This document provides an introduction to advanced tunnel formwork systems used in construction. It discusses:
- The benefits of tunnel formwork in reducing construction time and costs compared to traditional formwork methods.
- The key components of tunnel formwork systems including vertical panels, platforms, and props.
- How the tunnel formwork system allows continuous pouring of walls and slabs in one operation to achieve a 1-3 day slab cycle.
- A case study of a real estate project in Pune, India where tunnel formwork was used to construct high-rise apartment towers, reducing construction timelines.
- Conclusions that while tunnel formwork requires higher initial investment, it provides faster returns and overall becomes more economical