REPORT ON INDUSTRIAL VISIT
TO
GREEN POWER SUGAR
PLANT, GOPUJ, SATARA.
SUBMITTED BY-: SECOND YEAR
MECHANICAL STUDENTS
SARASWATI INSTITUTE OF TECHNOLOGY,
SECTOR-5,BEHIND M.S.E.B SUB STAION,
KHARGHAR,NAVIMUMBAI.410210
PREPARED BY : PANKAJ VASKAR
ROLL NO:- 75,DIV:-B
SUBJECT :- PROFESSIONAL PRACTICS II
Iv report writing
ACKNOWLEDGEMENT :
We take this opportunity to thank our professor SAGAR
KADUsir for giving us an opportunity to go for an
industrial visit .our heartfelt that gratitude also goes out
to green power sugar plant to visit their industry and
guiding us through the various process and machinery
used.A special thank to the employees of green sugar for
Finally heartfelt gratitude to all our classmates for
making this trip a memorable one.
ABOUT COMPANY PROFILE:-
This company is registered under the Maharashtra
society act on 2013 this industry is situated at village
GOPUJ ,taluka khatav satatra. The total capital
investment of this industry is 800 Crs. And annual
turnover is 300 Crs.
ABOUT A GREEN SUGAR INDUSTRIAL VISIT:-
To learn about the process how to made sugar .our
guiders are from that industry itself, very helpful during
the visit and give the knowledge about boiler which is
water tube boiler and its control panel. We were visit
power house of the green sugar and it is very useful to
understand to our student as per academic curriculum
activities.
We are study about the generation of power with steam
turbine and seen turbine generator coupling for power
generation and learn about generator generation
capacity of 14 mw and turbine is reaction type. And also
Learn about the control panel working and function and
indicating of symbols.
At end of the process learn the packaging machine and
test sweet sugar.
STEPS TO PRODUCE SUGAR FROM SUGAR CANE
The major unit operations are shownin figure these
are
1. Extraction of juice
2. Clarification
3. Evaporation
4. Crystallization
5. Centrifugation
ABOUT STEAM POWER PLANT:-
We visited the power plant and their we seen the
counstruction true power plant which was divided into
three main parts.
1)TURBINE
2)GEAR BOX
3) GENRATOR
WORKING:-
In thermal power staion fuel such as coal ,oil,gas is
burned in furnace to produce heat –chemical to heat
energy.this heat is used to change water into steam in
the boiler. This drives the genrater to produce electricity-
kinetic to electrical energy
It generates out 14 MW power in 8 hours. Very
first the needed amount of electricity is utilized by the
industry and the remaining electricity is distributed to
the government of Maharashtra .
All the students were glad to know this fact and all were
very much exited to listen something more about this
power generator and all the students were alloweded to
move into the cabin to show the full working of power
plant in computer.
CLICK IMAGES OF STEAM TURBINE
COOLING TOWER:-
WATER TUBE BOILER
CONCLUSION :-
We study about all the boiler and how power
plant works as well as how steam is produce with help of
water tube boiler , working of turbine too.
All the students have camly heard all the instructions and
Took up the necessary information about the industry
student enjoyed their industrial visit and they thankful to
the professor sagar kadu to give up the kind opportunity
to visit wonderful industry.

More Related Content

PPTX
Biopharamceuticals from plants
PPTX
Strategies to enhance production of secondary metabolites
PPTX
Plantibodies
PDF
Seed Storage Proteins in Plants
PPTX
Biotransformation
PPT
Plant tissue culture
PPTX
career`s in biotechnology
DOCX
Industrial Visit report
Biopharamceuticals from plants
Strategies to enhance production of secondary metabolites
Plantibodies
Seed Storage Proteins in Plants
Biotransformation
Plant tissue culture
career`s in biotechnology
Industrial Visit report

What's hot (20)

DOCX
Industrial Visit Report
PDF
Mini Project Format
PDF
Final Year Project Completion Certificate
DOCX
Industrial Training Report-1
PDF
A Project Report on Industrial Visit to Parle-G & Monginis
PDF
DLW Electrical Engineering industrial training Report
PDF
Industrial visit report Greater noida
PPTX
Industrial Internship Presentation
PPTX
DURGAPUR PROJECTS LIMITED
DOC
Industrial visit for Department OF Mechanical Engineering - BHEL
PPTX
Green technology ppt
DOCX
Declaration by the candidate
PDF
Internship completion letter
PDF
Project report on Health & Safety
DOCX
Project on Industrial Exposure
DOCX
Internship Report on the Company Overview of
PDF
Final Year Project Report Sample for Engineers - IIT and State University
DOCX
Report on Sugar mill bisalpur by sachin kumar
PDF
BHEL PROJECT REPORT ( TRAINING REPORT )
PPTX
Railway Accident Avoiding System: A Safety Measure
Industrial Visit Report
Mini Project Format
Final Year Project Completion Certificate
Industrial Training Report-1
A Project Report on Industrial Visit to Parle-G & Monginis
DLW Electrical Engineering industrial training Report
Industrial visit report Greater noida
Industrial Internship Presentation
DURGAPUR PROJECTS LIMITED
Industrial visit for Department OF Mechanical Engineering - BHEL
Green technology ppt
Declaration by the candidate
Internship completion letter
Project report on Health & Safety
Project on Industrial Exposure
Internship Report on the Company Overview of
Final Year Project Report Sample for Engineers - IIT and State University
Report on Sugar mill bisalpur by sachin kumar
BHEL PROJECT REPORT ( TRAINING REPORT )
Railway Accident Avoiding System: A Safety Measure
Ad

Viewers also liked (20)

PDF
Ppt elementos de la comunicación
PDF
Canada's Government Slide Share
PDF
Proceso de comunicacion
PDF
Chartered Food Hygiene 001
DOCX
201510430311004 pgsd ii a an ayatilah 1
PDF
2. nagarjuna sagar_visit__report
DOCX
Unemployment in Somaliland Report By Mohamed Muse Haji Abdi
PPTX
How to Grow Stevia (Nature's Sweetener, Stevia Rebaudiana Bertoni, Stevia Cor...
PPTX
Actividad 1. averiguar emisor, receptor, canal, código y mensaje.
PPTX
ГБОУ Школа №1238 Дошкольные группы: Праздник Масленица
DOCX
DOCX
Thermal Power plant visit Report by Amit Hinge
PPTX
ГБОУ Школа №1238 Дошкольные группы: 1 группа Конкурс утренней зарядки
DOCX
PPTX
Caden project
DOCX
Secuencia de clase 8 a
PDF
Coderstrust explained
PPTX
3Com 160088001
PPTX
ГБОУ Школа №1238 Дошкольные группы: гимнастика в 11 группе
PDF
World: Fruits, Nuts And Peel (Sugar Preserved) - Market Report. Analysis And ...
Ppt elementos de la comunicación
Canada's Government Slide Share
Proceso de comunicacion
Chartered Food Hygiene 001
201510430311004 pgsd ii a an ayatilah 1
2. nagarjuna sagar_visit__report
Unemployment in Somaliland Report By Mohamed Muse Haji Abdi
How to Grow Stevia (Nature's Sweetener, Stevia Rebaudiana Bertoni, Stevia Cor...
Actividad 1. averiguar emisor, receptor, canal, código y mensaje.
ГБОУ Школа №1238 Дошкольные группы: Праздник Масленица
Thermal Power plant visit Report by Amit Hinge
ГБОУ Школа №1238 Дошкольные группы: 1 группа Конкурс утренней зарядки
Caden project
Secuencia de clase 8 a
Coderstrust explained
3Com 160088001
ГБОУ Школа №1238 Дошкольные группы: гимнастика в 11 группе
World: Fruits, Nuts And Peel (Sugar Preserved) - Market Report. Analysis And ...
Ad

Recently uploaded (20)

PPTX
Fundamentals of Mechanical Engineering.pptx
PPT
Occupational Health and Safety Management System
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
PDF
86236642-Electric-Loco-Shed.pdf jfkduklg
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PDF
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
PDF
Soil Improvement Techniques Note - Rabbi
PDF
PPT on Performance Review to get promotions
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
communication and presentation skills 01
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Fundamentals of Mechanical Engineering.pptx
Occupational Health and Safety Management System
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
86236642-Electric-Loco-Shed.pdf jfkduklg
Visual Aids for Exploratory Data Analysis.pdf
III.4.1.2_The_Space_Environment.p pdffdf
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
Safety Seminar civil to be ensured for safe working.
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Integrating Fractal Dimension and Time Series Analysis for Optimized Hyperspe...
Soil Improvement Techniques Note - Rabbi
PPT on Performance Review to get promotions
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
communication and presentation skills 01
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Fundamentals of safety and accident prevention -final (1).pptx
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Mitigating Risks through Effective Management for Enhancing Organizational Pe...

Iv report writing

  • 1. REPORT ON INDUSTRIAL VISIT TO GREEN POWER SUGAR PLANT, GOPUJ, SATARA. SUBMITTED BY-: SECOND YEAR MECHANICAL STUDENTS SARASWATI INSTITUTE OF TECHNOLOGY, SECTOR-5,BEHIND M.S.E.B SUB STAION, KHARGHAR,NAVIMUMBAI.410210 PREPARED BY : PANKAJ VASKAR ROLL NO:- 75,DIV:-B SUBJECT :- PROFESSIONAL PRACTICS II
  • 3. ACKNOWLEDGEMENT : We take this opportunity to thank our professor SAGAR KADUsir for giving us an opportunity to go for an industrial visit .our heartfelt that gratitude also goes out to green power sugar plant to visit their industry and guiding us through the various process and machinery used.A special thank to the employees of green sugar for Finally heartfelt gratitude to all our classmates for making this trip a memorable one. ABOUT COMPANY PROFILE:- This company is registered under the Maharashtra society act on 2013 this industry is situated at village GOPUJ ,taluka khatav satatra. The total capital investment of this industry is 800 Crs. And annual turnover is 300 Crs.
  • 4. ABOUT A GREEN SUGAR INDUSTRIAL VISIT:- To learn about the process how to made sugar .our guiders are from that industry itself, very helpful during the visit and give the knowledge about boiler which is water tube boiler and its control panel. We were visit power house of the green sugar and it is very useful to understand to our student as per academic curriculum activities. We are study about the generation of power with steam turbine and seen turbine generator coupling for power generation and learn about generator generation capacity of 14 mw and turbine is reaction type. And also Learn about the control panel working and function and indicating of symbols. At end of the process learn the packaging machine and test sweet sugar.
  • 5. STEPS TO PRODUCE SUGAR FROM SUGAR CANE The major unit operations are shownin figure these are 1. Extraction of juice 2. Clarification 3. Evaporation 4. Crystallization 5. Centrifugation
  • 6. ABOUT STEAM POWER PLANT:- We visited the power plant and their we seen the counstruction true power plant which was divided into three main parts. 1)TURBINE 2)GEAR BOX 3) GENRATOR WORKING:- In thermal power staion fuel such as coal ,oil,gas is burned in furnace to produce heat –chemical to heat energy.this heat is used to change water into steam in the boiler. This drives the genrater to produce electricity- kinetic to electrical energy It generates out 14 MW power in 8 hours. Very first the needed amount of electricity is utilized by the industry and the remaining electricity is distributed to the government of Maharashtra .
  • 7. All the students were glad to know this fact and all were very much exited to listen something more about this power generator and all the students were alloweded to move into the cabin to show the full working of power plant in computer. CLICK IMAGES OF STEAM TURBINE
  • 9. CONCLUSION :- We study about all the boiler and how power plant works as well as how steam is produce with help of water tube boiler , working of turbine too. All the students have camly heard all the instructions and Took up the necessary information about the industry student enjoyed their industrial visit and they thankful to the professor sagar kadu to give up the kind opportunity to visit wonderful industry.