Published in July 2011 by the Workplace Safety
and Health Council in collaboration with the
Ministry of Manpower.
All rights reserved. This publication may not be
reproduced or transmitted in any form or by any
means, in whole or in part, without prior written
permission. The information provided in this
publication is accurate as at time of printing.
All cases shared in this publication are meant for
learning purposes only. The learning points for
each case are not exhaustive and should not be
taken to encapsulate all the responsibilities and
obligations of the user of this publication under
the law. The Workplace Safety and Health Council
does not accept any liability or responsibility to any
party for losses or damage arising from following
this publication.
This publication is available on the
Workplace Safety and Health Council
Website: www.wshc.sg
Email: contact@wshc.sg
Guidebook for
Lifting Supervisors
Year of issue: 2011
First revision: 2014
Contents
1. Introduction and Background					 2
2. Common Systematic Lapses Involving Lifting Activities		 3
3. Roles and Responsibilities of Lifting Supervisors		 4
4. Common Hazards Associated with Unsecured/ Slippage of Loads 5
5. Common Hazards Associated with Lifting Operations
Involving Mobile Cranes 6
6. Lifting Plans 7
7. Risk Assessment and Permit-to-Work				 8
8. Statutory Inspection of Lifting Equipment				 10
9. Pre-use Inspection of Lifting Equipment				 11
10. Selection of Lifting Gears for Lifting Operations 12
11. Estimation of Weight of Load 13
12. Recommended Rigging and Slinging Methods 15
13. Recommended Crane Signals 18
14. Annex A: Sample Basic Lifting Plan 19
15. Useful References 23
2 3
1. Introduction and Background
Accident statistics have shown that fatalities and dangerous occurrences1
at workplace
involving lifting equipment such as cranes has been on an uptrend over the last few years (see
Chart 1). Such accidents include failures or toppling of heavy lifting equipment such as cranes
during lifting activities, as well as workers being struck by falling or swinging objects while
being lifted. From these statistics, there is still much to be done to improve our crane and lifting
safety practices at our workplaces. The safe execution of lifting activities is a multi-party effort.
Every stakeholder in the value chain (i.e., manufacturers, crane contractors, engineers and
designers, project managers, lifting supervisors, operators and workers) has a stake in the lifting
operation and must do their part to ensure the safe operation of the lifting work at all times.
The role of the lifting team, which comprises the lifting supervisor, crane operator, rigger and
signalman, is crucial to ensure safe lifting activities at workplaces. Many of these past accidents
had shown that proper planning, co-ordination and supervision of the lifting work could
have prevented the accidents and the needless loss of lives. In particular, the role of the lifting
supervisor is key especially given the collaborative nature of the work and the importance
of ensuring that the various parties are trained and competent, and that they carry out their
roles safely and effectively. This Guidebook for Lifting Supervisors is developed to provide
greater practical guidance for lifting supervisors to ensure safe supervision of lifting work at
the workplace. The Guidebook not only provides guidelines on the roles and responsibilities
but also information on common hazards associated with lifting, Lifting Plans, Risk Assessment
(RA), Permit-to-Work (PTW) System and Safe Work Procedures (SWP), and recommended
rigging and crane signals.
Chart 1: Crane-related fatalities and dangerous occurences, 2007-2012.
1
Dangerous occurrences are incidents involving collapse or failure of a crane, derrick, winch, hoist,
piling frame or other appliance used in raising or lowering persons or goods, or any load bearing
part thereof (except breakage of chain or rope slings), or the overturning of a crane.
30
25
20
15
10
5
0
2007 2008 2009 2010 2011 2012
2
26
6
20
5
18
Fatal Dangerous Ocurrence
4
17
5
18
10
21
2. Common Systemic Lapses Involving
Lifting Activities
Accidents involving lifting activities occur due to many reasons. However, investigations into
such accidents often reveal that the primary causes could be attributed to poor planning,
supervision and co-ordination of the lifting operations. Effective implementation of a
comprehensive Lifting Plan which comprises comprehensive RA, clear method statement/
SWP, use of suitable lifting equipment, competent lifting team, and PTW system will ensure
safe lifting operations at all workplaces. The following is a list of common systemic lapses that
often lead to accidents involving lifting activities.
• Absence or lack of RA prior to lifting operation.
• Lack of implementation of relevant control measures identified in RA.
• Absence or lack of proper Lifting Plan for each lifting operation.
• Absence or lack of a PTW system to manage the lifting operation.
• Failure to adopt a proper rigging method for the lifting operation.
• Poor maintenance of lifting equipment (e.g., safety devices, lifting gears).
• Poor site control (e.g., failure to maintain a “safe exclusion zone”with barricades/ barriers
so that workers not involved in the lifting operation are prohibited from entering the
lifting area).
4 5
3. Roles and Responsibilities of
Lifting Supervisors
Lifting supervisors appointed for tower or mobile cranes at the worksites must complete the
Lifting Supervisors Safety Course conducted by an accredited training provider. They must also
have relevant experience in lifting operations for at least one year.
The duties and responsibilities of a lifting supervisor include:
• co-ordinating and supervising all lifting activities in accordance with the Lifting Plan;
• briefing all lifting team members (i.e., crane operators, riggers and signalmen) on the Lifting
Plan, risk control measure and safe lifting procedure before the commencement of any
lifting operation;
• ensuring that only registered crane operators, appointed riggers and appointed signalmen
participate in any lifting operation involving the use of mobile and tower cranes;
• ensuring that the ground conditions are safe for any lifting operation to be performed by
mobile cranes;
• be present during all lifting operations; and
• if unsafe conditions are reported to him, to take suitable measures to rectify the conditions
so that the lifting operation can be conducted safely.
Many accidents occurred due to unsecured loads or loads that slipped off during lifting.
The following are some common hazards associated with lifting of loads:
• defective or damaged lifting gears such as slings,
hooks, inserts, eyes, shackles;
• improper rigging of loads;
• lack of proper receptacles for loose loads such as
bricks; or
• under capacity of lifting gears.
4. Common Hazards Associated with
Unsecured/ Slippage of Loads
Figure 1: Defective or damaged
crane hooks.
6 7
6
5. Common Hazards Associated with
Lifting Operations Involving
Mobile Cranes
Accidents involving mobile cranes are one of the more common types of crane-related incidents.
Many accidents occurred due to either structural failure of the load bearing part of the crane or
toppling or collapsing of cranes when they became unstable. The following are some common
hazards associated with lifting operations involving mobile cranes.
(a) Structural failure of crane component such as the boom, jib, hydraulic rams or wire rope
due to the crane being loaded beyond its loading capacity.
(b) The stability of the cranes can be affected by:
• poor ground conditions (e.g., unstable ground);
• failure to use or fully extend outriggers or stabilisers;
• failure to level the crane;
• rapid derricking, slewing or manoeuvring;
• overloading of cranes;
• bypassing of safety devices; or
• high wind conditions.
(c) Contact or collision due to insufficient safe clearance space between mobile crane and
other buildings or structures (e.g., other cranes, overhead power lines, etc).
(d) Falling objects as a result of improper securing of loads during lifting operations, or
during erecting or dismantling activities. Falling objects present a risk of injury to workers
and the public.
The purpose of a Lifting Plan is to facilitate common understanding amongst the lifting team
for a safe lifting operation. A typical basic Lifting Plan incorporated with PTW as shown in Annex
A is recommended for use at the workplaces. It addresses some key factors affecting safe lifting
operations such as:
• details of the load;
• details of the lifting equipment/ lifting gears used;
• means of communications;
• personnel involved in the lifting operation;
• physical and environmental considerations;
• sequence/ special precautions; and
• sketch of the zone of operation.
Lifting supervisors must brief the lifting team members, which typically consists of the crane
operator,riggerandsignalmen,ontheLiftingPlanbeforecommencementofanyliftingoperation.
The lifting supervisor must stop the lifting operation immediately if it deviates from the Lifting
Plan that has been approved by the project manager.
6. Lifting Plans
8 9
7. Risk Assessment and Permit-to-Work
Risk assessment (RA) is the process of evaluating the probability and consequences of injury
or illness arising from exposure to an identified hazard, and determining the appropriate risk
control measures. The three basic steps of RA are:
1) Hazard Identification
Identify the hazards associated with each work activity and the type of potential accidents/
incidents that can result from the hazards. Some of the examples of hazards associated with
lifting operations are poorly maintained wire ropes, defective safety devices of cranes, improper
rigging methods, and so on.
2) Risk Evaluation
The process of estimating the risk levels of the identified hazards in terms of the severity of any
injuries/ damage if an accident were to occur and the likelihood of its occurrence. For example,
the risk level of workers working underneath a suspended pre-cast component should be
assessed as high risks as the consequences of the load dropping could result in killing the
workers underneath it.
2) Risk Control
Identify appropriate risk control measures to reduce the risk level to an acceptable level. Using
the last example of a suspended pre-cast component, an appropriate risk control measure
would be the establishment of “safe exclusion zones” to prohibit workers from working
directly underneath a suspended load. The exclusion zone should also be demarcated to
prevent any unauthorised entry.
Permit-to-Work (PTW) System is a system to manage and control certain types of hazardous
work including lifting operations. The contractor’s supervisor co-ordinating the lifting
operation is to apply for the PTW to carry out the lifting operation. In the application for PTW,
he should state the scope and conditions in which the lifting operation is to be carried out. An
independent inspection is then conducted on-site to verify that appropriate control measures
have been taken to mitigate any foreseeable risks. After confirming that the measures have
indeed been taken, the application would then be approved by an authorised person (typically
the project manager).
Lifting supervisors must ensure that a permit is issued by the project manager before he
instructs the lifting team to carry out any lifting operation at the worksite. Table 1 illustrates a
typical workflow for the application and approval of a PTW for a lifting operation.
Apply
After a proper RA has been conducted and a written Lifting Plan has been
developed, the supervisor, who is coordinating the lifting operation, is
required to apply to the project manager or the occupier of a worksite
for permission to proceed with the lifting operation. The application,
containing the Lifting Plan, shall be given to the worksite’s appointed safety
assessor for evaluation of the lifting operation.
Assess and Inspect
The appointed safety assessor who is either a Workplace Safety and Health
(WSH) officer or a competent person, upon receipt of the application for a
PTW, shall:
• assess whether all reasonably practicable measures have been taken
to ensure the safety and health of the persons who will be carrying out
the lifting operation in the worksite;
• inspect the site (including its surroundings) where the lifting operation
is to be carried out together with the supervisor of the person who is
to carry out the work to ensure that the lifting operation can be carried
out safely; and
• if the appointed safety assessor is satisfied that the lifting operation
can be carried out safely, he endorses the application and forwards it
to the project manager.
Approve
The project manager shall evaluate the application endorsed by the safety
assessor. If he is satisfied that all reasonably practicable measures to ensure
safe lifting operation are taken and provided, he will approve and issue the
PTW to the supervisor carrying out the work.
Monitor
The project manager of the worksite shall continually review the progress
of the lifting operation being carried out in the worksite to ensure that the
lifting operation is being carried out safely. The supervisor of any person
who carries out the lifting operation in a worksite shall:
• ensure that the measures necessary to ensure the safety and health of
the person at work are taken and are in place at all times during the
validity period of the PTW; and
• inform the project manager of the worksite upon completion of the
lifting operation.
Revoke
If the project manager of a worksite who, after issuing a PTW for the lifting
operation, finds that carrying out the lifting operation poses or is likely
to pose a risk to the safety, health and welfare of persons at work in the
worksite, he may order the lifting operation to cease immediately and
revoke the PTW.
Table 1: Workflow for the application and approval of a permit for a lifting operation.
10 11
8. Statutory Inspection of
Lifting Equipment
Under the WSH (General Provisions) Regulations, lifting equipment such as cranes, lifting
appliances and lifting gears shall be inspected by an authorised examiner:
• at least once every 12 months; or
• at least once every six months for lifting equipment carrying persons.
An authorised examiner must also be engaged to inspect the lifting equipment:
• after modification or repairs of its load bearing components;
• when there is a change in equipment configuration, such as alteration of the boom length
or tower crane height; or
• after an incident or accident involving the lifting equipment.
9. Pre-use Inspection of Lifting Equipment
Lifting supervisor must ensure that the crane operator conduct pre-use inspection before each
lifting operation to ensure that the equipment is suitable, safe and correctly installed for the
lifting operation. The pre-use checks must include:
• visual inspection of the lifting equipment;
• functional test of the lifting equipment;
• functional test of the safety system and devices; and
• functional test of the emergency stop device.
Lifting gears must also be inspected to ensure that they are free of any faults or defects before
any lifting operation can begin.
Lifting supervisor must not allow the lifting operation to be carried out if any defects are
spotted during the pre-use checks by the crane operator until all the faults of the cranes are
fully rectified. Similarly, lifting gears must not be used if defects are spotted and reported by
the riggers.
12 13
Factors affecting the choice of lifting gear for each lifting operation are:
• weight and type of load;
• available lifting points;
• position of the centre of gravity of load;
• mode of use (See Table 2 for a sample chart of Mode Factors which lists the appropriate
types of sling and methods of securing loads to slings.); and
• environment factors (e.g., wind speed conditions).
10. Selection of Lifting Gears
for Lifting Operations
MODE FACTORS
Maximum load to be lifted = mode factor x SWL marked on the sling
Key: NP = non preferred, NA = not applicable
1 2 3 4 5 6 7 8 9
Material
Single leg
in line
Single leg
choked
Single leg
basket
Single
leg back
hooked
Single leg
halshed
Endless in
line
Endless
choked
Endless
basket
0-90°
Chain 1 0.8 1.4 1 NP NP 1 NP
Wire rope 1 1 1.4 1 2 NP 1 1.4
Webbing 1 0.8 1.4 NA NP 1 0.8 1.4
Fibre Rope 1 0.8 1.4 1 1.6 1 0.8 1.4
Roundsling NA NA NA NA NA 1 0.8 1.4
Table 2: A sample Mode Factors chart.
11. Estimation of Weight of Load
The following may be used as a general guidance to estimate the weight of load going to be
lifted in the lifting operation.
• Check if the weight is marked on the load.
• Check if the weight is indicated on any documentation (e.g., shipping documents).
• Check if the weight is indicated on the construction drawing of the load.
• If the load is still on a trailer or truck, weigh it physically over a bridge.
• Estimate the weight using Table 3 or the formulae in Figure 2 (note that factors such as
site conditions, water content, decomposition, irregular shapes and residues in vessels can
affect the accuracy of load weight to be estimated).
Material Type Weight (kg) per m3
Oil 800
Concrete 2,400
Brick 2,100
Water 1,000
Steel and Iron 7,700
Aluminium 2,700
Earth 1,600
Paper 1,120
Copper 8,800
Lead 11,200
Wood 800
1,000 kgs = 1 ton
Table 3: Average weight of various materials.
14 15
Pyramid = ¼ l b h Solid cyclinder = π r2
l
Thick walled pipe = π (r1
2
- r2
2
) l Thin walled pipe = π d l t
Rectangular solid = l b h Sphere = 4 π r3
3
Figure 2: Volumes of common shapes.
12. Recommended Rigging and
Slinging Methods
The Included Angle of Slings
• It is important to be aware of the increased loadings on the slings when lifting at larger
included angles or smaller sling angles. For rigging configurations with two-legged slings,
the included angle should not exceed 90° as this will reduce the SWL of the slings.
• The slings must sit in the base of the hook and be clear of the latch to prevent fouling of
the latch.
Rig to the Centre of Gravity (C.G.)
				
Figure 4: Good load control starts with rigging the load to the centre of gravity directly below the load
hook.
				
Figure 3: The working load limit is valid for a single leg or multiple legs.
C.G.
45° 45°
Included Angle
90° Maximum
Sling Angle Sling Angle
16 17
Hinge Points Chain Slings
Figure 5: Use a single master link for a single
and two-legged chain slings.
Figure 6: Use a master link with sub-links for
three- or four-legged chain slings.
Hinge Points Wire Rope and Synthetic Slings
Figure 7: Use a single master link instead
of placing wire rope slings directly on the
load hook.
Figure 8: Use a master link with sub-links for
all three- or four-legged wire rope slings.
Figure 9: Prevent fouling of safety latch
on load. Sling in base of hook.
Fouling of Latch
Figure 10: Sling fouled on latch.
Connection of Slings to Shackles
Figure 12: Use a shackle that is large enough
to prevent pinching of the synthetic slings.
Figure 11: Use a shackle with diameter
greater than wire rope diameter if there is no
thimble in the eye.
18 19 20
13. Recommended Crane Signals
Jib Up Travel to me
Jib Down
Derricking Jib
Travel from me
Figure 13: Recommended crane signals.
Signal with both hands.
Hoist Slew Left
Lower Slew Right
Clench and unclench fingers
to signal take the strain.
Arm extended, pointing with finger
in direction of swing of boom.
Signalwithonehand.Otherhandonhead.
Clench and unclench fingers
to signal inch the load.
Retract Jib/
Trolley In
Emergency
Stop
Extend Jib/
Trolley Out
Stop
Telescoping Jib / Horizontal Jib
Signalwithonehand.Otherhandonhead.
14. Annex A: Sample Basic Lifting Plan
Sample Basic Lifting Plan
1. General
Project
Location of lifting operation
Contractor carrying out the
lifting operation
Date/ time of lifting
operation
Validity period of
lifting operation
2. Details of the Load/s
Description of load/s
Overall dimensions
Weight of load Kg / tonne  Known weight  Estimated weight
Centre of gravity  Obvious  Estimated  Determined by drawing
3. Details of the Lifting Equipment/ Lifting Gears
Type of lifting
equipment:
Maximum SWL as
certified on the LM cert
Date of last
certification
Max boom / Jib length m Fly jib / offset
Intended load radius
Distance between the load and the crane
SWL at this radius
Type of lifting gears Slings / webbing / chains / shackles / spreader beam / receptacle
Combined weight of the
lifting gears Kg / tonne
Certification of
lifting gears
 Yes
 No
SWL of LG Kg / tonne
4. Means of Communications
Can the operator see the loading and unloading point for the load from his position?
 Yes  No
What are the means of communication between the lifting crew?
 Standard hand signals  Radio  Others _________________
5. Personnel Involved In Lifting Operation
Position Name Qualification/ Experience
Site Supervisor
Lifting Supervisor
Crane Operator/
Lift Equipment Operator
Rigger
Signalman
Others (please state)
21 22 23
Applied by: Signature: Date:
Name: Time:
Prepared by: Signature: Date:
Name: Time:
Assessed by: Signature: Date:
Name: Time:
Approved by: Signature: Date:
Name: Time:
7. Sequence / Special Precautions 8. Sketch of the zone of operation:
(It is recommended that you include the initial
location of the load, the final location and path
of the load. It is also important to indicate any
obstructions or equipment that may obstruct the
lifting operation).
• Code of Practice on Safe Lifting Operation in the Workplace, First revision 2013.
• SS536: 2008 Code of Practice for the Safe Use of Mobile Cranes.
• SS559: 2010 Code of Practice for the Safe Use of Tower Cranes.
• SS343 – Part 1: 2001 Specification for Lifting Gear – Wire Rope Slings.
• SS343 – Part 2: 1989 Specification for Lifting Gear – Hooks.
• SS343 – Part 3: 1990 Specification for Lifting Gear – Shackles.
• SS497: 2002 Specification for Design, Safe Use and Maintenance of OverheadTravelling Cranes.
• Lifting Equipment - A User’s Pocket Guide published by LEEA, UK.
• The Lifting Engineers Handbook published by LEEA, UK.
• Best Rigging Practices by Crosby Group Inc.
• Worker’s Safety Handbook for Crane Operator, 2011.
• Worker’s Safety Handbook for Rigger and Signalman, 2011.
• Worker’s Safety Handbook for Lorry Crane Operator, 2012.
15. Useful References
Note:
1. This is only a sample Lifting Plan, the content is by no means comprehensive. Users would have to
include key critical document and information such as load capacity chart, range diagram, rigging
method, sling angle, etc to ensure safe lifting operations.
2. Further guidance can be obtained from the following collaterals:
• Guidebook for Lifting Supervisors
• Worker’s Handbook for Crane Operator
• Worker’s Handbook for Rigger and Signalman
6. Physical and Environmental Consideration (please include any details in the space provided)
Ground
conditions:
Is the ground made safe (e.g., placing steel plate)?
 Yes  No
___________________________________________________________
Are the outriggers evenly extended?
 Yes  No
___________________________________________________________
Obstacles:
Are there any overhead obstacles such as power lines?
 Yes  No
___________________________________________________________
Are there nearby buildings or structure, equipment or stacked materials
that may obstruct lifting operation from being carried out safely?  Yes  No
___________________________________________________________
Lighting:
Is the lighting condition adequate?
 Yes  No
___________________________________________________________
Demarcation:
Has the zone of operation been barricaded (with warning signs and
barriers) to prevent unauthorised access?  Yes  No
___________________________________________________________
Environment:
Do not proceed with the lifting operation under the following circumstances:
 Thunderstorm and lightning strikes in the area. The ground condition must be
checked after a thunderstorm.
 Strong winds that may sway the suspended load.
 Other circumstances (please specify).
24 25
This page is meant to be blank This page is meant to be blank
26
This page is meant to be blank

More Related Content

PPTX
308585532-Presentation-about-lifting.pptx
PDF
Industrial-Vehicle-Guide_042524 PDF 3.pdf
PDF
l (3).pdfwaddafe,;,f;l,eal;'g,;g,:<D:">F<:>ADS:"ELR
PPTX
Converted_Rigging_Slinging_Training_Northstar (1).pptx
PDF
Align_Lifting Induction_A5_4Mar M00R.pdf
PDF
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
PPTX
Summary of all type of lifting_16th Nov.pptx
PPTX
Crane Operation - Lifting
308585532-Presentation-about-lifting.pptx
Industrial-Vehicle-Guide_042524 PDF 3.pdf
l (3).pdfwaddafe,;,f;l,eal;'g,;g,:<D:">F<:>ADS:"ELR
Converted_Rigging_Slinging_Training_Northstar (1).pptx
Align_Lifting Induction_A5_4Mar M00R.pdf
252113184 method-statement-for-office-container-and-equipment-mobilization (1)
Summary of all type of lifting_16th Nov.pptx
Crane Operation - Lifting

Similar to Lifting_Supervisors_Guidebook_Revised_2014.pdf (20)

PDF
2000 08 safe use of mobile cranes in construction sites
PDF
Sfpsg the safe use of telehandlers in construction 110210 a
PPTX
A critical lift plan designed specifically for the critical lift .pptx
DOCX
Overhead Crane Safety: Mitigating Lifting Hazards
PDF
Overhead Crane Safety_ Mitigating Lifting Hazards (1).pdf
PDF
26.pdf
PDF
Safety Tip: 10 Steps to Safer Crane Operation
PDF
Crane Safety Tips for Construction Project..pdf
PDF
Forklift Operations: Safety through Cartoons
PDF
Forklift Operations: Safety through Cartoons
PPT
TS-1 - PPT MAGESH.ppt
PPTX
Manual handling
PPT
TS-1 - PPT - VISHNURAJ G.ppt
DOCX
Liffting supervisor
PDF
Segurança no uso, manutenção, limpeza e regulamentação de pontes rolantes
PDF
Cranes for You - Everything about the Appointed Person.pdf
PPTX
Lifting and Rigging Safety Training.pptx
PPTX
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
PDF
CRANE SAFETY HANDBOOK
DOCX
9 lifting operations with tower crane risk assessment templates
2000 08 safe use of mobile cranes in construction sites
Sfpsg the safe use of telehandlers in construction 110210 a
A critical lift plan designed specifically for the critical lift .pptx
Overhead Crane Safety: Mitigating Lifting Hazards
Overhead Crane Safety_ Mitigating Lifting Hazards (1).pdf
26.pdf
Safety Tip: 10 Steps to Safer Crane Operation
Crane Safety Tips for Construction Project..pdf
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
TS-1 - PPT MAGESH.ppt
Manual handling
TS-1 - PPT - VISHNURAJ G.ppt
Liffting supervisor
Segurança no uso, manutenção, limpeza e regulamentação de pontes rolantes
Cranes for You - Everything about the Appointed Person.pdf
Lifting and Rigging Safety Training.pptx
الروافع البرجيه واخطارها والتعامل معها. ومكوناتها
CRANE SAFETY HANDBOOK
9 lifting operations with tower crane risk assessment templates
Ad

Recently uploaded (20)

PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PPTX
History, Philosophy and sociology of education (1).pptx
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PPTX
Introduction to Building Materials
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
PPTX
Unit 4 Skeletal System.ppt.pptxopresentatiom
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
IGGE1 Understanding the Self1234567891011
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
PPTX
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
PDF
advance database management system book.pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
Final Presentation General Medicine 03-08-2024.pptx
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
History, Philosophy and sociology of education (1).pptx
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
Orientation - ARALprogram of Deped to the Parents.pptx
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Introduction to Building Materials
UNIT III MENTAL HEALTH NURSING ASSESSMENT
Unit 4 Skeletal System.ppt.pptxopresentatiom
202450812 BayCHI UCSC-SV 20250812 v17.pptx
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Paper A Mock Exam 9_ Attempt review.pdf.
IGGE1 Understanding the Self1234567891011
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
Chinmaya Tiranga quiz Grand Finale.pdf
What if we spent less time fighting change, and more time building what’s rig...
Chinmaya Tiranga Azadi Quiz (Class 7-8 )
advance database management system book.pdf
Ad

Lifting_Supervisors_Guidebook_Revised_2014.pdf

  • 1. Published in July 2011 by the Workplace Safety and Health Council in collaboration with the Ministry of Manpower. All rights reserved. This publication may not be reproduced or transmitted in any form or by any means, in whole or in part, without prior written permission. The information provided in this publication is accurate as at time of printing. All cases shared in this publication are meant for learning purposes only. The learning points for each case are not exhaustive and should not be taken to encapsulate all the responsibilities and obligations of the user of this publication under the law. The Workplace Safety and Health Council does not accept any liability or responsibility to any party for losses or damage arising from following this publication. This publication is available on the Workplace Safety and Health Council Website: www.wshc.sg Email: contact@wshc.sg Guidebook for Lifting Supervisors
  • 2. Year of issue: 2011 First revision: 2014
  • 3. Contents 1. Introduction and Background 2 2. Common Systematic Lapses Involving Lifting Activities 3 3. Roles and Responsibilities of Lifting Supervisors 4 4. Common Hazards Associated with Unsecured/ Slippage of Loads 5 5. Common Hazards Associated with Lifting Operations Involving Mobile Cranes 6 6. Lifting Plans 7 7. Risk Assessment and Permit-to-Work 8 8. Statutory Inspection of Lifting Equipment 10 9. Pre-use Inspection of Lifting Equipment 11 10. Selection of Lifting Gears for Lifting Operations 12 11. Estimation of Weight of Load 13 12. Recommended Rigging and Slinging Methods 15 13. Recommended Crane Signals 18 14. Annex A: Sample Basic Lifting Plan 19 15. Useful References 23
  • 4. 2 3 1. Introduction and Background Accident statistics have shown that fatalities and dangerous occurrences1 at workplace involving lifting equipment such as cranes has been on an uptrend over the last few years (see Chart 1). Such accidents include failures or toppling of heavy lifting equipment such as cranes during lifting activities, as well as workers being struck by falling or swinging objects while being lifted. From these statistics, there is still much to be done to improve our crane and lifting safety practices at our workplaces. The safe execution of lifting activities is a multi-party effort. Every stakeholder in the value chain (i.e., manufacturers, crane contractors, engineers and designers, project managers, lifting supervisors, operators and workers) has a stake in the lifting operation and must do their part to ensure the safe operation of the lifting work at all times. The role of the lifting team, which comprises the lifting supervisor, crane operator, rigger and signalman, is crucial to ensure safe lifting activities at workplaces. Many of these past accidents had shown that proper planning, co-ordination and supervision of the lifting work could have prevented the accidents and the needless loss of lives. In particular, the role of the lifting supervisor is key especially given the collaborative nature of the work and the importance of ensuring that the various parties are trained and competent, and that they carry out their roles safely and effectively. This Guidebook for Lifting Supervisors is developed to provide greater practical guidance for lifting supervisors to ensure safe supervision of lifting work at the workplace. The Guidebook not only provides guidelines on the roles and responsibilities but also information on common hazards associated with lifting, Lifting Plans, Risk Assessment (RA), Permit-to-Work (PTW) System and Safe Work Procedures (SWP), and recommended rigging and crane signals. Chart 1: Crane-related fatalities and dangerous occurences, 2007-2012. 1 Dangerous occurrences are incidents involving collapse or failure of a crane, derrick, winch, hoist, piling frame or other appliance used in raising or lowering persons or goods, or any load bearing part thereof (except breakage of chain or rope slings), or the overturning of a crane. 30 25 20 15 10 5 0 2007 2008 2009 2010 2011 2012 2 26 6 20 5 18 Fatal Dangerous Ocurrence 4 17 5 18 10 21 2. Common Systemic Lapses Involving Lifting Activities Accidents involving lifting activities occur due to many reasons. However, investigations into such accidents often reveal that the primary causes could be attributed to poor planning, supervision and co-ordination of the lifting operations. Effective implementation of a comprehensive Lifting Plan which comprises comprehensive RA, clear method statement/ SWP, use of suitable lifting equipment, competent lifting team, and PTW system will ensure safe lifting operations at all workplaces. The following is a list of common systemic lapses that often lead to accidents involving lifting activities. • Absence or lack of RA prior to lifting operation. • Lack of implementation of relevant control measures identified in RA. • Absence or lack of proper Lifting Plan for each lifting operation. • Absence or lack of a PTW system to manage the lifting operation. • Failure to adopt a proper rigging method for the lifting operation. • Poor maintenance of lifting equipment (e.g., safety devices, lifting gears). • Poor site control (e.g., failure to maintain a “safe exclusion zone”with barricades/ barriers so that workers not involved in the lifting operation are prohibited from entering the lifting area).
  • 5. 4 5 3. Roles and Responsibilities of Lifting Supervisors Lifting supervisors appointed for tower or mobile cranes at the worksites must complete the Lifting Supervisors Safety Course conducted by an accredited training provider. They must also have relevant experience in lifting operations for at least one year. The duties and responsibilities of a lifting supervisor include: • co-ordinating and supervising all lifting activities in accordance with the Lifting Plan; • briefing all lifting team members (i.e., crane operators, riggers and signalmen) on the Lifting Plan, risk control measure and safe lifting procedure before the commencement of any lifting operation; • ensuring that only registered crane operators, appointed riggers and appointed signalmen participate in any lifting operation involving the use of mobile and tower cranes; • ensuring that the ground conditions are safe for any lifting operation to be performed by mobile cranes; • be present during all lifting operations; and • if unsafe conditions are reported to him, to take suitable measures to rectify the conditions so that the lifting operation can be conducted safely. Many accidents occurred due to unsecured loads or loads that slipped off during lifting. The following are some common hazards associated with lifting of loads: • defective or damaged lifting gears such as slings, hooks, inserts, eyes, shackles; • improper rigging of loads; • lack of proper receptacles for loose loads such as bricks; or • under capacity of lifting gears. 4. Common Hazards Associated with Unsecured/ Slippage of Loads Figure 1: Defective or damaged crane hooks.
  • 6. 6 7 6 5. Common Hazards Associated with Lifting Operations Involving Mobile Cranes Accidents involving mobile cranes are one of the more common types of crane-related incidents. Many accidents occurred due to either structural failure of the load bearing part of the crane or toppling or collapsing of cranes when they became unstable. The following are some common hazards associated with lifting operations involving mobile cranes. (a) Structural failure of crane component such as the boom, jib, hydraulic rams or wire rope due to the crane being loaded beyond its loading capacity. (b) The stability of the cranes can be affected by: • poor ground conditions (e.g., unstable ground); • failure to use or fully extend outriggers or stabilisers; • failure to level the crane; • rapid derricking, slewing or manoeuvring; • overloading of cranes; • bypassing of safety devices; or • high wind conditions. (c) Contact or collision due to insufficient safe clearance space between mobile crane and other buildings or structures (e.g., other cranes, overhead power lines, etc). (d) Falling objects as a result of improper securing of loads during lifting operations, or during erecting or dismantling activities. Falling objects present a risk of injury to workers and the public. The purpose of a Lifting Plan is to facilitate common understanding amongst the lifting team for a safe lifting operation. A typical basic Lifting Plan incorporated with PTW as shown in Annex A is recommended for use at the workplaces. It addresses some key factors affecting safe lifting operations such as: • details of the load; • details of the lifting equipment/ lifting gears used; • means of communications; • personnel involved in the lifting operation; • physical and environmental considerations; • sequence/ special precautions; and • sketch of the zone of operation. Lifting supervisors must brief the lifting team members, which typically consists of the crane operator,riggerandsignalmen,ontheLiftingPlanbeforecommencementofanyliftingoperation. The lifting supervisor must stop the lifting operation immediately if it deviates from the Lifting Plan that has been approved by the project manager. 6. Lifting Plans
  • 7. 8 9 7. Risk Assessment and Permit-to-Work Risk assessment (RA) is the process of evaluating the probability and consequences of injury or illness arising from exposure to an identified hazard, and determining the appropriate risk control measures. The three basic steps of RA are: 1) Hazard Identification Identify the hazards associated with each work activity and the type of potential accidents/ incidents that can result from the hazards. Some of the examples of hazards associated with lifting operations are poorly maintained wire ropes, defective safety devices of cranes, improper rigging methods, and so on. 2) Risk Evaluation The process of estimating the risk levels of the identified hazards in terms of the severity of any injuries/ damage if an accident were to occur and the likelihood of its occurrence. For example, the risk level of workers working underneath a suspended pre-cast component should be assessed as high risks as the consequences of the load dropping could result in killing the workers underneath it. 2) Risk Control Identify appropriate risk control measures to reduce the risk level to an acceptable level. Using the last example of a suspended pre-cast component, an appropriate risk control measure would be the establishment of “safe exclusion zones” to prohibit workers from working directly underneath a suspended load. The exclusion zone should also be demarcated to prevent any unauthorised entry. Permit-to-Work (PTW) System is a system to manage and control certain types of hazardous work including lifting operations. The contractor’s supervisor co-ordinating the lifting operation is to apply for the PTW to carry out the lifting operation. In the application for PTW, he should state the scope and conditions in which the lifting operation is to be carried out. An independent inspection is then conducted on-site to verify that appropriate control measures have been taken to mitigate any foreseeable risks. After confirming that the measures have indeed been taken, the application would then be approved by an authorised person (typically the project manager). Lifting supervisors must ensure that a permit is issued by the project manager before he instructs the lifting team to carry out any lifting operation at the worksite. Table 1 illustrates a typical workflow for the application and approval of a PTW for a lifting operation. Apply After a proper RA has been conducted and a written Lifting Plan has been developed, the supervisor, who is coordinating the lifting operation, is required to apply to the project manager or the occupier of a worksite for permission to proceed with the lifting operation. The application, containing the Lifting Plan, shall be given to the worksite’s appointed safety assessor for evaluation of the lifting operation. Assess and Inspect The appointed safety assessor who is either a Workplace Safety and Health (WSH) officer or a competent person, upon receipt of the application for a PTW, shall: • assess whether all reasonably practicable measures have been taken to ensure the safety and health of the persons who will be carrying out the lifting operation in the worksite; • inspect the site (including its surroundings) where the lifting operation is to be carried out together with the supervisor of the person who is to carry out the work to ensure that the lifting operation can be carried out safely; and • if the appointed safety assessor is satisfied that the lifting operation can be carried out safely, he endorses the application and forwards it to the project manager. Approve The project manager shall evaluate the application endorsed by the safety assessor. If he is satisfied that all reasonably practicable measures to ensure safe lifting operation are taken and provided, he will approve and issue the PTW to the supervisor carrying out the work. Monitor The project manager of the worksite shall continually review the progress of the lifting operation being carried out in the worksite to ensure that the lifting operation is being carried out safely. The supervisor of any person who carries out the lifting operation in a worksite shall: • ensure that the measures necessary to ensure the safety and health of the person at work are taken and are in place at all times during the validity period of the PTW; and • inform the project manager of the worksite upon completion of the lifting operation. Revoke If the project manager of a worksite who, after issuing a PTW for the lifting operation, finds that carrying out the lifting operation poses or is likely to pose a risk to the safety, health and welfare of persons at work in the worksite, he may order the lifting operation to cease immediately and revoke the PTW. Table 1: Workflow for the application and approval of a permit for a lifting operation.
  • 8. 10 11 8. Statutory Inspection of Lifting Equipment Under the WSH (General Provisions) Regulations, lifting equipment such as cranes, lifting appliances and lifting gears shall be inspected by an authorised examiner: • at least once every 12 months; or • at least once every six months for lifting equipment carrying persons. An authorised examiner must also be engaged to inspect the lifting equipment: • after modification or repairs of its load bearing components; • when there is a change in equipment configuration, such as alteration of the boom length or tower crane height; or • after an incident or accident involving the lifting equipment. 9. Pre-use Inspection of Lifting Equipment Lifting supervisor must ensure that the crane operator conduct pre-use inspection before each lifting operation to ensure that the equipment is suitable, safe and correctly installed for the lifting operation. The pre-use checks must include: • visual inspection of the lifting equipment; • functional test of the lifting equipment; • functional test of the safety system and devices; and • functional test of the emergency stop device. Lifting gears must also be inspected to ensure that they are free of any faults or defects before any lifting operation can begin. Lifting supervisor must not allow the lifting operation to be carried out if any defects are spotted during the pre-use checks by the crane operator until all the faults of the cranes are fully rectified. Similarly, lifting gears must not be used if defects are spotted and reported by the riggers.
  • 9. 12 13 Factors affecting the choice of lifting gear for each lifting operation are: • weight and type of load; • available lifting points; • position of the centre of gravity of load; • mode of use (See Table 2 for a sample chart of Mode Factors which lists the appropriate types of sling and methods of securing loads to slings.); and • environment factors (e.g., wind speed conditions). 10. Selection of Lifting Gears for Lifting Operations MODE FACTORS Maximum load to be lifted = mode factor x SWL marked on the sling Key: NP = non preferred, NA = not applicable 1 2 3 4 5 6 7 8 9 Material Single leg in line Single leg choked Single leg basket Single leg back hooked Single leg halshed Endless in line Endless choked Endless basket 0-90° Chain 1 0.8 1.4 1 NP NP 1 NP Wire rope 1 1 1.4 1 2 NP 1 1.4 Webbing 1 0.8 1.4 NA NP 1 0.8 1.4 Fibre Rope 1 0.8 1.4 1 1.6 1 0.8 1.4 Roundsling NA NA NA NA NA 1 0.8 1.4 Table 2: A sample Mode Factors chart. 11. Estimation of Weight of Load The following may be used as a general guidance to estimate the weight of load going to be lifted in the lifting operation. • Check if the weight is marked on the load. • Check if the weight is indicated on any documentation (e.g., shipping documents). • Check if the weight is indicated on the construction drawing of the load. • If the load is still on a trailer or truck, weigh it physically over a bridge. • Estimate the weight using Table 3 or the formulae in Figure 2 (note that factors such as site conditions, water content, decomposition, irregular shapes and residues in vessels can affect the accuracy of load weight to be estimated). Material Type Weight (kg) per m3 Oil 800 Concrete 2,400 Brick 2,100 Water 1,000 Steel and Iron 7,700 Aluminium 2,700 Earth 1,600 Paper 1,120 Copper 8,800 Lead 11,200 Wood 800 1,000 kgs = 1 ton Table 3: Average weight of various materials.
  • 10. 14 15 Pyramid = ¼ l b h Solid cyclinder = π r2 l Thick walled pipe = π (r1 2 - r2 2 ) l Thin walled pipe = π d l t Rectangular solid = l b h Sphere = 4 π r3 3 Figure 2: Volumes of common shapes. 12. Recommended Rigging and Slinging Methods The Included Angle of Slings • It is important to be aware of the increased loadings on the slings when lifting at larger included angles or smaller sling angles. For rigging configurations with two-legged slings, the included angle should not exceed 90° as this will reduce the SWL of the slings. • The slings must sit in the base of the hook and be clear of the latch to prevent fouling of the latch. Rig to the Centre of Gravity (C.G.) Figure 4: Good load control starts with rigging the load to the centre of gravity directly below the load hook. Figure 3: The working load limit is valid for a single leg or multiple legs. C.G. 45° 45° Included Angle 90° Maximum Sling Angle Sling Angle
  • 11. 16 17 Hinge Points Chain Slings Figure 5: Use a single master link for a single and two-legged chain slings. Figure 6: Use a master link with sub-links for three- or four-legged chain slings. Hinge Points Wire Rope and Synthetic Slings Figure 7: Use a single master link instead of placing wire rope slings directly on the load hook. Figure 8: Use a master link with sub-links for all three- or four-legged wire rope slings. Figure 9: Prevent fouling of safety latch on load. Sling in base of hook. Fouling of Latch Figure 10: Sling fouled on latch. Connection of Slings to Shackles Figure 12: Use a shackle that is large enough to prevent pinching of the synthetic slings. Figure 11: Use a shackle with diameter greater than wire rope diameter if there is no thimble in the eye.
  • 12. 18 19 20 13. Recommended Crane Signals Jib Up Travel to me Jib Down Derricking Jib Travel from me Figure 13: Recommended crane signals. Signal with both hands. Hoist Slew Left Lower Slew Right Clench and unclench fingers to signal take the strain. Arm extended, pointing with finger in direction of swing of boom. Signalwithonehand.Otherhandonhead. Clench and unclench fingers to signal inch the load. Retract Jib/ Trolley In Emergency Stop Extend Jib/ Trolley Out Stop Telescoping Jib / Horizontal Jib Signalwithonehand.Otherhandonhead. 14. Annex A: Sample Basic Lifting Plan Sample Basic Lifting Plan 1. General Project Location of lifting operation Contractor carrying out the lifting operation Date/ time of lifting operation Validity period of lifting operation 2. Details of the Load/s Description of load/s Overall dimensions Weight of load Kg / tonne  Known weight  Estimated weight Centre of gravity  Obvious  Estimated  Determined by drawing 3. Details of the Lifting Equipment/ Lifting Gears Type of lifting equipment: Maximum SWL as certified on the LM cert Date of last certification Max boom / Jib length m Fly jib / offset Intended load radius Distance between the load and the crane SWL at this radius Type of lifting gears Slings / webbing / chains / shackles / spreader beam / receptacle Combined weight of the lifting gears Kg / tonne Certification of lifting gears  Yes  No SWL of LG Kg / tonne 4. Means of Communications Can the operator see the loading and unloading point for the load from his position?  Yes  No What are the means of communication between the lifting crew?  Standard hand signals  Radio  Others _________________ 5. Personnel Involved In Lifting Operation Position Name Qualification/ Experience Site Supervisor Lifting Supervisor Crane Operator/ Lift Equipment Operator Rigger Signalman Others (please state)
  • 13. 21 22 23 Applied by: Signature: Date: Name: Time: Prepared by: Signature: Date: Name: Time: Assessed by: Signature: Date: Name: Time: Approved by: Signature: Date: Name: Time: 7. Sequence / Special Precautions 8. Sketch of the zone of operation: (It is recommended that you include the initial location of the load, the final location and path of the load. It is also important to indicate any obstructions or equipment that may obstruct the lifting operation). • Code of Practice on Safe Lifting Operation in the Workplace, First revision 2013. • SS536: 2008 Code of Practice for the Safe Use of Mobile Cranes. • SS559: 2010 Code of Practice for the Safe Use of Tower Cranes. • SS343 – Part 1: 2001 Specification for Lifting Gear – Wire Rope Slings. • SS343 – Part 2: 1989 Specification for Lifting Gear – Hooks. • SS343 – Part 3: 1990 Specification for Lifting Gear – Shackles. • SS497: 2002 Specification for Design, Safe Use and Maintenance of OverheadTravelling Cranes. • Lifting Equipment - A User’s Pocket Guide published by LEEA, UK. • The Lifting Engineers Handbook published by LEEA, UK. • Best Rigging Practices by Crosby Group Inc. • Worker’s Safety Handbook for Crane Operator, 2011. • Worker’s Safety Handbook for Rigger and Signalman, 2011. • Worker’s Safety Handbook for Lorry Crane Operator, 2012. 15. Useful References Note: 1. This is only a sample Lifting Plan, the content is by no means comprehensive. Users would have to include key critical document and information such as load capacity chart, range diagram, rigging method, sling angle, etc to ensure safe lifting operations. 2. Further guidance can be obtained from the following collaterals: • Guidebook for Lifting Supervisors • Worker’s Handbook for Crane Operator • Worker’s Handbook for Rigger and Signalman 6. Physical and Environmental Consideration (please include any details in the space provided) Ground conditions: Is the ground made safe (e.g., placing steel plate)?  Yes  No ___________________________________________________________ Are the outriggers evenly extended?  Yes  No ___________________________________________________________ Obstacles: Are there any overhead obstacles such as power lines?  Yes  No ___________________________________________________________ Are there nearby buildings or structure, equipment or stacked materials that may obstruct lifting operation from being carried out safely?  Yes  No ___________________________________________________________ Lighting: Is the lighting condition adequate?  Yes  No ___________________________________________________________ Demarcation: Has the zone of operation been barricaded (with warning signs and barriers) to prevent unauthorised access?  Yes  No ___________________________________________________________ Environment: Do not proceed with the lifting operation under the following circumstances:  Thunderstorm and lightning strikes in the area. The ground condition must be checked after a thunderstorm.  Strong winds that may sway the suspended load.  Other circumstances (please specify).
  • 14. 24 25 This page is meant to be blank This page is meant to be blank
  • 15. 26 This page is meant to be blank