JOB TITLE / AIM: JSA for Hydrotesting (Utility water, fire water, potable water)
JSA DATE: 19/06/06 JSA NO./ REVISION: 101
SUPERVISOR/ JSA LEADER: M. Ramzan SCRIBE: Hernand Suyom/Abdullah Khan
PARTICIPANTS : Sharif Ullah Khan, Shoaib Farman
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Approved:
Bruce Boxshall 21-June-06
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of Equipment & workers
2. Water Refilling
3. Hydro testing
4. Water Releasing
5.Demobilization
Alternatives Considered: N/A
Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency
Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.
File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
-
1 Mobilization of the following
equipment:
- Hand pump
- Pressure gauge
- Flexible wire hose
Unauthorised equipment/tools brought out to
site
Before mobilizing any equipment/tools make sure
that the E &P Personnel & BHP got inspected the
equipment. Checklist are in equipment
Ensure that gas testing was conducted whenever
bringing the equipment in transition and
Operations areas
Unskilled and uninducted personnel starting
the job
Ensure that all personnel prior to start have been
inducted and oriented about the hazard in the job
site. All persons working in Operations areaa to
be Operaitons inducted. Only trained personnel
shall do the Hydrotesting
Workers starting the job unfit to work All personnel must be undergone fitness for work
assessment thru DEL doctor
Workers starting the job without necessary
controls in place (eg JSA, Permits as required)
JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion. Persons signed at the back of JSA at
each toolbox meeting.
All works undertaken in Operations areas to be
performed under CWP.
Hand Injury Ensure proper hauling of materials/get help if
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Back injury
Miscommunication
required/Wear hand gloves.
Ensure proper posture and positioning
Ensure standby radio fully charge are in place at
all times
Ensure that area to be secured and barricaded with
hydrotesting sign board in place
2 Water Refilling & Pressurizing to
15 bar manually using hand pump
Unauthorised person
Miscommunication
Trips/fallls
Poor visibility/lighting
Heat Stress/Exhaustion
Snake bite
Tripping hazards
SIMOPS
Ensure that all workers have been informed when
the Hydrotesting will be conducted properly lit
and barricaded by a barrier. Ensure only 15bars
max. pressure to be conducted for testing.
It is advised that the testing to be conducted at
night or break time hours to minimized the
SIMOPS or personnel interface
Ensure that workers shall not step of the pipe
walking across the pipe
Ensure workers are following the correct
procedure of positioning and lifting. Get help if
required.
Ensure sufficient light are in place.
Ensure that workers are oriented about the job and
no one will be allowed to work alone. Make
buddy system
Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
Workers will inform and be aware about the
presence at the area. No killing of snakes
Ensure that workers accessing the right walkway
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
and watch your steps.
Other worker not involve in the job must not
come closer to the area
Ensure workers are accessing the right pathway
and equipment must maintain the speed limit
Ensure banks person are available at the area
Ensure no works shall perform when strong wind
comes
Ensure that whenever heavy equipment on the
area no works shall commence at excavated area
3. Hydro testing High Presssure Burst
Miscommunication
Tripping hazards
Ensure that the equipment was inspected by BHP
and calibrated prior to use. Calibration
certificates to be reviewed prior to use
Ensure that QC conducting the testing are wearing
Full PPE and a standby barrier to secure
themselves from high pressure leak
Ensure that no any person will be on the
Hydrotesting area.
Ensure max. 15bars pressure to be kept during
testing
Ensure sufficient man power will be designated as
watchman to ensure nobody will enter the
Hydrotesting zone
Ensure that workers performing the testing are
trained.
Unauthorized operator should not operate the
tester
Always refer to manufacturers methodology of
testing
Ensure that during Hydrotesting no other workers
touching the pipe
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Ensure that the Relief valve was install
Ensure that gas testing was conducted whenever
working in transition zone area
Ensure that workers will not step on the pipe
Whenever strong wind comes the work must be
stop
4. Water Releasing Unauthorised person
Miscommunication
Trips/fallls
Poor visibility/lighting
Heat Stress/Exhaustion
Snake bite
Tripping hazards
SIMOPS
Ensure that all workers have been informed when
the water releasing will be conducted properly
lit and barricaded by a barrier.
It is advised that the testing to be conducted at
night or break time hours to minimized the
SIMOPS or personnel interface
Ensure that workers shall not step of the pipe
walking across the pipe
Ensure workers are following the correct
procedure of positioning and lifting. Get help if
required.
Ensure sufficient light are in place.
Ensure that workers are oriented about the job and
no one will be allowed to work alone. Make
buddy system
Ensure potable water/sufficient shelter is available
each area where workers are doing the job. First
aid kit available at site.
Workers will inform and be aware about the
presence at the area. No killing of snakes
Ensure that workers accessing the right walkway
and watch your steps.
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
Other worker not involve in the job must not
come closer to the area
Ensure workers are accessing the right pathway
and equipment must maintain the speed limit
Ensure banks person are available at the area
Ensure no works shall perform when strong wind
comes
Ensure that whenever heavy equipment on the
area no works shall commence at excavated area
5. Demobilization Same as item one Same as item one

More Related Content

DOC
Job safety analysis
DOCX
JSA-Piling or Concreting for Foundations & Building
DOC
Jsa heat-treatment
PDF
Job safety Analysis
DOCX
21 Confined Space Working Risk Assessment Templates.docx
PDF
Bizsafe Risk Assessment
DOCX
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
DOCX
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx
Job safety analysis
JSA-Piling or Concreting for Foundations & Building
Jsa heat-treatment
Job safety Analysis
21 Confined Space Working Risk Assessment Templates.docx
Bizsafe Risk Assessment
28 Edge protection to open edges, shafts and risers Risk Assessment Templates...
32 Use of Aluminium mobile Scaffolding Risk Assessment Templates.docx

What's hot (20)

PDF
Amn safety induction j 175 - staff rev 4 - s 14
PDF
Permit to work training
DOCX
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
PDF
December -15 Daily Observation Report
PPTX
Health and safety induction
PDF
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
PDF
Job safety analysis
PDF
Risk Assessment For Installation of Drainage Pipes.pdf
PDF
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
PPTX
Rescue at heights westfields 2017
DOCX
Near miss report
PDF
Risk assessment for testing & commissioning of cranes
PPTX
Rigging & slinging
PPSX
Emergency response osha 2012
PDF
Risk Assessment Example.pdf
PPTX
Dropped Object prevention Campaign (1).pptx
PPTX
Near miss
PDF
Work at Height | Safety during work at hight
PPT
NGI-Permit to Work
DOCX
6 excavations (temporary works) risk assessment templates
Amn safety induction j 175 - staff rev 4 - s 14
Permit to work training
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
December -15 Daily Observation Report
Health and safety induction
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Job safety analysis
Risk Assessment For Installation of Drainage Pipes.pdf
Safety handbook Saudi Aramco BY Muhammad Fahad Ansari 12IEEM14
Rescue at heights westfields 2017
Near miss report
Risk assessment for testing & commissioning of cranes
Rigging & slinging
Emergency response osha 2012
Risk Assessment Example.pdf
Dropped Object prevention Campaign (1).pptx
Near miss
Work at Height | Safety during work at hight
NGI-Permit to Work
6 excavations (temporary works) risk assessment templates
Ad

Similar to JSA for Hydrotesting.pdf (20)

DOC
Generic Hydrotest.doc
PDF
HSE interview for the Health and Safety Engineer for
PDF
Drilling Rig SMS Safety Presentation .pdf
PDF
JHA Handling Materials in crane and hydra
PDF
LPG Chloride treaters foundation execution_Rev.00.pdf
PPTX
Oil_and_Gas_Safety_Topics_Presentation.pptx
PDF
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
DOC
Ma 115 boom crane cable tray repair
DOC
EDEAGHE ONOSABUNA GABRIEL CV (1)
DOCX
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
PPTX
IIC Safety Orientation PowerPoint FINAL.pptx
PPTX
Life saving rule for project 07.02.018-1.pptx
DOCX
J.D. Resume 11-24-14
DOCX
Excavation & Back filling work 02.docx
PDF
Lease Operator
DOC
Safe System Of Work [SSOW Gen 01 [Digging In Vicinity Of Und
PDF
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
PPTX
Tank Maintenance Mechanical work-inspection
PDF
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
PPTX
Coveris.TPM.Step 0.12.21.15.pptx
Generic Hydrotest.doc
HSE interview for the Health and Safety Engineer for
Drilling Rig SMS Safety Presentation .pdf
JHA Handling Materials in crane and hydra
LPG Chloride treaters foundation execution_Rev.00.pdf
Oil_and_Gas_Safety_Topics_Presentation.pptx
008-SWMS-GENERAL-ONSITE-ACTIVITIES-AND-REPAIRS.pdf
Ma 115 boom crane cable tray repair
EDEAGHE ONOSABUNA GABRIEL CV (1)
SECONDARY PIPE RACK AND PIG LAUNCHER.docx
IIC Safety Orientation PowerPoint FINAL.pptx
Life saving rule for project 07.02.018-1.pptx
J.D. Resume 11-24-14
Excavation & Back filling work 02.docx
Lease Operator
Safe System Of Work [SSOW Gen 01 [Digging In Vicinity Of Und
JHA LIFTING ERECTION OF VESSEL EQUIPMENT.pdf
Tank Maintenance Mechanical work-inspection
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
Coveris.TPM.Step 0.12.21.15.pptx
Ad

Recently uploaded (20)

PPTX
Lesson notes of climatology university.
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Unit 4 Skeletal System.ppt.pptxopresentatiom
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
Hazard Identification & Risk Assessment .pdf
PDF
Indian roads congress 037 - 2012 Flexible pavement
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
Trump Administration's workforce development strategy
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
Empowerment Technology for Senior High School Guide
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
Lesson notes of climatology university.
Final Presentation General Medicine 03-08-2024.pptx
Unit 4 Skeletal System.ppt.pptxopresentatiom
Supply Chain Operations Speaking Notes -ICLT Program
Weekly quiz Compilation Jan -July 25.pdf
UV-Visible spectroscopy..pptx UV-Visible Spectroscopy – Electronic Transition...
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Practical Manual AGRO-233 Principles and Practices of Natural Farming
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Hazard Identification & Risk Assessment .pdf
Indian roads congress 037 - 2012 Flexible pavement
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Trump Administration's workforce development strategy
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
History, Philosophy and sociology of education (1).pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Empowerment Technology for Senior High School Guide
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...

JSA for Hydrotesting.pdf

  • 1. F _____ JOB TITLE / AIM: JSA for Hydrotesting (Utility water, fire water, potable water) JSA DATE: 19/06/06 JSA NO./ REVISION: 101 SUPERVISOR/ JSA LEADER: M. Ramzan SCRIBE: Hernand Suyom/Abdullah Khan PARTICIPANTS : Sharif Ullah Khan, Shoaib Farman LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs: Approved: Bruce Boxshall 21-June-06 Attach copies of any relevant documentation/ drawings. Part 2: Job Safety Analysis Job Steps: 1.Mobilization of Equipment & workers 2. Water Refilling 3. Hydro testing 4. Water Releasing 5.Demobilization Alternatives Considered: N/A Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03. Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of emergency
  • 2. Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system. File: 10.30 JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) - 1 Mobilization of the following equipment: - Hand pump - Pressure gauge - Flexible wire hose Unauthorised equipment/tools brought out to site Before mobilizing any equipment/tools make sure that the E &P Personnel & BHP got inspected the equipment. Checklist are in equipment Ensure that gas testing was conducted whenever bringing the equipment in transition and Operations areas Unskilled and uninducted personnel starting the job Ensure that all personnel prior to start have been inducted and oriented about the hazard in the job site. All persons working in Operations areaa to be Operaitons inducted. Only trained personnel shall do the Hydrotesting Workers starting the job unfit to work All personnel must be undergone fitness for work assessment thru DEL doctor Workers starting the job without necessary controls in place (eg JSA, Permits as required) JSA must be in place prior to work. Ensure all the persons take part in the toolbox meeting discussion. Persons signed at the back of JSA at each toolbox meeting. All works undertaken in Operations areas to be performed under CWP. Hand Injury Ensure proper hauling of materials/get help if
  • 3. JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) Back injury Miscommunication required/Wear hand gloves. Ensure proper posture and positioning Ensure standby radio fully charge are in place at all times Ensure that area to be secured and barricaded with hydrotesting sign board in place 2 Water Refilling & Pressurizing to 15 bar manually using hand pump Unauthorised person Miscommunication Trips/fallls Poor visibility/lighting Heat Stress/Exhaustion Snake bite Tripping hazards SIMOPS Ensure that all workers have been informed when the Hydrotesting will be conducted properly lit and barricaded by a barrier. Ensure only 15bars max. pressure to be conducted for testing. It is advised that the testing to be conducted at night or break time hours to minimized the SIMOPS or personnel interface Ensure that workers shall not step of the pipe walking across the pipe Ensure workers are following the correct procedure of positioning and lifting. Get help if required. Ensure sufficient light are in place. Ensure that workers are oriented about the job and no one will be allowed to work alone. Make buddy system Ensure potable water/sufficient shelter is available each area where workers are doing the job. First aid kit available at site. Workers will inform and be aware about the presence at the area. No killing of snakes Ensure that workers accessing the right walkway
  • 4. JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) and watch your steps. Other worker not involve in the job must not come closer to the area Ensure workers are accessing the right pathway and equipment must maintain the speed limit Ensure banks person are available at the area Ensure no works shall perform when strong wind comes Ensure that whenever heavy equipment on the area no works shall commence at excavated area 3. Hydro testing High Presssure Burst Miscommunication Tripping hazards Ensure that the equipment was inspected by BHP and calibrated prior to use. Calibration certificates to be reviewed prior to use Ensure that QC conducting the testing are wearing Full PPE and a standby barrier to secure themselves from high pressure leak Ensure that no any person will be on the Hydrotesting area. Ensure max. 15bars pressure to be kept during testing Ensure sufficient man power will be designated as watchman to ensure nobody will enter the Hydrotesting zone Ensure that workers performing the testing are trained. Unauthorized operator should not operate the tester Always refer to manufacturers methodology of testing Ensure that during Hydrotesting no other workers touching the pipe
  • 5. JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) Ensure that the Relief valve was install Ensure that gas testing was conducted whenever working in transition zone area Ensure that workers will not step on the pipe Whenever strong wind comes the work must be stop 4. Water Releasing Unauthorised person Miscommunication Trips/fallls Poor visibility/lighting Heat Stress/Exhaustion Snake bite Tripping hazards SIMOPS Ensure that all workers have been informed when the water releasing will be conducted properly lit and barricaded by a barrier. It is advised that the testing to be conducted at night or break time hours to minimized the SIMOPS or personnel interface Ensure that workers shall not step of the pipe walking across the pipe Ensure workers are following the correct procedure of positioning and lifting. Get help if required. Ensure sufficient light are in place. Ensure that workers are oriented about the job and no one will be allowed to work alone. Make buddy system Ensure potable water/sufficient shelter is available each area where workers are doing the job. First aid kit available at site. Workers will inform and be aware about the presence at the area. No killing of snakes Ensure that workers accessing the right walkway and watch your steps.
  • 6. JSA No: JOB TITLE: Step Describe Job Step Potential Hazards Hazard Controls No (Copy from part 2 of form) (Use Hazard Checklist) Other worker not involve in the job must not come closer to the area Ensure workers are accessing the right pathway and equipment must maintain the speed limit Ensure banks person are available at the area Ensure no works shall perform when strong wind comes Ensure that whenever heavy equipment on the area no works shall commence at excavated area 5. Demobilization Same as item one Same as item one