Pros and Cons for Simulation-
1(Baseline)
Problem Analysis
Assumptions for Simulated scenario 1
• The firm has presently 20 sales representative
• The marketing dept. generates the order for the products
• The production dept. produces and ships the products
• Each sale representative generates 10 orders per week
• The production department has a fixed total capacity of 400 orders
• The production utilization rate is 80%
• The revenue per order is £300
• The marketing dept. budget is 15% of the sales total revenues
• The weekly salary of a sales representative is £15 per week
• The process of recruiting or firing a sales representative takes, on
average, 8 weeks
• Customers’ tolerance level of the delivery delay is to be 1-6 week
Pros and Cons for Simulation-
1(Baseline) Cont…
Causal Loop Diagram (CLD)
Pros and Cons for Simulation-1(Baseline) Cont…
Stock and Flow Diagram
Pros and Cons for Simulation-1(Baseline) Cont…
A list of model data, and the dimensions of all variables in the model
Serial
Number
Variables Dimensions of Variables Amount
1 Number of Sales
Representative
Employees 20
2 Hiring/firing Rate Employees
3 Sales Representative Gap Employees 12
4 Targeted Sales
Representative
Employees 32
5 Sales Representative Based
on Marketing Budget
Employees
6 Sales Representative Based
on Utilization
Employees
7 Hiring/firing Delay Weeks 8
8 Delivery Delay Weeks 1-6
9 Order Rate Units
10 Number of Orders Units 320
11 Shipment Rate Units
12 Maximum Production Units
13 Order Per SR Units 10
14 Revenue Per Order United Kingdom Pounds 300
15 Revenue Rate United Kingdom Pounds
16 Total Revenue United Kingdom Pounds 96000
17 Budget Percentage United Kingdom Pounds 0.15
18 Budget Rate United Kingdom Pounds
19 Marketing Budget United Kingdom Pounds 14400
20 Payment Rate United Kingdom Pounds 15
Pros and Cons for Simulation-1(Baseline) Cont…
Simulated Output Table
Weeks MarketingBudget Nooforders NoofSR TotalRevenue BudgetRate
Hiring/
Firing
Rate
OrderRate
Payment
Rate
`RevenueRate
Shipment
Rate
Budget
Percent
age`
Deliver
y
Delay
Hiring/F
iring
Delay
Max
Product
ion
OrderPerSR
RevenuePer
Order
SRBasedon
Utilization
SR
Gap
SRBasedon
Mkt.Budget
Targeted
SR
Initial 14,400.00 320 20 96,000.00 0.15 6 8 320 10 300 32 12 960 32
1 34,150.10 639 21.43 208,122.40 19,765.10 1.43 320 15 131,887.50 53.3 0.15 6 8 320 10 300 32 10.57 2,276.67 32
2 75,045.77 958 22.69 394,799.23 40,910.67 1.26 320 15 227,587.50 159.67 0.15 6 8 320 10 300 32 9.31 5,003.05 32
3 147,656.69 1,277.00 23.8 645,460.81 72,625.92 1.11 320 15 323,287.50 212.83 0.15 6 8 320 10 300 32 8.2 9,843.78 32
4 261,054.08 1,596.00 24.78 951,035.92 113,412.39 0.98 320 15 418,987.50 266 0.15 6 8 320 10 300 32 7.22 17,403.61 32
5 423,023.11 1,915.00 25.64 1,303,739.39 161,984.03 0.86 320 15 514,687.50 319.16 0.15 6 8 320 10 300 32 6.36 28,201.54 32
6 640,245.23 2,234.00 26.4 1,696,889.77 217,237.12 0.76 320 15 610,387.50 372.33 0.15 6 8 320 10 300 32 5.6 42,683.02 32
7 917,509.81 2,114.38 27.07 2,083,828.94 277,279.58 0.67 320 15 664,218.75 352.33 0.15 6 8 320 10 300 32 4.93 61,167.32 32
8 1,246,773.87 1,675.75 27.66 2,346,993.63 329,279.06 0.59 320 15 592,443.75 279.16 0.15 6 8 320 10 300 32 4.34 83,118.26 32
9 1,605,239.91 918.13 28.17 2,413,481.34 358,481.04 0.52 320 15 424,968.75 153.00 0.15 6 8 320 10 300 32 3.83 107,015.99 32
10 1,959,774.94 1011.12 28.63 2,220,725.06 354,550.03 0.46 320 15 161,793.75 168.50 0.15 6 8 320 10 300 32 3.37 130,651.66 32
11 2,274,595.37 1785.05 29.03 1,905,889.63 314,835.43 0.4 320 15 150000.75 1785.4 0.15 6 8 320 10 300 32 2.97 151,639.69 32
Pros and Cons for Simulation-1(Baseline) Cont…
Relationship between Targeted SR and Order Rate
12:17 PM Fri, Apr 24, 2015
Relation between No. of SR and Order Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
20
25
30
319
320
321
1: No of Sales Representativ e 2: Order Rate
1
1
1
1
2 2 2 2
Pros and Cons for Simulation-1(Baseline) Cont…
Relationship between Marketing Budget and Targeted SR
12:20 PM Fri, Apr 24, 2015
Relation Between Mkt. Budget and Target SR
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
0
1500000
3000000
31
32
33
1: Marketing Budget 2: Target SR
1
1
1
1
2 2 2 2
Pros and Cons for Simulation-1(Baseline) Cont…
Relationship between Delivery Delay and No of Orders
12:20 PM Fri, Apr 24, 2015
Relation Between No. of Orders and Deliv ery Delay
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
0
1500
3000
5
6
7
1: No of orders 2: Deliv ery Delay
1
1
1
1
2 2 2 2
Pros and Cons for Simulation-1(Baseline) Cont…
Relationship between Targeted SR and Revenue Rate
12:22 PM Fri, Apr 24, 2015
Relation Between No. of SR and Rev enue Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
20
25
30
0
350000
700000
1: No of Sales Representativ e 2: Rev enue Rate
1
1
1
1
2
2
2
2
Pros and Cons for Simulation-1(Baseline) Cont…
Relationship between Targeted SR and Payment Rate
12:22 PM Fri, Apr 24, 2015
Relation Between No. of SR and Pay ment Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
20
25
30
14
15
16
1: No of Sales Representativ e 2: Pay ment Rate
1
1
1
1
2 2 2 2
Pros and Cons for Simulation-1(Baseline) Cont…
Relationship between Delivery Delay and Revenue Rate
12:24 PM Fri, Apr 24, 2015
Relation Between Deliv ery Delay and Rev enue Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
5
6
7
0
350000
700000
1: Deliv ery Delay 2: Rev enue Rate
1 1 1 1
2
2
2
2
Pros and Cons for Simulation-2
Problem Analysis
Assumptions for Simulated scenario 1
• The fraction of revenues to the marketing
department is 10%.
• There is no recruitment or firing of sales
representatives.
• The customers’ delivery delay monitoring time is
2 weeks.
• The production utilisation fraction is 60%.
Pros and Cons for Simulation-2 Cont…
Causal Loop Diagram (CLD)
Pros and Cons for Simulation-2 Cont…
Stock and Flow Diagram
Pros and Cons for Simulation-2 Cont…
A list of model data, and the dimensions of
all variables in the model
Serial
Number
Variables Dimensions of Variables Amount
1 Number of orders Units 240
2 Marketing budget United kingdom pound s 7200
3 Total revenue United kingdom pound 72000
4 Order rate Units 10
5 Revenue rate United kingdom pound 72000
6 Budget rate United kingdom pound 7200
7 Shipment rate Units
8 Payment rate United kingdom pound 15
10 Order per sales representative Units 10
11 Target Sales representative Employees 24
12 SR based on utilization Employees 24
13 Sales representative based on
marketing budget
Employees 480
14 Maximum production Units 240
15 Budget percentage United Kingdom Pounds .10
16 Revenue per order United Kingdom Pounds 300
17 Delivery delay weeks 2
Pros and Cons for Simulation-2 Cont…
Simulated Output Table
Weeks
Marketing
Budget
Noof
orders
TotalRevenue BudgetRate OrderRate
Paym
ent
Rate
`Revenue
Rate
Shipment
Rate
Budget
Percentage
`
Delivery
Delay
Max
Produ
ction
Order
Per
SR
Reven
ue Per
Order
SR
Based
on
Utiliz
ation
SRBased
onMkt.
Budget
TargetedSR
Initial 7,200.00 320 72,000.00 0.1 2 240 10 300 24 480 24
1 18,105.17 559 183,967.33 10,920.17 240 15 122,887.50 279.5 0.1 2 240 10 300 24 1,207.01 24
2 42,438.37 798 354,206.63 24,348.20 240 15 194,587.50 399 0.1 2 240 10 300 24 2,829.22 24
3 85,189.50 628.38 537,359.25 42,766.13 240 15 225,918.75 314 0.1 2 240 10 300 24 5,679.30 24
4 143,258.44 219.75 627,419.06 58,083.94 240 15 148,143.75 109.5 0.1 2 240 10 300 24 9,550.56 24
5 205,174.12 305 587,988.38 61,930.68 240 15 22,500.00 152.5 0.1 2 240 10 300 24 13,678.27 24
6 261,789.52 325 531,357.98 56,630.40 240 15 18000 162.5 0.1 2 240 10 300 24 17,452.63 24
7 313,053.85 395 491,708.34 51,279.33 240 15 11,629.69 197.5 0.1 2 240 10 300 24 20,870.26 24
8 362,669.01 405 518,578.18 49,630.16 240 15 76,500.00 202.5 0.1 2 240 10 300 24 24,177.93 24
9 417,524.97 606.23 611,173.62 54,870.96 240 15 147,466.41 303 0.1 2 240 10 300 24 27,835.00 24
10 483,192.19 591.23 731,299.22 65,682.22 240 15 185,807.81 295.5 0.1 2 240 10 300 24 32,212.81 24
11 559,815.82 339.68 808,992.13 76,638.63 240 15 154,331.54 169.5 0.1 2 240 10 300 24 37,321.05 24
Pros and Cons for Simulation-2 Cont…
Simulated Output Graphs
List of the plotted variables in the graph:
 Marketing Budget
 Revenue Rate
 Number of Sales Representative
 Order Rate
 Targeted Sales Representative
 Number of Orders
 Delivery Delay
 Payment Rate
Pros and Cons for Simulation-2 Cont…
Relationship between Targeted SR and
Order Rate
12:55 PM Fri, Apr 24, 2015
Relationship between Target SR and Order Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
23
24
25
239
240
241
1: Target SR 2: Order Rate
1 1 1 1
2 2 2 2
Pros and Cons for Simulation-2 Cont…
Relationship between Marketing Budget and
Targeted SR
12:56 PM Fri, Apr 24, 2015
Relationship between Mkt. Budget and Target SR
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
0
300000
600000
23
24
25
1: Marketing Budget 2: Target SR
1
1
1
1
2 2 2 2
Pros and Cons for Simulation-2 Cont…
Relationship between Marketing Budget and
Targeted SR
12:56 PM Fri, Apr 24, 2015
Relationship between Mkt. Budget and Target SR
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
0
300000
600000
23
24
25
1: Marketing Budget 2: Target SR
1
1
1
1
2 2 2 2
Pros and Cons for Simulation-2 Cont…
Relationship between Delivery Delay and No
of Orders
12:58 PM Fri, Apr 24, 2015
Relationship between Deliv ery Delay and No. of Orders
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
1
2
3
0
400
800
1: Deliv ery Delay 2: No of orders
1 1 1 1
2
2
2
2
Pros and Cons for Simulation-2 Cont…
Relationship between Targeted SR and
Revenue Rate
12:59 PM Fri, Apr 24, 2015
Relationship between Target SR and Rev enue Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
23
24
25
0
150000
300000
1: Target SR 2: Rev enue Rate
1 1 1 1
2
2
2
2
Pros and Cons for Simulation-2 Cont…
Relationship between Targeted SR and
Payment Rate
12:59 PM Fri, Apr 24, 2015
Relationship between Target SR and Pay ment Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
23
24
25
14
15
16
1: Target SR 2: Pay ment Rate
1 1 1 1
2 2 2 2
Pros and Cons for Simulation-2 Cont…
Relationship between Delivery Delay and
Revenue Rate
1:00 PM Fri, Apr 24, 2015
Relationship between Deliv ery i Delay and Rev enue Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
1
2
3
0
150000
300000
1: Deliv ery Delay 2: Rev enue Rate
1 1 1 1
2
2
2
2
Pros and Cons for Simulation-3
Problem Analysis
• Assumptions for Simulated scenario 1
• The fraction of revenues to the marketing
department is 20%.
• There is no recruitment or firing of sales
representatives.
• The customers’ delivery delay monitoring time is
8 weeks.
• The production utilisation fraction is 100%.
Pros and Cons for Simulation-3 Cont…
Causal Loop Diagram (CLD)
Pros and Cons for Simulation-3 Cont…
Stock and Flow Diagram
Pros and Cons for Simulation-3 Cont…
A list of model data, and the dimensions of all
variables in the model
Serial
Number
Variables Dimensions of
Variables
Amount
1 Number of orders Units 400
2 Marketing budget United kingdom pound s 24000
3 Total revenue United kingdom pound 120000
4 Order rate Units 10
5 Revenue rate United kingdom pound 120000
6 Budget rate United kingdom pound 24000
7 Shipment rate Units
8 Payment rate United kingdom pound 15
10 Order per sales representative Units 10
11 Target Sales representative Employees 40
12 SR based on utilization Employees 40
13 Sales representative based on
marketing budget
Employees 8000
14 Maximum production Units 400
15 Budget percentage United Kingdom Pounds .20
16 Revenue per order United Kingdom Pounds 300
17 Delivery delay weeks 8
Pros and Cons for Simulation-3 Cont…
Simulated Output Table
Weeks
Marketing
Budget
Noof
orders
TotalRevenue BudgetRate OrderRate
Paym
ent
Rate
`Revenue
Rate
Shipment
Rate
Budget
Percentage
`
Delivery
Delay
Max
Produ
ction
Order
Per
SR
Reven
ue Per
Order
SR
Based
on
Utiliz
ation
SRBased
onMkt.
Budget
TargetedSR
Initial 24,000.00 400 120,000.00 0.2 8 400 10 300 40 1,600.00 40
1 54,684.80 719 230,187.70 30,699.80 400 15 140,887.50 89.88 0.2 8 400 10 300 40 3,645.65 40
2 114,490.71 1,118.00 430,954.29 59,820.92 400 15 260,587.50 139.75 0.2 8 400 10 300 40 7,632.71 40
3 220,219.57 1,517.00 705,497.93 105,743.85 400 15 380,287.50 189.63 0.2 8 400 10 300 40 14,681.30 40
4 385,556.54 1,916.00 1,040,133.46 165,351.98 400 15 499,987.50 239.5 0.2 8 400 10 300 40 25,703.77 40
5 621,648.31 2,315.00 1,423,714.19 236,106.76 400 15 619,687.50 289.38 0.2 8 400 10 300 40 41,443.22 40
6 937,573.89 2,714.00 1,847,161.11 315,940.58 400 15 739,387.50 339.25 0.2 8 400 10 300 40 62,504.93 40
7 1,340,728.22 3,113.00 2,303,079.28 403,169.33 400 15 859,087.50 389.25 0.2 8 400 10 300 40 89,381.88 40
8 1,837,134.52 3,512.00 2,785,445.48 496,421.29 400 15 978,787.50 439 0.2 8 400 10 300 40 122,475.63 40
9 2,430,423.90 3,442.38 3,247,259.85 593,304.39 400 15 1,055,118.75 430.25 0.2 8 400 10 300 40 162,028.26 40
10 3,106,384.43 2,973.75 3,560,628.07 675,975.52 400 15 989,343.75 371.63 0.2 8 400 10 300 40 207,092.30 40
11 3,828,798.26 2,106.13 3,642,067.99 722,428.84 400 15 803,868.75 263.25 0.2 8 400 10 300 40 255,253.22 40
Pros and Cons for Simulation-3 Cont…
Relationship between Marketing Budget and
Revenue Rate
1:07 PM Fri, Apr 24, 2015
Relationship between Mkt. Budget and Rev enue Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
0
2000000
4000000
50000
600000
1150000
1: Marketing Budget 2: Rev enue Rate
1
1
1
1
2
2
2
2
Pros and Cons for Simulation-3 Cont…
Simulated Output Graphs
List of the plotted variables in the graph:
• Marketing Budget
• Revenue Rate
• Number of Sales Representative
• Order Rate
• Targeted Sales Representative
• Number of Orders
• Delivery Delay
• Payment Rate
Pros and Cons for Simulation-3 Cont…
Relationship between Targeted SR and Order
Rate
1:08 PM Fri, Apr 24, 2015
Relationship between Target SR and Order Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
39
40
41
399
400
401
1: Target SR 2: Order Rate
1 1 1 1
2 2 2 2
Pros and Cons for Simulation-3 Cont…
Relationship between Marketing Budget and
Targeted SR
1:09 PM Fri, Apr 24, 2015
Relationship between Mkt. Budget and Target SR
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
0
2000000
4000000
39
40
41
1: Marketing Budget 2: Target SR
1
1
1
1
2 2 2 2
Pros and Cons for Simulation-3 Cont…
Relationship between Delivery Delay and No of
Orders
1:10 PM Fri, Apr 24, 2015
Relationship between Deliv ery Delay and No of Orders
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
7
8
9
0
2000
4000
1: Deliv ery Delay 2: No of orders
1 1 1 1
2
2
2
2
Pros and Cons for Simulation-3 Cont…
Relationship between Targeted SR and Revenue
Rate
1:11 PM Fri, Apr 24, 2015
Relationship between Target SR and Rev enue Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
39
40
41
50000
600000
1150000
1: Target SR 2: Rev enue Rate
1 1 1 1
2
2
2
2
Pros and Cons for Simulation-3 Cont…
Relationship between Targeted SR and Payment
Rate
1:12 PM Fri, Apr 24, 2015
Relationship between Target SR and Pay ment Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
39
40
41
14
15
16
1: Target SR 2: Pay ment Rate
1 1 1 1
2 2 2 2
Pros and Cons for Simulation-3 Cont…
Relationship between Delivery Delay and Revenue
Rate
1:13 PM Fri, Apr 24, 2015
Relationship between Deliv ery Delay and Rev enue Rate
Page 1
1.00 3.75 6.50 9.25 12.00
Weeks
1:
1:
1:
2:
2:
2:
7
8
9
50000
600000
1150000
1: Deliv ery Delay 2: Rev enue Rate
1 1 1 1
2
2
2
2
Findings
• The increased marketing budget is the cause of increased amount of
revenues
• The increased revenues are the cause of the increased order rate and
sales representatives
• The hiring rate is 2 SR per week and there is no firing (For Baseline
Simulation)
• Shipment rate is the function of no of orders and delivery delay
• Minimizing the delivery delay increases the shipment Rate and no. of
orders
• Exceeding the maximum capacity brings diseconomies of scale in the
organization
• Customer order is affected by the multiple variables e.g. Customer
interest, reputation, delivery delay, no. of sales representatives
• Maximum capacity determines the targeted no. of sales
representatives
• In case of 100% and 60% utilization, no hiring decision is wrong since
the organization has only 20 SR
Recommendations
• Organization should not recruit employee ignoring the
maximum capacity because it will require extra
machineries and employees
• Organization should maintain the proper range of
delivery delay to retain the customers and increase the
reputation
• Organization should maintain a proper capacity cushion
(Reserved Capacity) for the variability of demand
• Organization should minimize the hiring/firing delay to
minimize the overall cost
• To increase the utilization rate above 50%, it must hire
new employees
• Organization should maintain hiring decision in case of
100% and 60% utilization rate to meet the extra demand
Discussion Session
Feel free to ask Question
????????????
Gratitude

More Related Content

PPTX
Business Model Canvas & Budgeting- Kodai
PDF
Pay Forecast PowerPoint Presentation Slides
PDF
Financial Projection PowerPoint Presentation Slides
PDF
samsung engineering 028050 Algorithm Investment Report
PDF
Revenue Projection PowerPoint Presentation Slides
PDF
Financial Forecast PowerPoint Presentation Slides
PDF
Revenue Forecasting PowerPoint Presentation Slides
PDF
Money Projection PowerPoint Presentation Slides
Business Model Canvas & Budgeting- Kodai
Pay Forecast PowerPoint Presentation Slides
Financial Projection PowerPoint Presentation Slides
samsung engineering 028050 Algorithm Investment Report
Revenue Projection PowerPoint Presentation Slides
Financial Forecast PowerPoint Presentation Slides
Revenue Forecasting PowerPoint Presentation Slides
Money Projection PowerPoint Presentation Slides

Similar to Interaction between Marketing and Production functions.pdf (20)

PDF
Income Projection PowerPoint Presentation Slides
PDF
jeilpharm 271980 Algorithm Investment Report
PDF
kakao 035720 Algorithm Investment Report
PDF
kakao 035720 Algorithm Investment Report
PDF
MGMT260 - Financial Projections
PDF
green cross labsell 144510 Algorithm Investment Report
PDF
kakao games corp 293490 Algorithm Investment Report
PDF
bioneer 064550 Algorithm Investment Report
PDF
Income Forecast PowerPoint Presentation Slides
PPTX
The Numbers
PDF
ecoprobm 247540 Algorithm Investment Report
PDF
protec 053610 Algorithm Investment Report.pdf
PDF
kakao 035720 Algorithm Investment Report
PDF
lg display-034220-Algorithm Investment Report
PDF
Monetary Forecast PowerPoint Presentation Slides
PDF
Monthly Corporate Evaluation PowerPoint Presentation Slides
PDF
The Finance Perspective: The Business Model for the Subscription Economy
PDF
gs 078930 Algorithm Investment Report
PDF
cj 001040 Algorithm Investment Report
PDF
kakaogames 293490 Algorithm Investment Report
Income Projection PowerPoint Presentation Slides
jeilpharm 271980 Algorithm Investment Report
kakao 035720 Algorithm Investment Report
kakao 035720 Algorithm Investment Report
MGMT260 - Financial Projections
green cross labsell 144510 Algorithm Investment Report
kakao games corp 293490 Algorithm Investment Report
bioneer 064550 Algorithm Investment Report
Income Forecast PowerPoint Presentation Slides
The Numbers
ecoprobm 247540 Algorithm Investment Report
protec 053610 Algorithm Investment Report.pdf
kakao 035720 Algorithm Investment Report
lg display-034220-Algorithm Investment Report
Monetary Forecast PowerPoint Presentation Slides
Monthly Corporate Evaluation PowerPoint Presentation Slides
The Finance Perspective: The Business Model for the Subscription Economy
gs 078930 Algorithm Investment Report
cj 001040 Algorithm Investment Report
kakaogames 293490 Algorithm Investment Report
Ad

More from Samsul Alam (20)

PDF
Revisiting the Rana Plaza Collapse Tragedy in Bangladesh: A Study of Aftermat...
PDF
Corporate Social Responsibility and Ethical Practices in the Readymade Garmen...
PDF
A Conceptual Framework for Family Business Strategic Direction in the Banglad...
PDF
Term paper report on System Simulation by group of Spirit of Unity.pdf
PDF
An Analysis of Indian Commercial Dynamism in International Trade: 2000-2021
PDF
Application of Management Information Systems in the Financial Sector: An ove...
PDF
Predicting students’ intention to continue business courses on online platfor...
PDF
Linking Competitive Strategies with Human Resource Information System: A Comp...
PDF
The Role of Technology Entrepreneurship in Facilitating Corporate Donations: ...
PDF
COVID-19 impact on Facebook-based social commerce in Bangladesh
PDF
Ready-made garments inclusion: A study on science and technology park of Extr...
PDF
Is It Feasible to Include Ready-Made Garments Sector in Badajoz Zone under Sc...
PDF
Leadership Attributes and Organizational Goal Achievement--An Ethical Perspec...
PDF
Impact of 4G Mobile Service Quality on Customer Satisfaction in Dhaka City: A...
PDF
Reviewing the Global Smartphone Industry Strategic Implication in Response to...
PDF
Investment on IT: Students Perspective
PDF
Financial Analysis of Retail Business Organization: A Case of Wal-Mart Stores...
PDF
Spain-Bangladesh international trade for small and medium enterprises: Explor...
PDF
Impact of Blue Ocean Strategy on Organizational Performance: A literature rev...
PDF
Country Risk and Its Effect on International Finance Management
Revisiting the Rana Plaza Collapse Tragedy in Bangladesh: A Study of Aftermat...
Corporate Social Responsibility and Ethical Practices in the Readymade Garmen...
A Conceptual Framework for Family Business Strategic Direction in the Banglad...
Term paper report on System Simulation by group of Spirit of Unity.pdf
An Analysis of Indian Commercial Dynamism in International Trade: 2000-2021
Application of Management Information Systems in the Financial Sector: An ove...
Predicting students’ intention to continue business courses on online platfor...
Linking Competitive Strategies with Human Resource Information System: A Comp...
The Role of Technology Entrepreneurship in Facilitating Corporate Donations: ...
COVID-19 impact on Facebook-based social commerce in Bangladesh
Ready-made garments inclusion: A study on science and technology park of Extr...
Is It Feasible to Include Ready-Made Garments Sector in Badajoz Zone under Sc...
Leadership Attributes and Organizational Goal Achievement--An Ethical Perspec...
Impact of 4G Mobile Service Quality on Customer Satisfaction in Dhaka City: A...
Reviewing the Global Smartphone Industry Strategic Implication in Response to...
Investment on IT: Students Perspective
Financial Analysis of Retail Business Organization: A Case of Wal-Mart Stores...
Spain-Bangladesh international trade for small and medium enterprises: Explor...
Impact of Blue Ocean Strategy on Organizational Performance: A literature rev...
Country Risk and Its Effect on International Finance Management
Ad

Recently uploaded (20)

PPTX
operations management : demand supply ch
PPTX
chapter 2 entrepreneurship full lecture ppt
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
DOCX
FINALS-BSHhchcuvivicucucucucM-Centro.docx
PDF
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PDF
Kishore Vora - Best CFO in India to watch in 2025.pdf
PPTX
Astra-Investor- business Presentation (1).pptx
DOCX
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
PPTX
Slide gioi thieu VietinBank Quy 2 - 2025
PPTX
CTG - Business Update 2Q2025 & 6M2025.pptx
PPTX
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
PDF
Booking.com The Global AI Sentiment Report 2025
PDF
533158074-Saudi-Arabia-Companies-List-Contact.pdf
PDF
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
PDF
#1 Safe and Secure Verified Cash App Accounts for Purchase.pdf
PDF
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...
operations management : demand supply ch
chapter 2 entrepreneurship full lecture ppt
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
Solaris Resources Presentation - Corporate August 2025.pdf
FINALS-BSHhchcuvivicucucucucM-Centro.docx
PMB 401-Identification-of-Potential-Biotechnological-Products.pdf
Slide gioi thieu VietinBank Quy 2 - 2025
Kishore Vora - Best CFO in India to watch in 2025.pdf
Astra-Investor- business Presentation (1).pptx
Center Enamel Powering Innovation and Resilience in the Italian Chemical Indu...
Slide gioi thieu VietinBank Quy 2 - 2025
CTG - Business Update 2Q2025 & 6M2025.pptx
2 - Self & Personality 587689213yiuedhwejbmansbeakjrk
1911 Gold Corporate Presentation Aug 2025.pdf
Booking.com The Global AI Sentiment Report 2025
533158074-Saudi-Arabia-Companies-List-Contact.pdf
Susan Semmelmann: Enriching the Lives of others through her Talents and Bless...
#1 Safe and Secure Verified Cash App Accounts for Purchase.pdf
Satish NS: Fostering Innovation and Sustainability: Haier India’s Customer-Ce...

Interaction between Marketing and Production functions.pdf

  • 1. Interaction between Marketing and Production functions Department of Management Information Systems (MIS) MBA, 2nd Semester University of Dhaka Dhaka-1000 Samsul Alam ID: 05-002 Chanchal Molla ID: 05-014 Md. Habibur Rahman ID: 05-032 Md. Mehedi Shamim ID: 05-041 By the Group of Spirit of Unity
  • 2. Curtesy To our honorable Teacher Professor Professor Department of MIS Faculty of Business Studies University of Dhaka Dhaka-1000.
  • 3. Pros and Cons for Simulation- 1(Baseline) Problem Analysis Assumptions for Simulated scenario 1 • The firm has presently 20 sales representative • The marketing dept. generates the order for the products • The production dept. produces and ships the products • Each sale representative generates 10 orders per week • The production department has a fixed total capacity of 400 orders • The production utilization rate is 80% • The revenue per order is £300 • The marketing dept. budget is 15% of the sales total revenues • The weekly salary of a sales representative is £15 per week • The process of recruiting or firing a sales representative takes, on average, 8 weeks • Customers’ tolerance level of the delivery delay is to be 1-6 week
  • 4. Pros and Cons for Simulation- 1(Baseline) Cont… Causal Loop Diagram (CLD)
  • 5. Pros and Cons for Simulation-1(Baseline) Cont… Stock and Flow Diagram
  • 6. Pros and Cons for Simulation-1(Baseline) Cont… A list of model data, and the dimensions of all variables in the model Serial Number Variables Dimensions of Variables Amount 1 Number of Sales Representative Employees 20 2 Hiring/firing Rate Employees 3 Sales Representative Gap Employees 12 4 Targeted Sales Representative Employees 32 5 Sales Representative Based on Marketing Budget Employees 6 Sales Representative Based on Utilization Employees 7 Hiring/firing Delay Weeks 8 8 Delivery Delay Weeks 1-6 9 Order Rate Units 10 Number of Orders Units 320 11 Shipment Rate Units 12 Maximum Production Units 13 Order Per SR Units 10 14 Revenue Per Order United Kingdom Pounds 300 15 Revenue Rate United Kingdom Pounds 16 Total Revenue United Kingdom Pounds 96000 17 Budget Percentage United Kingdom Pounds 0.15 18 Budget Rate United Kingdom Pounds 19 Marketing Budget United Kingdom Pounds 14400 20 Payment Rate United Kingdom Pounds 15
  • 7. Pros and Cons for Simulation-1(Baseline) Cont… Simulated Output Table Weeks MarketingBudget Nooforders NoofSR TotalRevenue BudgetRate Hiring/ Firing Rate OrderRate Payment Rate `RevenueRate Shipment Rate Budget Percent age` Deliver y Delay Hiring/F iring Delay Max Product ion OrderPerSR RevenuePer Order SRBasedon Utilization SR Gap SRBasedon Mkt.Budget Targeted SR Initial 14,400.00 320 20 96,000.00 0.15 6 8 320 10 300 32 12 960 32 1 34,150.10 639 21.43 208,122.40 19,765.10 1.43 320 15 131,887.50 53.3 0.15 6 8 320 10 300 32 10.57 2,276.67 32 2 75,045.77 958 22.69 394,799.23 40,910.67 1.26 320 15 227,587.50 159.67 0.15 6 8 320 10 300 32 9.31 5,003.05 32 3 147,656.69 1,277.00 23.8 645,460.81 72,625.92 1.11 320 15 323,287.50 212.83 0.15 6 8 320 10 300 32 8.2 9,843.78 32 4 261,054.08 1,596.00 24.78 951,035.92 113,412.39 0.98 320 15 418,987.50 266 0.15 6 8 320 10 300 32 7.22 17,403.61 32 5 423,023.11 1,915.00 25.64 1,303,739.39 161,984.03 0.86 320 15 514,687.50 319.16 0.15 6 8 320 10 300 32 6.36 28,201.54 32 6 640,245.23 2,234.00 26.4 1,696,889.77 217,237.12 0.76 320 15 610,387.50 372.33 0.15 6 8 320 10 300 32 5.6 42,683.02 32 7 917,509.81 2,114.38 27.07 2,083,828.94 277,279.58 0.67 320 15 664,218.75 352.33 0.15 6 8 320 10 300 32 4.93 61,167.32 32 8 1,246,773.87 1,675.75 27.66 2,346,993.63 329,279.06 0.59 320 15 592,443.75 279.16 0.15 6 8 320 10 300 32 4.34 83,118.26 32 9 1,605,239.91 918.13 28.17 2,413,481.34 358,481.04 0.52 320 15 424,968.75 153.00 0.15 6 8 320 10 300 32 3.83 107,015.99 32 10 1,959,774.94 1011.12 28.63 2,220,725.06 354,550.03 0.46 320 15 161,793.75 168.50 0.15 6 8 320 10 300 32 3.37 130,651.66 32 11 2,274,595.37 1785.05 29.03 1,905,889.63 314,835.43 0.4 320 15 150000.75 1785.4 0.15 6 8 320 10 300 32 2.97 151,639.69 32
  • 8. Pros and Cons for Simulation-1(Baseline) Cont… Relationship between Targeted SR and Order Rate 12:17 PM Fri, Apr 24, 2015 Relation between No. of SR and Order Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 20 25 30 319 320 321 1: No of Sales Representativ e 2: Order Rate 1 1 1 1 2 2 2 2
  • 9. Pros and Cons for Simulation-1(Baseline) Cont… Relationship between Marketing Budget and Targeted SR 12:20 PM Fri, Apr 24, 2015 Relation Between Mkt. Budget and Target SR Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 0 1500000 3000000 31 32 33 1: Marketing Budget 2: Target SR 1 1 1 1 2 2 2 2
  • 10. Pros and Cons for Simulation-1(Baseline) Cont… Relationship between Delivery Delay and No of Orders 12:20 PM Fri, Apr 24, 2015 Relation Between No. of Orders and Deliv ery Delay Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 0 1500 3000 5 6 7 1: No of orders 2: Deliv ery Delay 1 1 1 1 2 2 2 2
  • 11. Pros and Cons for Simulation-1(Baseline) Cont… Relationship between Targeted SR and Revenue Rate 12:22 PM Fri, Apr 24, 2015 Relation Between No. of SR and Rev enue Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 20 25 30 0 350000 700000 1: No of Sales Representativ e 2: Rev enue Rate 1 1 1 1 2 2 2 2
  • 12. Pros and Cons for Simulation-1(Baseline) Cont… Relationship between Targeted SR and Payment Rate 12:22 PM Fri, Apr 24, 2015 Relation Between No. of SR and Pay ment Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 20 25 30 14 15 16 1: No of Sales Representativ e 2: Pay ment Rate 1 1 1 1 2 2 2 2
  • 13. Pros and Cons for Simulation-1(Baseline) Cont… Relationship between Delivery Delay and Revenue Rate 12:24 PM Fri, Apr 24, 2015 Relation Between Deliv ery Delay and Rev enue Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 5 6 7 0 350000 700000 1: Deliv ery Delay 2: Rev enue Rate 1 1 1 1 2 2 2 2
  • 14. Pros and Cons for Simulation-2 Problem Analysis Assumptions for Simulated scenario 1 • The fraction of revenues to the marketing department is 10%. • There is no recruitment or firing of sales representatives. • The customers’ delivery delay monitoring time is 2 weeks. • The production utilisation fraction is 60%.
  • 15. Pros and Cons for Simulation-2 Cont… Causal Loop Diagram (CLD)
  • 16. Pros and Cons for Simulation-2 Cont… Stock and Flow Diagram
  • 17. Pros and Cons for Simulation-2 Cont… A list of model data, and the dimensions of all variables in the model Serial Number Variables Dimensions of Variables Amount 1 Number of orders Units 240 2 Marketing budget United kingdom pound s 7200 3 Total revenue United kingdom pound 72000 4 Order rate Units 10 5 Revenue rate United kingdom pound 72000 6 Budget rate United kingdom pound 7200 7 Shipment rate Units 8 Payment rate United kingdom pound 15 10 Order per sales representative Units 10 11 Target Sales representative Employees 24 12 SR based on utilization Employees 24 13 Sales representative based on marketing budget Employees 480 14 Maximum production Units 240 15 Budget percentage United Kingdom Pounds .10 16 Revenue per order United Kingdom Pounds 300 17 Delivery delay weeks 2
  • 18. Pros and Cons for Simulation-2 Cont… Simulated Output Table Weeks Marketing Budget Noof orders TotalRevenue BudgetRate OrderRate Paym ent Rate `Revenue Rate Shipment Rate Budget Percentage ` Delivery Delay Max Produ ction Order Per SR Reven ue Per Order SR Based on Utiliz ation SRBased onMkt. Budget TargetedSR Initial 7,200.00 320 72,000.00 0.1 2 240 10 300 24 480 24 1 18,105.17 559 183,967.33 10,920.17 240 15 122,887.50 279.5 0.1 2 240 10 300 24 1,207.01 24 2 42,438.37 798 354,206.63 24,348.20 240 15 194,587.50 399 0.1 2 240 10 300 24 2,829.22 24 3 85,189.50 628.38 537,359.25 42,766.13 240 15 225,918.75 314 0.1 2 240 10 300 24 5,679.30 24 4 143,258.44 219.75 627,419.06 58,083.94 240 15 148,143.75 109.5 0.1 2 240 10 300 24 9,550.56 24 5 205,174.12 305 587,988.38 61,930.68 240 15 22,500.00 152.5 0.1 2 240 10 300 24 13,678.27 24 6 261,789.52 325 531,357.98 56,630.40 240 15 18000 162.5 0.1 2 240 10 300 24 17,452.63 24 7 313,053.85 395 491,708.34 51,279.33 240 15 11,629.69 197.5 0.1 2 240 10 300 24 20,870.26 24 8 362,669.01 405 518,578.18 49,630.16 240 15 76,500.00 202.5 0.1 2 240 10 300 24 24,177.93 24 9 417,524.97 606.23 611,173.62 54,870.96 240 15 147,466.41 303 0.1 2 240 10 300 24 27,835.00 24 10 483,192.19 591.23 731,299.22 65,682.22 240 15 185,807.81 295.5 0.1 2 240 10 300 24 32,212.81 24 11 559,815.82 339.68 808,992.13 76,638.63 240 15 154,331.54 169.5 0.1 2 240 10 300 24 37,321.05 24
  • 19. Pros and Cons for Simulation-2 Cont… Simulated Output Graphs List of the plotted variables in the graph:  Marketing Budget  Revenue Rate  Number of Sales Representative  Order Rate  Targeted Sales Representative  Number of Orders  Delivery Delay  Payment Rate
  • 20. Pros and Cons for Simulation-2 Cont… Relationship between Targeted SR and Order Rate 12:55 PM Fri, Apr 24, 2015 Relationship between Target SR and Order Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 23 24 25 239 240 241 1: Target SR 2: Order Rate 1 1 1 1 2 2 2 2
  • 21. Pros and Cons for Simulation-2 Cont… Relationship between Marketing Budget and Targeted SR 12:56 PM Fri, Apr 24, 2015 Relationship between Mkt. Budget and Target SR Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 0 300000 600000 23 24 25 1: Marketing Budget 2: Target SR 1 1 1 1 2 2 2 2
  • 22. Pros and Cons for Simulation-2 Cont… Relationship between Marketing Budget and Targeted SR 12:56 PM Fri, Apr 24, 2015 Relationship between Mkt. Budget and Target SR Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 0 300000 600000 23 24 25 1: Marketing Budget 2: Target SR 1 1 1 1 2 2 2 2
  • 23. Pros and Cons for Simulation-2 Cont… Relationship between Delivery Delay and No of Orders 12:58 PM Fri, Apr 24, 2015 Relationship between Deliv ery Delay and No. of Orders Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 1 2 3 0 400 800 1: Deliv ery Delay 2: No of orders 1 1 1 1 2 2 2 2
  • 24. Pros and Cons for Simulation-2 Cont… Relationship between Targeted SR and Revenue Rate 12:59 PM Fri, Apr 24, 2015 Relationship between Target SR and Rev enue Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 23 24 25 0 150000 300000 1: Target SR 2: Rev enue Rate 1 1 1 1 2 2 2 2
  • 25. Pros and Cons for Simulation-2 Cont… Relationship between Targeted SR and Payment Rate 12:59 PM Fri, Apr 24, 2015 Relationship between Target SR and Pay ment Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 23 24 25 14 15 16 1: Target SR 2: Pay ment Rate 1 1 1 1 2 2 2 2
  • 26. Pros and Cons for Simulation-2 Cont… Relationship between Delivery Delay and Revenue Rate 1:00 PM Fri, Apr 24, 2015 Relationship between Deliv ery i Delay and Rev enue Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 1 2 3 0 150000 300000 1: Deliv ery Delay 2: Rev enue Rate 1 1 1 1 2 2 2 2
  • 27. Pros and Cons for Simulation-3 Problem Analysis • Assumptions for Simulated scenario 1 • The fraction of revenues to the marketing department is 20%. • There is no recruitment or firing of sales representatives. • The customers’ delivery delay monitoring time is 8 weeks. • The production utilisation fraction is 100%.
  • 28. Pros and Cons for Simulation-3 Cont… Causal Loop Diagram (CLD)
  • 29. Pros and Cons for Simulation-3 Cont… Stock and Flow Diagram
  • 30. Pros and Cons for Simulation-3 Cont… A list of model data, and the dimensions of all variables in the model Serial Number Variables Dimensions of Variables Amount 1 Number of orders Units 400 2 Marketing budget United kingdom pound s 24000 3 Total revenue United kingdom pound 120000 4 Order rate Units 10 5 Revenue rate United kingdom pound 120000 6 Budget rate United kingdom pound 24000 7 Shipment rate Units 8 Payment rate United kingdom pound 15 10 Order per sales representative Units 10 11 Target Sales representative Employees 40 12 SR based on utilization Employees 40 13 Sales representative based on marketing budget Employees 8000 14 Maximum production Units 400 15 Budget percentage United Kingdom Pounds .20 16 Revenue per order United Kingdom Pounds 300 17 Delivery delay weeks 8
  • 31. Pros and Cons for Simulation-3 Cont… Simulated Output Table Weeks Marketing Budget Noof orders TotalRevenue BudgetRate OrderRate Paym ent Rate `Revenue Rate Shipment Rate Budget Percentage ` Delivery Delay Max Produ ction Order Per SR Reven ue Per Order SR Based on Utiliz ation SRBased onMkt. Budget TargetedSR Initial 24,000.00 400 120,000.00 0.2 8 400 10 300 40 1,600.00 40 1 54,684.80 719 230,187.70 30,699.80 400 15 140,887.50 89.88 0.2 8 400 10 300 40 3,645.65 40 2 114,490.71 1,118.00 430,954.29 59,820.92 400 15 260,587.50 139.75 0.2 8 400 10 300 40 7,632.71 40 3 220,219.57 1,517.00 705,497.93 105,743.85 400 15 380,287.50 189.63 0.2 8 400 10 300 40 14,681.30 40 4 385,556.54 1,916.00 1,040,133.46 165,351.98 400 15 499,987.50 239.5 0.2 8 400 10 300 40 25,703.77 40 5 621,648.31 2,315.00 1,423,714.19 236,106.76 400 15 619,687.50 289.38 0.2 8 400 10 300 40 41,443.22 40 6 937,573.89 2,714.00 1,847,161.11 315,940.58 400 15 739,387.50 339.25 0.2 8 400 10 300 40 62,504.93 40 7 1,340,728.22 3,113.00 2,303,079.28 403,169.33 400 15 859,087.50 389.25 0.2 8 400 10 300 40 89,381.88 40 8 1,837,134.52 3,512.00 2,785,445.48 496,421.29 400 15 978,787.50 439 0.2 8 400 10 300 40 122,475.63 40 9 2,430,423.90 3,442.38 3,247,259.85 593,304.39 400 15 1,055,118.75 430.25 0.2 8 400 10 300 40 162,028.26 40 10 3,106,384.43 2,973.75 3,560,628.07 675,975.52 400 15 989,343.75 371.63 0.2 8 400 10 300 40 207,092.30 40 11 3,828,798.26 2,106.13 3,642,067.99 722,428.84 400 15 803,868.75 263.25 0.2 8 400 10 300 40 255,253.22 40
  • 32. Pros and Cons for Simulation-3 Cont… Relationship between Marketing Budget and Revenue Rate 1:07 PM Fri, Apr 24, 2015 Relationship between Mkt. Budget and Rev enue Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 0 2000000 4000000 50000 600000 1150000 1: Marketing Budget 2: Rev enue Rate 1 1 1 1 2 2 2 2
  • 33. Pros and Cons for Simulation-3 Cont… Simulated Output Graphs List of the plotted variables in the graph: • Marketing Budget • Revenue Rate • Number of Sales Representative • Order Rate • Targeted Sales Representative • Number of Orders • Delivery Delay • Payment Rate
  • 34. Pros and Cons for Simulation-3 Cont… Relationship between Targeted SR and Order Rate 1:08 PM Fri, Apr 24, 2015 Relationship between Target SR and Order Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 39 40 41 399 400 401 1: Target SR 2: Order Rate 1 1 1 1 2 2 2 2
  • 35. Pros and Cons for Simulation-3 Cont… Relationship between Marketing Budget and Targeted SR 1:09 PM Fri, Apr 24, 2015 Relationship between Mkt. Budget and Target SR Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 0 2000000 4000000 39 40 41 1: Marketing Budget 2: Target SR 1 1 1 1 2 2 2 2
  • 36. Pros and Cons for Simulation-3 Cont… Relationship between Delivery Delay and No of Orders 1:10 PM Fri, Apr 24, 2015 Relationship between Deliv ery Delay and No of Orders Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 7 8 9 0 2000 4000 1: Deliv ery Delay 2: No of orders 1 1 1 1 2 2 2 2
  • 37. Pros and Cons for Simulation-3 Cont… Relationship between Targeted SR and Revenue Rate 1:11 PM Fri, Apr 24, 2015 Relationship between Target SR and Rev enue Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 39 40 41 50000 600000 1150000 1: Target SR 2: Rev enue Rate 1 1 1 1 2 2 2 2
  • 38. Pros and Cons for Simulation-3 Cont… Relationship between Targeted SR and Payment Rate 1:12 PM Fri, Apr 24, 2015 Relationship between Target SR and Pay ment Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 39 40 41 14 15 16 1: Target SR 2: Pay ment Rate 1 1 1 1 2 2 2 2
  • 39. Pros and Cons for Simulation-3 Cont… Relationship between Delivery Delay and Revenue Rate 1:13 PM Fri, Apr 24, 2015 Relationship between Deliv ery Delay and Rev enue Rate Page 1 1.00 3.75 6.50 9.25 12.00 Weeks 1: 1: 1: 2: 2: 2: 7 8 9 50000 600000 1150000 1: Deliv ery Delay 2: Rev enue Rate 1 1 1 1 2 2 2 2
  • 40. Findings • The increased marketing budget is the cause of increased amount of revenues • The increased revenues are the cause of the increased order rate and sales representatives • The hiring rate is 2 SR per week and there is no firing (For Baseline Simulation) • Shipment rate is the function of no of orders and delivery delay • Minimizing the delivery delay increases the shipment Rate and no. of orders • Exceeding the maximum capacity brings diseconomies of scale in the organization • Customer order is affected by the multiple variables e.g. Customer interest, reputation, delivery delay, no. of sales representatives • Maximum capacity determines the targeted no. of sales representatives • In case of 100% and 60% utilization, no hiring decision is wrong since the organization has only 20 SR
  • 41. Recommendations • Organization should not recruit employee ignoring the maximum capacity because it will require extra machineries and employees • Organization should maintain the proper range of delivery delay to retain the customers and increase the reputation • Organization should maintain a proper capacity cushion (Reserved Capacity) for the variability of demand • Organization should minimize the hiring/firing delay to minimize the overall cost • To increase the utilization rate above 50%, it must hire new employees • Organization should maintain hiring decision in case of 100% and 60% utilization rate to meet the extra demand