pg 
DANCO METAL FINISHING
	 TENT IMPROVEMENT 	
	  MEZZANINE
LOCATION: 1745 Monticello
	 Ontario, CA 91761
PROJECT SUMMARY:
Danco Metal Surfacing Company is planed
to the following “tenant improved”, which
entailed Modifying the existing office and
warehouse space and the installation of a
mezzanine area.
SCOPE OF WORK: My participation
throughout this project started with task
of picking up existing redlines, and draft-
ing the missing details. Upon which i need
to coordinated between the various gov-
ernmental agencies and act as project
coordinator with the on site project man-
ager.
FINISHED FLOOR PLAN OF THE OVERALL
BUILDING.
GENERAL CONSOLIDATED CONSTRUCTORS
 MANNING ENGINEERING
pg 
MASONRY CONSTRUCTION DETAILS CRE-
ATED FOR THE MECHANICAL ROOM. ALL
DETAILS WHERE CREATED BY AUTOCAD
2012.
18'-6
16'-0
17'-0
(E) CONC.
SLAB
(E) TILT-UP
CONC. WALL
(N) MASONRY
COLUMN
7/8 WITH EPOXY COATING
CEMENT PLASTER AT
UNDERSIDE
(E) 2X15 RAFTER
10 OFF, EQ. SPACED
(E) SUB-PURLINS
2X4 @ 2' O.C. TYP
(E) 6X18 BEAM
(N) MASONRY
COLUMN
(E) CONC. COLUMN
(IN BACKGROUND)
(N) MASONRY
COLUMN
SAW CUT (E)SLAB
FOR (N) SLAB SLOPED
(N) CONC. BLOCK
WALL PER STRUCT.
(E) REINF. CONC.
SLAB
FLOOR PIT
PER DETAIL
LOWEST POINT
IN ROOM
CONT. PLASTIC LINER
SEE DETAIL 1 OF D-1
(N) REINF. CONC.
SLAB PER STRUCT.
1/4PER FT. SLOPE
(E) FOOTING
3X PLATE
(E) 6X18 BEAM
1/4 : 12
(E) CONC. COLUMN
(IN BACKGROUND)
(N) MASONRY
COLUMN
(N) MASONRY
COLUMN (N) EQUIPMENT ON RAISED
ON CONC. PAD
(N) 4X BEAM
SEE STRUCT.
SECTION A SCALE: 1/4 = 1'-0
14' - 0
TORCHDOWN
MODIFIED BITUMEN MEMBRANE ROOFING W/ MINERAL
GRANULAR SURFACE, COLOR; TBD AS MANUFACTURED
BY CERTAINTEED CORP, FLINTASTIC GTA,
ICC-ES ESR-1388 OVER 1-PLY 30# GLASBASE
(OR EQUAL) OVER CDX PLYWOOD
(E) PARAPET
(N) 8 THK CONC.
BLOCKWALL
(N) REINF. CONC. SLAB
PER STRUCT.
20' - 0
(E) ROLL - DOOR
TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE
TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE
20' - 0
GENERALCONSOLIDATEDINC.
DANCO,EN,LLC.
TENANTIMPROVEMENT
REVISIO
4/8/1
MEZZANINE 
CONTAINMENT SECTION
DETAILS ELEVATIONS AND SECTION
pg 
SUPERIOR QUALITY
FOODS
LOCATION: 2355 EAST FRANCIS ST.
	 Ontario, CA 91761
PROJECT SUMMARY:
Superior Quality Food wished to expand
the production of existing product line by
the installation of two new boilers and the
demolition of the existing boiler.
SCOPE OF WORK: This project was de-
sign build within General Consolidated
Constructors. The design was created by
Rob McCoy  myself based on a previous
project. This project was created with
Autocad 2012.
FLOOR PLAN
GENERAL CONSOLIDATED CONSTRUCTORS
 MANNING ENGINEERING
SITE PLAN
FLOOR PLAN OF THE NEW BOILER
EXTENSION.
pg 
ELEVATION AND DETAILSROOF PLAN
ROOF PLAN OF THE BOILER CANOPY. STRUCTURAL SECTION OF THE CANOPY POST CONNECTION
EQUIPMENT ELEVATION
pg 
LA ZAMORANA CANDY
					 CO.
LOCATION: 7700 WILSON AVE.
	 HUNTINGTON PARK , CA 91761
PROJECT SUMMARY:
La Zamorana Candy Co. required a new fa-
cility in order to me the expanding. So the
construction of a new production kitchen
and waste line as a “tenant improve-
ment” was required.
SCOPE OF WORK: This project was design
build within General Consolidated Con-
structors. The design was created by Rob
McCoy based on the requirement given
to us by the client. The difficulty of this
project was coordinate between Public
Health and Industrial Waste.
GENERAL CONSOLIDATED CONSTRUCTORS
 HAITHAM ENGINEERING
FLOOR PLAN WAS CREATED IN AUTOCAD 2012. THEY
LAYOUT OF THE DESIGN WAS CREATED BY ROB MCCOY
AND MY SELF BASED ON THE FUTURE NEEDS OF THE
CLIENT
pg 
STRUCTURAL DETAIL STAIR SECTION AND INTERIOR EQUIPMENT ELEVATION
THE STRUCTURAL DETAIL WAS
CREATED UNDER THE DIRECTION
OF THE PROJECT ENGINEER.

More Related Content

DOCX
Gagnon Patrice new CV3 light
PDF
Regeneration of Daneshouse
PDF
Multi Town House Current Projects
DOC
Jeff Jvancich Resume 2016
PPTX
Central West Fall Open House - Oct 28 2019
DOCX
ATT_1442257750728_matt resume
DOC
Jesus Mendoza .CV 2016
Gagnon Patrice new CV3 light
Regeneration of Daneshouse
Multi Town House Current Projects
Jeff Jvancich Resume 2016
Central West Fall Open House - Oct 28 2019
ATT_1442257750728_matt resume
Jesus Mendoza .CV 2016

What's hot (20)

PDF
27 Hurst Ave
PDF
Scott M Tidwell Resume 030415
PDF
Cedarvale-Forest Hill CLC Presentation - November 27 2019
PDF
SIMON DESIGN ENGINEERING
PDF
Uniworld garden-2 up date
PPTX
Fairbank & Oakwood Construction Liaison Committee July 2018
DOCX
dave resume sept 2015
PDF
Western works final
PDF
Superintendent Portfolio
DOC
SP-6-05 Flagler Avenue Retail-Residential Project
PDF
Cedarvale- Forest Hill Construction Update (July 29, 2020)
PPTX
Rehab work & costing
DOC
Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)
PDF
CLC: Leaside and Laird - Sept 13 2021
PDF
Eglinton - Mount Pleasant CLC 13 Jan 2021
PPTX
Ongoing & Suspended Projects as of September 2011
PDF
KÖLD CRYOTHERAPY PDF portfolio
DOCX
resume 6.0
DOCX
CV Kevin Maguire
PPTX
Central Eastern Works Open House - October 2019
27 Hurst Ave
Scott M Tidwell Resume 030415
Cedarvale-Forest Hill CLC Presentation - November 27 2019
SIMON DESIGN ENGINEERING
Uniworld garden-2 up date
Fairbank & Oakwood Construction Liaison Committee July 2018
dave resume sept 2015
Western works final
Superintendent Portfolio
SP-6-05 Flagler Avenue Retail-Residential Project
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Rehab work & costing
Preliminary Plat Staff Report (S-6-05 NSB SE Interchange)
CLC: Leaside and Laird - Sept 13 2021
Eglinton - Mount Pleasant CLC 13 Jan 2021
Ongoing & Suspended Projects as of September 2011
KÖLD CRYOTHERAPY PDF portfolio
resume 6.0
CV Kevin Maguire
Central Eastern Works Open House - October 2019
Ad

Similar to Linkeden files (20)

PPTX
Mission Critical Data Center Retrofit Project - Catawaba County, NC
PDF
Muhammad_Aslam_CV
DOCX
Krishna kumar cv
PDF
Success is in the Details - Colocation Data Centers
PDF
CV. Mechincal Engineer
PDF
MEC - COMPANY PROFILE
DOCX
projects
PDF
Robert Zachowski Mechanical Engineer Resume 10-25-16
DOCX
Resume_Krishna Kumar_Btech_EL
DOCX
Breiter_Kevin_BreiteK_2016 (D)
PDF
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
DOCX
VG_Lee_CV_2015_1
PDF
CV-_SDhiman_27-04-2016
DOCX
jahangir
DOCX
CARGILLPROJOVERVIEW_rev1
PDF
MW Project Experience Updated 7-24-16
PPTX
Graham Port Plaza Emergency Repair
PDF
Expediting a Smooth Move - Design Assist Services in Norcross, GA
DOCX
Darrell Resume2014
PDF
Thinking, Delivering On-the-fly - Data Center Mechanical Installation
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Muhammad_Aslam_CV
Krishna kumar cv
Success is in the Details - Colocation Data Centers
CV. Mechincal Engineer
MEC - COMPANY PROFILE
projects
Robert Zachowski Mechanical Engineer Resume 10-25-16
Resume_Krishna Kumar_Btech_EL
Breiter_Kevin_BreiteK_2016 (D)
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
VG_Lee_CV_2015_1
CV-_SDhiman_27-04-2016
jahangir
CARGILLPROJOVERVIEW_rev1
MW Project Experience Updated 7-24-16
Graham Port Plaza Emergency Repair
Expediting a Smooth Move - Design Assist Services in Norcross, GA
Darrell Resume2014
Thinking, Delivering On-the-fly - Data Center Mechanical Installation
Ad

Linkeden files

  • 1. pg DANCO METAL FINISHING TENT IMPROVEMENT MEZZANINE LOCATION: 1745 Monticello Ontario, CA 91761 PROJECT SUMMARY: Danco Metal Surfacing Company is planed to the following “tenant improved”, which entailed Modifying the existing office and warehouse space and the installation of a mezzanine area. SCOPE OF WORK: My participation throughout this project started with task of picking up existing redlines, and draft- ing the missing details. Upon which i need to coordinated between the various gov- ernmental agencies and act as project coordinator with the on site project man- ager. FINISHED FLOOR PLAN OF THE OVERALL BUILDING. GENERAL CONSOLIDATED CONSTRUCTORS MANNING ENGINEERING
  • 2. pg MASONRY CONSTRUCTION DETAILS CRE- ATED FOR THE MECHANICAL ROOM. ALL DETAILS WHERE CREATED BY AUTOCAD 2012. 18'-6 16'-0 17'-0 (E) CONC. SLAB (E) TILT-UP CONC. WALL (N) MASONRY COLUMN 7/8 WITH EPOXY COATING CEMENT PLASTER AT UNDERSIDE (E) 2X15 RAFTER 10 OFF, EQ. SPACED (E) SUB-PURLINS 2X4 @ 2' O.C. TYP (E) 6X18 BEAM (N) MASONRY COLUMN (E) CONC. COLUMN (IN BACKGROUND) (N) MASONRY COLUMN SAW CUT (E)SLAB FOR (N) SLAB SLOPED (N) CONC. BLOCK WALL PER STRUCT. (E) REINF. CONC. SLAB FLOOR PIT PER DETAIL LOWEST POINT IN ROOM CONT. PLASTIC LINER SEE DETAIL 1 OF D-1 (N) REINF. CONC. SLAB PER STRUCT. 1/4PER FT. SLOPE (E) FOOTING 3X PLATE (E) 6X18 BEAM 1/4 : 12 (E) CONC. COLUMN (IN BACKGROUND) (N) MASONRY COLUMN (N) MASONRY COLUMN (N) EQUIPMENT ON RAISED ON CONC. PAD (N) 4X BEAM SEE STRUCT. SECTION A SCALE: 1/4 = 1'-0 14' - 0 TORCHDOWN MODIFIED BITUMEN MEMBRANE ROOFING W/ MINERAL GRANULAR SURFACE, COLOR; TBD AS MANUFACTURED BY CERTAINTEED CORP, FLINTASTIC GTA, ICC-ES ESR-1388 OVER 1-PLY 30# GLASBASE (OR EQUAL) OVER CDX PLYWOOD (E) PARAPET (N) 8 THK CONC. BLOCKWALL (N) REINF. CONC. SLAB PER STRUCT. 20' - 0 (E) ROLL - DOOR TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE TOALIGNTOADJACENTTILT-UPWALLALONGNORTHSIDE 20' - 0 GENERALCONSOLIDATEDINC. DANCO,EN,LLC. TENANTIMPROVEMENT REVISIO 4/8/1 MEZZANINE CONTAINMENT SECTION DETAILS ELEVATIONS AND SECTION
  • 3. pg SUPERIOR QUALITY FOODS LOCATION: 2355 EAST FRANCIS ST. Ontario, CA 91761 PROJECT SUMMARY: Superior Quality Food wished to expand the production of existing product line by the installation of two new boilers and the demolition of the existing boiler. SCOPE OF WORK: This project was de- sign build within General Consolidated Constructors. The design was created by Rob McCoy myself based on a previous project. This project was created with Autocad 2012. FLOOR PLAN GENERAL CONSOLIDATED CONSTRUCTORS MANNING ENGINEERING SITE PLAN FLOOR PLAN OF THE NEW BOILER EXTENSION.
  • 4. pg ELEVATION AND DETAILSROOF PLAN ROOF PLAN OF THE BOILER CANOPY. STRUCTURAL SECTION OF THE CANOPY POST CONNECTION EQUIPMENT ELEVATION
  • 5. pg LA ZAMORANA CANDY CO. LOCATION: 7700 WILSON AVE. HUNTINGTON PARK , CA 91761 PROJECT SUMMARY: La Zamorana Candy Co. required a new fa- cility in order to me the expanding. So the construction of a new production kitchen and waste line as a “tenant improve- ment” was required. SCOPE OF WORK: This project was design build within General Consolidated Con- structors. The design was created by Rob McCoy based on the requirement given to us by the client. The difficulty of this project was coordinate between Public Health and Industrial Waste. GENERAL CONSOLIDATED CONSTRUCTORS HAITHAM ENGINEERING FLOOR PLAN WAS CREATED IN AUTOCAD 2012. THEY LAYOUT OF THE DESIGN WAS CREATED BY ROB MCCOY AND MY SELF BASED ON THE FUTURE NEEDS OF THE CLIENT
  • 6. pg STRUCTURAL DETAIL STAIR SECTION AND INTERIOR EQUIPMENT ELEVATION THE STRUCTURAL DETAIL WAS CREATED UNDER THE DIRECTION OF THE PROJECT ENGINEER.