RESEARCH ON DESIGN OF SEMI-POLYGONAL SEGMENT OF SUBMERGED
FLOATING TUNNEL
M S S Krishna Shanmukha1, J Purna Chandra Rao2
1 Student, Department of Civil Engineering, SRK Institute of Technology, Vijayawada, Andhra Pradesh, India,
2Assistant Professor, Department of Civil Engineering, SRK Institute of Technology, Vijayawada,
Andhra Pradesh, India
-----------------------------------------------------------------------***--------------------------------------------------------------------
Abstract - From the mid of 19th century, many countries
initiated their research on this typical project called
Submerged FloatingTunnel(SFT). This structureissubmerged
in the water and eventually floats with the help of large sized
pontoons and tethers. This conceptual design is given
according to the safety, economy, fine appearance,
waterproofing, applicability and environmentalprotection. In
this design it describes the other factors like corrosion
resistance, design of joints between the sections and type of
ventilation. The main consideration in this research is about
the structure’s buoyancy and it issuccessfullysatisfiedwhichis
the key factor for tunnel to float with the help of pontoons.
This paper provides the applicable and meaningful
suggestions regarding thedesignofsubmergedfloatingtunnel
which includes both architectural and structural designofthe
tunnel and pontoons.
Key Words: Archimedes Bridge, Buoyancy, Pontoons,
Submerged floating tunnel.
1. INTRODUCTION
Submerged Floating Tunnel is ingenious structure used to
cross the water bodies which have greater bed depths and
this structure is different from traditional concrete bridges
supported with columns and the bridges which are
suspended or anchored. This tunnel floats because of
buoyancy and is suspended in place by means of tethers or
bracings between the two tunnels.
1.1 Supremacy of the tunnel:
 It doesn't obstruct any naval transportation.
 Distance and Time of travel for the destination
decreases.
 There will be minimal amount of slope, vertical and
horizontal gradients.
 It is an all-weather construction and doesn’t get
effected by the change of climate.
 The cost of construction of the tunnel segments
doesn't increase with an increase in the tunnel
length.
 The design of this tunnel includes high knowledge
on the different topics including materials sciences,
waterproofing of concrete, seismic analysis and
hydrology etc.
1.2 Codes used for Design:
 For the designing of practically possible and
sustainable tunnel segments IS: 5878 (Part IV)-
1971t is the code used for the design and
construction of the tunnel segments of SFT.
 For the resistance and durability against the waves
IS 4651-3 (1974) Part III is used for thedesigningof
the water exposed part of the tunnel.
 For the provision of ventilation, lighting and
dewatering of the tunnel IS 5878-2-2 Part II Section
2 is the code taken into consideration.
 IS SP 35 1987 is the code used for the plumbing
elements inside the tunnel.
 IS 8147 is the code used for the designing water
proofing and outermost layer of the tunnel segment
which is made up of aluminum alloy.
3. Preliminary survey of the materials:
3.1 Aluminum 6061:
This is an aluminum alloy which has high resistance to the
pressures and its tensile strength is high compared to the
different types of steel. It also overtakes many metals and
alloys when considering the resistivityagainstthecorrosion.
The main reason behind this is thatthepercentageofferrous
composition is less than 0.7, so that the metal doesn’t get
oxidized.
Usually, this material is used in the in the fittings of
airplanes, ships and in pistons. In this project,
aluminium6061 has been used as the outer covering for the
tunnel, to protect inner layer of concrete from deterioration
and wave action. Other properties including physical,
mechanical and thermal are perfectly satisfied to use this
material for water proofing and outermost cover for the
tunnel.
3.2 Concrete:
In this design, [1] reinforced concrete has been used in the
main structural components like tunnel outer segments,
shear walls, beams, columns and for traffic deck.Aportion of
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 08 Issue: 01 | Jan 2021 www.irjet.net p-ISSN: 2395-0072
© 2021, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 232
reinforced cement is used in the construction of footpaths,
platforms, supporting beams and in the concrete shafts.
M50 grade reinforced concrete is made use of in the
construction of tunnel segments and shear walls.
M30 grade partially reinforced concrete is used for
sidewalks or footpaths.
M40 grade Reinforced Cement Concretepavementisusedas
traffic flowing deck in this tunnel.
3.3 Steel:
Steel is mainly used in reinforcement and some of the steel
cables are attached to the pontoon as an extra support.
For the reinforcement Fe 550 is used as the structural
contains n number of tension members.
As the steel cables are exposed to water, they are coated
with the aluminum alloy or by the use of nano coating
procedure.
3.4 Construction Foam:
Construction foam blocks are used as insulating and filling
materials to reduce the usage of concreteandtopromote the
light weight structures. In this design ExpandedPolystyrene
(EPS)46 grade has been used. It is used as [8] filler material
in the platforms, shaft. In pontoon it is used to increase the
ability of floating.
4. Calculating the Ratio of Buoyancy to Weight:
The ratio of the tunnel should be in the range of 0.5 to 0.8. As
it is not possible to construct to full tunnel assinglesegment,
the design of tunnel segments has been done using different
lengths.
 100 meters tunnel segments as the initial and final
segment and for connection to the shore or land.
 250 meters tunnel segments are used all over
except in the center of the river and this width is
helpful for passage of small yachtsandfishingboats.
 450 meters tunnel segment is used inthemiddlefor
passage of cruise and cargo ships.
4.1 For 100 meters:
For the calculation of buoyancy to weight ratio we should
assume the volume of each structural member which is the
multiplied by the densityofthematerial usedinconstruction
of structural element.
Let us assume the Buoyancy Force (v×ρ×g) is 35×103 KN.
Some of the structural and mechanical elements like
Aluminum – 6061 lining, Concrete lining, Concrete Deck,
Shear Wall, Footing, Foot Path, High Speed Electric Train,
Platform, Heavy Load Truck, Light Weight Vehicles and 4
Wheelers contribute the maximum weight of the structure.
For the above structural and mechanical the total weight of
tunnel will around 45×103 KN.
The Buoyancy to Weight ratio of the tunnel is 0.75 which
satisfies the assumption of the previous researches.
Assuming the pontoon of dimensions 80×34×12 could
possess the weight of 13×103 KN and its buoyancy will be
around 32×103 KN.
So, the total weight to be balanced by Pontoon Buoyancy is
(12.7+45-35) ×103 which is equal to 22.7×103 KN.
Considering ‘h’ be depth of submerged Pontoon.
So, h = 22.7×107/2.7×107= 8.7 mts,
h = 8.7 m. So, in equilibrium state 8.7m depth will be
submerged of a total height = 12m.
Total buoyancy of tunnel and pontoon to Total weight of
tunnel and pontoon ratio ~ 1.17.
If the ratio of buoyancy to weight for any object is greater or
equal to 1, it will float and the designed tunnel segment will
submerge up to 8.7m from mean sea-level.
The calculation is similar for 250 and 450-meter segments
only difference is the above values buoyancy and weight
values are multiplied by 2.5 and 4.5.
For 250 meters, the height of submersion of the tunnel will
be around 1.19 meter from mean sea-level.
For 450 meters of tunnel section, the height of submersion
will be around 1.78 meter from mean sea level and a couple
of pontoons are placed at both ends.
5. Submerged Floating Tunnel Design Model:
5.1 Tunnel layers:
In this design tunnel consists of two layers, first layers is
made of aluminum 6065 of 0.5 to 1-meter thickness and this
layer is exposed to the surrounding water. The second layer
made use of reinforced concrete inside the aluminum layer
with 1meter thickness. These two layers were continued
throughout the tunnel length.
5.2 Roadway:
For this, the design used two types of decks;firstoneis made
of traditional reinforced concrete and finished with asphalt
and the second type deck is made of steel this is helpful for
ease of construction and carrying. Thickness of the deck
should be around 0.5 to 1 meters, as conventional slab and
asphalt layers should be finished with thickness not greater
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 08 Issue: 01 | Jan 2021 www.irjet.net p-ISSN: 2395-0072
© 2021, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 233
than 0.075 meters. The deck is of width 13 meters with 3
lanes for free flow of traffic.
5.3 Sidewalks:
This design consists of a couple of sidewalks [3] on both
sides of the pavement with the widths 1 meter on the left
and 2 meters on the right and each with thickness 1 meter.
These can be made of full concrete and steel or can be made
of construction foam and finished with concrete over the
surface with thickness of 0.1 meters.
All the above-mentioned tunnel elements should be
constructed throughout the tunnel segments. Some of the
tunnel elements are given belowwhichareto beconstructed
at some stipulated place depending upon the need and for
supporting the load.
5.4 Shear walls:
These are placed under the deck as a vertical support to
control the deformation of the deck due to traffic loading.
For shear wall, dimensions for heightandwidthare6meters
and 2 meters respectively. Theseshear wallsdimensionscan
be modified depending upon the type of load acting over the
deck.
[4] Some of the other elements like supporting columns and
beams of dimensions 1meter×1meterareused.Columns are
placed for every 7.5 meters in Z- direction.
5.5 Platforms:
These are constructed in the partition cell at the corner of
the concrete layer with construction foam inside and are
finished with concrete of thickness 0.1 meter. Overall
dimensions of the platform are height of 3 meter and width
of 1.8 to 2 meter.
5.6 Stair cases:
These are used for movement between the two levels of
tunnels. These are shafted in the sidewalks with required
dimensions.
5.7 Shafts:
These are the cylindrical supporting connections between
the tunnel and pontoon which resist the tunnel movement
and drowning, Shafts are made of two layers same as tunnel
with aluminum and highly reinforced concrete. Overallshaft
diameter is 8 meters. Aluminum layers is made up with the
thickness of 0.5 thickness and concrete layerofthickness 4.5
to 5.5 meters and the remaining is filled with ventilation
ducts, power cables and with construction foam for
insulation. The height of the shafts should be max of 20
meters.
5.8 Pontoons:
These are connected at the shaft top and the outer layer is
made of aluminum, later total area is filledwithconstruction
foam for floating and to support buoyancy. The dimensions
of the pontoons are 80×34×12 meters with respective to
length, breadth and height.
6. Mechanical, Electrical and Plumbing (MEP)
Equipment:
[5] Mechanical systems present in this tunnel design are
elevators, escalators, ventilation fans or ducts and the
locomotive train.
Electrical systems present in this tunnel include the overall
lighting of the tunnel, power supply boards, and generator
electric connections.
Plumbing systems in this tunnel are water drainingsystems,
hoses of drinking water and restrooms etc.
The overall cross-sectional view of thetunnel fromthenorth
direction are shown in the Fig (1) and the cross-sectional
view of the shaft is shown in the Fig (2).
Fig(1)
Fig(2)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 08 Issue: 01 | Jan 2021 www.irjet.net p-ISSN: 2395-0072
© 2021, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 234
*all the above values are in meters
7. Advantages of the design:
7.1 Levels:
This design consists of two levels in tunnel where top level
consists of only a deck and foot paths and bottom level is
partitioned into two parts where one side is given for
medical emergencies and transportation on road and other
side is given for railway transportation.
7.2 Ventilation:
Ventilation can be provided in both horizontal and vertical
ways. But in this design, we areprovidingvertical ventilation
and the ventilation fans and ducts are fixed to the tunnel
ceiling and end of the hoses are connected to a shaft,
continued up to pontoon.Thequantity anddimensionsof the
axial fans are determined after the calculation of different
factors like amount of production of smog, carbonmonoxide
in normal working condition and in damaged or destructive
condition. In that emergency cases we can use jet fans for
fast diffusion of gases.
All the electrical and plumbing works are to be implanted in
the concrete lining of the tunnel for safety and aestheticlook
of the tunnel.
8. Conclusion:
As [6] the submerged floating tunnel is a complicated
structure and there is no practical construction done, there
is so much of possibility for researches on this structure.
This paper has done research on the polygonal tube design
of the tunnel, materials, corrosion resistance, ventilation,
waterproofing and various calculations like buoyancy to
weight ratio of tunnel and pontoons. Other elements like
structural analysis, joint design is to be studied further for
practical applicability.
REFERENCES
[1]https://www.worldscientific.com/worldscibooks/10.114
2/5300
[2]https://www.sciencedirect.com/science/article/pii/B97
8075068987800010X
[3]https://ph.bornpottytrained.com/5659-how-to-lay-
paving-tiles-yourself.html
[4]https://www.sciencedirect.com/science/article/abs/pii/
S0886779897900158
[5]https://issuu.com/iabse.secretariat/docs/19_2018_marc
h_vol_48_no_1
[6] https://www.engineeringcivil.com/submerged-floating-
tunnel.html
BIOGRAPHIES
M S S Krishna Shanmukha,
B.Tech Student,
Major field aspect in Structural
Engineering.
J Purna Chandra Rao,
M.Tech, Assistant Professor,
Major Field aspect in
Environmental Engineering.

More Related Content

PDF
IRJET - Development and Mechanical Testing of Bagasse and Coconut Coir Hybrid...
PDF
IRJET - Design & Optimization of Screw Compressor Housing Thickness
PDF
Reduction of Splatters in Intercell Welding of a Lead Acid Battery
PDF
Uses of Plastic Waste in Road Construction in Maiduguri
PDF
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
PDF
IRJET-Structural behaviour of Prestressed Box Girder Bridge with Variation of...
PDF
IRJET- A Study on Influence of Graphene Oxide Powder on Compressive Strength ...
PDF
Effect of Fly Ash and Polymer on Compressive Strength of Concrete
IRJET - Development and Mechanical Testing of Bagasse and Coconut Coir Hybrid...
IRJET - Design & Optimization of Screw Compressor Housing Thickness
Reduction of Splatters in Intercell Welding of a Lead Acid Battery
Uses of Plastic Waste in Road Construction in Maiduguri
MODELLING AND VIBRATION ANALYSIS OF REINFORCED CONCRETE BRIDGE
IRJET-Structural behaviour of Prestressed Box Girder Bridge with Variation of...
IRJET- A Study on Influence of Graphene Oxide Powder on Compressive Strength ...
Effect of Fly Ash and Polymer on Compressive Strength of Concrete

What's hot (20)

PDF
REVIEW ON PROCESS PARAMETER OPTIMIZATION FOR FORGING PROCESS
PDF
Optimization of energy in public buildings
PDF
IRJET- Experimental Investigation of Wear Behaviour of Aluminium Metal Matrix...
PDF
Effect on Compressive and Tensile Strength of Cement Concrete Road Pavements ...
PDF
MECHANICAL RECYCLING OF CFRP ALONG WITH CASE STUDY OF BICYCLE FRAME
PDF
IRJET- Experimental Investigation on Concrete by Partial Replacement of Coars...
PDF
Analysis of Prestressed Concrete Girder for Bridges
PDF
Study on Integral Bridge with Composite deck for IRC Standards
PDF
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
PDF
IRJET- Determination of Fracture Parameters of Self-Compacting Lightweight Co...
PDF
IRJET- Characteristic Strength of Polymer Impregnated Concrete
PDF
IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...
PDF
IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...
PDF
Utilization of iron ore tailings as replacement to
PDF
A comparative study on effect of basic oxygen furnace slag and iron cutting w...
PDF
IRJET- Experimental Study on Partial Replacement of Cement with Fly Ash and F...
PDF
IRJET- Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...
PDF
IRJET- Comparative Study on the Characteristic Behaviour of CFDSST, CFDSSAT &...
PDF
Utilization of Demolished Concrete Waste for New Construction and Evaluation ...
PDF
IRJET- A Comparative Study on Strength and Durability of Concrete using Coppe...
REVIEW ON PROCESS PARAMETER OPTIMIZATION FOR FORGING PROCESS
Optimization of energy in public buildings
IRJET- Experimental Investigation of Wear Behaviour of Aluminium Metal Matrix...
Effect on Compressive and Tensile Strength of Cement Concrete Road Pavements ...
MECHANICAL RECYCLING OF CFRP ALONG WITH CASE STUDY OF BICYCLE FRAME
IRJET- Experimental Investigation on Concrete by Partial Replacement of Coars...
Analysis of Prestressed Concrete Girder for Bridges
Study on Integral Bridge with Composite deck for IRC Standards
IRJET- Design of a Prestressed Concrete Bridge and Analysis by CSiBridge
IRJET- Determination of Fracture Parameters of Self-Compacting Lightweight Co...
IRJET- Characteristic Strength of Polymer Impregnated Concrete
IRJET-Investigation and Analysis of Effect of Admixtures over the Strength of...
IRJET- Replacement of Course and Fine Aggregates in Concrete by using Mangalo...
Utilization of iron ore tailings as replacement to
A comparative study on effect of basic oxygen furnace slag and iron cutting w...
IRJET- Experimental Study on Partial Replacement of Cement with Fly Ash and F...
IRJET- Behavior of Ultra High Performance Concrete (UHPC) and Normal Conc...
IRJET- Comparative Study on the Characteristic Behaviour of CFDSST, CFDSSAT &...
Utilization of Demolished Concrete Waste for New Construction and Evaluation ...
IRJET- A Comparative Study on Strength and Durability of Concrete using Coppe...
Ad

Similar to IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tunnel (20)

PPTX
Submerged floating tunnel
PPT
Submerged floating tunnel ppt
PPTX
SUBMERGED FLOATING TUNNEL Civil engineering presentation
DOCX
Submerged Floating Tunnel by Shantanu Patil
PPTX
Nikhil Gopi.doc.pptx
PDF
Design of Floating Bridge Cross Over
PPTX
409967709-Submerged-Floating-tunnel.pptx
PPT
Floating tunnel
PPTX
floating tunnels
PPT
THE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
PPTX
Submerged floating tunnel
PPTX
SUBMERGED FLOATING TUNNEL
PPTX
RMT Group5 presentation.pptx
PPTX
SUBMERGED FLOATING TUNNEL,COMPETITIVE FEATURES OF SFT CASE STUDY ON A SFT : T...
PDF
Design of Horse-Shoe Shaped Cross Passage for a Twin Tunnel System
PPTX
Busan geoje fixed link
PPTX
PPT
Submerged tunnel technical seminar
PPTX
Submerged Floating Tunnel
PDF
Immersed tunnels Proposal Mumbai, India
Submerged floating tunnel
Submerged floating tunnel ppt
SUBMERGED FLOATING TUNNEL Civil engineering presentation
Submerged Floating Tunnel by Shantanu Patil
Nikhil Gopi.doc.pptx
Design of Floating Bridge Cross Over
409967709-Submerged-Floating-tunnel.pptx
Floating tunnel
floating tunnels
THE INTRODUCTION OF SUBMERGED FLOATING TUNNELS
Submerged floating tunnel
SUBMERGED FLOATING TUNNEL
RMT Group5 presentation.pptx
SUBMERGED FLOATING TUNNEL,COMPETITIVE FEATURES OF SFT CASE STUDY ON A SFT : T...
Design of Horse-Shoe Shaped Cross Passage for a Twin Tunnel System
Busan geoje fixed link
Submerged tunnel technical seminar
Submerged Floating Tunnel
Immersed tunnels Proposal Mumbai, India
Ad

More from IRJET Journal (20)

PDF
Enhanced heart disease prediction using SKNDGR ensemble Machine Learning Model
PDF
Utilizing Biomedical Waste for Sustainable Brick Manufacturing: A Novel Appro...
PDF
Kiona – A Smart Society Automation Project
PDF
DESIGN AND DEVELOPMENT OF BATTERY THERMAL MANAGEMENT SYSTEM USING PHASE CHANG...
PDF
Invest in Innovation: Empowering Ideas through Blockchain Based Crowdfunding
PDF
SPACE WATCH YOUR REAL-TIME SPACE INFORMATION HUB
PDF
A Review on Influence of Fluid Viscous Damper on The Behaviour of Multi-store...
PDF
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
PDF
Explainable AI(XAI) using LIME and Disease Detection in Mango Leaf by Transfe...
PDF
BRAIN TUMOUR DETECTION AND CLASSIFICATION
PDF
The Project Manager as an ambassador of the contract. The case of NEC4 ECC co...
PDF
"Enhanced Heat Transfer Performance in Shell and Tube Heat Exchangers: A CFD ...
PDF
Advancements in CFD Analysis of Shell and Tube Heat Exchangers with Nanofluid...
PDF
Breast Cancer Detection using Computer Vision
PDF
Auto-Charging E-Vehicle with its battery Management.
PDF
Analysis of high energy charge particle in the Heliosphere
PDF
A Novel System for Recommending Agricultural Crops Using Machine Learning App...
PDF
Auto-Charging E-Vehicle with its battery Management.
PDF
Analysis of high energy charge particle in the Heliosphere
PDF
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Enhanced heart disease prediction using SKNDGR ensemble Machine Learning Model
Utilizing Biomedical Waste for Sustainable Brick Manufacturing: A Novel Appro...
Kiona – A Smart Society Automation Project
DESIGN AND DEVELOPMENT OF BATTERY THERMAL MANAGEMENT SYSTEM USING PHASE CHANG...
Invest in Innovation: Empowering Ideas through Blockchain Based Crowdfunding
SPACE WATCH YOUR REAL-TIME SPACE INFORMATION HUB
A Review on Influence of Fluid Viscous Damper on The Behaviour of Multi-store...
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Explainable AI(XAI) using LIME and Disease Detection in Mango Leaf by Transfe...
BRAIN TUMOUR DETECTION AND CLASSIFICATION
The Project Manager as an ambassador of the contract. The case of NEC4 ECC co...
"Enhanced Heat Transfer Performance in Shell and Tube Heat Exchangers: A CFD ...
Advancements in CFD Analysis of Shell and Tube Heat Exchangers with Nanofluid...
Breast Cancer Detection using Computer Vision
Auto-Charging E-Vehicle with its battery Management.
Analysis of high energy charge particle in the Heliosphere
A Novel System for Recommending Agricultural Crops Using Machine Learning App...
Auto-Charging E-Vehicle with its battery Management.
Analysis of high energy charge particle in the Heliosphere
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...

Recently uploaded (20)

PPTX
Geodesy 1.pptx...............................................
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
composite construction of structures.pdf
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPT
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
PPT
Project quality management in manufacturing
PPTX
Sustainable Sites - Green Building Construction
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PDF
PPT on Performance Review to get promotions
PPTX
additive manufacturing of ss316l using mig welding
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
Model Code of Practice - Construction Work - 21102022 .pdf
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
DOCX
573137875-Attendance-Management-System-original
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
Geodesy 1.pptx...............................................
UNIT-1 - COAL BASED THERMAL POWER PLANTS
composite construction of structures.pdf
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
CRASH COURSE IN ALTERNATIVE PLUMBING CLASS
Project quality management in manufacturing
Sustainable Sites - Green Building Construction
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPT on Performance Review to get promotions
additive manufacturing of ss316l using mig welding
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
Model Code of Practice - Construction Work - 21102022 .pdf
UNIT 4 Total Quality Management .pptx
Foundation to blockchain - A guide to Blockchain Tech
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
573137875-Attendance-Management-System-original
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx

IRJET - Research on Design of Semi-Polygonal Segment of Submerged Floating Tunnel

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 08 Issue: 01 | Jan 2021 www.irjet.net p-ISSN: 2395-0072 © 2021, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 231 RESEARCH ON DESIGN OF SEMI-POLYGONAL SEGMENT OF SUBMERGED FLOATING TUNNEL M S S Krishna Shanmukha1, J Purna Chandra Rao2 1 Student, Department of Civil Engineering, SRK Institute of Technology, Vijayawada, Andhra Pradesh, India, 2Assistant Professor, Department of Civil Engineering, SRK Institute of Technology, Vijayawada, Andhra Pradesh, India -----------------------------------------------------------------------***-------------------------------------------------------------------- Abstract - From the mid of 19th century, many countries initiated their research on this typical project called Submerged FloatingTunnel(SFT). This structureissubmerged in the water and eventually floats with the help of large sized pontoons and tethers. This conceptual design is given according to the safety, economy, fine appearance, waterproofing, applicability and environmentalprotection. In this design it describes the other factors like corrosion resistance, design of joints between the sections and type of ventilation. The main consideration in this research is about the structure’s buoyancy and it issuccessfullysatisfiedwhichis the key factor for tunnel to float with the help of pontoons. This paper provides the applicable and meaningful suggestions regarding thedesignofsubmergedfloatingtunnel which includes both architectural and structural designofthe tunnel and pontoons. Key Words: Archimedes Bridge, Buoyancy, Pontoons, Submerged floating tunnel. 1. INTRODUCTION Submerged Floating Tunnel is ingenious structure used to cross the water bodies which have greater bed depths and this structure is different from traditional concrete bridges supported with columns and the bridges which are suspended or anchored. This tunnel floats because of buoyancy and is suspended in place by means of tethers or bracings between the two tunnels. 1.1 Supremacy of the tunnel:  It doesn't obstruct any naval transportation.  Distance and Time of travel for the destination decreases.  There will be minimal amount of slope, vertical and horizontal gradients.  It is an all-weather construction and doesn’t get effected by the change of climate.  The cost of construction of the tunnel segments doesn't increase with an increase in the tunnel length.  The design of this tunnel includes high knowledge on the different topics including materials sciences, waterproofing of concrete, seismic analysis and hydrology etc. 1.2 Codes used for Design:  For the designing of practically possible and sustainable tunnel segments IS: 5878 (Part IV)- 1971t is the code used for the design and construction of the tunnel segments of SFT.  For the resistance and durability against the waves IS 4651-3 (1974) Part III is used for thedesigningof the water exposed part of the tunnel.  For the provision of ventilation, lighting and dewatering of the tunnel IS 5878-2-2 Part II Section 2 is the code taken into consideration.  IS SP 35 1987 is the code used for the plumbing elements inside the tunnel.  IS 8147 is the code used for the designing water proofing and outermost layer of the tunnel segment which is made up of aluminum alloy. 3. Preliminary survey of the materials: 3.1 Aluminum 6061: This is an aluminum alloy which has high resistance to the pressures and its tensile strength is high compared to the different types of steel. It also overtakes many metals and alloys when considering the resistivityagainstthecorrosion. The main reason behind this is thatthepercentageofferrous composition is less than 0.7, so that the metal doesn’t get oxidized. Usually, this material is used in the in the fittings of airplanes, ships and in pistons. In this project, aluminium6061 has been used as the outer covering for the tunnel, to protect inner layer of concrete from deterioration and wave action. Other properties including physical, mechanical and thermal are perfectly satisfied to use this material for water proofing and outermost cover for the tunnel. 3.2 Concrete: In this design, [1] reinforced concrete has been used in the main structural components like tunnel outer segments, shear walls, beams, columns and for traffic deck.Aportion of
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 08 Issue: 01 | Jan 2021 www.irjet.net p-ISSN: 2395-0072 © 2021, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 232 reinforced cement is used in the construction of footpaths, platforms, supporting beams and in the concrete shafts. M50 grade reinforced concrete is made use of in the construction of tunnel segments and shear walls. M30 grade partially reinforced concrete is used for sidewalks or footpaths. M40 grade Reinforced Cement Concretepavementisusedas traffic flowing deck in this tunnel. 3.3 Steel: Steel is mainly used in reinforcement and some of the steel cables are attached to the pontoon as an extra support. For the reinforcement Fe 550 is used as the structural contains n number of tension members. As the steel cables are exposed to water, they are coated with the aluminum alloy or by the use of nano coating procedure. 3.4 Construction Foam: Construction foam blocks are used as insulating and filling materials to reduce the usage of concreteandtopromote the light weight structures. In this design ExpandedPolystyrene (EPS)46 grade has been used. It is used as [8] filler material in the platforms, shaft. In pontoon it is used to increase the ability of floating. 4. Calculating the Ratio of Buoyancy to Weight: The ratio of the tunnel should be in the range of 0.5 to 0.8. As it is not possible to construct to full tunnel assinglesegment, the design of tunnel segments has been done using different lengths.  100 meters tunnel segments as the initial and final segment and for connection to the shore or land.  250 meters tunnel segments are used all over except in the center of the river and this width is helpful for passage of small yachtsandfishingboats.  450 meters tunnel segment is used inthemiddlefor passage of cruise and cargo ships. 4.1 For 100 meters: For the calculation of buoyancy to weight ratio we should assume the volume of each structural member which is the multiplied by the densityofthematerial usedinconstruction of structural element. Let us assume the Buoyancy Force (v×ρ×g) is 35×103 KN. Some of the structural and mechanical elements like Aluminum – 6061 lining, Concrete lining, Concrete Deck, Shear Wall, Footing, Foot Path, High Speed Electric Train, Platform, Heavy Load Truck, Light Weight Vehicles and 4 Wheelers contribute the maximum weight of the structure. For the above structural and mechanical the total weight of tunnel will around 45×103 KN. The Buoyancy to Weight ratio of the tunnel is 0.75 which satisfies the assumption of the previous researches. Assuming the pontoon of dimensions 80×34×12 could possess the weight of 13×103 KN and its buoyancy will be around 32×103 KN. So, the total weight to be balanced by Pontoon Buoyancy is (12.7+45-35) ×103 which is equal to 22.7×103 KN. Considering ‘h’ be depth of submerged Pontoon. So, h = 22.7×107/2.7×107= 8.7 mts, h = 8.7 m. So, in equilibrium state 8.7m depth will be submerged of a total height = 12m. Total buoyancy of tunnel and pontoon to Total weight of tunnel and pontoon ratio ~ 1.17. If the ratio of buoyancy to weight for any object is greater or equal to 1, it will float and the designed tunnel segment will submerge up to 8.7m from mean sea-level. The calculation is similar for 250 and 450-meter segments only difference is the above values buoyancy and weight values are multiplied by 2.5 and 4.5. For 250 meters, the height of submersion of the tunnel will be around 1.19 meter from mean sea-level. For 450 meters of tunnel section, the height of submersion will be around 1.78 meter from mean sea level and a couple of pontoons are placed at both ends. 5. Submerged Floating Tunnel Design Model: 5.1 Tunnel layers: In this design tunnel consists of two layers, first layers is made of aluminum 6065 of 0.5 to 1-meter thickness and this layer is exposed to the surrounding water. The second layer made use of reinforced concrete inside the aluminum layer with 1meter thickness. These two layers were continued throughout the tunnel length. 5.2 Roadway: For this, the design used two types of decks;firstoneis made of traditional reinforced concrete and finished with asphalt and the second type deck is made of steel this is helpful for ease of construction and carrying. Thickness of the deck should be around 0.5 to 1 meters, as conventional slab and asphalt layers should be finished with thickness not greater
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 08 Issue: 01 | Jan 2021 www.irjet.net p-ISSN: 2395-0072 © 2021, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 233 than 0.075 meters. The deck is of width 13 meters with 3 lanes for free flow of traffic. 5.3 Sidewalks: This design consists of a couple of sidewalks [3] on both sides of the pavement with the widths 1 meter on the left and 2 meters on the right and each with thickness 1 meter. These can be made of full concrete and steel or can be made of construction foam and finished with concrete over the surface with thickness of 0.1 meters. All the above-mentioned tunnel elements should be constructed throughout the tunnel segments. Some of the tunnel elements are given belowwhichareto beconstructed at some stipulated place depending upon the need and for supporting the load. 5.4 Shear walls: These are placed under the deck as a vertical support to control the deformation of the deck due to traffic loading. For shear wall, dimensions for heightandwidthare6meters and 2 meters respectively. Theseshear wallsdimensionscan be modified depending upon the type of load acting over the deck. [4] Some of the other elements like supporting columns and beams of dimensions 1meter×1meterareused.Columns are placed for every 7.5 meters in Z- direction. 5.5 Platforms: These are constructed in the partition cell at the corner of the concrete layer with construction foam inside and are finished with concrete of thickness 0.1 meter. Overall dimensions of the platform are height of 3 meter and width of 1.8 to 2 meter. 5.6 Stair cases: These are used for movement between the two levels of tunnels. These are shafted in the sidewalks with required dimensions. 5.7 Shafts: These are the cylindrical supporting connections between the tunnel and pontoon which resist the tunnel movement and drowning, Shafts are made of two layers same as tunnel with aluminum and highly reinforced concrete. Overallshaft diameter is 8 meters. Aluminum layers is made up with the thickness of 0.5 thickness and concrete layerofthickness 4.5 to 5.5 meters and the remaining is filled with ventilation ducts, power cables and with construction foam for insulation. The height of the shafts should be max of 20 meters. 5.8 Pontoons: These are connected at the shaft top and the outer layer is made of aluminum, later total area is filledwithconstruction foam for floating and to support buoyancy. The dimensions of the pontoons are 80×34×12 meters with respective to length, breadth and height. 6. Mechanical, Electrical and Plumbing (MEP) Equipment: [5] Mechanical systems present in this tunnel design are elevators, escalators, ventilation fans or ducts and the locomotive train. Electrical systems present in this tunnel include the overall lighting of the tunnel, power supply boards, and generator electric connections. Plumbing systems in this tunnel are water drainingsystems, hoses of drinking water and restrooms etc. The overall cross-sectional view of thetunnel fromthenorth direction are shown in the Fig (1) and the cross-sectional view of the shaft is shown in the Fig (2). Fig(1) Fig(2)
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 08 Issue: 01 | Jan 2021 www.irjet.net p-ISSN: 2395-0072 © 2021, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 234 *all the above values are in meters 7. Advantages of the design: 7.1 Levels: This design consists of two levels in tunnel where top level consists of only a deck and foot paths and bottom level is partitioned into two parts where one side is given for medical emergencies and transportation on road and other side is given for railway transportation. 7.2 Ventilation: Ventilation can be provided in both horizontal and vertical ways. But in this design, we areprovidingvertical ventilation and the ventilation fans and ducts are fixed to the tunnel ceiling and end of the hoses are connected to a shaft, continued up to pontoon.Thequantity anddimensionsof the axial fans are determined after the calculation of different factors like amount of production of smog, carbonmonoxide in normal working condition and in damaged or destructive condition. In that emergency cases we can use jet fans for fast diffusion of gases. All the electrical and plumbing works are to be implanted in the concrete lining of the tunnel for safety and aestheticlook of the tunnel. 8. Conclusion: As [6] the submerged floating tunnel is a complicated structure and there is no practical construction done, there is so much of possibility for researches on this structure. This paper has done research on the polygonal tube design of the tunnel, materials, corrosion resistance, ventilation, waterproofing and various calculations like buoyancy to weight ratio of tunnel and pontoons. Other elements like structural analysis, joint design is to be studied further for practical applicability. REFERENCES [1]https://www.worldscientific.com/worldscibooks/10.114 2/5300 [2]https://www.sciencedirect.com/science/article/pii/B97 8075068987800010X [3]https://ph.bornpottytrained.com/5659-how-to-lay- paving-tiles-yourself.html [4]https://www.sciencedirect.com/science/article/abs/pii/ S0886779897900158 [5]https://issuu.com/iabse.secretariat/docs/19_2018_marc h_vol_48_no_1 [6] https://www.engineeringcivil.com/submerged-floating- tunnel.html BIOGRAPHIES M S S Krishna Shanmukha, B.Tech Student, Major field aspect in Structural Engineering. J Purna Chandra Rao, M.Tech, Assistant Professor, Major Field aspect in Environmental Engineering.