SlideShare a Scribd company logo
1	
  
	
  
	
  
Public Safety Communications Research
LTE	
  Demonstration	
  Network	
  Test	
  Plan	
  	
  
Phase	
  3	
  Part	
  1:	
  Network	
  
Interoperability	
  &	
  Drive	
  Test	
  
	
  
	
  
Version	
  2.4	
  
May	
  7,	
  2013	
  
	
  
	
  
2	
  
	
  
1 Contents
2	
   List	
  of	
  Tables	
  ........................................................................................................................................	
  5	
  
3	
   List	
  of	
  Figures	
  .......................................................................................................................................	
  5	
  
4	
   Introduction	
  .........................................................................................................................................	
  5	
  
5	
   Network	
  Interoperability	
  .....................................................................................................................	
  7	
  
5.1	
   Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  Cisco	
  EPC)	
  ...................................................................	
  8	
  
5.1.1	
   Test	
  Description	
  ...................................................................................................................	
  8	
  
5.1.2	
   Reference	
  .............................................................................................................................	
  8	
  
5.1.3	
   Required	
  Equipment	
  ............................................................................................................	
  8	
  
5.1.4	
   Test	
  Procedure	
  .....................................................................................................................	
  9	
  
5.1.5	
   Expected	
  Outcome	
  ...............................................................................................................	
  9	
  
5.1.6	
   Additional	
  Tests	
  ...................................................................................................................	
  9	
  
5.2	
   Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  ALU	
  EPC)	
  .....................................................................	
  9	
  
5.2.1	
   Test	
  Description	
  ...................................................................................................................	
  9	
  
5.2.2	
   Reference	
  .............................................................................................................................	
  9	
  
5.2.3	
   Required	
  Equipment	
  ............................................................................................................	
  9	
  
5.2.4	
   Test	
  Procedure	
  ...................................................................................................................	
  10	
  
5.3	
   Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  General	
  Dynamics	
  Broadband	
  EPC)	
  .........................	
  10	
  
5.3.1	
   Test	
  Description	
  .................................................................................................................	
  10	
  
5.3.2	
   Reference	
  ...........................................................................................................................	
  10	
  
5.3.3	
   Required	
  Equipment	
  ..........................................................................................................	
  10	
  
5.3.4	
   Test	
  Procedure	
  ...................................................................................................................	
  11	
  
5.4	
   Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  MSI	
  Solutions/Ericsson	
  EPC)	
  .....................................	
  11	
  
5.4.1	
   Test	
  Description	
  .................................................................................................................	
  11	
  
5.4.2	
   Reference	
  ...........................................................................................................................	
  11	
  
5.4.3	
   Required	
  Equipment	
  ..........................................................................................................	
  11	
  
5.4.4	
   Test	
  Procedure	
  ...................................................................................................................	
  12	
  
5.5	
   Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  NSN/Harris	
  EPC)	
  .......................................................	
  12	
  
5.5.1	
   Test	
  Description	
  .................................................................................................................	
  12	
  
5.5.2	
   Reference	
  ...........................................................................................................................	
  12	
  
5.5.3	
   Required	
  Equipment	
  ..........................................................................................................	
  12	
  
5.5.4	
   Test	
  Procedure	
  ...................................................................................................................	
  13	
  
3	
  
	
  
6	
   Network	
  Drive	
  Testing	
  .......................................................................................................................	
  13	
  
6.1	
   Additional	
  Considerations	
  ..........................................................................................................	
  14	
  
6.2	
   Single	
  User	
  Throughput:	
  UL	
  UDP;	
  No	
  Load	
  ................................................................................	
  15	
  
6.2.1	
   Test	
  Description	
  .................................................................................................................	
  15	
  
6.2.2	
   Reference	
  ...........................................................................................................................	
  15	
  
6.2.3	
   Required	
  Equipment	
  ..........................................................................................................	
  15	
  
6.2.4	
   Test	
  Procedure	
  ...................................................................................................................	
  16	
  
6.2.5	
   Expected	
  Outcome	
  .............................................................................................................	
  16	
  
6.3	
   Single	
  User	
  Throughput:	
  DL	
  UDP;	
  No	
  Load	
  ................................................................................	
  17	
  
6.3.1	
   Test	
  Description	
  .................................................................................................................	
  17	
  
6.3.2	
   Reference	
  ...........................................................................................................................	
  17	
  
6.3.3	
   Required	
  Equipment	
  ..........................................................................................................	
  17	
  
6.3.4	
   Test	
  Procedure	
  ...................................................................................................................	
  17	
  
6.3.5	
   Expected	
  Outcome	
  .............................................................................................................	
  18	
  
6.4	
   Single	
  User	
  Throughput:	
  	
  UL	
  TCP;	
  No	
  Load	
  ................................................................................	
  19	
  
6.5	
   Single	
  User	
  Throughput:	
  	
  DL	
  TCP;	
  No	
  Load	
  ................................................................................	
  19	
  
6.6	
   Single	
  User	
  Throughput:	
  UL	
  UDP;	
  70%	
  Load	
  ..............................................................................	
  19	
  
6.6.1	
   Test	
  Description	
  .................................................................................................................	
  19	
  
6.6.2	
   Reference	
  ...........................................................................................................................	
  19	
  
6.6.3	
   Required	
  Equipment	
  ..........................................................................................................	
  19	
  
6.6.4	
   Test	
  Procedure	
  ...................................................................................................................	
  20	
  
6.6.5	
   Expected	
  Outcome	
  .............................................................................................................	
  20	
  
6.7	
   Single	
  User	
  Throughput:	
  DL	
  UDP;	
  70%	
  Load	
  ..............................................................................	
  21	
  
6.7.1	
   Test	
  Description	
  .................................................................................................................	
  21	
  
6.7.2	
   Reference	
  ...........................................................................................................................	
  21	
  
6.7.3	
   Required	
  Equipment	
  ..........................................................................................................	
  21	
  
6.7.4	
   Test	
  Procedure	
  ...................................................................................................................	
  21	
  
6.7.5	
   Expected	
  Outcome	
  .............................................................................................................	
  22	
  
6.8	
   Single	
  User	
  Throughput:	
  	
  UL	
  TCP;	
  70%	
  Load	
  ..............................................................................	
  23	
  
6.9	
   Single	
  User	
  Throughput:	
  	
  DL	
  TCP;	
  70%	
  Load	
  ..............................................................................	
  23	
  
6.10	
   Multi-­‐User	
  Throughput:	
  	
  UL	
  UDP;	
  No	
  Load	
  ................................................................................	
  23	
  
6.10.1	
   Test	
  Description	
  .................................................................................................................	
  23	
  
4	
  
	
  
6.10.2	
   Reference	
  ...........................................................................................................................	
  23	
  
6.10.3	
   Required	
  Equipment	
  ..........................................................................................................	
  23	
  
6.10.4	
   Test	
  Procedure	
  ...................................................................................................................	
  23	
  
6.10.5	
   Expected	
  Outcome	
  .............................................................................................................	
  24	
  
6.11	
   Multi-­‐User	
  Throughput:	
  	
  DL	
  UDP;	
  No	
  Load	
  ................................................................................	
  25	
  
6.11.1	
   Test	
  Description	
  .................................................................................................................	
  25	
  
6.11.2	
   Reference	
  ...........................................................................................................................	
  25	
  
6.11.3	
   Required	
  Equipment	
  ..........................................................................................................	
  25	
  
6.11.4	
   Test	
  Procedure	
  ...................................................................................................................	
  25	
  
6.11.5	
   Expected	
  Outcome	
  .............................................................................................................	
  26	
  
6.12	
   Multi-­‐User	
  Throughput:	
  UL	
  TCP;	
  No	
  Load	
  ..................................................................................	
  27	
  
6.13	
   Multi-­‐User	
  Throughput:	
  DL	
  TCP:	
  No	
  Load	
  ..................................................................................	
  27	
  
6.14	
   Multi-­‐User	
  Throughput:	
  UL	
  UDP;	
  70%	
  Load	
  ..............................................................................	
  27	
  
6.14.1	
   Test	
  Description	
  .................................................................................................................	
  27	
  
6.14.2	
   Reference	
  ...........................................................................................................................	
  28	
  
6.14.3	
   Required	
  Equipment	
  ..........................................................................................................	
  28	
  
6.14.4	
   Test	
  Procedure	
  ...................................................................................................................	
  28	
  
6.14.5	
   Expected	
  Outcome	
  .............................................................................................................	
  29	
  
6.15	
   Multi-­‐User	
  Throughput:	
  DL	
  UDP:	
  70%	
  Load	
  ..............................................................................	
  29	
  
6.15.1	
   Test	
  Description	
  .................................................................................................................	
  29	
  
6.15.2	
   Reference	
  ...........................................................................................................................	
  30	
  
6.15.3	
   Required	
  Equipment	
  ..........................................................................................................	
  30	
  
6.15.4	
   Test	
  Procedure	
  ...................................................................................................................	
  30	
  
6.15.5	
   Expected	
  Outcome	
  .............................................................................................................	
  31	
  
6.16	
   Multi-­‐User	
  Throughput:	
  UL	
  TCP;	
  70%	
  Load	
  ...............................................................................	
  31	
  
6.17	
   Multi-­‐User	
  Throughput:	
  DL	
  TCP:	
  70%	
  Load	
  ...............................................................................	
  31	
  
6.18	
   Network	
  Latency:	
  Single	
  User;	
  No	
  Load	
  .....................................................................................	
  31	
  
6.18.1	
   Test	
  Description	
  .................................................................................................................	
  31	
  
6.18.2	
   Reference	
  ...........................................................................................................................	
  32	
  
6.18.3	
   Required	
  Equipment	
  ..........................................................................................................	
  32	
  
6.18.4	
   Test	
  Procedure	
  ...................................................................................................................	
  32	
  
6.18.5	
   Expected	
  Outcome	
  .............................................................................................................	
  32	
  
5	
  
	
  
6.19	
   Network	
  Latency:	
  Single	
  User;	
  70%	
  Load	
  ...................................................................................	
  33	
  
7	
   UE	
  Interoperability	
  Tests	
  ...................................................................................................................	
  33	
  
8	
   Vendor	
  Test	
  Case	
  Checklist	
  ................................................................................................................	
  33	
  
9	
   Acronyms	
  ...........................................................................................................................................	
  35	
  
10	
   Optional	
  Information	
  and	
  Tests	
  .....................................................................................................	
  35	
  
10.1	
   Extra	
  IOT	
  Information	
  ................................................................................................................	
  35	
  
10.1.1	
   Verify	
  Message	
  Flow	
  ..........................................................................................................	
  35	
  
10.1.2	
   Tracking	
  Area	
  Updates	
  .......................................................................................................	
  36	
  
10.1.3	
   Detach	
  Information	
  ............................................................................................................	
  36	
  
10.2	
   Call	
  Flow	
  Diagram	
  ......................................................................................................................	
  37	
  
10.2.1	
   UE	
  Attach	
  ...........................................................................................................................	
  37	
  
10.2.2	
   TAU	
  UE	
  Call	
  Flow	
  ................................................................................................................	
  38	
  
10.2.3	
   UE	
  Detach	
  Call	
  Flow	
  ...........................................................................................................	
  38	
  
	
  
2 List of Tables
Table	
  1:	
  	
  Vendor	
  Test	
  Case	
  Checklist	
  .....................................................................................................	
  3433	
  
3 List of Figures
Figure	
  1:	
  Test	
  Diagram	
  .................................................................................	
  Error!	
  Bookmark	
  not	
  defined.8	
  
	
  
4 Introduction
Public	
  Safety	
  Communications	
  Research	
  (PSCR)	
  has	
  established	
  three	
  major	
  phases	
  of	
  testing	
  and	
  
evaluation.	
  	
  The	
  primary	
  focus	
  of	
  Phase	
  3	
  Part	
  1	
  is	
  to	
  test	
  LTE	
  infrastructure	
  for	
  interoperability	
  and	
  to	
  
drive	
  test	
  each	
  vendor’s	
  implementation.	
  	
  Phase	
  3	
  Part	
  2	
  will	
  focus	
  on	
  EPC	
  interface	
  conformance	
  
testing.	
  	
  	
  
	
  
It	
  should	
  be	
  noted	
  that	
  PSCR	
  reserves	
  the	
  right	
  to	
  add	
  additional	
  phases	
  (beyond	
  the	
  three	
  currently	
  
defined)	
  of	
  testing	
  at	
  any	
  time.	
  An	
  example	
  of	
  the	
  type	
  of	
  tests	
  that	
  would	
  be	
  encountered	
  in	
  later	
  
phases	
  is	
  multiple	
  EPS	
  handover	
  within	
  a	
  PLMN	
  utilizing	
  the	
  S5	
  and	
  S10	
  interfaces.	
  
	
  
6	
  
	
  
If	
  time	
  allows	
  further	
  IOT	
  may	
  be	
  performed	
  in	
  Phase	
  3	
  Part	
  1	
  that	
  involves	
  other	
  EPC	
  components.	
  	
  
Several	
  vendors	
  are	
  utilizing	
  EPC	
  components	
  manufactured	
  by	
  different	
  vendors	
  and	
  are	
  already	
  
performing	
  multi-­‐vendor	
  interworking	
  involving	
  the	
  S6a	
  and	
  Gx	
  interfaces.	
  	
  All	
  vendors	
  will	
  be	
  notified	
  in	
  
advance	
  of	
  the	
  addition	
  of	
  new	
  interoperability	
  tests	
  to	
  Phase	
  3	
  Part	
  1	
  and	
  will	
  be	
  given	
  an	
  opportunity	
  
to	
  review	
  and	
  comment	
  on	
  any	
  new	
  tests	
  before	
  they	
  are	
  executed	
  in	
  the	
  PSCR	
  laboratory.	
  	
  
	
  
Interoperability	
  Tests:	
  	
  The	
  primary	
  focus	
  of	
  interoperability	
  testing	
  in	
  the	
  PSCR	
  demonstration	
  network	
  
is	
  to	
  evaluate	
  how	
  different	
  vendor’s	
  EPC	
  and	
  RAN	
  interact	
  with	
  each	
  other.	
  	
  Specifically,	
  the	
  
interoperability	
  section	
  of	
  this	
  document	
  considers	
  a	
  configuration	
  where	
  a	
  given	
  vendor’s	
  eNB	
  is	
  
integrated	
  with	
  another	
  vendor’s	
  EPC.	
  	
  Specific	
  scenarios	
  are	
  then	
  executed	
  against	
  each	
  configuration.	
  	
  
See	
  Section	
  5	
  of	
  this	
  test	
  plan	
  for	
  more	
  details.	
  
	
  
A	
  secondary	
  focus	
  of	
  interoperability	
  testing	
  in	
  the	
  demonstration	
  network	
  is	
  to	
  evaluate	
  a	
  given	
  
vendor’s	
  UE	
  against	
  several	
  other	
  eNB	
  implementations.	
  	
  This	
  evaluation	
  will	
  be	
  performed	
  according	
  
the	
  UE	
  IOT	
  test	
  plan	
  created	
  by	
  CTIA.	
  
	
  
http://files.ctia.org/pdf/CTIA_LTE_IOT_Test_Plan_Rev_1.0.pdf	
  
	
  
Network	
  Drive	
  Tests:	
  	
  	
  
The	
  purpose	
  of	
  network	
  drive	
  testing	
  is	
  to	
  evaluate	
  the	
  coverage	
  and	
  performance	
  of	
  a	
  network	
  with	
  at	
  
least	
  one	
  active	
  data	
  session	
  established.	
  	
  The	
  network	
  in	
  this	
  case	
  will	
  consist	
  of	
  RAN	
  and	
  EPC	
  
equipment	
  provided	
  by	
  the	
  same	
  vendor.	
  	
  The	
  set	
  of	
  drive	
  tests	
  in	
  Section	
  6	
  will	
  be	
  conducted	
  against	
  
each	
  vendor	
  that	
  is	
  providing	
  a	
  RAN	
  and	
  an	
  EPC	
  to	
  the	
  demonstration	
  network.	
  	
  In	
  order	
  to	
  
accommodate	
  those	
  vendors	
  who	
  are	
  only	
  supplying	
  an	
  EPC,	
  PSCR	
  will	
  help	
  to	
  put	
  the	
  EPC	
  vendor	
  in	
  
contact	
  with	
  a	
  RAN	
  vendor	
  (or	
  vendors)	
  so	
  that	
  drive	
  testing	
  may	
  be	
  conducted	
  which	
  utilizes	
  the	
  
vendor’s	
  EPC.	
  	
  	
  See	
  Section	
  6	
  of	
  this	
  test	
  plan	
  for	
  more	
  detailed	
  information.	
  
	
  	
  
Additional	
  Information:	
  	
  
	
  
1) Results	
  of	
  all	
  Phase	
  3	
  tests	
  will	
  be	
  recorded	
  as	
  either	
  executed	
  or	
  not	
  executed	
  unless	
  otherwise	
  
stated.
2) 	
  It	
  is	
  possible	
  that	
  Phase	
  3	
  Part	
  2	
  tests	
  could	
  pre-­‐empt	
  Phase	
  3	
  Part	
  1	
  testing	
  as	
  conformance	
  
test	
  events	
  are	
  scheduled.	
  	
  When	
  this	
  occurs,	
  Phase	
  3	
  Part	
  1	
  tests	
  will	
  be	
  halted	
  for	
  a	
  period	
  of	
  
two	
  to	
  three	
  weeks	
  to	
  allow	
  for	
  the	
  scheduled	
  conformance	
  test	
  event	
  to	
  complete.	
  	
  All	
  parties	
  
will	
  be	
  notified	
  in	
  advanced	
  of	
  a	
  scheduled	
  test	
  event.	
  	
  Refer	
  to	
  the	
  Phase	
  3	
  Part	
  2	
  test	
  plan	
  for	
  
detailed	
  information	
  regarding	
  how	
  EPC	
  conformance	
  testing	
  will	
  be	
  handled	
  in	
  the	
  PSCR	
  
demonstration	
  network.
3) For	
  network	
  driving	
  testing,	
  PSCR	
  staff	
  will	
  drive	
  test	
  a	
  pre-­‐defined	
  route,	
  log	
  data,	
  and	
  analyze	
  
the	
  collected	
  data.	
  	
  The	
  vendor(s)	
  will	
  help	
  support	
  the	
  driving	
  test	
  effort	
  by	
  providing	
  personnel	
  
to	
  help	
  with	
  troubleshooting	
  the	
  infrastructure	
  (or	
  the	
  UE)	
  and	
  to	
  help	
  with	
  the	
  operations	
  and	
  
maintenance	
  of	
  the	
  infrastructure.
7	
  
	
  
4) For	
  all	
  tests	
  in	
  this	
  test	
  plan,	
  PSCR	
  will	
  use	
  the	
  JDSU	
  SART	
  tool	
  that	
  it	
  currently	
  owns	
  for	
  
performing	
  monitoring	
  of	
  the	
  EPC	
  core	
  interfaces.	
  	
  In	
  addition,	
  for	
  the	
  monitoring	
  of	
  the	
  Uu	
  
interface	
  PSCR	
  will	
  use	
  the	
  Linkmaster	
  and	
  drive	
  test	
  software,	
  which	
  it	
  currently	
  owns.	
  	
  A	
  tap	
  
point	
  will	
  be	
  provided	
  in	
  order	
  for	
  vendors	
  to	
  perform	
  monitoring,	
  troubleshooting,	
  and	
  
message	
  logging	
  of	
  the	
  traffic	
  on	
  the	
  EPC	
  interfaces	
  using	
  their	
  preferred	
  monitoring	
  tool	
  (e.g.	
  
Wireshark).
5) As	
  additional	
  clarification,	
  all	
  eNBs	
  will	
  use	
  GPS	
  for	
  their	
  timing	
  reference.	
  	
  
6) All	
  networks	
  should	
  be	
  upgraded	
  to	
  3GPP	
  Release	
  9	
  (December	
  2009	
  Phase	
  3	
  Freeze)	
  prior	
  to	
  
testing.
5 Network Interoperability
	
  
This	
  section	
  of	
  the	
  test	
  plan	
  will	
  focus	
  on	
  three	
  basic	
  scenarios	
  in	
  order	
  to	
  evaluate	
  LTE	
  infrastructure	
  for	
  
interoperability.	
  	
  These	
  scenarios	
  will	
  be	
  used	
  to	
  exercise	
  as	
  many	
  of	
  the	
  EPC	
  interfaces	
  as	
  possible	
  along	
  
with	
  the	
  Uu	
  interface.	
  	
  The	
  scenarios	
  and	
  the	
  interfaces	
  each	
  scenario	
  exercises	
  are	
  listed	
  below:	
  
1) UE	
  Attach	
  –	
  Uu,	
  S1,	
  S6a	
  
2) UE	
  Detach	
  –	
  Uu,	
  S1,	
  S6a	
  
3) Data	
  Session	
  Establishment	
  –	
  Uu,	
  S1,	
  S1-­‐U,	
  S11,	
  S5,	
  Gx	
  
The	
  scenarios	
  listed	
  above	
  will	
  drive	
  the	
  interoperability	
  test	
  cases.	
  	
  Each	
  test	
  case	
  will	
  focus	
  on	
  varying	
  a	
  
single	
  network	
  element	
  while	
  holding	
  all	
  other	
  network	
  elements	
  in	
  the	
  LTE	
  system	
  constant.	
  	
  The	
  list	
  of	
  
LTE	
  network	
  elements	
  to	
  be	
  varied	
  is	
  as	
  follows:	
  
1) eNB	
  
A	
  vendor’s	
  EPC	
  (vendor	
  X)	
  will	
  be	
  selected	
  and	
  the	
  network	
  elements	
  that	
  compose	
  the	
  EPC	
  will	
  be	
  held	
  
constant.	
  	
  The	
  eNB	
  will	
  be	
  the	
  network	
  element	
  under	
  test.	
  	
  For	
  example,	
  an	
  eNB’s	
  supplied	
  by	
  vendor	
  A	
  
will	
  be	
  integrated	
  with	
  vendor	
  X’s	
  EPC.	
  	
  	
  The	
  three	
  scenarios	
  listed	
  above	
  will	
  then	
  be	
  executed	
  using	
  a	
  
single	
  eNB	
  from	
  vendor	
  A	
  and	
  vendor	
  X’s	
  EPC.	
  	
  The	
  three	
  scenarios	
  listed	
  above	
  will	
  then	
  be	
  executed	
  
using	
  a	
  single	
  eNB	
  from	
  vendor	
  B	
  and	
  vendor	
  X’s	
  EPC.	
  	
  This	
  process	
  will	
  be	
  repeated	
  until	
  all	
  three	
  
scenarios	
  listed	
  above	
  have	
  been	
  executed	
  against	
  all	
  eNBs	
  in	
  the	
  PSCR	
  laboratory	
  utilizing	
  vendor	
  X’s	
  
EPC.	
  
8	
  
	
  
Ue
Vendor Z
P-GWS-GW
MME PCRF
HSSS6a
eNodeB
Vendor A
Aggregation
Router
S1-MME
S1-U
S1
Uu
S5
S11
Gx
eNodeB
Vendor B
S1
EPS
Vendor X
Optional
Vendor Y
SGi
APN
App Server
& Internet
	
  
Figure	
  1:	
  Test	
  Diagram	
  
The	
  detailed	
  test	
  cases	
  below	
  will	
  identify	
  the	
  infrastructure	
  vendors	
  involved,	
  each	
  vendor’s	
  role	
  in	
  the	
  
test,	
  and	
  what	
  equipment	
  each	
  vendor	
  shall	
  supply	
  for	
  the	
  test.	
  	
  All	
  tests	
  in	
  this	
  section	
  will	
  be	
  
performed	
  in	
  the	
  laboratory.	
  	
  Initially	
  the	
  test	
  will	
  be	
  conducted	
  in	
  cabled	
  environment.	
  	
  After	
  it	
  has	
  
been	
  determined	
  that	
  the	
  tests	
  have	
  be	
  successfully	
  executed	
  in	
  a	
  cabled	
  environment,	
  the	
  tests	
  will	
  be	
  
conducted	
  over	
  the	
  air	
  in	
  the	
  laboratory.	
  
5.1 Network Element Under Test: eNB (with Cisco EPC)
5.1.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  verify	
  that	
  a	
  given	
  vendor’s	
  eNB	
  can	
  successfully	
  interoperate	
  with	
  a	
  Cisco	
  
EPC.	
  
5.1.2 Reference
PSCR	
  
5.1.3 Required Equipment
The	
  list	
  of	
  equipment	
  required	
  for	
  this	
  test	
  is	
  as	
  follows	
  
1) EPC	
  
2) eNBs	
  from	
  multiple	
  vendors	
  
3) UE	
  
4) Network	
  Monitor	
  Tool	
  
5) Uu	
  Monitor	
  Tool	
  
For	
  this	
  test	
  the	
  EPC	
  will	
  be	
  supplied	
  by	
  Cisco.	
  	
  RAN	
  equipment	
  (eNB)	
  will	
  be	
  supplied	
  by	
  the	
  following	
  
vendors	
  (in	
  no	
  particular	
  order):	
  
1) Alcatel	
  Lucent	
  
2) General	
  Dynamics	
  Broadband	
  
3) Motorola	
  Solutions	
  Incorporated	
  (MSI)/Ericsson	
  
9	
  
	
  
4) Nokia	
  Siemens	
  Networks	
  (NSN)/Harris	
  
The	
  UE	
  will	
  be	
  a	
  MSI	
  UM	
  1000	
  USB	
  Dongle.	
  
5.1.4 Test Procedure
1) Integrate	
  the	
  Alcatel	
  Lucent	
  eNB	
  with	
  the	
  Cisco	
  EPC.	
  
2) Turn	
  on	
  the	
  message	
  tracing	
  capability	
  in	
  the	
  eNB	
  and	
  MME	
  for	
  troubleshooting	
  purposes.	
  	
  	
  
3) Mirror	
  all	
  EPC	
  interfaces	
  in	
  the	
  Cisco	
  EPC	
  to	
  a	
  monitor	
  port.	
  	
  This	
  will	
  be	
  used	
  for	
  
troubleshooting	
  purposes.	
  
4) Connect	
  the	
  monitor	
  port	
  to	
  the	
  network-­‐monitoring	
  tool.	
  	
  	
  
5) Provision	
  the	
  MSI	
  in	
  the	
  Cisco	
  HSS.	
  
6) Program	
  the	
  UE	
  SIM	
  card	
  with	
  the	
  correct	
  IMSI	
  and	
  Ki	
  values.	
  
7) Connect	
  the	
  UE	
  dongle	
  to	
  a	
  laptop	
  that	
  contains	
  the	
  appropriate	
  connection	
  manager	
  software	
  
and	
  that	
  contains	
  the	
  Uu	
  monitor	
  software.	
  
8) Perform	
  a	
  UE	
  Attach	
  by	
  turning	
  on	
  the	
  UE.	
  
9) Establish	
  a	
  data	
  session	
  by	
  utilizing	
  the	
  connection	
  manager	
  software	
  and	
  browsing	
  to	
  
www.pscr.gov.	
  
10) Perform	
  a	
  UE	
  Detach	
  by	
  clicking	
  “Disconnect”	
  on	
  the	
  connection	
  manager.	
  
11) Repeat	
  steps	
  1	
  –	
  10	
  for	
  the	
  eNBs	
  supplied	
  by	
  General	
  Dynamics	
  Broadband,	
  MSI,	
  and	
  
NSN/Harris.	
  
5.1.5 Expected Outcome
Verify	
  that	
  the	
  UE	
  attached,	
  a	
  data	
  session	
  was	
  established,	
  and	
  that	
  the	
  UE	
  detached.	
  
See	
  Appendix	
  of	
  optional	
  information	
  that	
  may	
  be	
  captured	
  during	
  the	
  testing.	
  
5.1.6 Additional Tests
Repeat	
  section	
  5.1.1-­‐5.1.5	
  with	
  the	
  Thales	
  EPC	
  
5.2 Network Element Under Test: eNB (with ALU EPC)
	
  
5.2.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  verify	
  that	
  a	
  given	
  vendor’s	
  eNB	
  can	
  successfully	
  interoperate	
  with	
  an	
  
Alcatel	
  Lucent	
  EPC.	
  
5.2.2 Reference
PSCR	
  
5.2.3 Required Equipment
The	
  list	
  of	
  equipment	
  required	
  for	
  this	
  test	
  is	
  as	
  follows	
  
1) EPC	
  
2) eNBs	
  from	
  multiple	
  vendors	
  
3) UE	
  
4) Network	
  Monitor	
  Tool	
  
10	
  
	
  
5) Uu	
  Monitor	
  Tool	
  
For	
  this	
  test	
  Alcatel	
  Lucent	
  will	
  supply	
  the	
  EPC.	
  	
  RAN	
  equipment	
  (eNB)	
  will	
  be	
  supplied	
  by	
  the	
  following	
  
vendors:	
  
1) General	
  Dynamics	
  Broadband	
  
2) MSI	
  
3) NSN/Harris	
  
The	
  UE	
  will	
  be	
  supplied	
  by	
  MSI.	
  
5.2.4 Test Procedure
1) Integrate	
  the	
  General	
  Dynamics	
  Broadband	
  eNB	
  with	
  the	
  Alcatel	
  Lucent	
  EPC.	
  
2) Turn	
  on	
  the	
  message	
  tracing	
  capability	
  in	
  the	
  eNB	
  and	
  MME	
  for	
  troubleshooting	
  purposes.	
  
3) Mirror	
  all	
  EPC	
  interfaces	
  in	
  the	
  Alcatel	
  Lucent	
  EPC	
  to	
  a	
  monitor	
  port.	
  	
  This	
  will	
  be	
  used	
  for	
  
troubleshooting	
  purposes.	
  
4) Connect	
  the	
  monitor	
  port	
  to	
  the	
  network-­‐monitoring	
  tool.	
  
5) Provision	
  the	
  MSI	
  in	
  the	
  Alcatel	
  Lucent	
  HSS.	
  
6) Program	
  the	
  UE	
  SIM	
  card	
  with	
  the	
  correct	
  IMSI	
  and	
  Ki	
  values.	
  
7) Connect	
  the	
  UE	
  dongle	
  to	
  a	
  laptop	
  that	
  contains	
  the	
  appropriate	
  connection	
  manager	
  software	
  
and	
  that	
  contains	
  the	
  Uu	
  monitor	
  software.	
  
8) Perform	
  a	
  UE	
  Attach	
  by	
  turning	
  on	
  the	
  UE.	
  
9) Establish	
  a	
  data	
  session	
  by	
  utilizing	
  the	
  connection	
  manager	
  software	
  and	
  browsing	
  to	
  
www.pscr.gov.	
  
10) Perform	
  a	
  UE	
  Detach	
  by	
  clicking	
  “Disconnect”	
  on	
  the	
  connection	
  manager.	
  
11) Repeat	
  steps	
  1	
  –	
  10	
  for	
  the	
  eNBs	
  supplied	
  by	
  MSI	
  Solutions/Ericsson	
  and	
  NSN/Harris.	
  
	
  
5.3 Network Element Under Test: eNB (with General Dynamics Broadband EPC)
	
  
5.3.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  verify	
  that	
  a	
  given	
  vendor’s	
  eNB	
  can	
  successfully	
  interoperate	
  with	
  a	
  
General	
  Dynamics	
  Broadband	
  EPC.	
  
5.3.2 Reference
PSCR	
  
5.3.3 Required Equipment
The	
  list	
  of	
  equipment	
  required	
  for	
  this	
  test	
  is	
  as	
  follows	
  
1) EPC	
  
2) eNBs	
  from	
  multiple	
  vendors	
  
3) UE	
  
4) Network	
  Monitor	
  Tool	
  
11	
  
	
  
5) Uu	
  Monitor	
  Tool	
  
For	
  this	
  test	
  General	
  Dynamics	
  Broadband	
  will	
  supply	
  the	
  EPC.	
  	
  RAN	
  equipment	
  (eNB)	
  will	
  be	
  supplied	
  by	
  
the	
  following	
  vendors:	
  
1) Alcatel	
  Lucent	
  
2) MSI	
  
3) NSN/Harris	
  
The	
  UE	
  will	
  be	
  a	
  MSI	
  UM	
  1000	
  USB	
  Dongle	
  	
  
5.3.4 Test Procedure
1) Integrate	
  the	
  Alcatel	
  Lucent	
  eNB	
  with	
  the	
  General	
  Dynamics	
  Broadband	
  EPC.	
  
2) Turn	
  on	
  the	
  message	
  tracing	
  capability	
  in	
  the	
  eNB	
  and	
  MME	
  for	
  troubleshooting	
  purposes.	
  
3) Mirror	
  all	
  EPC	
  interfaces	
  in	
  the	
  General	
  Dynamics	
  Broadband	
  EPC	
  to	
  a	
  monitor	
  port.	
  	
  This	
  will	
  be	
  
used	
  for	
  troubleshooting	
  purposes.	
  
4) Connect	
  the	
  monitor	
  port	
  to	
  the	
  network-­‐monitoring	
  tool.	
  
5) Provision	
  the	
  MSI	
  in	
  the	
  General	
  Dynamics	
  Broadband	
  HSS.	
  
6) Program	
  the	
  UE	
  SIM	
  card	
  with	
  the	
  correct	
  IMSI	
  and	
  Ki	
  values.	
  
7) Connect	
  the	
  UE	
  dongle	
  to	
  a	
  laptop	
  that	
  contains	
  the	
  appropriate	
  connection	
  manager	
  software	
  
and	
  that	
  contains	
  the	
  Uu	
  monitor	
  software.	
  
8) Perform	
  a	
  UE	
  Attach	
  by	
  turning	
  on	
  the	
  UE.	
  
9) Establish	
  a	
  data	
  session	
  by	
  utilizing	
  the	
  connection	
  manager	
  software	
  and	
  browsing	
  to	
  
www.pscr.gov.	
  
10) Perform	
  a	
  UE	
  Detach	
  by	
  clicking	
  “Disconnect”	
  on	
  the	
  connection	
  manager.	
  
11) Repeat	
  steps	
  1	
  –	
  10	
  for	
  the	
  eNBs	
  supplied	
  by	
  MSI	
  Solutions/Ericsson	
  and	
  NSN/Harris.	
  
5.4 Network Element Under Test: eNB (with MSI Solutions/Ericsson EPC)
	
  
5.4.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  verify	
  that	
  a	
  given	
  vendor’s	
  eNB	
  can	
  successfully	
  interoperate	
  with	
  a	
  MSI	
  
Solutions/Ericsson	
  EPC.	
  
5.4.2 Reference
PSCR	
  
5.4.3 Required Equipment
The	
  list	
  of	
  equipment	
  required	
  for	
  this	
  test	
  is	
  as	
  follows	
  
1) EPC	
  
2) eNBs	
  from	
  multiple	
  vendors	
  
3) UE	
  
4) Network	
  Monitor	
  Tool	
  
5) Uu	
  Monitor	
  Tool	
  
12	
  
	
  
For	
  this	
  test	
  the	
  EPC	
  will	
  be	
  supplied	
  by	
  MSI.	
  	
  RAN	
  equipment	
  (eNB)	
  will	
  be	
  supplied	
  by	
  the	
  following	
  
vendors:	
  
1) Alcatel	
  Lucent	
  
2) General	
  Dynamics	
  Broadband	
  
3) NSN/Harris	
  
The	
  UE	
  will	
  be	
  a	
  MSI	
  UM	
  1000	
  USB	
  Dongle	
  	
  
5.4.4 Test Procedure
1) Integrate	
  the	
  Alcatel	
  Lucent	
  eNB	
  with	
  the	
  MSI	
  Solutions.	
  
2) Turn	
  on	
  the	
  message	
  tracing	
  capability	
  in	
  the	
  eNB	
  and	
  MME	
  for	
  troubleshooting	
  purposes.	
  
3) Mirror	
  all	
  EPC	
  interfaces	
  in	
  the	
  MSI	
  Solutions	
  to	
  a	
  monitor	
  port.	
  	
  This	
  will	
  be	
  used	
  for	
  
troubleshooting	
  purposes.	
  
4) Connect	
  the	
  monitor	
  port	
  to	
  the	
  network-­‐monitoring	
  tool.	
  
5) Provision	
  the	
  MSI	
  in	
  the	
  MSI	
  HSS.	
  
6) Program	
  the	
  UE	
  SIM	
  card	
  with	
  the	
  correct	
  IMSI	
  and	
  Ki	
  values.	
  
7) Connect	
  the	
  UE	
  dongle	
  to	
  a	
  laptop	
  that	
  contains	
  the	
  appropriate	
  connection	
  manager	
  software	
  
and	
  that	
  contains	
  the	
  Uu	
  monitor	
  software.	
  
8) Perform	
  a	
  UE	
  Attach	
  by	
  turning	
  on	
  the	
  UE.	
  
9) Establish	
  a	
  data	
  session	
  by	
  utilizing	
  the	
  connection	
  manager	
  software	
  and	
  browsing	
  to	
  
www.pscr.gov.	
  
10) Perform	
  a	
  UE	
  Detach	
  by	
  clicking	
  “Disconnect”	
  on	
  the	
  connection	
  manager.	
  
11) Repeat	
  steps	
  1	
  –	
  10	
  for	
  the	
  eNBs	
  supplied	
  by	
  General	
  Dynamics	
  Broadband	
  and	
  NSN/Harris.	
  
5.5 Network Element Under Test: eNB (with NSN/Harris EPC)
	
  
5.5.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  verify	
  that	
  a	
  given	
  vendor’s	
  eNB	
  can	
  successfully	
  interoperate	
  with	
  a	
  
NSN/Harris	
  EPC.	
  
5.5.2 Reference
PSCR	
  
5.5.3 Required Equipment
The	
  list	
  of	
  equipment	
  required	
  for	
  this	
  test	
  is	
  as	
  follows	
  
1) EPC	
  
2) eNBs	
  from	
  multiple	
  vendors	
  
3) UE	
  
4) Network	
  Monitor	
  Tool	
  
5) Uu	
  Monitor	
  Tool	
  
13	
  
	
  
For	
  this	
  test	
  NSN/Harris	
  will	
  supply	
  the	
  EPC.	
  	
  RAN	
  equipment	
  (eNB)	
  will	
  be	
  supplied	
  by	
  the	
  following	
  
vendors:	
  
1) Alcatel	
  Lucent	
  
2) General	
  Dynamics	
  Broadband	
  
3) MSI	
  
The	
  UE	
  will	
  be	
  a	
  MSI	
  UM	
  1000	
  USB	
  Dongle.	
  
5.5.4 Test Procedure
1) Integrate	
  the	
  Alcatel	
  Lucent	
  eNB	
  with	
  the	
  NSN/Harris	
  EPC.	
  
2) Turn	
  on	
  the	
  message	
  tracing	
  capability	
  in	
  the	
  eNB	
  and	
  MME	
  for	
  troubleshooting	
  purposes.	
  
3) Mirror	
  all	
  EPC	
  interfaces	
  in	
  the	
  NSN/Harris	
  EPC	
  to	
  a	
  monitor	
  port.	
  	
  This	
  will	
  be	
  used	
  for	
  
troubleshooting	
  purposes.	
  
4) Connect	
  the	
  monitor	
  port	
  to	
  the	
  network-­‐monitoring	
  tool.	
  
5) Provision	
  the	
  MSI	
  in	
  the	
  NSN/Harris	
  HSS.	
  
6) Program	
  the	
  UE	
  SIM	
  card	
  with	
  the	
  correct	
  IMSI	
  and	
  Ki	
  values.	
  
7) Connect	
  the	
  UE	
  dongle	
  to	
  a	
  laptop	
  that	
  contains	
  the	
  appropriate	
  connection	
  manager	
  software	
  
and	
  that	
  contains	
  the	
  Uu	
  monitor	
  software.	
  
8) Perform	
  a	
  UE	
  Attach	
  by	
  turning	
  on	
  the	
  UE.	
  
9) Establish	
  a	
  data	
  session	
  by	
  utilizing	
  the	
  connection	
  manager	
  software	
  and	
  browsing	
  to	
  
www.pscr.gov.	
  
10) Perform	
  a	
  UE	
  Detach	
  by	
  clicking	
  “Disconnect”	
  on	
  the	
  connection	
  manager.	
  
11) Repeat	
  steps	
  1	
  –	
  10	
  for	
  the	
  eNBs	
  supplied	
  by	
  General	
  Dynamics	
  Broadband	
  and	
  MSI.	
  
6 Network Drive Testing
The	
  purpose	
  of	
  network	
  drive	
  testing	
  is	
  to	
  evaluate	
  the	
  performance	
  of	
  a	
  single	
  LTE	
  network	
  in	
  an	
  
operational	
  environment.	
  	
  All	
  tests	
  will	
  be	
  conducted	
  in	
  the	
  field	
  against	
  each	
  infrastructure	
  vendor’s	
  
system.	
  	
  	
  
The	
  tests	
  contained	
  in	
  this	
  section	
  have	
  been	
  designed	
  to	
  expand	
  on	
  the	
  tests	
  that	
  were	
  written	
  into	
  
PSCR	
  Phase	
  1	
  and	
  Phase	
  2.	
  	
  These	
  phases	
  contained	
  a	
  limited	
  amount	
  of	
  over	
  the	
  air	
  network	
  
performance	
  tests	
  along	
  with	
  extensive	
  throughput	
  testing	
  in	
  a	
  laboratory	
  environment.	
  	
  The	
  objective	
  
of	
  the	
  tests	
  in	
  this	
  section	
  is	
  to	
  test	
  the	
  LTE	
  system	
  (infrastructure	
  and	
  UEs)	
  in	
  an	
  operational	
  
environment.	
  
Keeping	
  consistent	
  with	
  PSCR’s	
  methodology	
  of	
  leveraging	
  industry	
  accepted	
  techniques	
  for	
  testing,	
  
PSCR’s	
  drive	
  testing	
  and	
  network	
  evaluation	
  is	
  based	
  upon	
  some	
  of	
  the	
  testing	
  concepts	
  presented	
  in	
  
the	
  JDSU	
  application	
  note	
  titled	
  “LTE	
  and	
  EPC	
  Test	
  An	
  Overview	
  of	
  Test	
  Concepts	
  and	
  Tools	
  for	
  Trials”.	
  1
	
  
The	
  testing	
  concepts	
  presented	
  in	
  the	
  application	
  note	
  have	
  been	
  modified	
  to	
  fit	
  the	
  needs	
  of	
  PSCR.	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
1
	
  http://www.jdsu.com/NoIndexLiterature/lte_test_appnote.pdf	
  	
  
14	
  
	
  
Additionally	
  the	
  GSMA	
  TS112
,	
  Annex	
  C	
  document	
  has	
  been	
  significantly	
  utilized	
  in	
  multiple	
  sections	
  of	
  
this	
  document.	
  	
  
The	
  major	
  areas	
  PSCR	
  will	
  be	
  focusing	
  its	
  testing	
  efforts	
  on	
  are:	
  
1) Single	
  User	
  Throughput	
  
2) Intra-­‐LTE	
  Handover	
  
3) Network	
  Latency	
  
PSCR	
  will	
  establish	
  a	
  single	
  drive	
  route	
  that	
  all	
  vendor	
  systems	
  will	
  be	
  evaluated	
  against.	
  	
  For	
  all	
  test	
  
cases	
  in	
  this	
  section,	
  PSCR	
  will	
  log	
  data	
  along	
  this	
  route	
  using	
  a	
  drive	
  test-­‐logging	
  tool	
  such	
  as	
  the	
  Anritsu	
  
Link	
  Master	
  or	
  JDSU	
  E6474A	
  drive	
  test	
  software.	
  	
  The	
  data	
  will	
  then	
  be	
  post	
  processed	
  and	
  analyzed	
  by	
  
PSCR.	
  
The	
  drive	
  test	
  software	
  contains	
  a	
  “sequencer”	
  function.	
  	
  The	
  purpose	
  of	
  the	
  function	
  is	
  to	
  automate	
  the	
  
use	
  of	
  various	
  applications	
  during	
  drive	
  testing.	
  	
  For	
  example,	
  the	
  end	
  user	
  can	
  configure	
  the	
  sequencer	
  
to	
  serially	
  run	
  an	
  FTP	
  session	
  followed	
  by	
  an	
  IPERF	
  session	
  then	
  followed	
  by	
  a	
  Web	
  Browsing	
  session.	
  	
  
Upon	
  completion	
  of	
  the	
  Web	
  Browsing	
  session	
  the	
  sequence	
  will	
  be	
  repeated	
  starting	
  with	
  the	
  
establishment	
  of	
  an	
  FTP	
  session.	
  	
  	
  
Network	
  load	
  will	
  utilize	
  OFDMA	
  Channel	
  Noise	
  Generator	
  (OCNG)3
	
  as	
  implemented	
  by	
  vendors	
  within	
  
their	
  RAN	
  for	
  downlink	
  (DL)	
  load.	
  	
  Investigation	
  is	
  ongoing	
  if	
  uplink	
  (UL)	
  loading	
  can	
  be	
  accomplished	
  in	
  a	
  
controlled	
  manner	
  for	
  drive	
  testing.	
  	
  If	
  possible	
  -­‐	
  use	
  of	
  3GPP-­‐C1	
  simulation	
  for	
  70%	
  loading	
  may	
  be	
  used	
  
for	
  the	
  UL	
  loading	
  tests.	
  	
  	
  
6.1 Additional Considerations
	
  
1) For	
  all	
  tests	
  in	
  this	
  section,	
  the	
  desire	
  is	
  to	
  test	
  handovers,	
  either	
  S1	
  	
  or	
  X2	
  .	
  	
  Vendor	
  
assistance	
  on	
  configuring	
  the	
  tests	
  will	
  be	
  necessary.	
  	
  These	
  tests	
  will	
  initially	
  use	
  the	
  default	
  
bearer	
  (dedicated	
  bearer	
  will	
  be	
  run	
  in	
  Phase	
  2).	
  Testing	
  will	
  encompass	
  intra	
  eNB	
  handover	
  
and	
  inter	
  eNB	
  based	
  handover.	
  	
  	
  Handovers	
  will	
  be	
  run	
  in	
  same	
  and	
  adjacent	
  cell	
  loaded	
  and	
  
unloaded	
  conditions.	
  	
  The	
  methodology	
  for	
  X2	
  and	
  S1	
  should	
  be	
  the	
  same.	
  
2) The	
  UE	
  should	
  perform	
  handovers	
  as	
  requested	
  by	
  the	
  network,	
  and	
  behave	
  as	
  expected	
  
from	
  the	
  user	
  perspective	
  without	
  losing	
  services.	
  
3) There	
  must	
  be	
  a	
  sufficient	
  number	
  of	
  E-­‐UTRA	
  cells	
  available	
  on	
  the	
  same	
  PLMN.	
  Required	
  
packet	
  bearers	
  to	
  be	
  tested	
  should	
  be	
  active,	
  and	
  available	
  in	
  all	
  parts	
  of	
  the	
  test	
  route.	
  
4) The	
  test	
  route(s)	
  should	
  contain	
  the	
  handoff	
  zones	
  to	
  allow	
  for	
  E-­‐UTRA	
  handover,	
  intra	
  
eNodeB	
  handover,	
  and	
  if	
  system	
  provisioning	
  allows	
  inter-­‐MME	
  handover.	
  	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
2
	
  http://www.gsma.com/newsroom/technical-­‐documents/	
  
3
	
  OCNG	
  as	
  per	
  3GPP	
  TS	
  36.521,	
  Appendix	
  5	
  
15	
  
	
  
5) It	
  shall	
  be	
  ensured	
  that	
  the	
  UE	
  performs	
  reselections/handovers	
  as	
  expected.	
  During	
  the	
  
test	
  drive	
  it	
  is	
  imperative	
  the	
  UE	
  remains	
  in	
  service	
  at	
  all	
  times,	
  that	
  the	
  packet	
  bearer	
  in	
  
question	
  is	
  maintained	
  throughout	
  the	
  test	
  route	
  and	
  that	
  the	
  data	
  download	
  and	
  upload	
  is	
  
resumed	
  correctly.	
  	
  	
  
6) All	
  UE	
  and	
  EPC	
  data	
  will	
  be	
  logged	
  for	
  control	
  and	
  user	
  plane.	
  	
  	
  
7) Use	
  of	
  iperf	
  is	
  recommended	
  for	
  initial	
  testing	
  and	
  further	
  tests	
  utilizing	
  video	
  and	
  voice	
  
applications	
  should	
  be	
  considered.	
  The	
  UE	
  should	
  perform	
  handovers	
  correctly,	
  without	
  
losing	
  service,	
  and	
  its	
  PDN	
  connectivity	
  should	
  remain	
  viable	
  before	
  and	
  after	
  the	
  
handovers.	
  
8) The	
  UE	
  should	
  successfully	
  resume	
  the	
  FTP	
  downloads	
  after	
  the	
  handovers.	
  
9) Metrics	
  evaluated	
  should	
  include	
  handover	
  success	
  rate,	
  control	
  plane	
  handover	
  
interruption	
  time,	
  user	
  plane	
  handover	
  interruption	
  time	
  and	
  packet	
  loss/jitter.	
  
	
  
6.2 Single User Throughput: UL UDP; No Load
6.2.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  behavior	
  of	
  single-­‐user	
  UL	
  UDP	
  throughput	
  while	
  driving	
  the	
  
established	
  PSCR	
  drive	
  route.	
  In	
  this	
  test	
  no	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  any	
  cell	
  in	
  the	
  system.	
  	
  
Based	
  on	
  the	
  findings	
  in	
  Phase	
  1	
  testing,	
  the	
  UE	
  will	
  be	
  configured	
  to	
  transmit	
  the	
  maximum	
  amount	
  of	
  
data	
  each	
  system’s	
  UL	
  can	
  sustain.	
  	
  	
  
The	
  analysis	
  of	
  the	
  resulting	
  log	
  files	
  will	
  also	
  include	
  determining	
  the	
  handover	
  success	
  rate	
  and	
  the	
  
dropped	
  data	
  session	
  rate.	
  	
  The	
  handover	
  success	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  successful	
  handovers	
  
divided	
  by	
  the	
  total	
  number	
  of	
  handovers	
  performed.	
  	
  Handover	
  in	
  this	
  context	
  includes	
  between	
  cells	
  
(a.k.a.	
  sectors)	
  on	
  a	
  single	
  site	
  and	
  between	
  the	
  cell	
  of	
  one	
  site	
  to	
  a	
  cell	
  of	
  another	
  site.	
  	
  	
  
A	
  dropped	
  data	
  session	
  in	
  this	
  context	
  refers	
  to	
  a	
  data	
  session	
  that	
  was	
  not	
  properly	
  terminated.	
  	
  The	
  
dropped	
  data	
  session	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  data	
  sessions	
  not	
  properly	
  terminated	
  divided	
  by	
  
the	
  total	
  number	
  of	
  data	
  sessions.	
  	
  	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
6.2.2 Reference
PSCR	
  
6.2.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  SART	
  	
  
2) UE	
  
3) Gladiator	
  or	
  Link	
  Master	
  post	
  processor	
  
4) An	
  application	
  server	
  with	
  iperf	
  
16	
  
	
  
6.2.4 Test Procedure
1) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UE	
  
2) Connect	
  UE	
  to	
  PC	
  that	
  contains	
  drive	
  test	
  software.	
  	
  Alternatively,	
  UE	
  can	
  be	
  connected	
  to	
  USB	
  
ports	
  on	
  JDSU	
  scanner.	
  
3) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
4) Start	
  drive	
  test	
  software	
  on	
  PC	
  and	
  connect	
  via	
  connection	
  manager.	
  
5) Configure	
  the	
  drive	
  test	
  software	
  sequencer	
  to	
  enable	
  an	
  iperf	
  UDP	
  session.	
  The	
  iperf	
  UDP	
  
session	
  will	
  be	
  terminated	
  at	
  the	
  PSCR	
  owned	
  application	
  server.	
  	
  The	
  transfer	
  of	
  the	
  iperf	
  data	
  
must	
  be	
  from	
  the	
  UE	
  to	
  the	
  eNB.	
  The	
  iperf	
  composite	
  stream	
  must	
  be	
  configured	
  to	
  the	
  
maximum	
  data	
  rate	
  the	
  UL	
  of	
  the	
  system	
  under	
  test	
  can	
  sustain.	
  
6) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
7) Attach	
  UE	
  to	
  the	
  network.	
  
8) Start	
  the	
  sequencer	
  in	
  the	
  drive	
  test	
  software.	
  	
  This	
  will	
  start	
  the	
  iperf	
  application.	
  	
  	
  
9) Drive	
  pre-­‐defined	
  route.	
  
10) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  the	
  drive	
  test	
  software.	
  
11) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
12) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  appropriate	
  drive	
  test	
  software	
  application.	
  	
  	
  
13) Average	
  UL	
  throughput	
  and	
  pathloss	
  over	
  all	
  10	
  drives.	
  Since	
  the	
  GPS	
  coordinate	
  values	
  will	
  not	
  
be	
  the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  have	
  to	
  be	
  employed	
  to	
  create	
  a	
  single	
  data	
  
set	
  that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
14) Analyze	
  the	
  data	
  for	
  UL	
  throughput,	
  handover	
  success	
  rate,	
  handover	
  delay	
  time,	
  and	
  dropped	
  
data	
  session	
  rate.	
  
15) NOTE:	
  	
  This	
  test	
  can	
  be	
  run	
  at	
  the	
  same	
  time	
  as	
  section	
  “6.3	
  Single	
  User	
  Throughput:	
  Downlink	
  
(DL)	
  UDP;	
  No	
  Load”	
  on	
  two	
  laptops	
  with	
  separate	
  UE.	
  
	
  
6.2.5 Expected Outcome
1) Plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  UL	
  Throughput	
  (Avg.	
  UL	
  Throughput	
  vs.	
  Location)	
  
b. Average	
  UL	
  Throughput	
  vs.	
  Average	
  Pathloss	
  
17	
  
	
  
2) Handover	
  Success	
  Rate	
  calculated	
  over	
  all	
  10	
  drives	
  
3) Handover	
  Delay	
  Time	
  calculated	
  over	
  all	
  10	
  drives.	
  
4) Dropped	
  Data	
  Session	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
6.3 Single User Throughput: DL UDP; No Load
6.3.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  behavior	
  of	
  single-­‐user	
  DL	
  UDP	
  throughput	
  while	
  driving	
  the	
  
established	
  PSCR	
  drive	
  route.	
  In	
  this	
  test	
  no	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  any	
  cell	
  in	
  the	
  system.	
  	
  
Based	
  on	
  the	
  findings	
  in	
  Phase	
  1	
  testing,	
  an	
  application	
  server	
  that	
  has	
  iperf	
  on	
  it	
  will	
  be	
  configured	
  to	
  
transmit	
  the	
  maximum	
  amount	
  of	
  data	
  each	
  system’s	
  DL	
  can	
  sustain.	
  	
  	
  
The	
  analysis	
  of	
  the	
  resulting	
  log	
  files	
  will	
  also	
  include	
  determining	
  the	
  handover	
  success	
  rate	
  and	
  the	
  
dropped	
  data	
  session	
  rate.	
  	
  The	
  handover	
  success	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  successful	
  handovers	
  
divided	
  by	
  the	
  total	
  number	
  of	
  handovers	
  performed.	
  	
  Handover	
  in	
  this	
  context	
  includes	
  between	
  cells	
  
(a.k.a.	
  sectors)	
  on	
  a	
  single	
  site	
  and	
  between	
  the	
  cell	
  of	
  one	
  site	
  to	
  a	
  cell	
  of	
  another	
  site.	
  	
  A	
  dropped	
  data	
  
session	
  in	
  this	
  context	
  refers	
  to	
  a	
  data	
  session	
  that	
  was	
  not	
  properly	
  terminated.	
  	
  The	
  dropped	
  data	
  
session	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  data	
  sessions	
  not	
  properly	
  terminated	
  divided	
  by	
  the	
  total	
  
number	
  of	
  data	
  sessions.	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
6.3.2 Reference
PSCR	
  
6.3.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  SART	
  	
  
2) UE	
  
3) UE	
  drive	
  test	
  post	
  processor	
  
4) An	
  application	
  server	
  with	
  iperf	
  
6.3.4 Test Procedure
1) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UE	
  
2) Connect	
  UE	
  to	
  PC	
  that	
  contains	
  drive	
  test	
  software.	
  	
  Alternatively,	
  UE	
  can	
  be	
  connected	
  to	
  USB	
  
ports	
  on	
  JDSU	
  scanner.	
  
3) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
4) Start	
  drive	
  test	
  software	
  on	
  PC.	
  
18	
  
	
  
5) Configure	
  the	
  application	
  server	
  to	
  enable	
  an	
  iperf	
  UDP	
  session.	
  The	
  iperf	
  UDP	
  session	
  will	
  be	
  
terminated	
  at	
  the	
  PSCR	
  owned	
  application	
  server.	
  The	
  transfer	
  of	
  the	
  iperf	
  data	
  must	
  be	
  from	
  
the	
  eNB	
  to	
  the	
  UE.	
  The	
  iperf	
  composite	
  stream	
  must	
  be	
  configured	
  to	
  the	
  maximum	
  data	
  rate	
  
the	
  DL	
  of	
  the	
  system	
  under	
  test	
  can	
  sustain.	
  
6) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
7) Attach	
  UE	
  to	
  the	
  network.	
  
8) Start	
  the	
  iperf	
  session	
  at	
  the	
  application	
  server.	
  	
  
9) Drive	
  pre-­‐defined	
  route.	
  
10) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  drive	
  test	
  software.	
  
11) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
12) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  UE	
  drive	
  test	
  post	
  processing	
  application.	
  	
  	
  
13) Average	
  pathloss,	
  DL	
  throughput,	
  DL	
  SNR,	
  and	
  DL	
  BLER	
  over	
  all	
  10	
  drives.	
  Since	
  the	
  GPS	
  
coordinate	
  values	
  will	
  not	
  be	
  the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  have	
  to	
  be	
  
employed	
  to	
  create	
  a	
  single	
  data	
  set	
  that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
14) Analyze	
  the	
  data	
  for	
  pathloss,	
  DL	
  throughput,	
  handover	
  success	
  rate,	
  and	
  dropped	
  data	
  session	
  
rate.	
  
15) NOTE:	
  	
  This	
  test	
  can	
  be	
  run	
  at	
  the	
  same	
  time	
  as	
  section	
  “6.2	
  Single	
  User	
  Throughput:	
  UL	
  UDP;	
  No	
  
Load”	
  on	
  two	
  laptops	
  with	
  separate	
  UE.	
  
	
  
6.3.5 Expected Outcome
1) Plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  DL	
  Throughput	
  (Avg.	
  DL	
  Throughput	
  vs.	
  Location)	
  
b. Average	
  DL	
  Throughput	
  vs.	
  Average	
  DL	
  SNR	
  
c. Average	
  DL	
  Throughput	
  vs.	
  Average	
  DL	
  BLER	
  
d. Average	
  DL	
  Throughput	
  vs.	
  pathloss	
  
2) Handover	
  Success	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
3) Handover	
  Delay	
  Time	
  calculated	
  over	
  all	
  10	
  drives.	
  
4) 	
  
19	
  
	
  
5) Dropped	
  Data	
  Session	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
6.4 Single User Throughput: UL TCP; No Load
Repeat	
  procedure	
  for	
  6.2	
  UDP	
  UL	
  loading.	
  	
  Use	
  TCP	
  stream	
  on	
  iperf/netperf	
  with	
  multiple	
  stream	
  and	
  
TCP	
  window	
  size	
  set	
  for	
  OS.	
  	
  NOTE:	
  	
  This	
  test	
  can	
  be	
  run	
  at	
  the	
  same	
  time	
  as	
  section	
  “6.5	
  Single	
  User	
  
Throughput:	
  DL	
  TCP;	
  No	
  Load”	
  on	
  two	
  laptops	
  with	
  separate	
  UE.	
  
6.5 Single User Throughput: DL TCP; No Load
Repeat	
  procedure	
  for	
  6.3	
  UDP	
  DL	
  loading.	
  	
  Use	
  TCP	
  stream	
  on	
  iperf/netperf	
  with	
  multiple	
  stream	
  and	
  
TCP	
  window	
  size	
  set	
  for	
  OS.	
  	
  NOTE:	
  	
  This	
  test	
  can	
  be	
  run	
  at	
  the	
  same	
  time	
  as	
  section	
  “6.4	
  Single	
  User	
  
Throughput:	
  UL	
  TCP;	
  No	
  Load”	
  on	
  two	
  laptops	
  with	
  separate	
  UE.	
  
6.6 Single User Throughput: UL UDP; 70% Load
6.6.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  behavior	
  of	
  single-­‐user	
  UL	
  UDP	
  throughput	
  while	
  driving	
  the	
  
established	
  PSCR	
  drive	
  route.	
  In	
  this	
  test	
  70%	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  all	
  cells	
  in	
  the	
  system.4
	
  	
  
Based	
  on	
  the	
  findings	
  in	
  Phase	
  1	
  testing,	
  the	
  UE	
  will	
  be	
  configured	
  to	
  transmit	
  the	
  maximum	
  amount	
  of	
  
data	
  each	
  system’s	
  UL	
  can	
  sustain.	
  	
  	
  
The	
  analysis	
  of	
  the	
  resulting	
  log	
  files	
  will	
  also	
  include	
  determining	
  the	
  handover	
  success	
  rate	
  and	
  the	
  
dropped	
  data	
  session	
  rate.	
  	
  The	
  handover	
  success	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  successful	
  handovers	
  
divided	
  by	
  the	
  total	
  number	
  of	
  handovers	
  performed.	
  	
  Handover	
  in	
  this	
  context	
  includes	
  between	
  cells	
  
(a.k.a.	
  sectors)	
  on	
  a	
  single	
  site	
  and	
  between	
  the	
  cell	
  of	
  one	
  site	
  to	
  a	
  cell	
  of	
  another	
  site.	
  	
  A	
  dropped	
  data	
  
session	
  in	
  this	
  context	
  refers	
  to	
  a	
  data	
  session	
  that	
  was	
  not	
  properly	
  terminated.	
  	
  The	
  dropped	
  data	
  
session	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  data	
  sessions	
  not	
  properly	
  terminated	
  divided	
  by	
  the	
  total	
  
number	
  of	
  data	
  sessions.	
  	
  	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
6.6.2 Reference
PSCR	
  
6.6.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  and	
  SART	
  
2) UE	
  
3) UE	
  drive	
  test	
  post	
  processor	
  
4) An	
  application	
  server	
  with	
  iperf	
  
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
4
	
  NOTE:	
  	
  If	
  70%	
  uplink	
  loading	
  is	
  possible	
  via	
  3GPP-­‐C1	
  simulation,	
  this	
  will	
  be	
  utilized	
  also.	
  
20	
  
	
  
6.6.4 Test Procedure
1) Set	
  OCNS	
  to	
  70%	
  on	
  the	
  DL	
  of	
  all	
  cells	
  in	
  the	
  network.	
  
2) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UE	
  
3) Connect	
  UE	
  to	
  PC	
  that	
  contains	
  JDSU	
  drive	
  test	
  software.	
  	
  Alternatively,	
  UE	
  can	
  be	
  connected	
  to	
  
USB	
  ports	
  on	
  JDSU	
  scanner.	
  
4) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
5) Start	
  drive	
  test	
  software	
  on	
  PC.	
  
6) Configure	
  the	
  drive	
  test	
  software	
  sequencer	
  to	
  enable	
  an	
  iperf	
  UDP	
  session.	
  The	
  iperf	
  UDP	
  
session	
  will	
  be	
  terminated	
  at	
  the	
  PSCR	
  owned	
  application	
  server.	
  The	
  transfer	
  of	
  the	
  iperf	
  data	
  
must	
  be	
  from	
  the	
  UE	
  to	
  the	
  eNB.	
  The	
  iperf	
  composite	
  stream	
  must	
  be	
  configured	
  to	
  the	
  
maximum	
  data	
  rate	
  the	
  UL	
  of	
  the	
  system	
  under	
  test	
  can	
  sustain.	
  
7) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
8) Attach	
  UE	
  to	
  the	
  network.	
  
9) Start	
  the	
  sequencer	
  in	
  the	
  drive	
  test	
  software.	
  	
  This	
  will	
  start	
  the	
  iperf	
  application.	
  	
  	
  
10) Drive	
  pre-­‐defined	
  route.	
  
11) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  drive	
  test	
  software.	
  
12) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
13) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  UE	
  drive	
  test	
  post	
  processing	
  application.	
  	
  	
  
14) Average	
  UL	
  throughput	
  and	
  pathloss	
  over	
  all	
  10	
  drives.	
  Since	
  the	
  GPS	
  coordinate	
  values	
  will	
  not	
  
be	
  the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  have	
  to	
  be	
  employed	
  to	
  create	
  a	
  single	
  data	
  
set	
  that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
15) Analyze	
  the	
  data	
  for	
  UL	
  throughput,	
  handover	
  success	
  rate,	
  handover	
  delay	
  time,	
  and	
  dropped	
  
data	
  session	
  rate.	
  
16) NOTE:	
  	
  This	
  test	
  can	
  be	
  run	
  at	
  the	
  same	
  time	
  as	
  section	
  “6.7	
  Single	
  User	
  Throughput:	
  DL	
  UDP;	
  
70%	
  Load”	
  on	
  two	
  laptops	
  with	
  separate	
  UE.	
  
	
  	
  	
  
6.6.5 Expected Outcome
1) Plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  UL	
  Throughput	
  (Avg.	
  UL	
  Throughput	
  vs.	
  Location)	
  
21	
  
	
  
b. Average	
  UL	
  Throughput	
  vs.	
  Average	
  pathloss	
  
2) Handover	
  Success	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
3) Handover	
  Delay	
  Time	
  calculated	
  over	
  all	
  10	
  drives.	
  
4) Dropped	
  Data	
  Session	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
6.7 Single User Throughput: DL UDP; 70% Load
6.7.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  behavior	
  of	
  single-­‐user	
  DL	
  UDP	
  throughput	
  while	
  driving	
  the	
  
established	
  PSCR	
  drive	
  route.	
  In	
  this	
  test	
  70%	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  all	
  cells	
  in	
  the	
  system.	
  	
  
Based	
  on	
  the	
  findings	
  in	
  Phase	
  1	
  testing,	
  the	
  UE	
  will	
  be	
  configured	
  to	
  transmit	
  the	
  maximum	
  amount	
  of	
  
data	
  each	
  system’s	
  UL	
  can	
  sustain.	
  	
  	
  
The	
  analysis	
  of	
  the	
  resulting	
  log	
  files	
  will	
  also	
  include	
  determining	
  the	
  handover	
  success	
  rate	
  and	
  the	
  
dropped	
  data	
  session	
  rate.	
  	
  The	
  handover	
  success	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  successful	
  handovers	
  
divided	
  by	
  the	
  total	
  number	
  of	
  handovers	
  performed.	
  	
  Handover	
  in	
  this	
  context	
  includes	
  between	
  cells	
  
(a.k.a.	
  sectors)	
  on	
  a	
  single	
  site	
  and	
  between	
  the	
  cell	
  of	
  one	
  site	
  to	
  a	
  cell	
  of	
  another	
  site.	
  	
  A	
  dropped	
  data	
  
session	
  in	
  this	
  context	
  refers	
  to	
  a	
  data	
  session	
  that	
  was	
  not	
  properly	
  terminated.	
  	
  The	
  dropped	
  data	
  
session	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  data	
  sessions	
  not	
  properly	
  terminated	
  divided	
  by	
  the	
  total	
  
number	
  of	
  data	
  sessions.	
  	
  	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
6.7.2 Reference
PSCR	
  
6.7.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  and	
  SART	
  
2) UE	
  
3) UE	
  drive	
  test	
  post	
  processor	
  
4) An	
  application	
  server	
  with	
  iperf	
  
6.7.4 Test Procedure
1) Set	
  OCNS	
  to	
  70%	
  on	
  the	
  DL	
  of	
  all	
  cells	
  in	
  the	
  network.	
  
2) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UE	
  
3) Connect	
  UE	
  to	
  PC	
  that	
  contains	
  JDSU	
  drive	
  test	
  software.	
  	
  Alternatively,	
  UE	
  can	
  be	
  connected	
  to	
  
USB	
  ports	
  on	
  JDSU	
  scanner.	
  
4) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
22	
  
	
  
5) Start	
  drive	
  test	
  software	
  on	
  PC.	
  
6) Configure	
  the	
  drive	
  test	
  software	
  sequencer	
  to	
  enable	
  an	
  iperf	
  UDP	
  session.	
  The	
  iperf	
  UDP	
  
session	
  will	
  be	
  terminated	
  at	
  the	
  PSCR	
  owned	
  application	
  server.	
  The	
  transfer	
  of	
  the	
  iperf	
  data	
  
must	
  be	
  from	
  the	
  UE	
  to	
  the	
  eNB.	
  The	
  iperf	
  composite	
  stream	
  must	
  be	
  configured	
  to	
  the	
  
maximum	
  data	
  rate	
  the	
  UL	
  of	
  the	
  system	
  under	
  test	
  can	
  sustain.	
  
7) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
8) Attach	
  UE	
  to	
  the	
  network.	
  
9) Start	
  the	
  sequencer	
  in	
  the	
  drive	
  test	
  software.	
  	
  This	
  will	
  start	
  the	
  iperf	
  application.	
  	
  	
  
10) Drive	
  pre-­‐defined	
  route.	
  
11) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  drive	
  test	
  software.	
  
12) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
13) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  UE	
  drive	
  test	
  post	
  processing	
  application.	
  	
  	
  
14) Average	
  UL	
  throughput	
  and	
  pathloss	
  over	
  all	
  10	
  drives.	
  Since	
  the	
  GPS	
  coordinate	
  values	
  will	
  not	
  
be	
  the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  have	
  to	
  be	
  employed	
  to	
  create	
  a	
  single	
  data	
  
set	
  that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
15) Analyze	
  the	
  data	
  for	
  UL	
  throughput,	
  handover	
  success	
  rate,	
  handover	
  delay	
  time,	
  and	
  dropped	
  
data	
  session	
  rate.	
  	
  
17) NOTE:	
  	
  This	
  test	
  can	
  be	
  run	
  at	
  the	
  same	
  time	
  as	
  section	
  “6.6	
  Single	
  User	
  Throughput:	
  UL	
  UDP;	
  
70%	
  Load”	
  on	
  two	
  laptops	
  with	
  separate	
  UE.	
  
	
  	
  
6.7.5 Expected Outcome
1) Plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  UL	
  Throughput	
  (Avg.	
  UL	
  Throughput	
  vs.	
  Location)	
  
b. Average	
  UL	
  Throughput	
  vs.	
  Average	
  pathloss	
  
2) Handover	
  Success	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
3) Handover	
  Delay	
  Time	
  calculated	
  over	
  all	
  10	
  drives.	
  
4) Dropped	
  Data	
  Session	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
	
  
23	
  
	
  
6.8 Single User Throughput: UL TCP; 70% Load
Repeat	
  procedure	
  for	
  6.6	
  UDP	
  UL	
  loading.	
  	
  Use	
  TCP	
  stream	
  on	
  iperf/netperf	
  with	
  multiple	
  stream	
  and	
  
TCP	
  window	
  size	
  set	
  for	
  OS.	
  	
  NOTE:	
  	
  This	
  test	
  can	
  be	
  run	
  at	
  the	
  same	
  time	
  as	
  section	
  “6.9	
  Single	
  User	
  
Throughput:	
  DL	
  TCP;	
  70%	
  Load”	
  on	
  two	
  laptops	
  with	
  separate	
  UE.	
  
6.9 Single User Throughput: DL TCP; 70% Load
Repeat	
  procedure	
  for	
  6.7	
  UDP	
  DL	
  loading.	
  	
  Use	
  TCP	
  stream	
  on	
  iperf/netperf	
  with	
  multiple	
  stream	
  and	
  
TCP	
  window	
  size	
  set	
  for	
  OS.	
  	
  NOTE:	
  	
  This	
  test	
  can	
  be	
  run	
  at	
  the	
  same	
  time	
  as	
  section	
  “6.8	
  Single	
  User	
  
Throughput:	
  UL	
  TCP;	
  70%	
  Load”	
  on	
  two	
  laptops	
  with	
  separate	
  UE.	
  
6.10 Multi-User Throughput: UL UDP; No Load
6.10.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  behavior	
  of	
  multi-­‐user	
  UL	
  UDP	
  throughput	
  while	
  driving	
  the	
  
established	
  PSCR	
  drive	
  route.	
  In	
  this	
  test	
  no	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  any	
  cell	
  in	
  the	
  system.	
  	
  Four	
  
UEs	
  will	
  be	
  used	
  to	
  perform	
  this	
  test.	
  	
  Based	
  on	
  the	
  findings	
  in	
  Phase	
  1	
  testing,	
  each	
  UE	
  will	
  initially	
  be	
  
configured	
  to	
  transmit	
  25%	
  of	
  the	
  maximum	
  amount	
  of	
  data	
  each	
  system’s	
  UL	
  can	
  sustain.	
  	
  	
  
The	
  analysis	
  of	
  the	
  resulting	
  log	
  files	
  will	
  also	
  include	
  determining	
  the	
  handover	
  success	
  rate	
  and	
  the	
  
dropped	
  data	
  session	
  rate.	
  	
  The	
  handover	
  success	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  successful	
  handovers	
  
divided	
  by	
  the	
  total	
  number	
  of	
  handovers	
  performed.	
  	
  Handover	
  in	
  this	
  context	
  includes	
  between	
  cells	
  
(a.k.a.	
  sectors)	
  on	
  a	
  single	
  site	
  and	
  between	
  the	
  cell	
  of	
  one	
  site	
  to	
  a	
  cell	
  of	
  another	
  site.	
  	
  A	
  dropped	
  data	
  
session	
  in	
  this	
  context	
  refers	
  to	
  a	
  data	
  session	
  that	
  was	
  not	
  properly	
  terminated.	
  	
  The	
  dropped	
  data	
  
session	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  data	
  sessions	
  not	
  properly	
  terminated	
  divided	
  by	
  the	
  total	
  
number	
  of	
  data	
  sessions.	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
6.10.2 Reference
PSCR	
  
6.10.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  and	
  SART	
  
2) Four	
  UEs	
  
3) UE	
  drive	
  test	
  post	
  processor	
  
4) An	
  application	
  server	
  with	
  iperf	
  
6.10.4 Test Procedure
1) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UE	
  
2) Connect	
  all	
  four	
  UEs	
  to	
  PC	
  that	
  contains	
  drive	
  test	
  software.	
  	
  Alternatively,	
  each	
  UE	
  can	
  be	
  
connected	
  to	
  a	
  USB	
  port	
  on	
  JDSU	
  scanner.	
  
24	
  
	
  
3) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
4) Start	
  drive	
  test	
  software	
  on	
  PC.	
  
5) Configure	
  the	
  drive	
  test	
  software	
  sequencer	
  to	
  enable	
  four-­‐iperf	
  UDP	
  session.	
  The	
  iperf	
  UDP	
  
session	
  will	
  be	
  terminated	
  at	
  the	
  PSCR	
  owned	
  application	
  server.	
  The	
  transfer	
  of	
  the	
  iperf	
  data	
  
must	
  be	
  from	
  the	
  UEs	
  to	
  the	
  eNB.	
  Each	
  iperf	
  composite	
  stream	
  must	
  be	
  configured	
  to	
  25%	
  of	
  
the	
  maximum	
  data	
  rate	
  the	
  UL	
  of	
  the	
  system	
  under	
  test	
  can	
  sustain.	
  
6) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
7) Attach	
  UEs	
  to	
  the	
  network.	
  
8) Start	
  the	
  sequencer	
  in	
  the	
  drive	
  test	
  software.	
  	
  This	
  will	
  start	
  the	
  iperf	
  application.	
  	
  	
  
9) Drive	
  pre-­‐defined	
  route.	
  
10) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  drive	
  test	
  software.	
  
11) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
12) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  UE	
  post	
  processing	
  application.	
  	
  	
  
13) For	
  each	
  UE,	
  average	
  UL	
  throughput	
  and	
  pathloss	
  over	
  all	
  10	
  drives.	
  Since	
  the	
  GPS	
  coordinate	
  
values	
  will	
  not	
  be	
  the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  have	
  to	
  be	
  employed	
  to	
  
create	
  a	
  single	
  data	
  set	
  that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
14) Analyze	
  the	
  data	
  for	
  the	
  average	
  UL	
  throughput,	
  handover	
  success	
  rate,	
  and	
  dropped	
  data	
  
session	
  rate	
  associated	
  with	
  each	
  UE.	
  	
  
6.10.5 Expected Outcome
1) For	
  all	
  four	
  UEs,	
  plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  UL	
  Throughput	
  (Avg.	
  UL	
  Throughput	
  vs.	
  Location)	
  
b. Average	
  UL	
  Throughput	
  vs.	
  Average	
  pathloss	
  
2) Handover	
  Success	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
3) Handover	
  Delay	
  Time	
  calculated	
  over	
  all	
  10	
  drives.	
  
4) Dropped	
  Data	
  Session	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
In	
  addition	
  to	
  the	
  above	
  plots	
  will	
  be	
  created	
  that	
  show:	
  
1) Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  
25	
  
	
  
a. The	
  aggregate	
  average	
  UL	
  throughput	
  for	
  all	
  four	
  UEs	
  (Aggregate	
  Avg.	
  UL	
  Throughput	
  vs.	
  
Location)	
  
2) Aggregate	
  Average	
  UL	
  Throughput	
  vs.	
  Average	
  pathloss	
  
3) Aggregate	
  Handover	
  Success	
  Rate	
  
4) Aggregate	
  Dropped	
  Data	
  Session	
  Rate	
  
6.11 Multi-User Throughput: DL UDP; No Load
6.11.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  behavior	
  of	
  multi-­‐user	
  DL	
  UDP	
  throughput	
  while	
  driving	
  the	
  
established	
  PSCR	
  drive	
  route.	
  In	
  this	
  test	
  no	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  any	
  cell	
  in	
  the	
  system.	
  	
  Four	
  
UEs	
  will	
  be	
  used	
  to	
  perform	
  this	
  test.	
  	
  Base	
  on	
  the	
  findings	
  in	
  Phase	
  1	
  testing,	
  an	
  application	
  server	
  that	
  
has	
  iperf	
  on	
  it	
  will	
  be	
  configured	
  to	
  transmit	
  four	
  separate	
  UDP	
  composite	
  streams.	
  	
  Each	
  stream	
  will	
  be	
  
configured	
  for	
  25%	
  of	
  the	
  maximum	
  amount	
  of	
  data	
  each	
  system’s	
  DL	
  can	
  sustain.	
  	
  	
  
The	
  analysis	
  of	
  the	
  resulting	
  log	
  files	
  will	
  also	
  include	
  determining	
  the	
  handover	
  success	
  rate	
  and	
  the	
  
dropped	
  data	
  session	
  rate.	
  	
  The	
  handover	
  success	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  successful	
  handovers	
  
divided	
  by	
  the	
  total	
  number	
  of	
  handovers	
  performed.	
  	
  Handover	
  in	
  this	
  context	
  includes	
  between	
  cells	
  
(a.k.a.	
  sectors)	
  on	
  a	
  single	
  site	
  and	
  between	
  the	
  cell	
  of	
  one	
  site	
  to	
  a	
  cell	
  of	
  another	
  site.	
  	
  A	
  dropped	
  data	
  
session	
  in	
  this	
  context	
  refers	
  to	
  a	
  data	
  session	
  that	
  was	
  not	
  properly	
  terminated.	
  	
  The	
  dropped	
  data	
  
session	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  data	
  sessions	
  not	
  properly	
  terminated	
  divided	
  by	
  the	
  total	
  
number	
  of	
  data	
  sessions.	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
6.11.2 Reference
PSCR	
  
6.11.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  and	
  SART	
  
2) Four	
  UEs	
  
3) UE	
  post	
  processor	
  
4) An	
  application	
  server	
  with	
  iperf	
  
6.11.4 Test Procedure
1) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UE	
  
2) Connect	
  all	
  four	
  UEs	
  to	
  PC	
  that	
  contains	
  JDSU	
  drive	
  test	
  software.	
  	
  Alternatively,	
  each	
  UE	
  can	
  be	
  
connected	
  to	
  a	
  USB	
  port	
  on	
  JDSU	
  scanner.	
  
26	
  
	
  
3) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
4) Start	
  drive	
  test	
  software	
  on	
  PC.	
  
5) Configure	
  the	
  application	
  server	
  to	
  enable	
  four-­‐iperf	
  UDP	
  session.	
  The	
  iperf	
  UDP	
  session	
  will	
  be	
  
terminated	
  at	
  the	
  PSCR	
  owned	
  application	
  server.	
  The	
  transfer	
  of	
  the	
  iperf	
  data	
  must	
  be	
  from	
  
the	
  eNB	
  to	
  the	
  UEs.	
  Each	
  iperf	
  composite	
  stream	
  must	
  be	
  configured	
  to	
  25%	
  of	
  the	
  maximum	
  
data	
  rate	
  the	
  DL	
  of	
  the	
  system	
  under	
  test	
  can	
  sustain.	
  
6) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
7) Attach	
  UEs	
  to	
  the	
  network.	
  
8) Start	
  all	
  four	
  iperf	
  sessions	
  at	
  the	
  application	
  server.	
  	
  
9) Drive	
  pre-­‐defined	
  route.	
  
10) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  drive	
  test	
  software.	
  
11) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
12) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  UE	
  post	
  processing	
  application.	
  	
  	
  
13) For	
  each	
  UE,	
  average	
  pathloss,	
  average	
  DL	
  throughput,	
  DL	
  SNR,	
  and	
  DL	
  BLER	
  over	
  all	
  10	
  drives.	
  
Since	
  the	
  GPS	
  coordinate	
  values	
  will	
  not	
  be	
  the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  
have	
  to	
  be	
  employed	
  to	
  create	
  a	
  single	
  data	
  set	
  that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
14) Analyze	
  the	
  data	
  for	
  the	
  average	
  pathloss,	
  DL	
  throughput,	
  handover	
  success	
  rate,	
  and	
  dropped	
  
data	
  session	
  rate	
  associated	
  with	
  each	
  UE.	
  
6.11.5 Expected Outcome
1) For	
  all	
  four	
  UEs,	
  plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  DL	
  Throughput	
  (Avg.	
  DL	
  Throughput	
  vs.	
  Location)	
  
b. Average	
  DL	
  Throughput	
  vs.	
  DL	
  SNR	
  
c. Average	
  DL	
  Throughput	
  vs.	
  DL	
  BLER	
  
d. Average	
  DL	
  Throughput	
  vs.	
  pathloss	
  
2) For	
  each	
  UE,	
  Handover	
  Success	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
3) For	
  each	
  UE,	
  Handover	
  Delay	
  Time	
  calculated	
  over	
  all	
  10	
  drives.	
  
4) 	
  
27	
  
	
  
5) For	
  each	
  UE,	
  Dropped	
  Data	
  Session	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
In	
  addition	
  to	
  the	
  above	
  plots	
  will	
  be	
  created	
  that	
  show:	
  
1) Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  
a. The	
  aggregate	
  average	
  DL	
  throughput	
  for	
  all	
  four	
  UEs	
  (Aggregate	
  Avg.	
  DL	
  Throughput	
  vs.	
  
Location)	
  
2) Aggregate	
  average	
  DL	
  Throughput	
  vs.	
  Average	
  DL	
  SNR	
  
3) Aggregate	
  average	
  DL	
  Throughput	
  vs.	
  Average	
  DL	
  BLER	
  
4) Aggregate	
  average	
  DL	
  Throughput	
  vs.	
  pathloss	
  
5) Aggregate	
  Handover	
  Success	
  Rate	
  
6) Aggregate	
  Dropped	
  Data	
  Session	
  Rate	
  
6.12 Multi-User Throughput: UL TCP; No Load
Repeat	
  procedure	
  6.10	
  for	
  UDP	
  UL	
  loading.	
  	
  Use	
  TCP	
  stream	
  on	
  iperf/netperf	
  with	
  multiple	
  stream	
  and	
  
TCP	
  window	
  size	
  set	
  for	
  OS.	
  
6.13 Multi-User Throughput: DL TCP: No Load
Repeat	
  procedure	
  6.11	
  for	
  UDP	
  DL	
  loading.	
  	
  Use	
  TCP	
  stream	
  on	
  iperf/netperf	
  with	
  multiple	
  stream	
  and	
  
TCP	
  window	
  size	
  set	
  for	
  OS.	
  
6.14 Multi-User Throughput: UL UDP; 70% Load
6.14.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  behavior	
  of	
  multi-­‐user	
  UL	
  UDP	
  throughput	
  while	
  driving	
  the	
  
established	
  PSCR	
  drive	
  route.	
  In	
  this	
  test	
  70%	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  all	
  cells	
  in	
  the	
  system	
  by	
  
using	
  OCNS.	
  	
  Four	
  UEs	
  will	
  be	
  used	
  to	
  perform	
  this	
  test.	
  	
  Based	
  on	
  the	
  findings	
  in	
  Phase	
  1	
  testing,	
  each	
  
UE	
  will	
  be	
  configured	
  to	
  transmit	
  25%	
  of	
  the	
  maximum	
  amount	
  of	
  data	
  each	
  system’s	
  UL	
  can	
  sustain.	
  	
  	
  
The	
  analysis	
  of	
  the	
  resulting	
  log	
  files	
  will	
  also	
  include	
  determining	
  the	
  handover	
  success	
  rate	
  and	
  the	
  
dropped	
  data	
  session	
  rate.	
  	
  The	
  handover	
  success	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  successful	
  handovers	
  
divided	
  by	
  the	
  total	
  number	
  of	
  handovers	
  performed.	
  	
  Handover	
  in	
  this	
  context	
  includes	
  between	
  cells	
  
(a.k.a.	
  sectors)	
  on	
  a	
  single	
  site	
  and	
  between	
  the	
  cell	
  of	
  one	
  site	
  to	
  a	
  cell	
  of	
  another	
  site.	
  	
  A	
  dropped	
  data	
  
session	
  in	
  this	
  context	
  refers	
  to	
  a	
  data	
  session	
  that	
  was	
  not	
  properly	
  terminated.	
  	
  The	
  dropped	
  data	
  
session	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  data	
  sessions	
  not	
  properly	
  terminated	
  divided	
  by	
  the	
  total	
  
number	
  of	
  data	
  sessions.	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
28	
  
	
  
6.14.2 Reference
PSCR	
  
6.14.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  and	
  SART	
  
2) Four	
  UEs	
  
3) UE	
  drive	
  test	
  post	
  processor	
  
4) An	
  application	
  server	
  with	
  iperf	
  
6.14.4 Test Procedure
1) Set	
  OCNS	
  to	
  70%	
  on	
  the	
  DL	
  for	
  all	
  cells	
  in	
  the	
  network.	
  
2) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UEs.	
  
3) Connect	
  all	
  four	
  UEs	
  to	
  PC	
  that	
  contains	
  JDSU	
  drive	
  test	
  software.	
  	
  Alternatively,	
  each	
  UE	
  can	
  be	
  
connected	
  to	
  a	
  USB	
  port	
  on	
  JDSU	
  scanner.	
  
4) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
5) Start	
  drive	
  test	
  software	
  on	
  PC.	
  
6) Configure	
  the	
  drive	
  test	
  software	
  sequencer	
  to	
  enable	
  four-­‐iperf	
  UDP	
  session.	
  The	
  iperf	
  UDP	
  
session	
  will	
  be	
  terminated	
  at	
  the	
  PSCR	
  owned	
  application	
  server.	
  The	
  transfer	
  of	
  the	
  iperf	
  data	
  
must	
  be	
  from	
  the	
  UEs	
  to	
  the	
  eNB.	
  Each	
  iperf	
  composite	
  stream	
  must	
  be	
  configured	
  to	
  25%	
  of	
  
the	
  maximum	
  data	
  rate	
  the	
  UL	
  of	
  the	
  system	
  under	
  test	
  can	
  sustain.	
  
7) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
8) Attach	
  UEs	
  to	
  the	
  network.	
  
9) Start	
  the	
  sequencer	
  in	
  the	
  drive	
  test	
  software.	
  	
  This	
  will	
  start	
  the	
  iperf	
  application.	
  	
  	
  
10) Drive	
  pre-­‐defined	
  route.	
  
11) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  drive	
  test	
  software.	
  
12) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
13) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  UE	
  drive	
  test	
  post	
  processing	
  application.	
  	
  	
  
14) For	
  each	
  UE,	
  average	
  UL	
  throughput	
  and	
  pathloss	
  over	
  all	
  10	
  drives.	
  Since	
  the	
  GPS	
  coordinate	
  
values	
  will	
  not	
  be	
  the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  have	
  to	
  be	
  employed	
  to	
  
create	
  a	
  single	
  data	
  set	
  that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
15) Analyze	
  the	
  data	
  for	
  the	
  average	
  UL	
  throughput,	
  handover	
  success	
  rate,	
  and	
  dropped	
  data	
  
session	
  rate	
  associated	
  with	
  each	
  UE.	
  	
  
29	
  
	
  
6.14.5 Expected Outcome
1) For	
  all	
  four	
  UEs,	
  plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  UL	
  Throughput	
  (Avg.	
  UL	
  Throughput	
  vs.	
  Location)	
  
b. Average	
  UL	
  Throughput	
  vs.	
  Average	
  pathloss	
  
2) Handover	
  Success	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
3) Handover	
  Delay	
  Time	
  calculated	
  over	
  all	
  10	
  drives.	
  
4) Dropped	
  Data	
  Session	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
In	
  addition	
  to	
  the	
  above	
  plots	
  will	
  be	
  created	
  that	
  show:	
  
1) Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  
a. The	
  aggregate	
  average	
  UL	
  throughput	
  for	
  all	
  four	
  UEs	
  (Aggregate	
  Avg.	
  UL	
  Throughput	
  vs.	
  
Location)	
  
2) Aggregate	
  Average	
  UL	
  Throughput	
  vs.	
  pathloss	
  
3) Aggregate	
  Handover	
  Success	
  Rate	
  
4) Aggregate	
  Dropped	
  Data	
  Session	
  Rate	
  
6.15 Multi-User Throughput: DL UDP: 70% Load
6.15.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  behavior	
  of	
  multi-­‐user	
  DL	
  UDP	
  throughput	
  while	
  driving	
  the	
  
established	
  PSCR	
  drive	
  route.	
  In	
  this	
  test	
  70%	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  all	
  cells	
  in	
  the	
  system	
  by	
  
using	
  OCNS.	
  	
  Four	
  UEs	
  will	
  be	
  used	
  to	
  perform	
  this	
  test.	
  	
  Based	
  on	
  the	
  findings	
  in	
  Phase	
  1	
  testing,	
  each	
  
UE	
  will	
  be	
  configured	
  to	
  transmit	
  25%	
  of	
  the	
  maximum	
  amount	
  of	
  data	
  each	
  system’s	
  UL	
  can	
  sustain.	
  	
  	
  
The	
  analysis	
  of	
  the	
  resulting	
  log	
  files	
  will	
  also	
  include	
  determining	
  the	
  handover	
  	
  success	
  rate	
  and	
  the	
  
dropped	
  data	
  session	
  rate.	
  	
  The	
  handover	
  success	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  successful	
  handovers	
  
divided	
  by	
  the	
  total	
  number	
  of	
  handovers	
  performed.	
  	
  Handover	
  in	
  this	
  context	
  includes	
  between	
  cells	
  
(a.k.a.	
  sectors)	
  on	
  a	
  single	
  site	
  and	
  between	
  the	
  cell	
  of	
  one	
  site	
  to	
  a	
  cell	
  of	
  another	
  site.	
  	
  A	
  dropped	
  data	
  
session	
  in	
  this	
  context	
  refers	
  to	
  a	
  data	
  session	
  that	
  was	
  not	
  properly	
  terminated.	
  	
  The	
  dropped	
  data	
  
session	
  rate	
  is	
  defined	
  as	
  the	
  number	
  of	
  data	
  sessions	
  not	
  properly	
  terminated	
  divided	
  by	
  the	
  total	
  
number	
  of	
  data	
  sessions.	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
30	
  
	
  
6.15.2 Reference
PSCR	
  
6.15.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  and	
  SART	
  
2) Four	
  UEs	
  
3) UE	
  drive	
  test	
  post	
  processor	
  
4) An	
  application	
  server	
  with	
  iperf	
  
6.15.4 Test Procedure
1) Set	
  OCNS	
  to	
  70%	
  on	
  the	
  DL	
  for	
  all	
  cells	
  in	
  the	
  network.	
  
2) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UEs.	
  
3) Connect	
  all	
  four	
  UEs	
  to	
  PC	
  that	
  contains	
  JDSU	
  drive	
  test	
  software.	
  	
  Alternatively,	
  each	
  UE	
  can	
  be	
  
connected	
  to	
  a	
  USB	
  port	
  on	
  JDSU	
  scanner.	
  
4) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
5) Start	
  drive	
  test	
  software	
  on	
  PC.	
  
6) Configure	
  the	
  drive	
  test	
  software	
  sequencer	
  to	
  enable	
  four-­‐iperf	
  UDP	
  session.	
  The	
  iperf	
  UDP	
  
session	
  will	
  be	
  terminated	
  at	
  the	
  PSCR	
  owned	
  application	
  server.	
  The	
  transfer	
  of	
  the	
  iperf	
  data	
  
must	
  be	
  from	
  the	
  UEs	
  to	
  the	
  eNB.	
  Each	
  iperf	
  composite	
  stream	
  must	
  be	
  configured	
  to	
  25%	
  of	
  
the	
  maximum	
  data	
  rate	
  the	
  UL	
  of	
  the	
  system	
  under	
  test	
  can	
  sustain.	
  
7) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
8) Attach	
  UEs	
  to	
  the	
  network.	
  
9) Start	
  the	
  sequencer	
  in	
  the	
  drive	
  test	
  software.	
  	
  This	
  will	
  start	
  the	
  iperf	
  application.	
  	
  	
  
10) Drive	
  pre-­‐defined	
  route.	
  
11) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  drive	
  test	
  software.	
  
12) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
13) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  UE	
  drive	
  test	
  post	
  processing	
  application.	
  	
  	
  
14) For	
  each	
  UE,	
  average	
  DL	
  throughput	
  and	
  pathloss	
  over	
  all	
  10	
  drives.	
  Since	
  the	
  GPS	
  coordinate	
  
values	
  will	
  not	
  be	
  the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  have	
  to	
  be	
  employed	
  to	
  
create	
  a	
  single	
  data	
  set	
  that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
15) Analyze	
  the	
  data	
  for	
  the	
  average	
  DL	
  throughput,	
  handover	
  success	
  rate,	
  and	
  dropped	
  data	
  
session	
  rate	
  associated	
  with	
  each	
  UE.	
  	
  
31	
  
	
  
6.15.5 Expected Outcome
1) For	
  all	
  four	
  UEs,	
  plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  DL	
  Throughput	
  (Avg.	
  DL	
  Throughput	
  vs.	
  Location)	
  
b. Average	
  DL	
  Throughput	
  vs.	
  Average	
  pathloss	
  
2) Handover	
  Success	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
3) Handover	
  Delay	
  Time	
  calculated	
  over	
  all	
  10	
  drives.	
  
4) Dropped	
  Data	
  Session	
  Rate	
  calculated	
  over	
  all	
  10	
  drives.	
  
In	
  addition	
  to	
  the	
  above	
  plots	
  will	
  be	
  created	
  that	
  show:	
  
1) Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  
a. The	
  aggregate	
  average	
  DL	
  throughput	
  for	
  all	
  four	
  UEs	
  (Aggregate	
  Avg.	
  DL	
  Throughput	
  vs.	
  
Location)	
  
2) Aggregate	
  Average	
  DL	
  Throughput	
  vs.	
  pathloss	
  
3) Aggregate	
  Handover	
  Success	
  Rate	
  
4) Aggregate	
  Dropped	
  Data	
  Session	
  Rate	
  
	
  
6.16 Multi-User Throughput: UL TCP; 70% Load
Repeat	
  procedure	
  6.14	
  for	
  UDP	
  UL	
  loading.	
  	
  Use	
  TCP	
  stream	
  on	
  iperf/netperf	
  with	
  multiple	
  stream	
  and	
  
TCP	
  window	
  size	
  set	
  for	
  OS.	
  
6.17 Multi-User Throughput: DL TCP: 70% Load
Repeat	
  procedure	
  6.15	
  for	
  UDP	
  DL	
  loading.	
  	
  Use	
  TCP	
  stream	
  on	
  iperf/netperf	
  with	
  multiple	
  stream	
  and	
  
TCP	
  window	
  size	
  set	
  for	
  OS.	
  
6.18 Network Latency: Single User; No Load
6.18.1 Test Description
The	
  purpose	
  of	
  this	
  test	
  is	
  to	
  evaluate	
  the	
  round	
  trip	
  latency	
  of	
  the	
  network	
  while	
  driving	
  the	
  established	
  
PSCR	
  drive	
  route.	
  In	
  this	
  test	
  no	
  load	
  will	
  be	
  applied	
  to	
  the	
  DL	
  of	
  any	
  cell	
  in	
  the	
  system.	
  A	
  single	
  UE	
  will	
  
be	
  used.	
  A	
  simple	
  ping	
  will	
  be	
  initiated	
  at	
  the	
  UE	
  that	
  will	
  be	
  destined	
  for	
  an	
  application	
  server.	
  	
  Three	
  
different	
  sizes	
  of	
  ping	
  packets	
  will	
  be	
  used.	
  	
  	
  
The	
  drive	
  route	
  will	
  be	
  driven	
  10	
  times	
  (subsequent	
  drives	
  may	
  not	
  be	
  necessary)	
  in	
  order	
  to	
  acquire	
  
enough	
  data.	
  	
  Separate	
  log	
  files	
  will	
  be	
  kept	
  for	
  each	
  pass	
  of	
  the	
  route.	
  
32	
  
	
  
6.18.2 Reference
PSCR	
  
6.18.3 Required Equipment
1) JDSU	
  and	
  Link	
  Master	
  drive	
  test	
  software,	
  Scanner,	
  and	
  SART	
  
2) UE	
  
3) UE	
  drive	
  test	
  post	
  processor	
  
4) An	
  application	
  server	
  	
  
6.18.4 Test Procedure
1) If	
  necessary	
  connect	
  external	
  mag	
  mount	
  antennas	
  to	
  UE	
  
2) Connect	
  UE	
  to	
  PC	
  that	
  contains	
  JDSU	
  drive	
  test	
  software.	
  	
  Alternatively,	
  UE	
  can	
  be	
  connected	
  to	
  
USB	
  ports	
  on	
  JDSU	
  scanner.	
  
3) Connect	
  GPS	
  antenna	
  to	
  JDSU	
  scanner	
  and	
  Link	
  Master	
  drive	
  test	
  computer.	
  
4) Start	
  drive	
  test	
  software	
  on	
  PC.	
  
5) Configure	
  the	
  drive	
  test	
  software	
  sequencer	
  to	
  enable	
  three	
  sequential	
  ping	
  sessions.	
  	
  The	
  
packet	
  sizes	
  for	
  each	
  ping	
  session	
  will	
  be	
  as	
  follows:	
  	
  32,	
  1000,	
  and	
  1500	
  bytes.	
  	
  All	
  sessions	
  will	
  
be	
  run	
  simultaneously.	
  	
  *NOTE:	
  	
  Set	
  to	
  not	
  fragment	
  packet.	
  
6) Start	
  logging	
  data	
  with	
  the	
  drive	
  test	
  software.	
  
7) Attach	
  UE	
  to	
  the	
  network.	
  
8) Start	
  the	
  sequencer	
  in	
  the	
  drive	
  test	
  software.	
  	
  This	
  will	
  cause	
  the	
  sequencer	
  to	
  run	
  through	
  
each	
  ping	
  session.	
  	
  	
  
9) Drive	
  pre-­‐defined	
  route.	
  
10) After	
  the	
  entire	
  route	
  has	
  been	
  driven,	
  stop	
  logging	
  on	
  drive	
  test	
  software.	
  
11) 	
  Drive	
  the	
  pre-­‐defined	
  route	
  nine	
  more	
  times.	
  
12) Post-­‐process	
  the	
  log	
  files	
  using	
  the	
  UE	
  drive	
  test	
  post	
  processing	
  application.	
  	
  	
  
13) Average	
  the	
  round	
  trip	
  latency	
  over	
  all	
  10	
  drives.	
  	
  Since	
  the	
  GPS	
  coordinate	
  values	
  will	
  not	
  be	
  
the	
  same	
  for	
  each	
  drive	
  a	
  binning	
  technique	
  will	
  have	
  to	
  be	
  employed	
  to	
  create	
  a	
  single	
  data	
  set	
  
that	
  can	
  be	
  overlaid	
  on	
  a	
  map.	
  
14) Analyze	
  the	
  data	
  for	
  average	
  round	
  trip	
  latency.	
  
6.18.5 Expected Outcome
1) Plots	
  will	
  be	
  created	
  that	
  show	
  the	
  following:	
  
33	
  
	
  
a. Overlay	
  of	
  the	
  following	
  parameters	
  on	
  drive	
  route:	
  	
  	
  
i. Average	
  Round	
  trip	
  latency	
  (Avg.	
  Latency	
  vs.	
  Location)	
  
b. Average	
  Latency	
  vs.	
  Average	
  pathloss	
  
c. Average	
  Latency	
  vs.	
  Average	
  DL	
  BLER	
  
d. Average	
  Latency	
  vs.	
  Average	
  DL	
  SNR	
  
6.19 Network Latency: Single User; 70% Load
Repeat	
  test	
  procedure	
  in	
  section	
  6.18	
  with	
  70%	
  load	
  applied	
  utilizing	
  OCNS	
  on	
  all	
  cells.	
  
	
  
7 UE Interoperability Tests
	
  
UE	
  interoperability	
  in	
  this	
  context	
  refers	
  to:	
  
1) UEs	
  manufactured	
  by	
  any	
  vendor	
  successfully	
  operating	
  with	
  eNBs	
  manufactured	
  by	
  any	
  vendor.	
  
Formal	
  UE	
  interoperability	
  tests	
  will	
  be	
  handled	
  in	
  the	
  PTCRB	
  as	
  part	
  of	
  the	
  BC	
  14	
  UE	
  certification	
  
process.	
  The	
  working	
  group	
  that	
  developed	
  the	
  CTIA	
  test	
  plan	
  was	
  composed	
  of	
  LTE	
  commercial	
  
operators	
  and	
  vendors	
  (both	
  UE	
  &	
  Infrastructure).	
  	
  The	
  test	
  plan	
  consists	
  of	
  laboratory	
  and	
  field	
  tests.	
  	
  	
  	
  	
  
PSCR	
  may	
  choose	
  to	
  execute	
  select	
  test	
  cases	
  from	
  the	
  CTIA	
  IOT	
  test	
  plan	
  in	
  order	
  to	
  perform	
  spot	
  
checks	
  on	
  received	
  devices	
  that	
  have	
  not	
  undergone	
  PTCRB	
  certification	
  before	
  arriving	
  at	
  the	
  PSCR	
  lab.	
  	
  
Please	
  refer	
  to	
  the	
  PSCR	
  UE	
  test	
  plan	
  for	
  more	
  information	
  regarding	
  UE	
  entrance	
  criteria	
  to	
  the	
  PSCR	
  
test	
  network.	
  	
  
The	
  CTIA	
  IOT	
  Test	
  Plan	
  can	
  be	
  downloaded	
  from	
  the	
  following	
  web	
  link:	
  
http://files.ctia.org/pdf/CTIA_LTE_IOT_Test_Plan_Rev_1.0.pdf	
  
8 Vendor Test Case Checklist
The	
  purpose	
  of	
  the	
  following	
  test	
  case	
  checklist	
  is	
  to	
  identify	
  the	
  Phase	
  3	
  test	
  cases	
  that	
  are	
  applicable	
  
to	
  each	
  vendor	
  type.	
  	
  Some	
  test	
  cases	
  are	
  end-­‐to-­‐end	
  by	
  nature	
  and	
  will	
  require	
  the	
  participation	
  of	
  a	
  
Ue,	
  eNB,	
  and	
  EPC	
  vendor	
  in	
  order	
  to	
  ensure	
  that	
  a	
  given	
  Phase	
  3	
  test	
  can	
  be	
  successfully	
  executed.	
  	
  The	
  
“All”	
  category	
  is	
  defined	
  as	
  participation	
  by	
  Ue,	
  eNB,	
  and	
  EPC	
  vendors.	
  
Every	
  vendor	
  who	
  participates	
  in	
  the	
  PSCR	
  demonstration	
  network	
  will	
  negotiate	
  with	
  PSCR	
  to	
  
determine	
  which	
  tests	
  will	
  be	
  required	
  for	
  successful	
  execution	
  of	
  Phase	
  3.	
  
	
  
34	
  
	
  
Table	
  1:	
  	
  Vendor	
  Test	
  Case	
  Checklist	
  
Phase	
  3	
  Part	
  1	
  Test	
  Title	
   Status	
   Ue	
   eNB	
   EPC	
   All	
  
Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  
Cisco	
  EPC)	
  
	
   	
   	
   	
   X	
  
Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  
Thales	
  EPC)	
  
	
   	
   	
   	
   X	
  
Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  
ALU	
  EPC)	
  
	
   	
   	
   	
   X	
  
Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  
GDBB	
  EPC)	
  
	
   	
   	
   	
   X	
  
Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  
MSI	
  Solutions	
  EPC)	
  
	
   	
   	
   	
   X	
  
Network	
  Element	
  Under	
  Test:	
  eNB	
  (with	
  
NSN	
  EPC)	
  
	
   	
   	
   	
   X	
  
Single	
  User	
  Throughput:	
  UL	
  UDP;	
  No	
  
Load	
  
	
   	
   	
   	
   X	
  
Single	
  User	
  Throughput:	
  DL	
  UDP;	
  No	
  
Load	
  
	
   	
   	
   	
   X	
  
Single	
  User	
  Throughput:	
  	
  UL	
  TCP;	
  No	
  
Load	
  
	
   	
   	
   	
   X	
  
Single	
  User	
  Throughput:	
  	
  DL	
  TCP;	
  No	
  
Load	
  
	
   	
   	
   	
   X	
  
Single	
  User	
  Throughput:	
  UL	
  UDP;	
  70%	
  
Load	
  
	
   	
   	
   	
   X	
  
Single	
  User	
  Throughput:	
  DL	
  UDP;	
  70%	
  
Load	
  
	
   	
   	
   	
   X	
  
Single	
  User	
  Throughput:	
  	
  UL	
  TCP;	
  70%	
  
Load	
  
	
   	
   	
   	
   X	
  
Single	
  User	
  Throughput:	
  	
  DL	
  TCP;	
  70%	
  
Load	
  
	
   	
   	
   	
   X	
  
Multi-­‐User	
  Throughput:	
  	
  UL	
  UDP;	
  No	
  
Load	
  
	
   	
   	
   	
   X	
  
Multi-­‐User	
  Throughput:	
  DL	
  (DL)	
  UDP;	
  No	
  
Load	
  
	
   	
   	
   	
   X	
  
Multi-­‐User	
  Throughput:	
  	
  UL	
  TCP;	
  No	
  
Load	
  
	
   	
   	
   	
   X	
  
Multi-­‐User	
  Throughput:	
  	
  DL	
  TCP;	
  No	
  
Load	
  
	
   	
   	
   	
   X	
  
Multi-­‐User	
  Throughput:	
  UL	
  UDP;	
  70%	
  
Load	
  
	
   	
   	
   	
   X	
  
Multi-­‐User	
  Throughput:	
  DL	
  UDP;	
  70%	
  
Load	
  
	
   	
   	
   	
   X	
  
Multi-­‐User	
  Throughput:	
  	
  UL	
  TCP;	
  70%	
  
Load	
  
	
   	
   	
   	
   X	
  
35	
  
	
  
Multi-­‐User	
  Throughput:	
  	
  DL	
  TCP;	
  70%	
  
Load	
  
	
   	
   	
   	
   X	
  
Network	
  Latency:	
  Single	
  User;	
  No	
  Load	
   	
   	
   	
   	
   X	
  
Network	
  Latency:	
  Single	
  User;	
  70%	
  Load	
   	
   	
   	
   	
   X	
  
	
  
9 Acronyms
See 3GPP TR 21.905 V8.8.0 (2009-03) Section 4
10 Optional Information and Tests
The	
  information	
  contained	
  in	
  this	
  section	
  is	
  for	
  comment,	
  informational	
  and	
  contains	
  optional	
  tests.	
  
10.1 Extra IOT Information5
Additional information beyond pass/fail maybe captured during the testing. This includes the following:
10.1.1 Verify Message Flow
• Verify that the monitored message sequence is correct.
• Verify that the Attach Request message (step 2) contains the following mandatory
information elements (IE): EPS attach type, NAS key set identifier, Old GUTI or IMSI, UE
network capability, ESM message container. The other optional IEs: Old P-TMSI
signature, Additional GUTI, DRX parameter, MS network capability and TMSI status may
be included too.
• Verify that the Attach Accept message (step 16) contains the following mandatory
information elements (IE): EPS attach result, T3412 value, TAI list, ESM message
container. The other optional IEs may be included too.
• Verify that the Attach Complete message (step 21) contains the ESM message container
IE.
• Verify that the INITIAL CONTEXT SETUP REQUEST message (step 16) contains the E-
RAB to be Setup List IE, the ATTACH ACCEPT message on NAS level and the required
optional IEs to establish a UE context in the eNB.
• Verify that the INITIAL CONTEXT SETUP RESPONSE message (step 19) contains the
E-RAB Setup list of successfully established E-RABs.
• Verify that ATTACH REQUEST, ATTACH ACCEPT and ATTACH COMPLETE
messages are transported successfully on the S1-MME interface.
• Verify that the related EPS Bearers have been established, and that the UE has been
issued with an IP Address.
	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  	
  
5
	
  Appendix	
  excerpt	
  from	
  MSF	
  contribution:	
  msf2009.178.02	
  	
  
36	
  
	
  
10.1.2 Tracking Area Updates
• Verify that the monitored message sequence is correct.
• Verify that the TAU Request message (from eNB to MME) contains the following
mandatory information elements (IE): EPS Update Type, old GUTI, NAS key set identifier
ASME. The other optional IEs may be included too.
• Verify that the TAU Accept message (from MME to eNB) contains the following
mandatory information elements (IE): EPS Update result. The other optional IEs may be
included too.
• Verify that the eNB send the TAU Complete message to MME if the GUTI is reallocated.
• Verify that TAU Request, TAU Accept and TAU Complete messages are transported
successfully on the S1-MME interface.
• Verify that the UE is in EMM-REGISTERED and ECM- CONNECTED in MME after TAU
complete.
• Verify the new TAI list
10.1.3 Detach Information
• Verify that the Detach Request message (from eNB to MME) contains the following
mandatory information elements (IE): Detach type, NAS key set identifier and GUTI/IMSI.
• Verify that the Default bearer is deleted.
• Verify that the UE is in EMM-DEREGISTERED and ECM-IDLE after the detach is
completed.
• Verify that DETACH Request,UE Context Release Command and UE Context Release
Complete messages are transported successfully on the S1-MME interface.
	
  
37	
  
	
  
10.2 Call Flow Diagram
10.2.1 UE Attach
1. Attach Request
MME S-GW PCRF HSSP-GW
2. Attach
Request
eNodeBUE
3. Identity Request
4. Identity Response
5a. Authentication / Security
16. Initial Context Setup Request / Attach Accept
First Uplink Data
18. RRC Connection Reconfiguration Complete
17. RRC Connection Reconfiguration
19. Initial Context Setup Response
25. Modify Bearer Response
22. Modify Bearer Request
First Downlink Data
26. Notify Request
27. Notify Response
15. Create Session Response
10. Create Session Request
8. Update Location Request
9. Update Location Ack
11. Create Session Request
13. Create Session Response
First Downlink Data
5b. Identity Request/Response
12. PCEF Initiated IP-CAN Session
Establishment/Modification
6. Ciphered Options Request
7. Ciphered Options Response
23. Modify Bearer Request
24. Modify Bearer Response
20. Direct Transfer
21. Attach Complete
38	
  
	
  
10.2.2 TAU UE Call Flow
10.2.3 UE Detach Call Flow
	
  
	
  
UE eNodeB MME
TAU Request
TAU Request
Authentication / Security
TAU Accept
TAU Accept
TAU Complete
HSS
TAU Complete
Authentication Information Request
Authentication Information Answer
UE eNodeB MME S-GW P-GW PCRF
Detach Request
Detach Accept
Delete Session Request
Delete Session Response
PCEF Initiated IP-CAN Session Termination
UE Context Release Command
UE Context Release Complete
Delete Session Request
Delete Session Response
HSS
Notify Request
Notify Answer

More Related Content

PDF
Rafal_Malanij_MSc_Dissertation
PDF
Firewall and proxy servers howto
PDF
Analytics configuration reference_sc61_a4
PDF
Plesk 8.1 for Windows
PDF
Oracle forms and resports
PDF
Cloud computing
PDF
Dw guide 11 g r2
PDF
Mikrotik
Rafal_Malanij_MSc_Dissertation
Firewall and proxy servers howto
Analytics configuration reference_sc61_a4
Plesk 8.1 for Windows
Oracle forms and resports
Cloud computing
Dw guide 11 g r2
Mikrotik

What's hot (19)

PDF
B12303
PDF
Book hudson
PDF
Akka java
DOCX
Sybase SQL AnyWhere12
PDF
Plesk 8.1 for Windows
PDF
Oracle apps integration_cookbook
PDF
CITRIX XENSERVER FREE/ADVANCED 5.6 HARDENING GUIDE
PDF
project Report on LAN Security Manager
PDF
Tr 3998 -deployment_guide_for_hosted_shared_desktops_and_on-demand_applicatio...
PDF
PostgreSQL 10 New Features (English)
PDF
Expert oracle database architecture
PDF
Avg afg uma_en_90_13
PDF
Administrator guide
DOC
zJOS System Events Automation Users Guide
PDF
PDF
D space manual 1.5.2
PDF
Rhel Tuningand Optimizationfor Oracle V11
PDF
Java web programming
PDF
Open acc.1.0
B12303
Book hudson
Akka java
Sybase SQL AnyWhere12
Plesk 8.1 for Windows
Oracle apps integration_cookbook
CITRIX XENSERVER FREE/ADVANCED 5.6 HARDENING GUIDE
project Report on LAN Security Manager
Tr 3998 -deployment_guide_for_hosted_shared_desktops_and_on-demand_applicatio...
PostgreSQL 10 New Features (English)
Expert oracle database architecture
Avg afg uma_en_90_13
Administrator guide
zJOS System Events Automation Users Guide
D space manual 1.5.2
Rhel Tuningand Optimizationfor Oracle V11
Java web programming
Open acc.1.0
Ad

Similar to Lte demonstration network test plan phase 3 part_1-v2_4_05072013 (20)

PDF
Sqlmap readme
PDF
B7.2 a1353-ra platform commissioning solaris 2.6
PDF
Administrator manual-e2
PDF
Specification of the Linked Media Layer
PDF
Drools expert-docs
PDF
System administration guide
PDF
Blue Doc User Manual
PDF
Milan_thesis.pdf
PDF
Gnugk manual-2.3.2
PDF
O reilly cisco ios access lists
PDF
Oreilly cisco ios access lists
PDF
GNU Gatekeeper Manual version 5.13 - New release
 
PDF
GNU Gatekeeper 5.11
 
PDF
Cenet-- capability enabled networking: towards least-privileged networking
PDF
MSc_Dissertation
PDF
Tcxd 300 manual_02.10.10
PDF
Ca 7 primer
Sqlmap readme
B7.2 a1353-ra platform commissioning solaris 2.6
Administrator manual-e2
Specification of the Linked Media Layer
Drools expert-docs
System administration guide
Blue Doc User Manual
Milan_thesis.pdf
Gnugk manual-2.3.2
O reilly cisco ios access lists
Oreilly cisco ios access lists
GNU Gatekeeper Manual version 5.13 - New release
 
GNU Gatekeeper 5.11
 
Cenet-- capability enabled networking: towards least-privileged networking
MSc_Dissertation
Tcxd 300 manual_02.10.10
Ca 7 primer
Ad

More from Pfedya (12)

PDF
R rep-m.2135-2008-pdf-e
PDF
R rep-m.2134-2008-pdf-e
PDF
R rep-m.2133-2008-pdf-e
PDF
Comparison of the link budget with experimental performance of a wi max system
PDF
R rep-m.2134-2008-pdf-e
PDF
Closed loop power control for lte uplink
PDF
Admission control for multihop wireless backhaul networks with qo s
PDF
A study of throughput for iu cs and iu-ps interface in umts core network
PDF
Practical security testing for lte networks
PDF
Radio network dimensioning and planning for wimax networks
PDF
1 cm52 (e)gprs measurements with r&s cmu200 and cm_ugo
PPT
Gprs
R rep-m.2135-2008-pdf-e
R rep-m.2134-2008-pdf-e
R rep-m.2133-2008-pdf-e
Comparison of the link budget with experimental performance of a wi max system
R rep-m.2134-2008-pdf-e
Closed loop power control for lte uplink
Admission control for multihop wireless backhaul networks with qo s
A study of throughput for iu cs and iu-ps interface in umts core network
Practical security testing for lte networks
Radio network dimensioning and planning for wimax networks
1 cm52 (e)gprs measurements with r&s cmu200 and cm_ugo
Gprs

Lte demonstration network test plan phase 3 part_1-v2_4_05072013

  • 1. 1       Public Safety Communications Research LTE  Demonstration  Network  Test  Plan     Phase  3  Part  1:  Network   Interoperability  &  Drive  Test       Version  2.4   May  7,  2013      
  • 2. 2     1 Contents 2   List  of  Tables  ........................................................................................................................................  5   3   List  of  Figures  .......................................................................................................................................  5   4   Introduction  .........................................................................................................................................  5   5   Network  Interoperability  .....................................................................................................................  7   5.1   Network  Element  Under  Test:  eNB  (with  Cisco  EPC)  ...................................................................  8   5.1.1   Test  Description  ...................................................................................................................  8   5.1.2   Reference  .............................................................................................................................  8   5.1.3   Required  Equipment  ............................................................................................................  8   5.1.4   Test  Procedure  .....................................................................................................................  9   5.1.5   Expected  Outcome  ...............................................................................................................  9   5.1.6   Additional  Tests  ...................................................................................................................  9   5.2   Network  Element  Under  Test:  eNB  (with  ALU  EPC)  .....................................................................  9   5.2.1   Test  Description  ...................................................................................................................  9   5.2.2   Reference  .............................................................................................................................  9   5.2.3   Required  Equipment  ............................................................................................................  9   5.2.4   Test  Procedure  ...................................................................................................................  10   5.3   Network  Element  Under  Test:  eNB  (with  General  Dynamics  Broadband  EPC)  .........................  10   5.3.1   Test  Description  .................................................................................................................  10   5.3.2   Reference  ...........................................................................................................................  10   5.3.3   Required  Equipment  ..........................................................................................................  10   5.3.4   Test  Procedure  ...................................................................................................................  11   5.4   Network  Element  Under  Test:  eNB  (with  MSI  Solutions/Ericsson  EPC)  .....................................  11   5.4.1   Test  Description  .................................................................................................................  11   5.4.2   Reference  ...........................................................................................................................  11   5.4.3   Required  Equipment  ..........................................................................................................  11   5.4.4   Test  Procedure  ...................................................................................................................  12   5.5   Network  Element  Under  Test:  eNB  (with  NSN/Harris  EPC)  .......................................................  12   5.5.1   Test  Description  .................................................................................................................  12   5.5.2   Reference  ...........................................................................................................................  12   5.5.3   Required  Equipment  ..........................................................................................................  12   5.5.4   Test  Procedure  ...................................................................................................................  13  
  • 3. 3     6   Network  Drive  Testing  .......................................................................................................................  13   6.1   Additional  Considerations  ..........................................................................................................  14   6.2   Single  User  Throughput:  UL  UDP;  No  Load  ................................................................................  15   6.2.1   Test  Description  .................................................................................................................  15   6.2.2   Reference  ...........................................................................................................................  15   6.2.3   Required  Equipment  ..........................................................................................................  15   6.2.4   Test  Procedure  ...................................................................................................................  16   6.2.5   Expected  Outcome  .............................................................................................................  16   6.3   Single  User  Throughput:  DL  UDP;  No  Load  ................................................................................  17   6.3.1   Test  Description  .................................................................................................................  17   6.3.2   Reference  ...........................................................................................................................  17   6.3.3   Required  Equipment  ..........................................................................................................  17   6.3.4   Test  Procedure  ...................................................................................................................  17   6.3.5   Expected  Outcome  .............................................................................................................  18   6.4   Single  User  Throughput:    UL  TCP;  No  Load  ................................................................................  19   6.5   Single  User  Throughput:    DL  TCP;  No  Load  ................................................................................  19   6.6   Single  User  Throughput:  UL  UDP;  70%  Load  ..............................................................................  19   6.6.1   Test  Description  .................................................................................................................  19   6.6.2   Reference  ...........................................................................................................................  19   6.6.3   Required  Equipment  ..........................................................................................................  19   6.6.4   Test  Procedure  ...................................................................................................................  20   6.6.5   Expected  Outcome  .............................................................................................................  20   6.7   Single  User  Throughput:  DL  UDP;  70%  Load  ..............................................................................  21   6.7.1   Test  Description  .................................................................................................................  21   6.7.2   Reference  ...........................................................................................................................  21   6.7.3   Required  Equipment  ..........................................................................................................  21   6.7.4   Test  Procedure  ...................................................................................................................  21   6.7.5   Expected  Outcome  .............................................................................................................  22   6.8   Single  User  Throughput:    UL  TCP;  70%  Load  ..............................................................................  23   6.9   Single  User  Throughput:    DL  TCP;  70%  Load  ..............................................................................  23   6.10   Multi-­‐User  Throughput:    UL  UDP;  No  Load  ................................................................................  23   6.10.1   Test  Description  .................................................................................................................  23  
  • 4. 4     6.10.2   Reference  ...........................................................................................................................  23   6.10.3   Required  Equipment  ..........................................................................................................  23   6.10.4   Test  Procedure  ...................................................................................................................  23   6.10.5   Expected  Outcome  .............................................................................................................  24   6.11   Multi-­‐User  Throughput:    DL  UDP;  No  Load  ................................................................................  25   6.11.1   Test  Description  .................................................................................................................  25   6.11.2   Reference  ...........................................................................................................................  25   6.11.3   Required  Equipment  ..........................................................................................................  25   6.11.4   Test  Procedure  ...................................................................................................................  25   6.11.5   Expected  Outcome  .............................................................................................................  26   6.12   Multi-­‐User  Throughput:  UL  TCP;  No  Load  ..................................................................................  27   6.13   Multi-­‐User  Throughput:  DL  TCP:  No  Load  ..................................................................................  27   6.14   Multi-­‐User  Throughput:  UL  UDP;  70%  Load  ..............................................................................  27   6.14.1   Test  Description  .................................................................................................................  27   6.14.2   Reference  ...........................................................................................................................  28   6.14.3   Required  Equipment  ..........................................................................................................  28   6.14.4   Test  Procedure  ...................................................................................................................  28   6.14.5   Expected  Outcome  .............................................................................................................  29   6.15   Multi-­‐User  Throughput:  DL  UDP:  70%  Load  ..............................................................................  29   6.15.1   Test  Description  .................................................................................................................  29   6.15.2   Reference  ...........................................................................................................................  30   6.15.3   Required  Equipment  ..........................................................................................................  30   6.15.4   Test  Procedure  ...................................................................................................................  30   6.15.5   Expected  Outcome  .............................................................................................................  31   6.16   Multi-­‐User  Throughput:  UL  TCP;  70%  Load  ...............................................................................  31   6.17   Multi-­‐User  Throughput:  DL  TCP:  70%  Load  ...............................................................................  31   6.18   Network  Latency:  Single  User;  No  Load  .....................................................................................  31   6.18.1   Test  Description  .................................................................................................................  31   6.18.2   Reference  ...........................................................................................................................  32   6.18.3   Required  Equipment  ..........................................................................................................  32   6.18.4   Test  Procedure  ...................................................................................................................  32   6.18.5   Expected  Outcome  .............................................................................................................  32  
  • 5. 5     6.19   Network  Latency:  Single  User;  70%  Load  ...................................................................................  33   7   UE  Interoperability  Tests  ...................................................................................................................  33   8   Vendor  Test  Case  Checklist  ................................................................................................................  33   9   Acronyms  ...........................................................................................................................................  35   10   Optional  Information  and  Tests  .....................................................................................................  35   10.1   Extra  IOT  Information  ................................................................................................................  35   10.1.1   Verify  Message  Flow  ..........................................................................................................  35   10.1.2   Tracking  Area  Updates  .......................................................................................................  36   10.1.3   Detach  Information  ............................................................................................................  36   10.2   Call  Flow  Diagram  ......................................................................................................................  37   10.2.1   UE  Attach  ...........................................................................................................................  37   10.2.2   TAU  UE  Call  Flow  ................................................................................................................  38   10.2.3   UE  Detach  Call  Flow  ...........................................................................................................  38     2 List of Tables Table  1:    Vendor  Test  Case  Checklist  .....................................................................................................  3433   3 List of Figures Figure  1:  Test  Diagram  .................................................................................  Error!  Bookmark  not  defined.8     4 Introduction Public  Safety  Communications  Research  (PSCR)  has  established  three  major  phases  of  testing  and   evaluation.    The  primary  focus  of  Phase  3  Part  1  is  to  test  LTE  infrastructure  for  interoperability  and  to   drive  test  each  vendor’s  implementation.    Phase  3  Part  2  will  focus  on  EPC  interface  conformance   testing.         It  should  be  noted  that  PSCR  reserves  the  right  to  add  additional  phases  (beyond  the  three  currently   defined)  of  testing  at  any  time.  An  example  of  the  type  of  tests  that  would  be  encountered  in  later   phases  is  multiple  EPS  handover  within  a  PLMN  utilizing  the  S5  and  S10  interfaces.    
  • 6. 6     If  time  allows  further  IOT  may  be  performed  in  Phase  3  Part  1  that  involves  other  EPC  components.     Several  vendors  are  utilizing  EPC  components  manufactured  by  different  vendors  and  are  already   performing  multi-­‐vendor  interworking  involving  the  S6a  and  Gx  interfaces.    All  vendors  will  be  notified  in   advance  of  the  addition  of  new  interoperability  tests  to  Phase  3  Part  1  and  will  be  given  an  opportunity   to  review  and  comment  on  any  new  tests  before  they  are  executed  in  the  PSCR  laboratory.       Interoperability  Tests:    The  primary  focus  of  interoperability  testing  in  the  PSCR  demonstration  network   is  to  evaluate  how  different  vendor’s  EPC  and  RAN  interact  with  each  other.    Specifically,  the   interoperability  section  of  this  document  considers  a  configuration  where  a  given  vendor’s  eNB  is   integrated  with  another  vendor’s  EPC.    Specific  scenarios  are  then  executed  against  each  configuration.     See  Section  5  of  this  test  plan  for  more  details.     A  secondary  focus  of  interoperability  testing  in  the  demonstration  network  is  to  evaluate  a  given   vendor’s  UE  against  several  other  eNB  implementations.    This  evaluation  will  be  performed  according   the  UE  IOT  test  plan  created  by  CTIA.     http://files.ctia.org/pdf/CTIA_LTE_IOT_Test_Plan_Rev_1.0.pdf     Network  Drive  Tests:       The  purpose  of  network  drive  testing  is  to  evaluate  the  coverage  and  performance  of  a  network  with  at   least  one  active  data  session  established.    The  network  in  this  case  will  consist  of  RAN  and  EPC   equipment  provided  by  the  same  vendor.    The  set  of  drive  tests  in  Section  6  will  be  conducted  against   each  vendor  that  is  providing  a  RAN  and  an  EPC  to  the  demonstration  network.    In  order  to   accommodate  those  vendors  who  are  only  supplying  an  EPC,  PSCR  will  help  to  put  the  EPC  vendor  in   contact  with  a  RAN  vendor  (or  vendors)  so  that  drive  testing  may  be  conducted  which  utilizes  the   vendor’s  EPC.      See  Section  6  of  this  test  plan  for  more  detailed  information.       Additional  Information:       1) Results  of  all  Phase  3  tests  will  be  recorded  as  either  executed  or  not  executed  unless  otherwise   stated. 2)  It  is  possible  that  Phase  3  Part  2  tests  could  pre-­‐empt  Phase  3  Part  1  testing  as  conformance   test  events  are  scheduled.    When  this  occurs,  Phase  3  Part  1  tests  will  be  halted  for  a  period  of   two  to  three  weeks  to  allow  for  the  scheduled  conformance  test  event  to  complete.    All  parties   will  be  notified  in  advanced  of  a  scheduled  test  event.    Refer  to  the  Phase  3  Part  2  test  plan  for   detailed  information  regarding  how  EPC  conformance  testing  will  be  handled  in  the  PSCR   demonstration  network. 3) For  network  driving  testing,  PSCR  staff  will  drive  test  a  pre-­‐defined  route,  log  data,  and  analyze   the  collected  data.    The  vendor(s)  will  help  support  the  driving  test  effort  by  providing  personnel   to  help  with  troubleshooting  the  infrastructure  (or  the  UE)  and  to  help  with  the  operations  and   maintenance  of  the  infrastructure.
  • 7. 7     4) For  all  tests  in  this  test  plan,  PSCR  will  use  the  JDSU  SART  tool  that  it  currently  owns  for   performing  monitoring  of  the  EPC  core  interfaces.    In  addition,  for  the  monitoring  of  the  Uu   interface  PSCR  will  use  the  Linkmaster  and  drive  test  software,  which  it  currently  owns.    A  tap   point  will  be  provided  in  order  for  vendors  to  perform  monitoring,  troubleshooting,  and   message  logging  of  the  traffic  on  the  EPC  interfaces  using  their  preferred  monitoring  tool  (e.g.   Wireshark). 5) As  additional  clarification,  all  eNBs  will  use  GPS  for  their  timing  reference.     6) All  networks  should  be  upgraded  to  3GPP  Release  9  (December  2009  Phase  3  Freeze)  prior  to   testing. 5 Network Interoperability   This  section  of  the  test  plan  will  focus  on  three  basic  scenarios  in  order  to  evaluate  LTE  infrastructure  for   interoperability.    These  scenarios  will  be  used  to  exercise  as  many  of  the  EPC  interfaces  as  possible  along   with  the  Uu  interface.    The  scenarios  and  the  interfaces  each  scenario  exercises  are  listed  below:   1) UE  Attach  –  Uu,  S1,  S6a   2) UE  Detach  –  Uu,  S1,  S6a   3) Data  Session  Establishment  –  Uu,  S1,  S1-­‐U,  S11,  S5,  Gx   The  scenarios  listed  above  will  drive  the  interoperability  test  cases.    Each  test  case  will  focus  on  varying  a   single  network  element  while  holding  all  other  network  elements  in  the  LTE  system  constant.    The  list  of   LTE  network  elements  to  be  varied  is  as  follows:   1) eNB   A  vendor’s  EPC  (vendor  X)  will  be  selected  and  the  network  elements  that  compose  the  EPC  will  be  held   constant.    The  eNB  will  be  the  network  element  under  test.    For  example,  an  eNB’s  supplied  by  vendor  A   will  be  integrated  with  vendor  X’s  EPC.      The  three  scenarios  listed  above  will  then  be  executed  using  a   single  eNB  from  vendor  A  and  vendor  X’s  EPC.    The  three  scenarios  listed  above  will  then  be  executed   using  a  single  eNB  from  vendor  B  and  vendor  X’s  EPC.    This  process  will  be  repeated  until  all  three   scenarios  listed  above  have  been  executed  against  all  eNBs  in  the  PSCR  laboratory  utilizing  vendor  X’s   EPC.  
  • 8. 8     Ue Vendor Z P-GWS-GW MME PCRF HSSS6a eNodeB Vendor A Aggregation Router S1-MME S1-U S1 Uu S5 S11 Gx eNodeB Vendor B S1 EPS Vendor X Optional Vendor Y SGi APN App Server & Internet   Figure  1:  Test  Diagram   The  detailed  test  cases  below  will  identify  the  infrastructure  vendors  involved,  each  vendor’s  role  in  the   test,  and  what  equipment  each  vendor  shall  supply  for  the  test.    All  tests  in  this  section  will  be   performed  in  the  laboratory.    Initially  the  test  will  be  conducted  in  cabled  environment.    After  it  has   been  determined  that  the  tests  have  be  successfully  executed  in  a  cabled  environment,  the  tests  will  be   conducted  over  the  air  in  the  laboratory.   5.1 Network Element Under Test: eNB (with Cisco EPC) 5.1.1 Test Description The  purpose  of  this  test  is  to  verify  that  a  given  vendor’s  eNB  can  successfully  interoperate  with  a  Cisco   EPC.   5.1.2 Reference PSCR   5.1.3 Required Equipment The  list  of  equipment  required  for  this  test  is  as  follows   1) EPC   2) eNBs  from  multiple  vendors   3) UE   4) Network  Monitor  Tool   5) Uu  Monitor  Tool   For  this  test  the  EPC  will  be  supplied  by  Cisco.    RAN  equipment  (eNB)  will  be  supplied  by  the  following   vendors  (in  no  particular  order):   1) Alcatel  Lucent   2) General  Dynamics  Broadband   3) Motorola  Solutions  Incorporated  (MSI)/Ericsson  
  • 9. 9     4) Nokia  Siemens  Networks  (NSN)/Harris   The  UE  will  be  a  MSI  UM  1000  USB  Dongle.   5.1.4 Test Procedure 1) Integrate  the  Alcatel  Lucent  eNB  with  the  Cisco  EPC.   2) Turn  on  the  message  tracing  capability  in  the  eNB  and  MME  for  troubleshooting  purposes.       3) Mirror  all  EPC  interfaces  in  the  Cisco  EPC  to  a  monitor  port.    This  will  be  used  for   troubleshooting  purposes.   4) Connect  the  monitor  port  to  the  network-­‐monitoring  tool.       5) Provision  the  MSI  in  the  Cisco  HSS.   6) Program  the  UE  SIM  card  with  the  correct  IMSI  and  Ki  values.   7) Connect  the  UE  dongle  to  a  laptop  that  contains  the  appropriate  connection  manager  software   and  that  contains  the  Uu  monitor  software.   8) Perform  a  UE  Attach  by  turning  on  the  UE.   9) Establish  a  data  session  by  utilizing  the  connection  manager  software  and  browsing  to   www.pscr.gov.   10) Perform  a  UE  Detach  by  clicking  “Disconnect”  on  the  connection  manager.   11) Repeat  steps  1  –  10  for  the  eNBs  supplied  by  General  Dynamics  Broadband,  MSI,  and   NSN/Harris.   5.1.5 Expected Outcome Verify  that  the  UE  attached,  a  data  session  was  established,  and  that  the  UE  detached.   See  Appendix  of  optional  information  that  may  be  captured  during  the  testing.   5.1.6 Additional Tests Repeat  section  5.1.1-­‐5.1.5  with  the  Thales  EPC   5.2 Network Element Under Test: eNB (with ALU EPC)   5.2.1 Test Description The  purpose  of  this  test  is  to  verify  that  a  given  vendor’s  eNB  can  successfully  interoperate  with  an   Alcatel  Lucent  EPC.   5.2.2 Reference PSCR   5.2.3 Required Equipment The  list  of  equipment  required  for  this  test  is  as  follows   1) EPC   2) eNBs  from  multiple  vendors   3) UE   4) Network  Monitor  Tool  
  • 10. 10     5) Uu  Monitor  Tool   For  this  test  Alcatel  Lucent  will  supply  the  EPC.    RAN  equipment  (eNB)  will  be  supplied  by  the  following   vendors:   1) General  Dynamics  Broadband   2) MSI   3) NSN/Harris   The  UE  will  be  supplied  by  MSI.   5.2.4 Test Procedure 1) Integrate  the  General  Dynamics  Broadband  eNB  with  the  Alcatel  Lucent  EPC.   2) Turn  on  the  message  tracing  capability  in  the  eNB  and  MME  for  troubleshooting  purposes.   3) Mirror  all  EPC  interfaces  in  the  Alcatel  Lucent  EPC  to  a  monitor  port.    This  will  be  used  for   troubleshooting  purposes.   4) Connect  the  monitor  port  to  the  network-­‐monitoring  tool.   5) Provision  the  MSI  in  the  Alcatel  Lucent  HSS.   6) Program  the  UE  SIM  card  with  the  correct  IMSI  and  Ki  values.   7) Connect  the  UE  dongle  to  a  laptop  that  contains  the  appropriate  connection  manager  software   and  that  contains  the  Uu  monitor  software.   8) Perform  a  UE  Attach  by  turning  on  the  UE.   9) Establish  a  data  session  by  utilizing  the  connection  manager  software  and  browsing  to   www.pscr.gov.   10) Perform  a  UE  Detach  by  clicking  “Disconnect”  on  the  connection  manager.   11) Repeat  steps  1  –  10  for  the  eNBs  supplied  by  MSI  Solutions/Ericsson  and  NSN/Harris.     5.3 Network Element Under Test: eNB (with General Dynamics Broadband EPC)   5.3.1 Test Description The  purpose  of  this  test  is  to  verify  that  a  given  vendor’s  eNB  can  successfully  interoperate  with  a   General  Dynamics  Broadband  EPC.   5.3.2 Reference PSCR   5.3.3 Required Equipment The  list  of  equipment  required  for  this  test  is  as  follows   1) EPC   2) eNBs  from  multiple  vendors   3) UE   4) Network  Monitor  Tool  
  • 11. 11     5) Uu  Monitor  Tool   For  this  test  General  Dynamics  Broadband  will  supply  the  EPC.    RAN  equipment  (eNB)  will  be  supplied  by   the  following  vendors:   1) Alcatel  Lucent   2) MSI   3) NSN/Harris   The  UE  will  be  a  MSI  UM  1000  USB  Dongle     5.3.4 Test Procedure 1) Integrate  the  Alcatel  Lucent  eNB  with  the  General  Dynamics  Broadband  EPC.   2) Turn  on  the  message  tracing  capability  in  the  eNB  and  MME  for  troubleshooting  purposes.   3) Mirror  all  EPC  interfaces  in  the  General  Dynamics  Broadband  EPC  to  a  monitor  port.    This  will  be   used  for  troubleshooting  purposes.   4) Connect  the  monitor  port  to  the  network-­‐monitoring  tool.   5) Provision  the  MSI  in  the  General  Dynamics  Broadband  HSS.   6) Program  the  UE  SIM  card  with  the  correct  IMSI  and  Ki  values.   7) Connect  the  UE  dongle  to  a  laptop  that  contains  the  appropriate  connection  manager  software   and  that  contains  the  Uu  monitor  software.   8) Perform  a  UE  Attach  by  turning  on  the  UE.   9) Establish  a  data  session  by  utilizing  the  connection  manager  software  and  browsing  to   www.pscr.gov.   10) Perform  a  UE  Detach  by  clicking  “Disconnect”  on  the  connection  manager.   11) Repeat  steps  1  –  10  for  the  eNBs  supplied  by  MSI  Solutions/Ericsson  and  NSN/Harris.   5.4 Network Element Under Test: eNB (with MSI Solutions/Ericsson EPC)   5.4.1 Test Description The  purpose  of  this  test  is  to  verify  that  a  given  vendor’s  eNB  can  successfully  interoperate  with  a  MSI   Solutions/Ericsson  EPC.   5.4.2 Reference PSCR   5.4.3 Required Equipment The  list  of  equipment  required  for  this  test  is  as  follows   1) EPC   2) eNBs  from  multiple  vendors   3) UE   4) Network  Monitor  Tool   5) Uu  Monitor  Tool  
  • 12. 12     For  this  test  the  EPC  will  be  supplied  by  MSI.    RAN  equipment  (eNB)  will  be  supplied  by  the  following   vendors:   1) Alcatel  Lucent   2) General  Dynamics  Broadband   3) NSN/Harris   The  UE  will  be  a  MSI  UM  1000  USB  Dongle     5.4.4 Test Procedure 1) Integrate  the  Alcatel  Lucent  eNB  with  the  MSI  Solutions.   2) Turn  on  the  message  tracing  capability  in  the  eNB  and  MME  for  troubleshooting  purposes.   3) Mirror  all  EPC  interfaces  in  the  MSI  Solutions  to  a  monitor  port.    This  will  be  used  for   troubleshooting  purposes.   4) Connect  the  monitor  port  to  the  network-­‐monitoring  tool.   5) Provision  the  MSI  in  the  MSI  HSS.   6) Program  the  UE  SIM  card  with  the  correct  IMSI  and  Ki  values.   7) Connect  the  UE  dongle  to  a  laptop  that  contains  the  appropriate  connection  manager  software   and  that  contains  the  Uu  monitor  software.   8) Perform  a  UE  Attach  by  turning  on  the  UE.   9) Establish  a  data  session  by  utilizing  the  connection  manager  software  and  browsing  to   www.pscr.gov.   10) Perform  a  UE  Detach  by  clicking  “Disconnect”  on  the  connection  manager.   11) Repeat  steps  1  –  10  for  the  eNBs  supplied  by  General  Dynamics  Broadband  and  NSN/Harris.   5.5 Network Element Under Test: eNB (with NSN/Harris EPC)   5.5.1 Test Description The  purpose  of  this  test  is  to  verify  that  a  given  vendor’s  eNB  can  successfully  interoperate  with  a   NSN/Harris  EPC.   5.5.2 Reference PSCR   5.5.3 Required Equipment The  list  of  equipment  required  for  this  test  is  as  follows   1) EPC   2) eNBs  from  multiple  vendors   3) UE   4) Network  Monitor  Tool   5) Uu  Monitor  Tool  
  • 13. 13     For  this  test  NSN/Harris  will  supply  the  EPC.    RAN  equipment  (eNB)  will  be  supplied  by  the  following   vendors:   1) Alcatel  Lucent   2) General  Dynamics  Broadband   3) MSI   The  UE  will  be  a  MSI  UM  1000  USB  Dongle.   5.5.4 Test Procedure 1) Integrate  the  Alcatel  Lucent  eNB  with  the  NSN/Harris  EPC.   2) Turn  on  the  message  tracing  capability  in  the  eNB  and  MME  for  troubleshooting  purposes.   3) Mirror  all  EPC  interfaces  in  the  NSN/Harris  EPC  to  a  monitor  port.    This  will  be  used  for   troubleshooting  purposes.   4) Connect  the  monitor  port  to  the  network-­‐monitoring  tool.   5) Provision  the  MSI  in  the  NSN/Harris  HSS.   6) Program  the  UE  SIM  card  with  the  correct  IMSI  and  Ki  values.   7) Connect  the  UE  dongle  to  a  laptop  that  contains  the  appropriate  connection  manager  software   and  that  contains  the  Uu  monitor  software.   8) Perform  a  UE  Attach  by  turning  on  the  UE.   9) Establish  a  data  session  by  utilizing  the  connection  manager  software  and  browsing  to   www.pscr.gov.   10) Perform  a  UE  Detach  by  clicking  “Disconnect”  on  the  connection  manager.   11) Repeat  steps  1  –  10  for  the  eNBs  supplied  by  General  Dynamics  Broadband  and  MSI.   6 Network Drive Testing The  purpose  of  network  drive  testing  is  to  evaluate  the  performance  of  a  single  LTE  network  in  an   operational  environment.    All  tests  will  be  conducted  in  the  field  against  each  infrastructure  vendor’s   system.       The  tests  contained  in  this  section  have  been  designed  to  expand  on  the  tests  that  were  written  into   PSCR  Phase  1  and  Phase  2.    These  phases  contained  a  limited  amount  of  over  the  air  network   performance  tests  along  with  extensive  throughput  testing  in  a  laboratory  environment.    The  objective   of  the  tests  in  this  section  is  to  test  the  LTE  system  (infrastructure  and  UEs)  in  an  operational   environment.   Keeping  consistent  with  PSCR’s  methodology  of  leveraging  industry  accepted  techniques  for  testing,   PSCR’s  drive  testing  and  network  evaluation  is  based  upon  some  of  the  testing  concepts  presented  in   the  JDSU  application  note  titled  “LTE  and  EPC  Test  An  Overview  of  Test  Concepts  and  Tools  for  Trials”.  1   The  testing  concepts  presented  in  the  application  note  have  been  modified  to  fit  the  needs  of  PSCR.                                                                                                                             1  http://www.jdsu.com/NoIndexLiterature/lte_test_appnote.pdf    
  • 14. 14     Additionally  the  GSMA  TS112 ,  Annex  C  document  has  been  significantly  utilized  in  multiple  sections  of   this  document.     The  major  areas  PSCR  will  be  focusing  its  testing  efforts  on  are:   1) Single  User  Throughput   2) Intra-­‐LTE  Handover   3) Network  Latency   PSCR  will  establish  a  single  drive  route  that  all  vendor  systems  will  be  evaluated  against.    For  all  test   cases  in  this  section,  PSCR  will  log  data  along  this  route  using  a  drive  test-­‐logging  tool  such  as  the  Anritsu   Link  Master  or  JDSU  E6474A  drive  test  software.    The  data  will  then  be  post  processed  and  analyzed  by   PSCR.   The  drive  test  software  contains  a  “sequencer”  function.    The  purpose  of  the  function  is  to  automate  the   use  of  various  applications  during  drive  testing.    For  example,  the  end  user  can  configure  the  sequencer   to  serially  run  an  FTP  session  followed  by  an  IPERF  session  then  followed  by  a  Web  Browsing  session.     Upon  completion  of  the  Web  Browsing  session  the  sequence  will  be  repeated  starting  with  the   establishment  of  an  FTP  session.       Network  load  will  utilize  OFDMA  Channel  Noise  Generator  (OCNG)3  as  implemented  by  vendors  within   their  RAN  for  downlink  (DL)  load.    Investigation  is  ongoing  if  uplink  (UL)  loading  can  be  accomplished  in  a   controlled  manner  for  drive  testing.    If  possible  -­‐  use  of  3GPP-­‐C1  simulation  for  70%  loading  may  be  used   for  the  UL  loading  tests.       6.1 Additional Considerations   1) For  all  tests  in  this  section,  the  desire  is  to  test  handovers,  either  S1    or  X2  .    Vendor   assistance  on  configuring  the  tests  will  be  necessary.    These  tests  will  initially  use  the  default   bearer  (dedicated  bearer  will  be  run  in  Phase  2).  Testing  will  encompass  intra  eNB  handover   and  inter  eNB  based  handover.      Handovers  will  be  run  in  same  and  adjacent  cell  loaded  and   unloaded  conditions.    The  methodology  for  X2  and  S1  should  be  the  same.   2) The  UE  should  perform  handovers  as  requested  by  the  network,  and  behave  as  expected   from  the  user  perspective  without  losing  services.   3) There  must  be  a  sufficient  number  of  E-­‐UTRA  cells  available  on  the  same  PLMN.  Required   packet  bearers  to  be  tested  should  be  active,  and  available  in  all  parts  of  the  test  route.   4) The  test  route(s)  should  contain  the  handoff  zones  to  allow  for  E-­‐UTRA  handover,  intra   eNodeB  handover,  and  if  system  provisioning  allows  inter-­‐MME  handover.                                                                                                                               2  http://www.gsma.com/newsroom/technical-­‐documents/   3  OCNG  as  per  3GPP  TS  36.521,  Appendix  5  
  • 15. 15     5) It  shall  be  ensured  that  the  UE  performs  reselections/handovers  as  expected.  During  the   test  drive  it  is  imperative  the  UE  remains  in  service  at  all  times,  that  the  packet  bearer  in   question  is  maintained  throughout  the  test  route  and  that  the  data  download  and  upload  is   resumed  correctly.       6) All  UE  and  EPC  data  will  be  logged  for  control  and  user  plane.       7) Use  of  iperf  is  recommended  for  initial  testing  and  further  tests  utilizing  video  and  voice   applications  should  be  considered.  The  UE  should  perform  handovers  correctly,  without   losing  service,  and  its  PDN  connectivity  should  remain  viable  before  and  after  the   handovers.   8) The  UE  should  successfully  resume  the  FTP  downloads  after  the  handovers.   9) Metrics  evaluated  should  include  handover  success  rate,  control  plane  handover   interruption  time,  user  plane  handover  interruption  time  and  packet  loss/jitter.     6.2 Single User Throughput: UL UDP; No Load 6.2.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  behavior  of  single-­‐user  UL  UDP  throughput  while  driving  the   established  PSCR  drive  route.  In  this  test  no  load  will  be  applied  to  the  DL  of  any  cell  in  the  system.     Based  on  the  findings  in  Phase  1  testing,  the  UE  will  be  configured  to  transmit  the  maximum  amount  of   data  each  system’s  UL  can  sustain.       The  analysis  of  the  resulting  log  files  will  also  include  determining  the  handover  success  rate  and  the   dropped  data  session  rate.    The  handover  success  rate  is  defined  as  the  number  of  successful  handovers   divided  by  the  total  number  of  handovers  performed.    Handover  in  this  context  includes  between  cells   (a.k.a.  sectors)  on  a  single  site  and  between  the  cell  of  one  site  to  a  cell  of  another  site.       A  dropped  data  session  in  this  context  refers  to  a  data  session  that  was  not  properly  terminated.    The   dropped  data  session  rate  is  defined  as  the  number  of  data  sessions  not  properly  terminated  divided  by   the  total  number  of  data  sessions.       The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.   6.2.2 Reference PSCR   6.2.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  SART     2) UE   3) Gladiator  or  Link  Master  post  processor   4) An  application  server  with  iperf  
  • 16. 16     6.2.4 Test Procedure 1) If  necessary  connect  external  mag  mount  antennas  to  UE   2) Connect  UE  to  PC  that  contains  drive  test  software.    Alternatively,  UE  can  be  connected  to  USB   ports  on  JDSU  scanner.   3) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.   4) Start  drive  test  software  on  PC  and  connect  via  connection  manager.   5) Configure  the  drive  test  software  sequencer  to  enable  an  iperf  UDP  session.  The  iperf  UDP   session  will  be  terminated  at  the  PSCR  owned  application  server.    The  transfer  of  the  iperf  data   must  be  from  the  UE  to  the  eNB.  The  iperf  composite  stream  must  be  configured  to  the   maximum  data  rate  the  UL  of  the  system  under  test  can  sustain.   6) Start  logging  data  with  the  drive  test  software.   7) Attach  UE  to  the  network.   8) Start  the  sequencer  in  the  drive  test  software.    This  will  start  the  iperf  application.       9) Drive  pre-­‐defined  route.   10) After  the  entire  route  has  been  driven,  stop  logging  on  the  drive  test  software.   11)  Drive  the  pre-­‐defined  route  nine  more  times.   12) Post-­‐process  the  log  files  using  the  appropriate  drive  test  software  application.       13) Average  UL  throughput  and  pathloss  over  all  10  drives.  Since  the  GPS  coordinate  values  will  not   be  the  same  for  each  drive  a  binning  technique  will  have  to  be  employed  to  create  a  single  data   set  that  can  be  overlaid  on  a  map.   14) Analyze  the  data  for  UL  throughput,  handover  success  rate,  handover  delay  time,  and  dropped   data  session  rate.   15) NOTE:    This  test  can  be  run  at  the  same  time  as  section  “6.3  Single  User  Throughput:  Downlink   (DL)  UDP;  No  Load”  on  two  laptops  with  separate  UE.     6.2.5 Expected Outcome 1) Plots  will  be  created  that  show  the  following:   a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  UL  Throughput  (Avg.  UL  Throughput  vs.  Location)   b. Average  UL  Throughput  vs.  Average  Pathloss  
  • 17. 17     2) Handover  Success  Rate  calculated  over  all  10  drives   3) Handover  Delay  Time  calculated  over  all  10  drives.   4) Dropped  Data  Session  Rate  calculated  over  all  10  drives.   6.3 Single User Throughput: DL UDP; No Load 6.3.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  behavior  of  single-­‐user  DL  UDP  throughput  while  driving  the   established  PSCR  drive  route.  In  this  test  no  load  will  be  applied  to  the  DL  of  any  cell  in  the  system.     Based  on  the  findings  in  Phase  1  testing,  an  application  server  that  has  iperf  on  it  will  be  configured  to   transmit  the  maximum  amount  of  data  each  system’s  DL  can  sustain.       The  analysis  of  the  resulting  log  files  will  also  include  determining  the  handover  success  rate  and  the   dropped  data  session  rate.    The  handover  success  rate  is  defined  as  the  number  of  successful  handovers   divided  by  the  total  number  of  handovers  performed.    Handover  in  this  context  includes  between  cells   (a.k.a.  sectors)  on  a  single  site  and  between  the  cell  of  one  site  to  a  cell  of  another  site.    A  dropped  data   session  in  this  context  refers  to  a  data  session  that  was  not  properly  terminated.    The  dropped  data   session  rate  is  defined  as  the  number  of  data  sessions  not  properly  terminated  divided  by  the  total   number  of  data  sessions.   The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.   6.3.2 Reference PSCR   6.3.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  SART     2) UE   3) UE  drive  test  post  processor   4) An  application  server  with  iperf   6.3.4 Test Procedure 1) If  necessary  connect  external  mag  mount  antennas  to  UE   2) Connect  UE  to  PC  that  contains  drive  test  software.    Alternatively,  UE  can  be  connected  to  USB   ports  on  JDSU  scanner.   3) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.   4) Start  drive  test  software  on  PC.  
  • 18. 18     5) Configure  the  application  server  to  enable  an  iperf  UDP  session.  The  iperf  UDP  session  will  be   terminated  at  the  PSCR  owned  application  server.  The  transfer  of  the  iperf  data  must  be  from   the  eNB  to  the  UE.  The  iperf  composite  stream  must  be  configured  to  the  maximum  data  rate   the  DL  of  the  system  under  test  can  sustain.   6) Start  logging  data  with  the  drive  test  software.   7) Attach  UE  to  the  network.   8) Start  the  iperf  session  at  the  application  server.     9) Drive  pre-­‐defined  route.   10) After  the  entire  route  has  been  driven,  stop  logging  on  drive  test  software.   11)  Drive  the  pre-­‐defined  route  nine  more  times.   12) Post-­‐process  the  log  files  using  the  UE  drive  test  post  processing  application.       13) Average  pathloss,  DL  throughput,  DL  SNR,  and  DL  BLER  over  all  10  drives.  Since  the  GPS   coordinate  values  will  not  be  the  same  for  each  drive  a  binning  technique  will  have  to  be   employed  to  create  a  single  data  set  that  can  be  overlaid  on  a  map.   14) Analyze  the  data  for  pathloss,  DL  throughput,  handover  success  rate,  and  dropped  data  session   rate.   15) NOTE:    This  test  can  be  run  at  the  same  time  as  section  “6.2  Single  User  Throughput:  UL  UDP;  No   Load”  on  two  laptops  with  separate  UE.     6.3.5 Expected Outcome 1) Plots  will  be  created  that  show  the  following:   a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  DL  Throughput  (Avg.  DL  Throughput  vs.  Location)   b. Average  DL  Throughput  vs.  Average  DL  SNR   c. Average  DL  Throughput  vs.  Average  DL  BLER   d. Average  DL  Throughput  vs.  pathloss   2) Handover  Success  Rate  calculated  over  all  10  drives.   3) Handover  Delay  Time  calculated  over  all  10  drives.   4)  
  • 19. 19     5) Dropped  Data  Session  Rate  calculated  over  all  10  drives.   6.4 Single User Throughput: UL TCP; No Load Repeat  procedure  for  6.2  UDP  UL  loading.    Use  TCP  stream  on  iperf/netperf  with  multiple  stream  and   TCP  window  size  set  for  OS.    NOTE:    This  test  can  be  run  at  the  same  time  as  section  “6.5  Single  User   Throughput:  DL  TCP;  No  Load”  on  two  laptops  with  separate  UE.   6.5 Single User Throughput: DL TCP; No Load Repeat  procedure  for  6.3  UDP  DL  loading.    Use  TCP  stream  on  iperf/netperf  with  multiple  stream  and   TCP  window  size  set  for  OS.    NOTE:    This  test  can  be  run  at  the  same  time  as  section  “6.4  Single  User   Throughput:  UL  TCP;  No  Load”  on  two  laptops  with  separate  UE.   6.6 Single User Throughput: UL UDP; 70% Load 6.6.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  behavior  of  single-­‐user  UL  UDP  throughput  while  driving  the   established  PSCR  drive  route.  In  this  test  70%  load  will  be  applied  to  the  DL  of  all  cells  in  the  system.4     Based  on  the  findings  in  Phase  1  testing,  the  UE  will  be  configured  to  transmit  the  maximum  amount  of   data  each  system’s  UL  can  sustain.       The  analysis  of  the  resulting  log  files  will  also  include  determining  the  handover  success  rate  and  the   dropped  data  session  rate.    The  handover  success  rate  is  defined  as  the  number  of  successful  handovers   divided  by  the  total  number  of  handovers  performed.    Handover  in  this  context  includes  between  cells   (a.k.a.  sectors)  on  a  single  site  and  between  the  cell  of  one  site  to  a  cell  of  another  site.    A  dropped  data   session  in  this  context  refers  to  a  data  session  that  was  not  properly  terminated.    The  dropped  data   session  rate  is  defined  as  the  number  of  data  sessions  not  properly  terminated  divided  by  the  total   number  of  data  sessions.       The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.   6.6.2 Reference PSCR   6.6.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  and  SART   2) UE   3) UE  drive  test  post  processor   4) An  application  server  with  iperf                                                                                                                             4  NOTE:    If  70%  uplink  loading  is  possible  via  3GPP-­‐C1  simulation,  this  will  be  utilized  also.  
  • 20. 20     6.6.4 Test Procedure 1) Set  OCNS  to  70%  on  the  DL  of  all  cells  in  the  network.   2) If  necessary  connect  external  mag  mount  antennas  to  UE   3) Connect  UE  to  PC  that  contains  JDSU  drive  test  software.    Alternatively,  UE  can  be  connected  to   USB  ports  on  JDSU  scanner.   4) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.   5) Start  drive  test  software  on  PC.   6) Configure  the  drive  test  software  sequencer  to  enable  an  iperf  UDP  session.  The  iperf  UDP   session  will  be  terminated  at  the  PSCR  owned  application  server.  The  transfer  of  the  iperf  data   must  be  from  the  UE  to  the  eNB.  The  iperf  composite  stream  must  be  configured  to  the   maximum  data  rate  the  UL  of  the  system  under  test  can  sustain.   7) Start  logging  data  with  the  drive  test  software.   8) Attach  UE  to  the  network.   9) Start  the  sequencer  in  the  drive  test  software.    This  will  start  the  iperf  application.       10) Drive  pre-­‐defined  route.   11) After  the  entire  route  has  been  driven,  stop  logging  on  drive  test  software.   12)  Drive  the  pre-­‐defined  route  nine  more  times.   13) Post-­‐process  the  log  files  using  the  UE  drive  test  post  processing  application.       14) Average  UL  throughput  and  pathloss  over  all  10  drives.  Since  the  GPS  coordinate  values  will  not   be  the  same  for  each  drive  a  binning  technique  will  have  to  be  employed  to  create  a  single  data   set  that  can  be  overlaid  on  a  map.   15) Analyze  the  data  for  UL  throughput,  handover  success  rate,  handover  delay  time,  and  dropped   data  session  rate.   16) NOTE:    This  test  can  be  run  at  the  same  time  as  section  “6.7  Single  User  Throughput:  DL  UDP;   70%  Load”  on  two  laptops  with  separate  UE.         6.6.5 Expected Outcome 1) Plots  will  be  created  that  show  the  following:   a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  UL  Throughput  (Avg.  UL  Throughput  vs.  Location)  
  • 21. 21     b. Average  UL  Throughput  vs.  Average  pathloss   2) Handover  Success  Rate  calculated  over  all  10  drives.   3) Handover  Delay  Time  calculated  over  all  10  drives.   4) Dropped  Data  Session  Rate  calculated  over  all  10  drives.   6.7 Single User Throughput: DL UDP; 70% Load 6.7.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  behavior  of  single-­‐user  DL  UDP  throughput  while  driving  the   established  PSCR  drive  route.  In  this  test  70%  load  will  be  applied  to  the  DL  of  all  cells  in  the  system.     Based  on  the  findings  in  Phase  1  testing,  the  UE  will  be  configured  to  transmit  the  maximum  amount  of   data  each  system’s  UL  can  sustain.       The  analysis  of  the  resulting  log  files  will  also  include  determining  the  handover  success  rate  and  the   dropped  data  session  rate.    The  handover  success  rate  is  defined  as  the  number  of  successful  handovers   divided  by  the  total  number  of  handovers  performed.    Handover  in  this  context  includes  between  cells   (a.k.a.  sectors)  on  a  single  site  and  between  the  cell  of  one  site  to  a  cell  of  another  site.    A  dropped  data   session  in  this  context  refers  to  a  data  session  that  was  not  properly  terminated.    The  dropped  data   session  rate  is  defined  as  the  number  of  data  sessions  not  properly  terminated  divided  by  the  total   number  of  data  sessions.       The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.   6.7.2 Reference PSCR   6.7.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  and  SART   2) UE   3) UE  drive  test  post  processor   4) An  application  server  with  iperf   6.7.4 Test Procedure 1) Set  OCNS  to  70%  on  the  DL  of  all  cells  in  the  network.   2) If  necessary  connect  external  mag  mount  antennas  to  UE   3) Connect  UE  to  PC  that  contains  JDSU  drive  test  software.    Alternatively,  UE  can  be  connected  to   USB  ports  on  JDSU  scanner.   4) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.  
  • 22. 22     5) Start  drive  test  software  on  PC.   6) Configure  the  drive  test  software  sequencer  to  enable  an  iperf  UDP  session.  The  iperf  UDP   session  will  be  terminated  at  the  PSCR  owned  application  server.  The  transfer  of  the  iperf  data   must  be  from  the  UE  to  the  eNB.  The  iperf  composite  stream  must  be  configured  to  the   maximum  data  rate  the  UL  of  the  system  under  test  can  sustain.   7) Start  logging  data  with  the  drive  test  software.   8) Attach  UE  to  the  network.   9) Start  the  sequencer  in  the  drive  test  software.    This  will  start  the  iperf  application.       10) Drive  pre-­‐defined  route.   11) After  the  entire  route  has  been  driven,  stop  logging  on  drive  test  software.   12)  Drive  the  pre-­‐defined  route  nine  more  times.   13) Post-­‐process  the  log  files  using  the  UE  drive  test  post  processing  application.       14) Average  UL  throughput  and  pathloss  over  all  10  drives.  Since  the  GPS  coordinate  values  will  not   be  the  same  for  each  drive  a  binning  technique  will  have  to  be  employed  to  create  a  single  data   set  that  can  be  overlaid  on  a  map.   15) Analyze  the  data  for  UL  throughput,  handover  success  rate,  handover  delay  time,  and  dropped   data  session  rate.     17) NOTE:    This  test  can  be  run  at  the  same  time  as  section  “6.6  Single  User  Throughput:  UL  UDP;   70%  Load”  on  two  laptops  with  separate  UE.       6.7.5 Expected Outcome 1) Plots  will  be  created  that  show  the  following:   a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  UL  Throughput  (Avg.  UL  Throughput  vs.  Location)   b. Average  UL  Throughput  vs.  Average  pathloss   2) Handover  Success  Rate  calculated  over  all  10  drives.   3) Handover  Delay  Time  calculated  over  all  10  drives.   4) Dropped  Data  Session  Rate  calculated  over  all  10  drives.    
  • 23. 23     6.8 Single User Throughput: UL TCP; 70% Load Repeat  procedure  for  6.6  UDP  UL  loading.    Use  TCP  stream  on  iperf/netperf  with  multiple  stream  and   TCP  window  size  set  for  OS.    NOTE:    This  test  can  be  run  at  the  same  time  as  section  “6.9  Single  User   Throughput:  DL  TCP;  70%  Load”  on  two  laptops  with  separate  UE.   6.9 Single User Throughput: DL TCP; 70% Load Repeat  procedure  for  6.7  UDP  DL  loading.    Use  TCP  stream  on  iperf/netperf  with  multiple  stream  and   TCP  window  size  set  for  OS.    NOTE:    This  test  can  be  run  at  the  same  time  as  section  “6.8  Single  User   Throughput:  UL  TCP;  70%  Load”  on  two  laptops  with  separate  UE.   6.10 Multi-User Throughput: UL UDP; No Load 6.10.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  behavior  of  multi-­‐user  UL  UDP  throughput  while  driving  the   established  PSCR  drive  route.  In  this  test  no  load  will  be  applied  to  the  DL  of  any  cell  in  the  system.    Four   UEs  will  be  used  to  perform  this  test.    Based  on  the  findings  in  Phase  1  testing,  each  UE  will  initially  be   configured  to  transmit  25%  of  the  maximum  amount  of  data  each  system’s  UL  can  sustain.       The  analysis  of  the  resulting  log  files  will  also  include  determining  the  handover  success  rate  and  the   dropped  data  session  rate.    The  handover  success  rate  is  defined  as  the  number  of  successful  handovers   divided  by  the  total  number  of  handovers  performed.    Handover  in  this  context  includes  between  cells   (a.k.a.  sectors)  on  a  single  site  and  between  the  cell  of  one  site  to  a  cell  of  another  site.    A  dropped  data   session  in  this  context  refers  to  a  data  session  that  was  not  properly  terminated.    The  dropped  data   session  rate  is  defined  as  the  number  of  data  sessions  not  properly  terminated  divided  by  the  total   number  of  data  sessions.   The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.   6.10.2 Reference PSCR   6.10.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  and  SART   2) Four  UEs   3) UE  drive  test  post  processor   4) An  application  server  with  iperf   6.10.4 Test Procedure 1) If  necessary  connect  external  mag  mount  antennas  to  UE   2) Connect  all  four  UEs  to  PC  that  contains  drive  test  software.    Alternatively,  each  UE  can  be   connected  to  a  USB  port  on  JDSU  scanner.  
  • 24. 24     3) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.   4) Start  drive  test  software  on  PC.   5) Configure  the  drive  test  software  sequencer  to  enable  four-­‐iperf  UDP  session.  The  iperf  UDP   session  will  be  terminated  at  the  PSCR  owned  application  server.  The  transfer  of  the  iperf  data   must  be  from  the  UEs  to  the  eNB.  Each  iperf  composite  stream  must  be  configured  to  25%  of   the  maximum  data  rate  the  UL  of  the  system  under  test  can  sustain.   6) Start  logging  data  with  the  drive  test  software.   7) Attach  UEs  to  the  network.   8) Start  the  sequencer  in  the  drive  test  software.    This  will  start  the  iperf  application.       9) Drive  pre-­‐defined  route.   10) After  the  entire  route  has  been  driven,  stop  logging  on  drive  test  software.   11)  Drive  the  pre-­‐defined  route  nine  more  times.   12) Post-­‐process  the  log  files  using  the  UE  post  processing  application.       13) For  each  UE,  average  UL  throughput  and  pathloss  over  all  10  drives.  Since  the  GPS  coordinate   values  will  not  be  the  same  for  each  drive  a  binning  technique  will  have  to  be  employed  to   create  a  single  data  set  that  can  be  overlaid  on  a  map.   14) Analyze  the  data  for  the  average  UL  throughput,  handover  success  rate,  and  dropped  data   session  rate  associated  with  each  UE.     6.10.5 Expected Outcome 1) For  all  four  UEs,  plots  will  be  created  that  show  the  following:   a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  UL  Throughput  (Avg.  UL  Throughput  vs.  Location)   b. Average  UL  Throughput  vs.  Average  pathloss   2) Handover  Success  Rate  calculated  over  all  10  drives.   3) Handover  Delay  Time  calculated  over  all  10  drives.   4) Dropped  Data  Session  Rate  calculated  over  all  10  drives.   In  addition  to  the  above  plots  will  be  created  that  show:   1) Overlay  of  the  following  parameters  on  drive  route:  
  • 25. 25     a. The  aggregate  average  UL  throughput  for  all  four  UEs  (Aggregate  Avg.  UL  Throughput  vs.   Location)   2) Aggregate  Average  UL  Throughput  vs.  Average  pathloss   3) Aggregate  Handover  Success  Rate   4) Aggregate  Dropped  Data  Session  Rate   6.11 Multi-User Throughput: DL UDP; No Load 6.11.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  behavior  of  multi-­‐user  DL  UDP  throughput  while  driving  the   established  PSCR  drive  route.  In  this  test  no  load  will  be  applied  to  the  DL  of  any  cell  in  the  system.    Four   UEs  will  be  used  to  perform  this  test.    Base  on  the  findings  in  Phase  1  testing,  an  application  server  that   has  iperf  on  it  will  be  configured  to  transmit  four  separate  UDP  composite  streams.    Each  stream  will  be   configured  for  25%  of  the  maximum  amount  of  data  each  system’s  DL  can  sustain.       The  analysis  of  the  resulting  log  files  will  also  include  determining  the  handover  success  rate  and  the   dropped  data  session  rate.    The  handover  success  rate  is  defined  as  the  number  of  successful  handovers   divided  by  the  total  number  of  handovers  performed.    Handover  in  this  context  includes  between  cells   (a.k.a.  sectors)  on  a  single  site  and  between  the  cell  of  one  site  to  a  cell  of  another  site.    A  dropped  data   session  in  this  context  refers  to  a  data  session  that  was  not  properly  terminated.    The  dropped  data   session  rate  is  defined  as  the  number  of  data  sessions  not  properly  terminated  divided  by  the  total   number  of  data  sessions.   The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.   6.11.2 Reference PSCR   6.11.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  and  SART   2) Four  UEs   3) UE  post  processor   4) An  application  server  with  iperf   6.11.4 Test Procedure 1) If  necessary  connect  external  mag  mount  antennas  to  UE   2) Connect  all  four  UEs  to  PC  that  contains  JDSU  drive  test  software.    Alternatively,  each  UE  can  be   connected  to  a  USB  port  on  JDSU  scanner.  
  • 26. 26     3) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.   4) Start  drive  test  software  on  PC.   5) Configure  the  application  server  to  enable  four-­‐iperf  UDP  session.  The  iperf  UDP  session  will  be   terminated  at  the  PSCR  owned  application  server.  The  transfer  of  the  iperf  data  must  be  from   the  eNB  to  the  UEs.  Each  iperf  composite  stream  must  be  configured  to  25%  of  the  maximum   data  rate  the  DL  of  the  system  under  test  can  sustain.   6) Start  logging  data  with  the  drive  test  software.   7) Attach  UEs  to  the  network.   8) Start  all  four  iperf  sessions  at  the  application  server.     9) Drive  pre-­‐defined  route.   10) After  the  entire  route  has  been  driven,  stop  logging  on  drive  test  software.   11)  Drive  the  pre-­‐defined  route  nine  more  times.   12) Post-­‐process  the  log  files  using  the  UE  post  processing  application.       13) For  each  UE,  average  pathloss,  average  DL  throughput,  DL  SNR,  and  DL  BLER  over  all  10  drives.   Since  the  GPS  coordinate  values  will  not  be  the  same  for  each  drive  a  binning  technique  will   have  to  be  employed  to  create  a  single  data  set  that  can  be  overlaid  on  a  map.   14) Analyze  the  data  for  the  average  pathloss,  DL  throughput,  handover  success  rate,  and  dropped   data  session  rate  associated  with  each  UE.   6.11.5 Expected Outcome 1) For  all  four  UEs,  plots  will  be  created  that  show  the  following:   a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  DL  Throughput  (Avg.  DL  Throughput  vs.  Location)   b. Average  DL  Throughput  vs.  DL  SNR   c. Average  DL  Throughput  vs.  DL  BLER   d. Average  DL  Throughput  vs.  pathloss   2) For  each  UE,  Handover  Success  Rate  calculated  over  all  10  drives.   3) For  each  UE,  Handover  Delay  Time  calculated  over  all  10  drives.   4)  
  • 27. 27     5) For  each  UE,  Dropped  Data  Session  Rate  calculated  over  all  10  drives.   In  addition  to  the  above  plots  will  be  created  that  show:   1) Overlay  of  the  following  parameters  on  drive  route:   a. The  aggregate  average  DL  throughput  for  all  four  UEs  (Aggregate  Avg.  DL  Throughput  vs.   Location)   2) Aggregate  average  DL  Throughput  vs.  Average  DL  SNR   3) Aggregate  average  DL  Throughput  vs.  Average  DL  BLER   4) Aggregate  average  DL  Throughput  vs.  pathloss   5) Aggregate  Handover  Success  Rate   6) Aggregate  Dropped  Data  Session  Rate   6.12 Multi-User Throughput: UL TCP; No Load Repeat  procedure  6.10  for  UDP  UL  loading.    Use  TCP  stream  on  iperf/netperf  with  multiple  stream  and   TCP  window  size  set  for  OS.   6.13 Multi-User Throughput: DL TCP: No Load Repeat  procedure  6.11  for  UDP  DL  loading.    Use  TCP  stream  on  iperf/netperf  with  multiple  stream  and   TCP  window  size  set  for  OS.   6.14 Multi-User Throughput: UL UDP; 70% Load 6.14.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  behavior  of  multi-­‐user  UL  UDP  throughput  while  driving  the   established  PSCR  drive  route.  In  this  test  70%  load  will  be  applied  to  the  DL  of  all  cells  in  the  system  by   using  OCNS.    Four  UEs  will  be  used  to  perform  this  test.    Based  on  the  findings  in  Phase  1  testing,  each   UE  will  be  configured  to  transmit  25%  of  the  maximum  amount  of  data  each  system’s  UL  can  sustain.       The  analysis  of  the  resulting  log  files  will  also  include  determining  the  handover  success  rate  and  the   dropped  data  session  rate.    The  handover  success  rate  is  defined  as  the  number  of  successful  handovers   divided  by  the  total  number  of  handovers  performed.    Handover  in  this  context  includes  between  cells   (a.k.a.  sectors)  on  a  single  site  and  between  the  cell  of  one  site  to  a  cell  of  another  site.    A  dropped  data   session  in  this  context  refers  to  a  data  session  that  was  not  properly  terminated.    The  dropped  data   session  rate  is  defined  as  the  number  of  data  sessions  not  properly  terminated  divided  by  the  total   number  of  data  sessions.   The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.  
  • 28. 28     6.14.2 Reference PSCR   6.14.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  and  SART   2) Four  UEs   3) UE  drive  test  post  processor   4) An  application  server  with  iperf   6.14.4 Test Procedure 1) Set  OCNS  to  70%  on  the  DL  for  all  cells  in  the  network.   2) If  necessary  connect  external  mag  mount  antennas  to  UEs.   3) Connect  all  four  UEs  to  PC  that  contains  JDSU  drive  test  software.    Alternatively,  each  UE  can  be   connected  to  a  USB  port  on  JDSU  scanner.   4) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.   5) Start  drive  test  software  on  PC.   6) Configure  the  drive  test  software  sequencer  to  enable  four-­‐iperf  UDP  session.  The  iperf  UDP   session  will  be  terminated  at  the  PSCR  owned  application  server.  The  transfer  of  the  iperf  data   must  be  from  the  UEs  to  the  eNB.  Each  iperf  composite  stream  must  be  configured  to  25%  of   the  maximum  data  rate  the  UL  of  the  system  under  test  can  sustain.   7) Start  logging  data  with  the  drive  test  software.   8) Attach  UEs  to  the  network.   9) Start  the  sequencer  in  the  drive  test  software.    This  will  start  the  iperf  application.       10) Drive  pre-­‐defined  route.   11) After  the  entire  route  has  been  driven,  stop  logging  on  drive  test  software.   12)  Drive  the  pre-­‐defined  route  nine  more  times.   13) Post-­‐process  the  log  files  using  the  UE  drive  test  post  processing  application.       14) For  each  UE,  average  UL  throughput  and  pathloss  over  all  10  drives.  Since  the  GPS  coordinate   values  will  not  be  the  same  for  each  drive  a  binning  technique  will  have  to  be  employed  to   create  a  single  data  set  that  can  be  overlaid  on  a  map.   15) Analyze  the  data  for  the  average  UL  throughput,  handover  success  rate,  and  dropped  data   session  rate  associated  with  each  UE.    
  • 29. 29     6.14.5 Expected Outcome 1) For  all  four  UEs,  plots  will  be  created  that  show  the  following:   a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  UL  Throughput  (Avg.  UL  Throughput  vs.  Location)   b. Average  UL  Throughput  vs.  Average  pathloss   2) Handover  Success  Rate  calculated  over  all  10  drives.   3) Handover  Delay  Time  calculated  over  all  10  drives.   4) Dropped  Data  Session  Rate  calculated  over  all  10  drives.   In  addition  to  the  above  plots  will  be  created  that  show:   1) Overlay  of  the  following  parameters  on  drive  route:   a. The  aggregate  average  UL  throughput  for  all  four  UEs  (Aggregate  Avg.  UL  Throughput  vs.   Location)   2) Aggregate  Average  UL  Throughput  vs.  pathloss   3) Aggregate  Handover  Success  Rate   4) Aggregate  Dropped  Data  Session  Rate   6.15 Multi-User Throughput: DL UDP: 70% Load 6.15.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  behavior  of  multi-­‐user  DL  UDP  throughput  while  driving  the   established  PSCR  drive  route.  In  this  test  70%  load  will  be  applied  to  the  DL  of  all  cells  in  the  system  by   using  OCNS.    Four  UEs  will  be  used  to  perform  this  test.    Based  on  the  findings  in  Phase  1  testing,  each   UE  will  be  configured  to  transmit  25%  of  the  maximum  amount  of  data  each  system’s  UL  can  sustain.       The  analysis  of  the  resulting  log  files  will  also  include  determining  the  handover    success  rate  and  the   dropped  data  session  rate.    The  handover  success  rate  is  defined  as  the  number  of  successful  handovers   divided  by  the  total  number  of  handovers  performed.    Handover  in  this  context  includes  between  cells   (a.k.a.  sectors)  on  a  single  site  and  between  the  cell  of  one  site  to  a  cell  of  another  site.    A  dropped  data   session  in  this  context  refers  to  a  data  session  that  was  not  properly  terminated.    The  dropped  data   session  rate  is  defined  as  the  number  of  data  sessions  not  properly  terminated  divided  by  the  total   number  of  data  sessions.   The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.  
  • 30. 30     6.15.2 Reference PSCR   6.15.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  and  SART   2) Four  UEs   3) UE  drive  test  post  processor   4) An  application  server  with  iperf   6.15.4 Test Procedure 1) Set  OCNS  to  70%  on  the  DL  for  all  cells  in  the  network.   2) If  necessary  connect  external  mag  mount  antennas  to  UEs.   3) Connect  all  four  UEs  to  PC  that  contains  JDSU  drive  test  software.    Alternatively,  each  UE  can  be   connected  to  a  USB  port  on  JDSU  scanner.   4) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.   5) Start  drive  test  software  on  PC.   6) Configure  the  drive  test  software  sequencer  to  enable  four-­‐iperf  UDP  session.  The  iperf  UDP   session  will  be  terminated  at  the  PSCR  owned  application  server.  The  transfer  of  the  iperf  data   must  be  from  the  UEs  to  the  eNB.  Each  iperf  composite  stream  must  be  configured  to  25%  of   the  maximum  data  rate  the  UL  of  the  system  under  test  can  sustain.   7) Start  logging  data  with  the  drive  test  software.   8) Attach  UEs  to  the  network.   9) Start  the  sequencer  in  the  drive  test  software.    This  will  start  the  iperf  application.       10) Drive  pre-­‐defined  route.   11) After  the  entire  route  has  been  driven,  stop  logging  on  drive  test  software.   12)  Drive  the  pre-­‐defined  route  nine  more  times.   13) Post-­‐process  the  log  files  using  the  UE  drive  test  post  processing  application.       14) For  each  UE,  average  DL  throughput  and  pathloss  over  all  10  drives.  Since  the  GPS  coordinate   values  will  not  be  the  same  for  each  drive  a  binning  technique  will  have  to  be  employed  to   create  a  single  data  set  that  can  be  overlaid  on  a  map.   15) Analyze  the  data  for  the  average  DL  throughput,  handover  success  rate,  and  dropped  data   session  rate  associated  with  each  UE.    
  • 31. 31     6.15.5 Expected Outcome 1) For  all  four  UEs,  plots  will  be  created  that  show  the  following:   a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  DL  Throughput  (Avg.  DL  Throughput  vs.  Location)   b. Average  DL  Throughput  vs.  Average  pathloss   2) Handover  Success  Rate  calculated  over  all  10  drives.   3) Handover  Delay  Time  calculated  over  all  10  drives.   4) Dropped  Data  Session  Rate  calculated  over  all  10  drives.   In  addition  to  the  above  plots  will  be  created  that  show:   1) Overlay  of  the  following  parameters  on  drive  route:   a. The  aggregate  average  DL  throughput  for  all  four  UEs  (Aggregate  Avg.  DL  Throughput  vs.   Location)   2) Aggregate  Average  DL  Throughput  vs.  pathloss   3) Aggregate  Handover  Success  Rate   4) Aggregate  Dropped  Data  Session  Rate     6.16 Multi-User Throughput: UL TCP; 70% Load Repeat  procedure  6.14  for  UDP  UL  loading.    Use  TCP  stream  on  iperf/netperf  with  multiple  stream  and   TCP  window  size  set  for  OS.   6.17 Multi-User Throughput: DL TCP: 70% Load Repeat  procedure  6.15  for  UDP  DL  loading.    Use  TCP  stream  on  iperf/netperf  with  multiple  stream  and   TCP  window  size  set  for  OS.   6.18 Network Latency: Single User; No Load 6.18.1 Test Description The  purpose  of  this  test  is  to  evaluate  the  round  trip  latency  of  the  network  while  driving  the  established   PSCR  drive  route.  In  this  test  no  load  will  be  applied  to  the  DL  of  any  cell  in  the  system.  A  single  UE  will   be  used.  A  simple  ping  will  be  initiated  at  the  UE  that  will  be  destined  for  an  application  server.    Three   different  sizes  of  ping  packets  will  be  used.       The  drive  route  will  be  driven  10  times  (subsequent  drives  may  not  be  necessary)  in  order  to  acquire   enough  data.    Separate  log  files  will  be  kept  for  each  pass  of  the  route.  
  • 32. 32     6.18.2 Reference PSCR   6.18.3 Required Equipment 1) JDSU  and  Link  Master  drive  test  software,  Scanner,  and  SART   2) UE   3) UE  drive  test  post  processor   4) An  application  server     6.18.4 Test Procedure 1) If  necessary  connect  external  mag  mount  antennas  to  UE   2) Connect  UE  to  PC  that  contains  JDSU  drive  test  software.    Alternatively,  UE  can  be  connected  to   USB  ports  on  JDSU  scanner.   3) Connect  GPS  antenna  to  JDSU  scanner  and  Link  Master  drive  test  computer.   4) Start  drive  test  software  on  PC.   5) Configure  the  drive  test  software  sequencer  to  enable  three  sequential  ping  sessions.    The   packet  sizes  for  each  ping  session  will  be  as  follows:    32,  1000,  and  1500  bytes.    All  sessions  will   be  run  simultaneously.    *NOTE:    Set  to  not  fragment  packet.   6) Start  logging  data  with  the  drive  test  software.   7) Attach  UE  to  the  network.   8) Start  the  sequencer  in  the  drive  test  software.    This  will  cause  the  sequencer  to  run  through   each  ping  session.       9) Drive  pre-­‐defined  route.   10) After  the  entire  route  has  been  driven,  stop  logging  on  drive  test  software.   11)  Drive  the  pre-­‐defined  route  nine  more  times.   12) Post-­‐process  the  log  files  using  the  UE  drive  test  post  processing  application.       13) Average  the  round  trip  latency  over  all  10  drives.    Since  the  GPS  coordinate  values  will  not  be   the  same  for  each  drive  a  binning  technique  will  have  to  be  employed  to  create  a  single  data  set   that  can  be  overlaid  on  a  map.   14) Analyze  the  data  for  average  round  trip  latency.   6.18.5 Expected Outcome 1) Plots  will  be  created  that  show  the  following:  
  • 33. 33     a. Overlay  of  the  following  parameters  on  drive  route:       i. Average  Round  trip  latency  (Avg.  Latency  vs.  Location)   b. Average  Latency  vs.  Average  pathloss   c. Average  Latency  vs.  Average  DL  BLER   d. Average  Latency  vs.  Average  DL  SNR   6.19 Network Latency: Single User; 70% Load Repeat  test  procedure  in  section  6.18  with  70%  load  applied  utilizing  OCNS  on  all  cells.     7 UE Interoperability Tests   UE  interoperability  in  this  context  refers  to:   1) UEs  manufactured  by  any  vendor  successfully  operating  with  eNBs  manufactured  by  any  vendor.   Formal  UE  interoperability  tests  will  be  handled  in  the  PTCRB  as  part  of  the  BC  14  UE  certification   process.  The  working  group  that  developed  the  CTIA  test  plan  was  composed  of  LTE  commercial   operators  and  vendors  (both  UE  &  Infrastructure).    The  test  plan  consists  of  laboratory  and  field  tests.           PSCR  may  choose  to  execute  select  test  cases  from  the  CTIA  IOT  test  plan  in  order  to  perform  spot   checks  on  received  devices  that  have  not  undergone  PTCRB  certification  before  arriving  at  the  PSCR  lab.     Please  refer  to  the  PSCR  UE  test  plan  for  more  information  regarding  UE  entrance  criteria  to  the  PSCR   test  network.     The  CTIA  IOT  Test  Plan  can  be  downloaded  from  the  following  web  link:   http://files.ctia.org/pdf/CTIA_LTE_IOT_Test_Plan_Rev_1.0.pdf   8 Vendor Test Case Checklist The  purpose  of  the  following  test  case  checklist  is  to  identify  the  Phase  3  test  cases  that  are  applicable   to  each  vendor  type.    Some  test  cases  are  end-­‐to-­‐end  by  nature  and  will  require  the  participation  of  a   Ue,  eNB,  and  EPC  vendor  in  order  to  ensure  that  a  given  Phase  3  test  can  be  successfully  executed.    The   “All”  category  is  defined  as  participation  by  Ue,  eNB,  and  EPC  vendors.   Every  vendor  who  participates  in  the  PSCR  demonstration  network  will  negotiate  with  PSCR  to   determine  which  tests  will  be  required  for  successful  execution  of  Phase  3.    
  • 34. 34     Table  1:    Vendor  Test  Case  Checklist   Phase  3  Part  1  Test  Title   Status   Ue   eNB   EPC   All   Network  Element  Under  Test:  eNB  (with   Cisco  EPC)           X   Network  Element  Under  Test:  eNB  (with   Thales  EPC)           X   Network  Element  Under  Test:  eNB  (with   ALU  EPC)           X   Network  Element  Under  Test:  eNB  (with   GDBB  EPC)           X   Network  Element  Under  Test:  eNB  (with   MSI  Solutions  EPC)           X   Network  Element  Under  Test:  eNB  (with   NSN  EPC)           X   Single  User  Throughput:  UL  UDP;  No   Load           X   Single  User  Throughput:  DL  UDP;  No   Load           X   Single  User  Throughput:    UL  TCP;  No   Load           X   Single  User  Throughput:    DL  TCP;  No   Load           X   Single  User  Throughput:  UL  UDP;  70%   Load           X   Single  User  Throughput:  DL  UDP;  70%   Load           X   Single  User  Throughput:    UL  TCP;  70%   Load           X   Single  User  Throughput:    DL  TCP;  70%   Load           X   Multi-­‐User  Throughput:    UL  UDP;  No   Load           X   Multi-­‐User  Throughput:  DL  (DL)  UDP;  No   Load           X   Multi-­‐User  Throughput:    UL  TCP;  No   Load           X   Multi-­‐User  Throughput:    DL  TCP;  No   Load           X   Multi-­‐User  Throughput:  UL  UDP;  70%   Load           X   Multi-­‐User  Throughput:  DL  UDP;  70%   Load           X   Multi-­‐User  Throughput:    UL  TCP;  70%   Load           X  
  • 35. 35     Multi-­‐User  Throughput:    DL  TCP;  70%   Load           X   Network  Latency:  Single  User;  No  Load           X   Network  Latency:  Single  User;  70%  Load           X     9 Acronyms See 3GPP TR 21.905 V8.8.0 (2009-03) Section 4 10 Optional Information and Tests The  information  contained  in  this  section  is  for  comment,  informational  and  contains  optional  tests.   10.1 Extra IOT Information5 Additional information beyond pass/fail maybe captured during the testing. This includes the following: 10.1.1 Verify Message Flow • Verify that the monitored message sequence is correct. • Verify that the Attach Request message (step 2) contains the following mandatory information elements (IE): EPS attach type, NAS key set identifier, Old GUTI or IMSI, UE network capability, ESM message container. The other optional IEs: Old P-TMSI signature, Additional GUTI, DRX parameter, MS network capability and TMSI status may be included too. • Verify that the Attach Accept message (step 16) contains the following mandatory information elements (IE): EPS attach result, T3412 value, TAI list, ESM message container. The other optional IEs may be included too. • Verify that the Attach Complete message (step 21) contains the ESM message container IE. • Verify that the INITIAL CONTEXT SETUP REQUEST message (step 16) contains the E- RAB to be Setup List IE, the ATTACH ACCEPT message on NAS level and the required optional IEs to establish a UE context in the eNB. • Verify that the INITIAL CONTEXT SETUP RESPONSE message (step 19) contains the E-RAB Setup list of successfully established E-RABs. • Verify that ATTACH REQUEST, ATTACH ACCEPT and ATTACH COMPLETE messages are transported successfully on the S1-MME interface. • Verify that the related EPS Bearers have been established, and that the UE has been issued with an IP Address.                                                                                                                           5  Appendix  excerpt  from  MSF  contribution:  msf2009.178.02    
  • 36. 36     10.1.2 Tracking Area Updates • Verify that the monitored message sequence is correct. • Verify that the TAU Request message (from eNB to MME) contains the following mandatory information elements (IE): EPS Update Type, old GUTI, NAS key set identifier ASME. The other optional IEs may be included too. • Verify that the TAU Accept message (from MME to eNB) contains the following mandatory information elements (IE): EPS Update result. The other optional IEs may be included too. • Verify that the eNB send the TAU Complete message to MME if the GUTI is reallocated. • Verify that TAU Request, TAU Accept and TAU Complete messages are transported successfully on the S1-MME interface. • Verify that the UE is in EMM-REGISTERED and ECM- CONNECTED in MME after TAU complete. • Verify the new TAI list 10.1.3 Detach Information • Verify that the Detach Request message (from eNB to MME) contains the following mandatory information elements (IE): Detach type, NAS key set identifier and GUTI/IMSI. • Verify that the Default bearer is deleted. • Verify that the UE is in EMM-DEREGISTERED and ECM-IDLE after the detach is completed. • Verify that DETACH Request,UE Context Release Command and UE Context Release Complete messages are transported successfully on the S1-MME interface.  
  • 37. 37     10.2 Call Flow Diagram 10.2.1 UE Attach 1. Attach Request MME S-GW PCRF HSSP-GW 2. Attach Request eNodeBUE 3. Identity Request 4. Identity Response 5a. Authentication / Security 16. Initial Context Setup Request / Attach Accept First Uplink Data 18. RRC Connection Reconfiguration Complete 17. RRC Connection Reconfiguration 19. Initial Context Setup Response 25. Modify Bearer Response 22. Modify Bearer Request First Downlink Data 26. Notify Request 27. Notify Response 15. Create Session Response 10. Create Session Request 8. Update Location Request 9. Update Location Ack 11. Create Session Request 13. Create Session Response First Downlink Data 5b. Identity Request/Response 12. PCEF Initiated IP-CAN Session Establishment/Modification 6. Ciphered Options Request 7. Ciphered Options Response 23. Modify Bearer Request 24. Modify Bearer Response 20. Direct Transfer 21. Attach Complete
  • 38. 38     10.2.2 TAU UE Call Flow 10.2.3 UE Detach Call Flow     UE eNodeB MME TAU Request TAU Request Authentication / Security TAU Accept TAU Accept TAU Complete HSS TAU Complete Authentication Information Request Authentication Information Answer UE eNodeB MME S-GW P-GW PCRF Detach Request Detach Accept Delete Session Request Delete Session Response PCEF Initiated IP-CAN Session Termination UE Context Release Command UE Context Release Complete Delete Session Request Delete Session Response HSS Notify Request Notify Answer