Lesson 1:
Start with the customer and test
your assumptions
Results:
 Conducting innovative inclusive research
involves: workshops, 50+ interviews, two
Marae visits and youth centre's around the
country. This allowed us to get a get wide
number of people of differing perspectives
and abilities. We used the resulting evidence
to build the Discover service.
 Conducting rounds of testing on six two week
sprints allowed us to refine quickly and gain
valuable customer feedback at every step.
Recommendations for action:
 This robust, quick way of engaging
customers should be standard on any
customer centred work.
DIA– Draft in confidence. Jan 2017
Lesson 2:
A great team is vital.
Results:
 Having a mix of skills allowed us to be both
flexible and thorough and a small team (3
people) allowed us to move quickly on any
new ideas and changes of directions.
 Having a team get along and have fun meant
that innovative ideas were able to be brought
to life. E.g. building a chat bot
 The team was cross functional: from doing
traditional service design work to highly
specialised UX and UAT work they were
willing to work outside the job title. This
allowed the team to save on hiring and
recruiting.
 Bringing experts in and out of the project only
when needed allowed time and money
savings. One short contract saved $72k.
Recommendations for action:
 Picking the right people so they complement
each others strengths and weaknesses is
vital to the success of any project.
 Only bring in experts for short term work
which is clearly defined.
“Put the right people in to do the job”—Lee
DIA– Draft in confidence. Jan 2017
Lesson 3:
A permissive environment leads to
success.
Results:
 Having a permissive environment meant that
ideas could be carried out quickly and that
evidence for decisions could be gathered
quickly. E.g. We had an idea for a workshop
on Monday then ran the workshop on Friday.
Recommendations for action:
 Having a permissive environment is essential
for any project to move quickly.
DIA– Draft in confidence. Jan 2017
Lesson 4:
Manage risk at the front to avoid
delays.
Results:
 Sometimes there were challenges and some
delays in getting the right feedback from the
right people in a timely manner. Navigating
organisational processes proved challenging
at times.
 It was difficult at times to shift mind-sets to
what’s possible rather than what’s not.
Us: “Well, what should we do?”
Others: “We can’t tell you. I can only tell you it’s
not right.”
To mitigate a lack of direction we made
decisions based on the available information.
 Keeping the project in two week sprints
allowed us to change directions quickly
without being wedded to any one particular
solution.
Recommendations for action:
 Projects should find out before interacting
with different business units, who the best
people to contact are for smooth delivery.
 Projects should keep the decision makers
informed at 2 weekly intervals so any
changes can be made quickly and easily.
“We didn’t do Agile, we were Agile.”—Lee
DIA– Draft in confidence. Jan 2017
Lesson 5:
Cultivate supportive people
Results:
 The support of the DCE and senior
managers insured that the project could
avoid political and financial pitfalls.
 However going to people with a defined
piece of work ensured some resistance vs.
coming to us (open to help at the outset)
 Other times we were encouraged and able to
complete processes quickly in the
organisation. The key: finding supportive
people.
 Once we found the right people and mind-
sets in different teams we cultivated a shared
understanding of success which enabled us
to deliver in tight timeframes.
 Enablers—ask “Are you happy” (Trust us) vs
Blockers—tell you “You haven’t done
X” (Don’t trust us)
Recommendations for action:
 Successful projects need support at the
highest levels to get across the line.
 At lower levels it’s essential to find the
supportive people (enablers) who help
projects deliver.
DIA– Draft in confidence. Jan 2017
Lesson 6:
Re-using Smartstart.
Results:
 Catalyst & TSS already had experience on
Smartstart and this enabled us to recruit the
right people and speed up our delivery.
 Infrastructure reuse allowed us to cut down
on decisions.
 Code & docs reuse meant time and money
was also saved.
 The Coms team was reused, but the level of
involvement (with us) wasn’t enough to do
detailed work for us.
Recommendations for action:
 Don’t blaze a trail, find a project that’s
recently done what you want to do and re-
use as much as possible.
DIA– Draft in confidence. Jan 2017
Lesson 7:
Avoid political noise to keep
focused.
Results:
 We’ve had to delay some recommendations
(awaiting approval). We should of engaged
some agencies earlier.
 However we’ve done the work anyway, so
now we’re ready when we do get sign off.
 We dealt with issues head on by bringing
them to the surface and clearing the air.
Recommendations for action:
 In order to deal with real issues we
recommend projects hold a meeting or a
workshop to bring them out in to the open.
Requires an experienced facilitator.
 Engage external organisations as early as
possible.
DIA– Draft in confidence. Jan 2017
Lesson 8:
Challenging deadlines.
Results:
 Having a December deadline and a tight
budget ensured delivery.
Recommendations for action:
 Avoid dead development zones such as the
Christmas break to ensure delivery.
DIA– Draft in confidence. Jan 2017
“Helpful way to get info without having to do
much work.” —customer comment about Discover
service.
“3 years ago we had to tell the CE and all the way up
the chain, that we were going to talk to customers —
things have changed for the better” —Shane
Lesson 9:
Design lessons.
Results:
 Having the freedom to put aside predefined
solutions and assumptions and to start from
the ground up in partnership with the
customer is and should be, the only way.
 Having a big room dedicated to design made
holding workshops and performing analysis
and design much quicker and thorough than
before.
Recommendations for action:
 Be clear about who’s doing what as soon as
possible.
 Having dedicated design space makes
design easier.
DIA– Draft in confidence. Jan 2017

More Related Content

PDF
How To Be an Influential Kaizen Coach - Joe Swartz & Mark Graban
PDF
Personal IAF log Mar 15 finalx
PDF
The Leader's Guide Workshop - Pivotal Labs Tokyo
PDF
2015 Lean Startup Conference - Leader's Guide Project Planner
PDF
The heart of agile
PDF
2015 Introduction to Lean Startup
PDF
2015 Balanced Teams: Product Management, Engineering, UX Design
PPTX
Leadership thoughts
How To Be an Influential Kaizen Coach - Joe Swartz & Mark Graban
Personal IAF log Mar 15 finalx
The Leader's Guide Workshop - Pivotal Labs Tokyo
2015 Lean Startup Conference - Leader's Guide Project Planner
The heart of agile
2015 Introduction to Lean Startup
2015 Balanced Teams: Product Management, Engineering, UX Design
Leadership thoughts

What's hot (20)

PPTX
The story of sprintz.work
PDF
Measurement and metrics
PPTX
Out of the silos and into the farm (NEPHP 2014)
PDF
30 psychological truths that drive agile adoption and its failure
PPTX
Intro to Balanced Teams
PDF
Sprintz fact sheet
PPTX
Leadership thoughts2
PPTX
Mindfulness agile minds-agileindia2017 - draft
PDF
Sprintz work Fact Sheet
PDF
Balanced Partnership
PDF
Remote innovation student_program_sept_2020
PPT
#Reverse Brainstorming - A Creative Group Problem-Solving Technique for Com...
PDF
Process, Creativity and Productivity
PPTX
Managers and the land of the lost 2016 oct
PPTX
Speed Dating + TRUE NORTH tool to simplify your challenges
PPTX
Risk leadership - implementing a risk strategy that works
PDF
5 ways to supercharge your transformation projects and keep people on your side
PPT
Project management
PDF
Sprint to Habits. As easy as 1,2,3 (Exo-World Talk)
The story of sprintz.work
Measurement and metrics
Out of the silos and into the farm (NEPHP 2014)
30 psychological truths that drive agile adoption and its failure
Intro to Balanced Teams
Sprintz fact sheet
Leadership thoughts2
Mindfulness agile minds-agileindia2017 - draft
Sprintz work Fact Sheet
Balanced Partnership
Remote innovation student_program_sept_2020
#Reverse Brainstorming - A Creative Group Problem-Solving Technique for Com...
Process, Creativity and Productivity
Managers and the land of the lost 2016 oct
Speed Dating + TRUE NORTH tool to simplify your challenges
Risk leadership - implementing a risk strategy that works
5 ways to supercharge your transformation projects and keep people on your side
Project management
Sprint to Habits. As easy as 1,2,3 (Exo-World Talk)
Ad

Viewers also liked (16)

DOCX
Practica virtual
PDF
Omnifuncional, o profissional que toda empresa quer
PPTX
Slide Deck about Cybersecurity by Marcos Semola 2017
PDF
Realidade virtual (rv) como tecnologia coadjuvante na educação
PDF
A Lenda do Conde Drácula pdf
PDF
Los errores de un gerente que hacen buena empleados renuncien
PDF
Les jours de la semaine
PDF
Lire et écrire
PDF
Jeux en biomes
PDF
Plazas siguiendo cuadro de mer 21 03-2017
PPTX
Informe cd
PDF
EL PIC DELS CORBS, també l´anomenem l´AIXEBE
PPTX
Pemanfaatan Efisiensi dan Reklamasi Lokasi Tambang
PPT
Reacciones adver.-a-medic. clase-1
PPTX
Technology in the early years
Practica virtual
Omnifuncional, o profissional que toda empresa quer
Slide Deck about Cybersecurity by Marcos Semola 2017
Realidade virtual (rv) como tecnologia coadjuvante na educação
A Lenda do Conde Drácula pdf
Los errores de un gerente que hacen buena empleados renuncien
Les jours de la semaine
Lire et écrire
Jeux en biomes
Plazas siguiendo cuadro de mer 21 03-2017
Informe cd
EL PIC DELS CORBS, també l´anomenem l´AIXEBE
Pemanfaatan Efisiensi dan Reklamasi Lokasi Tambang
Reacciones adver.-a-medic. clase-1
Technology in the early years
Ad

Similar to Lessons learned v0.4 (20)

PDF
Increasing Project Success
PDF
how-to-conduct-a-successful-project-debrief.pdf
PPTX
Project Management Handbook 10.1
PDF
Bloomberg PMI NYC Breakthrough consumer experience - Michael Nir
PDF
Aggregate_Guide A5 booklet FINAL 21.09
DOCX
Document2.docx NEW DOCUMENT FOR Merial 05042016
PDF
Kaizen, Nemawashi and a Project Management Work Cell
PDF
Onboarding at scale (Association for Talent Development talk, Aug. 2017)
PPSX
Collaborative work
PDF
The six step guide to practical project management
PDF
Agile Leadership introduction
PPT
Ace training building a successful project_09.21.2010
PDF
Sun Chemical - Inventory Management Fiori Applications: Design Thinking throu...
PPT
The Learn Phase: Recasting the Agile Manifesto
PDF
Remote working in the future
PDF
Creating a Start-up
PPTX
Boston UXPA 2016 | What’s Worse: A Root Canal or Selecting Health Insurance
PPT
Ace training building a successful project_02.16.10
PPTX
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
PDF
Crowdsourcing your documentation: Managing a crowdsourced documentation project
Increasing Project Success
how-to-conduct-a-successful-project-debrief.pdf
Project Management Handbook 10.1
Bloomberg PMI NYC Breakthrough consumer experience - Michael Nir
Aggregate_Guide A5 booklet FINAL 21.09
Document2.docx NEW DOCUMENT FOR Merial 05042016
Kaizen, Nemawashi and a Project Management Work Cell
Onboarding at scale (Association for Talent Development talk, Aug. 2017)
Collaborative work
The six step guide to practical project management
Agile Leadership introduction
Ace training building a successful project_09.21.2010
Sun Chemical - Inventory Management Fiori Applications: Design Thinking throu...
The Learn Phase: Recasting the Agile Manifesto
Remote working in the future
Creating a Start-up
Boston UXPA 2016 | What’s Worse: A Root Canal or Selecting Health Insurance
Ace training building a successful project_02.16.10
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Crowdsourcing your documentation: Managing a crowdsourced documentation project

Recently uploaded (20)

PPTX
June-4-Sermon-Powerpoint.pptx USE THIS FOR YOUR MOTIVATION
PPTX
innovation process that make everything different.pptx
PDF
Paper PDF World Game (s) Great Redesign.pdf
PPTX
artificialintelligenceai1-copy-210604123353.pptx
PDF
Unit-1 introduction to cyber security discuss about how to secure a system
DOC
Rose毕业证学历认证,利物浦约翰摩尔斯大学毕业证国外本科毕业证
PPTX
E -tech empowerment technologies PowerPoint
PPTX
Database Information System - Management Information System
PPTX
Slides PPTX World Game (s) Eco Economic Epochs.pptx
PDF
Tenda Login Guide: Access Your Router in 5 Easy Steps
PDF
Slides PDF The World Game (s) Eco Economic Epochs.pdf
PPTX
Internet___Basics___Styled_ presentation
PDF
Vigrab.top – Online Tool for Downloading and Converting Social Media Videos a...
PDF
Exploring VPS Hosting Trends for SMBs in 2025
DOCX
Unit-3 cyber security network security of internet system
PPT
FIRE PREVENTION AND CONTROL PLAN- LUS.FM.MQ.OM.UTM.PLN.00014.ppt
PPT
Ethics in Information System - Management Information System
PPTX
newyork.pptxirantrafgshenepalchinachinane
PPTX
Job_Card_System_Styled_lorem_ipsum_.pptx
PPTX
Introduction to cybersecurity and digital nettiquette
June-4-Sermon-Powerpoint.pptx USE THIS FOR YOUR MOTIVATION
innovation process that make everything different.pptx
Paper PDF World Game (s) Great Redesign.pdf
artificialintelligenceai1-copy-210604123353.pptx
Unit-1 introduction to cyber security discuss about how to secure a system
Rose毕业证学历认证,利物浦约翰摩尔斯大学毕业证国外本科毕业证
E -tech empowerment technologies PowerPoint
Database Information System - Management Information System
Slides PPTX World Game (s) Eco Economic Epochs.pptx
Tenda Login Guide: Access Your Router in 5 Easy Steps
Slides PDF The World Game (s) Eco Economic Epochs.pdf
Internet___Basics___Styled_ presentation
Vigrab.top – Online Tool for Downloading and Converting Social Media Videos a...
Exploring VPS Hosting Trends for SMBs in 2025
Unit-3 cyber security network security of internet system
FIRE PREVENTION AND CONTROL PLAN- LUS.FM.MQ.OM.UTM.PLN.00014.ppt
Ethics in Information System - Management Information System
newyork.pptxirantrafgshenepalchinachinane
Job_Card_System_Styled_lorem_ipsum_.pptx
Introduction to cybersecurity and digital nettiquette

Lessons learned v0.4

  • 1. DIA– Draft in confidence. Jan 2017 DIA Lessons Learned What we learned on the Discover Journey Jan 2017
  • 2. DIA– Draft in confidence. Jan 2017 Lesson 1: Start with the customer and test your assumptions Results:  Conducting innovative inclusive research involves: workshops, 50+ interviews, two Marae visits and youth centre's around the country. This allowed us to get a get wide number of people of differing perspectives and abilities. We used the resulting evidence to build the Discover service.  Conducting rounds of testing on six two week sprints allowed us to refine quickly and gain valuable customer feedback at every step. Recommendations for action:  This robust, quick way of engaging customers should be standard on any customer centred work.
  • 3. DIA– Draft in confidence. Jan 2017 Lesson 2: A great team is vital. Results:  Having a mix of skills allowed us to be both flexible and thorough and a small team (3 people) allowed us to move quickly on any new ideas and changes of directions.  Having a team get along and have fun meant that innovative ideas were able to be brought to life. E.g. building a chat bot  The team was cross functional: from doing traditional service design work to highly specialised UX and UAT work they were willing to work outside the job title. This allowed the team to save on hiring and recruiting.  Bringing experts in and out of the project only when needed allowed time and money savings. One short contract saved $72k. Recommendations for action:  Picking the right people so they complement each others strengths and weaknesses is vital to the success of any project.  Only bring in experts for short term work which is clearly defined. “Put the right people in to do the job”—Lee
  • 4. DIA– Draft in confidence. Jan 2017 Lesson 3: A permissive environment leads to success. Results:  Having a permissive environment meant that ideas could be carried out quickly and that evidence for decisions could be gathered quickly. E.g. We had an idea for a workshop on Monday then ran the workshop on Friday. Recommendations for action:  Having a permissive environment is essential for any project to move quickly.
  • 5. DIA– Draft in confidence. Jan 2017 Lesson 4: Manage risk at the front to avoid delays. Results:  Sometimes there were challenges and some delays in getting the right feedback from the right people in a timely manner. Navigating organisational processes proved challenging at times.  It was difficult at times to shift mind-sets to what’s possible rather than what’s not. Us: “Well, what should we do?” Others: “We can’t tell you. I can only tell you it’s not right.” To mitigate a lack of direction we made decisions based on the available information.  Keeping the project in two week sprints allowed us to change directions quickly without being wedded to any one particular solution. Recommendations for action:  Projects should find out before interacting with different business units, who the best people to contact are for smooth delivery.  Projects should keep the decision makers informed at 2 weekly intervals so any changes can be made quickly and easily. “We didn’t do Agile, we were Agile.”—Lee
  • 6. DIA– Draft in confidence. Jan 2017 Lesson 5: Cultivate supportive people Results:  The support of the DCE and senior managers insured that the project could avoid political and financial pitfalls.  However going to people with a defined piece of work ensured some resistance vs. coming to us (open to help at the outset)  Other times we were encouraged and able to complete processes quickly in the organisation. The key: finding supportive people.  Once we found the right people and mind- sets in different teams we cultivated a shared understanding of success which enabled us to deliver in tight timeframes.  Enablers—ask “Are you happy” (Trust us) vs Blockers—tell you “You haven’t done X” (Don’t trust us) Recommendations for action:  Successful projects need support at the highest levels to get across the line.  At lower levels it’s essential to find the supportive people (enablers) who help projects deliver.
  • 7. DIA– Draft in confidence. Jan 2017 Lesson 6: Re-using Smartstart. Results:  Catalyst & TSS already had experience on Smartstart and this enabled us to recruit the right people and speed up our delivery.  Infrastructure reuse allowed us to cut down on decisions.  Code & docs reuse meant time and money was also saved.  The Coms team was reused, but the level of involvement (with us) wasn’t enough to do detailed work for us. Recommendations for action:  Don’t blaze a trail, find a project that’s recently done what you want to do and re- use as much as possible.
  • 8. DIA– Draft in confidence. Jan 2017 Lesson 7: Avoid political noise to keep focused. Results:  We’ve had to delay some recommendations (awaiting approval). We should of engaged some agencies earlier.  However we’ve done the work anyway, so now we’re ready when we do get sign off.  We dealt with issues head on by bringing them to the surface and clearing the air. Recommendations for action:  In order to deal with real issues we recommend projects hold a meeting or a workshop to bring them out in to the open. Requires an experienced facilitator.  Engage external organisations as early as possible.
  • 9. DIA– Draft in confidence. Jan 2017 Lesson 8: Challenging deadlines. Results:  Having a December deadline and a tight budget ensured delivery. Recommendations for action:  Avoid dead development zones such as the Christmas break to ensure delivery.
  • 10. DIA– Draft in confidence. Jan 2017 “Helpful way to get info without having to do much work.” —customer comment about Discover service. “3 years ago we had to tell the CE and all the way up the chain, that we were going to talk to customers — things have changed for the better” —Shane Lesson 9: Design lessons. Results:  Having the freedom to put aside predefined solutions and assumptions and to start from the ground up in partnership with the customer is and should be, the only way.  Having a big room dedicated to design made holding workshops and performing analysis and design much quicker and thorough than before. Recommendations for action:  Be clear about who’s doing what as soon as possible.  Having dedicated design space makes design easier.
  • 11. DIA– Draft in confidence. Jan 2017