years plan to rectify the weaknesses and to improve the
industry’s performance as well as the image of the industry.
CIMP target to improve on the quality, time
efficiency, reducing foreign labour, and ensuring quality
of social and health in the industry.
7 Strategic Thrust
Thrust 1
• Integrate the construction industry value chain to enhance productivity and efficiency
Thrust 2
• Strengthen the construction industry’s image
Thrust 3
• Strive for the highest standard of quality, occupational safety and health, and environmental
practices
Thrust 4
• Develop human resource capabilities and capacities in the construction industry
Thrust 5
• Innovate through research and development and adopt new construction methods
Thrust 6
• Leverage on information and communication technology in the construction industry
Thrust 7
• Benefit from globalization including the export of construction products and services
8 Critical
Success
Factors
Productivity
Quality
Human
Resource
Knowledge
Innovation
Environmental
Practice
Industry
sustainability
Professionalism
Why?The Importance of Innovation
A highly adaptable capability in any robust industry condition.
‘management of change’
how & who
In 2003, six case studies were conducted by Cooperative Research Centre for
Construction Innovation of Australia in a research project called BRITE
(Building Research Innovation Technology and Environment).
[Case Study]
In 2003, six case studies were conducted by Cooperative Research Centre for
Construction Innovation of Australia in a research project called BRITE
(Building Research Innovation Technology and Environment).
[Case Study]
Case Study 1: Outstanding Whole of Life Gains Without Higher Up-Front Costs
Case Study 2: Concrete Planking Innovation Saves AUSD 300,000 on Major Sports Stadium
Case Study 3: Motorway Alliance Drives Performance Improvement
Case Study 4: Performance-Based Building Codes and Fire Engineering Yield Innovative
Design Solution
Case Study 5: Australia's First Fibre-Reinforced Polymer Bridge Deck on The Road Network
Case Study 6: Ground Penetrating Radar Finds Defects in Bridge Beams
The case studies were focusing on innovation and its
implementation, covering all industry players –
clients, contractors, consultants and suppliers.
In 2003, six case studies were conducted by Cooperative Research Centre for
Construction Innovation of Australia in a research project called BRITE
(Building Research Innovation Technology and Environment).
[Case Study]
In 2003, six case studies were conducted by Cooperative Research Centre for
Construction Innovation of Australia in a research project called BRITE
(Building Research Innovation Technology and Environment).
The case studies, which are conducted in Australia, describe the
dynamics of industry innovation.
This involves highlighting the benefits of innovation and describing how particular
companies have sought innovations, have decided on adoption and then
successfully implemented those selected.
[Case Study]
Ergo…
Innovation entails construction industry to meritoriously plan
for change holistically vis-à-vis to sustain in the caustic industry,
or vice-versa.
Why?
What?Integrated Communication
Change in communication within organizational practice throughout
business life, de facto of novelty in construction industry.
Multicultural complexity among construction participants commonly
would cause hitches, that this trigger difficulties in coordinating
activities for shared goals.
Significant large number of involvement in construction project with the conventional
one-off nature, is the cause of obstruction towards a progressive communication innovation.
Information technologies have been seen as an opportunity for greater
knowledge sharing in which better communication integration could be achieved.
Ergo…What?
Integrated Communication
Improvisation within construction industry may require an innovation for integrated
communication as a pre-requisite before the other changes shall emerge.
What?Technological Advancement
Construction organization has to be highly adaptive towards changes to sustain
within the industry such as acclimatize towards technological advancement,
not stagnancy.
Although the proposition for change is seen as arduous, the ability of one
organization to adapt with technological emergent would results
perpetuity of the organization in the industry.
Inconsistent technological adoption is one of the reasons the
construction project participants shall interoperate inefficiently
vis-à-vis cause billions of financial outflow.
Change reformation shall only take place effectively within all construction project
participants, if, the nature of one-off project to be deal with the same participants during
temporary coalitions with a constant knowledge transfer.
Key participants in Innovation Processes
Informed clients with high levels of technical
competence are an important “market-pull" factor in
driving innovation
(1,3,4, and 5)
[Case Study]
How to Innovate Successfully
Streamlining Activities
Improving knowledge flows by developing more intensive
industry relationships.
Integration of project experiences into continuous business
process to limit the loss of tacit knowledge between projects.
[Case Study]
Ergo…What?
Technological Advancement
In order for technological implementation to evolve efficaciously, change
management should improvise effectively.
How?Change Resistance
Materialize the change would require a well strategize management
scheme to ensure the changes aimed could be realize meritoriously.
Within the organization, resistance to change by staffs cause lack
of change implementation in continuous practice.
Refusing for persistent implementation by most construction players are
usually due to lack of credible plan to convince them of the outcome.
External Internal
Management
behavior
Changes can occur when there is needs.
By-law
Client
Authority
[ASBA Architect, 2013]
External Internal
Management
behavior
By-law
Client
Authority
By-law
Client
Authority
How?Change Resistance
[ASBA Architect, 2013]
Key features in Innovation Processes
Standards act as strong “market-pull” factor encouraging
the industry to improve performance
(1 and 4)
[Case Study]
How to Innovate Successfully
Building Relationships with Key Players
Active use of innovation brokers to facilitate efficient access to
technical support providers and other external players with
complementary knowledge bases.
Building extensive relationships with manufactures supplying
the industry, in view of their involvement in R&D programs.
Building long term relationships with manufacturers supplying
the industry, in view of the shift towards more cooperative
approaches to project delivery.
[Case Study]
Ergo…How?
Change Resistance
Strategy of change requires a persuasive support along the implementation process
to facilitate implementers and upkeep with any intangible occurrences.
How?Culture & Behaviour
Change shall be implemented consistently if the organizations’ players
solemn in implementing the change towards innovation culture.
In construction industry, forwarding towards sustainability organization
necessitate each participants to comprehend the legitimacy of current
practice de facto improving the sector.
Key participants in Innovation Processes
Small regional firms can be important innovation drivers
because of their knowledge of local conditions
(1,2,5, and 6)
[Case Study]
Key features in Innovation Processes
Mobilising integrated approaches to construction
projects, in response to industry fragmentation arising
from the "one-off" nature of most projects and the
proliferation of small players/contractors.
The type of contract employed by clients on projects has
a big impact on the ability of stakeholders to try new
approaches hence innovate
(2 and 3)
[Case Study]
The shortcomings experienced in the construction industry are also
caused by existing attitudes, cultures and behaviors.
An assessment of participation towards change such as involvement, training,
communication and education shall overcome the resistance to change behavior.
External Internal
Management
behavior
By-law
Client
Authority
How?Culture & Behaviour
“The changes for innovation will takes some
time to be accepted by the industry because of
the trust on the product and the acceptance on
the product by the key player.”
[ASBA Architect, 2013]
How to Innovate Successfully
Growing an Appropriate Internal Business Environment
Building a culture supportive of innovation, including
encouraging staff to share ideas, enhancing in-house technical
competence, supporting innovation champions, appreciating the
opportunities presented by problems and encouraging prudent
risk taking.
[Case Study]
How to Innovate Successfully
Effective Client Leadership
Maintaining high level of technical competence and a positive
approach to prudent risk taking.
[Case Study]
Ergo…How?
Culture & Behaviour
The change strategy oblige devoted, constant effort by all construction participants
either different parties nor within employees,
to partly innovate the organization towards a better tradition.
Thank You
Q&A
Blayse, A. and Manley, K. (2004) ‘Key Influences on Construction Innovation’, Construction
Innovation, Vol 4, No 3, pp 1-12
Carr D et al. Managing the change process: a field book for change agents, consultants,
team leaders, and reengineering managers. New York: McGraw-Hill, 1996. p. xiii, 24±25.
Henderson, J. and Ruikar, K. (2010) ‘Technology Implementation Strategies for Construction
Organisation’, Engineering, Construction and Architectural Management, Vol. 17 No. 3, pp
309-327
Jorge, A. & Annie R. (n.d.) ‘Drivers for Change: An Organizational Perspective on Sustainable
Construction’
Lars, S. & Per, O. (2010) ‘A Method for Action Research Interventions to Improve Joint
Problem Solving in Operational Teams in the Swedish Construction Industry’, Qualitative
Research in Accounting & Management, Vol. 7 No. 1, pp 97-123
Louise, S. (2007) ‘Technology, Change, and the Building Industry’, Real Estate Review, Vol. 36
No. 3
Salman, T. (2001) ‘A Change Management Model fro Saudi Construction Industry’,
International Journal of Project Management, Vol. 19, pp 161-169
Scott, F. & Anthony, T. (2007) ‘Exploring Change in Construction: Supply Chain
Management’, Engineering, Construction and Architectural Management, Vol. 14 No. 4, pp
319-333
Wanda, J & Debra, J. (1997) ‘An Improvisational Model of Change Management: The Case of
Groupware Technologies’, Sloan Management Review
References
Case Study 1: Outstanding Whole of Life Gains Without Higher Up-Front Costs
Case Study 2: Concrete Planking Innovation Saves AUSD 300,000 on Major Sports Stadium
Case Study 3: Motorway Alliance Drives Performance Improvement
Case Study 4: Performance-Based Building Codes and Fire Engineering Yield Innovative
Design Solution
Case Study 5: Australia's First Fibre-Reinforced Polymer Bridge Deck on The Road Network
Case Study 6: Ground Penetrating Radar Finds Defects in Bridge Beams
CaseStudy

More Related Content

PDF
The impact of innovation of the construction industry in ghana
PPTX
Research and development
PDF
Implementing innovation frameworks within facilities management contracts
PDF
Strategic Management of Technological Innovation
PPT
Technology and Innovation Management
PDF
Management Technology Innovation Change
PDF
Innovation management case study
PPTX
The business model innovation process: a temporal perspective
The impact of innovation of the construction industry in ghana
Research and development
Implementing innovation frameworks within facilities management contracts
Strategic Management of Technological Innovation
Technology and Innovation Management
Management Technology Innovation Change
Innovation management case study
The business model innovation process: a temporal perspective

What's hot (19)

PPTX
Research and Development and Information Technology
PPTX
'Business' of R&D
PPTX
How do we measure of r & d (research and development) in companies
PDF
International Journal of Engineering Research and Development (IJERD)
PDF
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
PDF
Enhancing Project Management Efficiency using Lean Concepts
PPT
Innovation Leadership1
PPTX
Research & development strategies across different industries
PPTX
Innovation Strategies
PPT
Managing technology and innovation
PPTX
Introduction to Management of Technology
PPTX
Innovation Management for BU syllabus
PPTX
2016 - Lecture 6 managing the internal processes.pot
PDF
The importance of an innovation management system_Maie Peetri
PPS
The challenges of transitions towards a more sustainable business v1.3
PPT
Innovation models
PPTX
Where lies the Innovator's Advantage in strategic sourcing?
PPTX
APPROACHES TO TECHNOLOGY STRATEGY
PDF
NAMII Initiative 2013 Part2
Research and Development and Information Technology
'Business' of R&D
How do we measure of r & d (research and development) in companies
International Journal of Engineering Research and Development (IJERD)
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Enhancing Project Management Efficiency using Lean Concepts
Innovation Leadership1
Research & development strategies across different industries
Innovation Strategies
Managing technology and innovation
Introduction to Management of Technology
Innovation Management for BU syllabus
2016 - Lecture 6 managing the internal processes.pot
The importance of an innovation management system_Maie Peetri
The challenges of transitions towards a more sustainable business v1.3
Innovation models
Where lies the Innovator's Advantage in strategic sourcing?
APPROACHES TO TECHNOLOGY STRATEGY
NAMII Initiative 2013 Part2

Viewers also liked (12)

PPTX
Tools for evaluating the effectiveness of your teaching technique 1
PPTX
Major tools of evaluation
PPT
Evaluation tools
PPTX
Tools and techniques of evaluation
PPTX
Data collection
PPTX
Curriculum change and innovation
PPT
Curriculum Innovation
PPTX
IMPLEMENTING THE CURRICULUM AS A CHANGE PROCESS
PPTX
Evaluation ppt
PPTX
Curriculum Change
PPTX
Evaluation – concepts and principles
PPT
Curriculum design and models
Tools for evaluating the effectiveness of your teaching technique 1
Major tools of evaluation
Evaluation tools
Tools and techniques of evaluation
Data collection
Curriculum change and innovation
Curriculum Innovation
IMPLEMENTING THE CURRICULUM AS A CHANGE PROCESS
Evaluation ppt
Curriculum Change
Evaluation – concepts and principles
Curriculum design and models

Similar to Innovation, Change & Strategy (20)

PDF
Lecture on Innovation & Cost Saving Strategies in Facilities Management
PDF
ILRI Seminar_Presentation by AHall_Our search for effective research and inno...
PDF
Impact of Sustainable Construction on Business Decisions
PDF
Essay Construction
PDF
Change Management Automotive Industry Summary Presentation Summary V.Final Dotx
PDF
CSCM Sustainability in-the-construction-industry-in-malaysia-the-challenges-a...
PDF
Engineering Staffing Services | Mastech Digital
PDF
Recomendations of the seminar
PDF
Wist_Nick_FinalEssay
PPT
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
PPT
034 innovation & productivity
PPTX
The Reality of Innovation Collaboration in SMEs (UK Foundries & Metal-Forming...
PDF
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
PDF
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
PDF
Vendor Driven Innovation
PDF
J012145256
PDF
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
PDF
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
DOCX
CHAPTER 12Managing Innovation and Fostering Corporate Entrepre
PDF
BobJordan-6-13-16a
Lecture on Innovation & Cost Saving Strategies in Facilities Management
ILRI Seminar_Presentation by AHall_Our search for effective research and inno...
Impact of Sustainable Construction on Business Decisions
Essay Construction
Change Management Automotive Industry Summary Presentation Summary V.Final Dotx
CSCM Sustainability in-the-construction-industry-in-malaysia-the-challenges-a...
Engineering Staffing Services | Mastech Digital
Recomendations of the seminar
Wist_Nick_FinalEssay
034 INNOVATION DELAY AND DISRUPTION, WASTE ON SITE
034 innovation & productivity
The Reality of Innovation Collaboration in SMEs (UK Foundries & Metal-Forming...
Risk Management in Industry 4.0 Maintenance: Identifying and Addressing Hazards
IRJET- Development of R&D Project Management Model in Indian Construction Ind...
Vendor Driven Innovation
J012145256
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
Lean and Agile Manufacturing as productivity enhancement techniques - a compa...
CHAPTER 12Managing Innovation and Fostering Corporate Entrepre
BobJordan-6-13-16a

Recently uploaded (20)

PPTX
AC-Unit1.pptx CRYPTOGRAPHIC NNNNFOR ALL
PDF
UNIT 1 Introduction fnfbbfhfhfbdhdbdto Java.pptx.pdf
PPTX
DOC-20250430-WA0014._20250714_235747_0000.pptx
PDF
SEVA- Fashion designing-Presentation.pdf
PDF
BRANDBOOK-Presidential Award Scheme-Kenya-2023
PPTX
artificialintelligencedata driven analytics23.pptx
PDF
Emailing DDDX-MBCaEiB.pdf DDD_Europe_2022_Intro_to_Context_Mapping_pdf-165590...
DOCX
actividad 20% informatica microsoft project
PPTX
AD Bungalow Case studies Sem 2.pptxvwewev
PPTX
Wisp Textiles: Where Comfort Meets Everyday Style
PDF
GREEN BUILDING MATERIALS FOR SUISTAINABLE ARCHITECTURE AND BUILDING STUDY
PPT
Machine printing techniques and plangi dyeing
PPTX
Fundamental Principles of Visual Graphic Design.pptx
PDF
Interior Structure and Construction A1 NGYANQI
PDF
The Advantages of Working With a Design-Build Studio
PPT
unit 1 ppt.ppthhhhhhhhhhhhhhhhhhhhhhhhhh
PDF
Benefits_of_Cast_Aluminium_Doors_Presentation.pdf
PPTX
building Planning Overview for step wise design.pptx
PDF
Design Thinking - Module 1 - Introduction To Design Thinking - Dr. Rohan Dasg...
PDF
Wio LTE JP Version v1.3b- 4G, Cat.1, Espruino Compatible\202001935, PCBA;Wio ...
AC-Unit1.pptx CRYPTOGRAPHIC NNNNFOR ALL
UNIT 1 Introduction fnfbbfhfhfbdhdbdto Java.pptx.pdf
DOC-20250430-WA0014._20250714_235747_0000.pptx
SEVA- Fashion designing-Presentation.pdf
BRANDBOOK-Presidential Award Scheme-Kenya-2023
artificialintelligencedata driven analytics23.pptx
Emailing DDDX-MBCaEiB.pdf DDD_Europe_2022_Intro_to_Context_Mapping_pdf-165590...
actividad 20% informatica microsoft project
AD Bungalow Case studies Sem 2.pptxvwewev
Wisp Textiles: Where Comfort Meets Everyday Style
GREEN BUILDING MATERIALS FOR SUISTAINABLE ARCHITECTURE AND BUILDING STUDY
Machine printing techniques and plangi dyeing
Fundamental Principles of Visual Graphic Design.pptx
Interior Structure and Construction A1 NGYANQI
The Advantages of Working With a Design-Build Studio
unit 1 ppt.ppthhhhhhhhhhhhhhhhhhhhhhhhhh
Benefits_of_Cast_Aluminium_Doors_Presentation.pdf
building Planning Overview for step wise design.pptx
Design Thinking - Module 1 - Introduction To Design Thinking - Dr. Rohan Dasg...
Wio LTE JP Version v1.3b- 4G, Cat.1, Espruino Compatible\202001935, PCBA;Wio ...

Innovation, Change & Strategy

  • 1. INNOVATION, CHANGE & STRATEGY IKHSAN Muhammad Ridhwan
  • 2. Construction Industry Master Plan (CIMP) was established on the 2006. It was a 10 years plan to rectify the weaknesses and to improve the industry’s performance as well as the image of the industry.
  • 3. CIMP target to improve on the quality, time efficiency, reducing foreign labour, and ensuring quality of social and health in the industry.
  • 4. 7 Strategic Thrust Thrust 1 • Integrate the construction industry value chain to enhance productivity and efficiency Thrust 2 • Strengthen the construction industry’s image Thrust 3 • Strive for the highest standard of quality, occupational safety and health, and environmental practices Thrust 4 • Develop human resource capabilities and capacities in the construction industry Thrust 5 • Innovate through research and development and adopt new construction methods Thrust 6 • Leverage on information and communication technology in the construction industry Thrust 7 • Benefit from globalization including the export of construction products and services
  • 7. A highly adaptable capability in any robust industry condition.
  • 10. In 2003, six case studies were conducted by Cooperative Research Centre for Construction Innovation of Australia in a research project called BRITE (Building Research Innovation Technology and Environment). [Case Study]
  • 11. In 2003, six case studies were conducted by Cooperative Research Centre for Construction Innovation of Australia in a research project called BRITE (Building Research Innovation Technology and Environment). [Case Study] Case Study 1: Outstanding Whole of Life Gains Without Higher Up-Front Costs Case Study 2: Concrete Planking Innovation Saves AUSD 300,000 on Major Sports Stadium Case Study 3: Motorway Alliance Drives Performance Improvement Case Study 4: Performance-Based Building Codes and Fire Engineering Yield Innovative Design Solution Case Study 5: Australia's First Fibre-Reinforced Polymer Bridge Deck on The Road Network Case Study 6: Ground Penetrating Radar Finds Defects in Bridge Beams
  • 12. The case studies were focusing on innovation and its implementation, covering all industry players – clients, contractors, consultants and suppliers. In 2003, six case studies were conducted by Cooperative Research Centre for Construction Innovation of Australia in a research project called BRITE (Building Research Innovation Technology and Environment). [Case Study]
  • 13. In 2003, six case studies were conducted by Cooperative Research Centre for Construction Innovation of Australia in a research project called BRITE (Building Research Innovation Technology and Environment). The case studies, which are conducted in Australia, describe the dynamics of industry innovation. This involves highlighting the benefits of innovation and describing how particular companies have sought innovations, have decided on adoption and then successfully implemented those selected. [Case Study]
  • 14. Ergo… Innovation entails construction industry to meritoriously plan for change holistically vis-à-vis to sustain in the caustic industry, or vice-versa. Why?
  • 16. Change in communication within organizational practice throughout business life, de facto of novelty in construction industry.
  • 17. Multicultural complexity among construction participants commonly would cause hitches, that this trigger difficulties in coordinating activities for shared goals.
  • 18. Significant large number of involvement in construction project with the conventional one-off nature, is the cause of obstruction towards a progressive communication innovation.
  • 19. Information technologies have been seen as an opportunity for greater knowledge sharing in which better communication integration could be achieved.
  • 20. Ergo…What? Integrated Communication Improvisation within construction industry may require an innovation for integrated communication as a pre-requisite before the other changes shall emerge.
  • 22. Construction organization has to be highly adaptive towards changes to sustain within the industry such as acclimatize towards technological advancement, not stagnancy.
  • 23. Although the proposition for change is seen as arduous, the ability of one organization to adapt with technological emergent would results perpetuity of the organization in the industry.
  • 24. Inconsistent technological adoption is one of the reasons the construction project participants shall interoperate inefficiently vis-à-vis cause billions of financial outflow.
  • 25. Change reformation shall only take place effectively within all construction project participants, if, the nature of one-off project to be deal with the same participants during temporary coalitions with a constant knowledge transfer.
  • 26. Key participants in Innovation Processes Informed clients with high levels of technical competence are an important “market-pull" factor in driving innovation (1,3,4, and 5) [Case Study]
  • 27. How to Innovate Successfully Streamlining Activities Improving knowledge flows by developing more intensive industry relationships. Integration of project experiences into continuous business process to limit the loss of tacit knowledge between projects. [Case Study]
  • 28. Ergo…What? Technological Advancement In order for technological implementation to evolve efficaciously, change management should improvise effectively.
  • 30. Materialize the change would require a well strategize management scheme to ensure the changes aimed could be realize meritoriously.
  • 31. Within the organization, resistance to change by staffs cause lack of change implementation in continuous practice.
  • 32. Refusing for persistent implementation by most construction players are usually due to lack of credible plan to convince them of the outcome.
  • 33. External Internal Management behavior Changes can occur when there is needs. By-law Client Authority [ASBA Architect, 2013]
  • 35. Key features in Innovation Processes Standards act as strong “market-pull” factor encouraging the industry to improve performance (1 and 4) [Case Study]
  • 36. How to Innovate Successfully Building Relationships with Key Players Active use of innovation brokers to facilitate efficient access to technical support providers and other external players with complementary knowledge bases. Building extensive relationships with manufactures supplying the industry, in view of their involvement in R&D programs. Building long term relationships with manufacturers supplying the industry, in view of the shift towards more cooperative approaches to project delivery. [Case Study]
  • 37. Ergo…How? Change Resistance Strategy of change requires a persuasive support along the implementation process to facilitate implementers and upkeep with any intangible occurrences.
  • 39. Change shall be implemented consistently if the organizations’ players solemn in implementing the change towards innovation culture.
  • 40. In construction industry, forwarding towards sustainability organization necessitate each participants to comprehend the legitimacy of current practice de facto improving the sector.
  • 41. Key participants in Innovation Processes Small regional firms can be important innovation drivers because of their knowledge of local conditions (1,2,5, and 6) [Case Study]
  • 42. Key features in Innovation Processes Mobilising integrated approaches to construction projects, in response to industry fragmentation arising from the "one-off" nature of most projects and the proliferation of small players/contractors. The type of contract employed by clients on projects has a big impact on the ability of stakeholders to try new approaches hence innovate (2 and 3) [Case Study]
  • 43. The shortcomings experienced in the construction industry are also caused by existing attitudes, cultures and behaviors.
  • 44. An assessment of participation towards change such as involvement, training, communication and education shall overcome the resistance to change behavior.
  • 45. External Internal Management behavior By-law Client Authority How?Culture & Behaviour “The changes for innovation will takes some time to be accepted by the industry because of the trust on the product and the acceptance on the product by the key player.” [ASBA Architect, 2013]
  • 46. How to Innovate Successfully Growing an Appropriate Internal Business Environment Building a culture supportive of innovation, including encouraging staff to share ideas, enhancing in-house technical competence, supporting innovation champions, appreciating the opportunities presented by problems and encouraging prudent risk taking. [Case Study]
  • 47. How to Innovate Successfully Effective Client Leadership Maintaining high level of technical competence and a positive approach to prudent risk taking. [Case Study]
  • 48. Ergo…How? Culture & Behaviour The change strategy oblige devoted, constant effort by all construction participants either different parties nor within employees, to partly innovate the organization towards a better tradition.
  • 50. Q&A
  • 51. Blayse, A. and Manley, K. (2004) ‘Key Influences on Construction Innovation’, Construction Innovation, Vol 4, No 3, pp 1-12 Carr D et al. Managing the change process: a field book for change agents, consultants, team leaders, and reengineering managers. New York: McGraw-Hill, 1996. p. xiii, 24±25. Henderson, J. and Ruikar, K. (2010) ‘Technology Implementation Strategies for Construction Organisation’, Engineering, Construction and Architectural Management, Vol. 17 No. 3, pp 309-327 Jorge, A. & Annie R. (n.d.) ‘Drivers for Change: An Organizational Perspective on Sustainable Construction’ Lars, S. & Per, O. (2010) ‘A Method for Action Research Interventions to Improve Joint Problem Solving in Operational Teams in the Swedish Construction Industry’, Qualitative Research in Accounting & Management, Vol. 7 No. 1, pp 97-123 Louise, S. (2007) ‘Technology, Change, and the Building Industry’, Real Estate Review, Vol. 36 No. 3 Salman, T. (2001) ‘A Change Management Model fro Saudi Construction Industry’, International Journal of Project Management, Vol. 19, pp 161-169 Scott, F. & Anthony, T. (2007) ‘Exploring Change in Construction: Supply Chain Management’, Engineering, Construction and Architectural Management, Vol. 14 No. 4, pp 319-333 Wanda, J & Debra, J. (1997) ‘An Improvisational Model of Change Management: The Case of Groupware Technologies’, Sloan Management Review References
  • 52. Case Study 1: Outstanding Whole of Life Gains Without Higher Up-Front Costs Case Study 2: Concrete Planking Innovation Saves AUSD 300,000 on Major Sports Stadium Case Study 3: Motorway Alliance Drives Performance Improvement Case Study 4: Performance-Based Building Codes and Fire Engineering Yield Innovative Design Solution Case Study 5: Australia's First Fibre-Reinforced Polymer Bridge Deck on The Road Network Case Study 6: Ground Penetrating Radar Finds Defects in Bridge Beams CaseStudy