Managing Claims Best Practices 
The key to preventing and managing claims for your home building business. 
LONG LIVE HAPPY HOMES® 
By: Alison Short 
Executive Vice President of New Home Division 
2-10 Home Buyers Warranty®
Why managing claims is important 
• 
Customer satisfaction 
• 
Reputation 
• 
Arbitration 
4Reduces your risk of going to court 
• 
Saves money 
4Court costs and lawyer fees can get expensive 
• 
Put focus back on fixing the issue and avoids escalation of disputes
Stop them before they happen 
#1 Quality control 
#2 Have a process in place
#1 Quality Control 
When hiring design professionals, 
consider the following: 
• 
Expertise in residential construction 
• 
Check references 
• 
Interview – does their working style match yours? 
• 
Look at other jobs they’ve worked on 
• 
Tell them what you expect 
• 
Listen to their recommendations 
Land Planner/ 
Civil Engineer 
Architect 
Geotechnical Engineer 
Structural Engineer
#1 Quality Control 
When hiring a Land Planner/Civil Engineer, 
consider the following: 
• 
Must understand issues that impact the project 
• 
Must be familiar with all land use, wetland 
and environmental laws 
• 
May assist with feasibility studies 
• 
May be required to complete environmental impact studies 
• 
May assist in rezoning, as necessary
#1 Quality Control 
When hiring an Architect, consider the following: 
• 
Make sure they understand your needs and expectations 
• 
Explore different solutions during conceptional design stage 
• 
Select the most promising concepts to develop 
• 
Must be buildable (i.e. Translate well from blueprint to 
actual construction) and cost-effective 
• 
Construction drawings should include detailed floor plans and 
elevations (with notes), specifications, framing and electrical plans 
• 
Review plans with mechanical trades prior to construction release
#1 Quality Control 
When hiring a Geotechnical Engineer, consider the following: 
• 
Oversees placement of all fill soils used to support foundation elements 
• 
Performs soil testing on lots with fill or suspected fill soils 
• 
Critical in areas where expansive, active or other unstable 
soil conditions exist 
• 
Determines boring depths and spacing 
• 
Provides sufficient detail and recommendations for the structural engineer 
• 
Builder should retain documentation of all work performed
#1 Quality Control 
When hiring a Structural Engineer, consider the following: 
• 
Responsible for foundation design in areas with expansive, active or 
other unstable soil conditions 
• 
Designs all post-tensioned slabs-on-ground, pier and grade beam and 
deep pile foundations 
• 
Inspects critical phases of construction, such as engineered foundation 
pre-pour or pile driving operations 
• 
Prepares detailed structural plans for multi-family or complex structures 
• 
Engineers shear walls to withstand seismic and wind loads 
• 
Understands budget constraints, including costs of materials and labor 
to complete project
#2 Have processes in place 
CONSISTENT CLAIMS HANDLING 
Handle each claim the same way to avoid a homeowner claiming the builder was biased. For example, repairing 
one homeowner’s defect, but not repairing another 
homeowner’s issue who has the same defect.
#2 Have processes in place 
SET EXPECTATIONS WITH HOME BUYERS 
It’s also important to let your buyers know the ins and outs of their new home, post-build. If something goes wrong or they have concerns, who should they call? How do they 
submit a formal complaint?
Proactive communication 
Be open and actively listen to 
the homeowner’s complaints 
Be considerate to the homeowner 
by maintaining goodwill and building trust 
Convey information in terms 
the homeowner will understand
Learn about the products 2-10 Home Buyers Warranty® offers, visit 2-10.com. 
LONG LIVE HAPPY HOMES®

More Related Content

PDF
RobertSHiltnerResume
PPTX
Building inspector
PPTX
Primex buildings system pvt. ltd
PDF
Giotan construction estimate sheets march 2013
PDF
Giotan build out cost sheets oct 2010
DOC
Robs resume (1)
PPTX
гипертекст
PPTX
Social Website
RobertSHiltnerResume
Building inspector
Primex buildings system pvt. ltd
Giotan construction estimate sheets march 2013
Giotan build out cost sheets oct 2010
Robs resume (1)
гипертекст
Social Website

Viewers also liked (16)

PDF
K bank fx & rates strategies views on thailand’s bond market in q3
PPTX
Phase i training-7
PPT
Global marketing of asem
PDF
Роль представителей общественности в ККС
DOCX
Cmmaao pmi-resume template-4
PDF
阿米計畫 A-Mi Project 使用說明
PDF
Cmmaao roster-pmi-pmp
DOC
essay 1
PPS
Power Català
PDF
Ghalia wahoud
PDF
Coffe table modern design
PDF
การลอกลายโดย Macromedia flash 8
PDF
Проект модельного закона об общественном контроле субъекта РФ
PDF
Read the latest edition of the CII North America Newsletter here
PDF
bai tap va phuong phap giai bai tap dien xoay chieu
PDF
Оценка деятельности отделов полиции и участковых пунктов полиции (на примере ...
K bank fx & rates strategies views on thailand’s bond market in q3
Phase i training-7
Global marketing of asem
Роль представителей общественности в ККС
Cmmaao pmi-resume template-4
阿米計畫 A-Mi Project 使用說明
Cmmaao roster-pmi-pmp
essay 1
Power Català
Ghalia wahoud
Coffe table modern design
การลอกลายโดย Macromedia flash 8
Проект модельного закона об общественном контроле субъекта РФ
Read the latest edition of the CII North America Newsletter here
bai tap va phuong phap giai bai tap dien xoay chieu
Оценка деятельности отделов полиции и участковых пунктов полиции (на примере ...
Ad

Similar to Managing claims best practices | 2-10 HBW (20)

PPTX
Six tips for success in the construction,
PPTX
Six tips for success in the construction,
PDF
Engineering Consulting Services: How They Drive Project Success from Concept ...
PPTX
Engineering Consulting Services: How They Drive Project Success from Concept ...
PPTX
Careers in Architecture, Engineering, and Construction.pptx
PDF
Hiring a General Contractor for Your Construction Project Will Give you Peace...
PPT
Mike\'s Marketing Tips!
DOC
Resume 2018
PPTX
WHAT IS CONSTRUCTION ENGINEERING MANAGEMENT?
PPTX
Matt Hann's career advice for Building Services Engineers
PDF
Final building-team
PDF
Final building-team
PDF
Project management
PPTX
What is construction engineering management?
PDF
Building Companies Crafting the Foundations of Modern Infras.pdf
PDF
Ici individual
PPT
What is a Water Resources Engineer?
PDF
20141016 recruitment of engineers in romania
DOCX
ADARSH kUMAR
PPTX
Brittain Hadley Brochure
Six tips for success in the construction,
Six tips for success in the construction,
Engineering Consulting Services: How They Drive Project Success from Concept ...
Engineering Consulting Services: How They Drive Project Success from Concept ...
Careers in Architecture, Engineering, and Construction.pptx
Hiring a General Contractor for Your Construction Project Will Give you Peace...
Mike\'s Marketing Tips!
Resume 2018
WHAT IS CONSTRUCTION ENGINEERING MANAGEMENT?
Matt Hann's career advice for Building Services Engineers
Final building-team
Final building-team
Project management
What is construction engineering management?
Building Companies Crafting the Foundations of Modern Infras.pdf
Ici individual
What is a Water Resources Engineer?
20141016 recruitment of engineers in romania
ADARSH kUMAR
Brittain Hadley Brochure
Ad

More from HomeBuyersWarranty (6)

PDF
Texas Case Study
PDF
A Look at Structural Claims
PDF
How-To-Guide: Content Curation for Builders and Real Estate Professionals
PDF
Structural claims process from start to finish.
PDF
Top tenmisconception warranty_0413
PDF
Building A Referral Program
Texas Case Study
A Look at Structural Claims
How-To-Guide: Content Curation for Builders and Real Estate Professionals
Structural claims process from start to finish.
Top tenmisconception warranty_0413
Building A Referral Program

Recently uploaded (20)

PDF
Rustomjee Pune - Luxury Lifestyle for Families and Investors
PDF
GYGY Mentis Premium Commercial Space in Noida
PDF
Whiteland Westin Residences Elite Edge Legacy @9999977783.pdf
PDF
Plots in Dholera Call:-8588-926-927 for Best Deal
PDF
DLF Privana North Elite Edge Legacy @9999977783.pdf
PDF
IVORY COUNTY BROCHURE CALL:-8588-926-927
PDF
Grandthum by Group 108 Construction Update July 2025
PDF
Top Reasons to Buy a Home in Mundhwa Pune in 2025
PDF
Make Yourself at Home - Raymond Mahim Mumbai
PDF
Signature Global Aspire 95 sector 95 gurugram
PDF
Whiteland The Aspen Sector 76, Gurgaon.pdf
PDF
Laguna Residence at City of Arabia, Dubai - ONE Development.pdf
PDF
Plots in Jattari Near Noida International Airport Yamuna Expressway Call:-858...
PDF
Technology & Flexibility: Tools for Retention Success | Christopher Birli
PDF
India Real Estate 2025Hottest Markets & Investment Insights.pdf
PDF
2 BHK Apartments in Devanahalli | Luxury Flats Near Bangalore Airport
PDF
Bayz 101 By Danube at Business Bay, Dubai.pdf
PDF
Signature global Orchard Avenue sector 93
PPT
industrial theory for the urban economics
PPTX
The Driving Principles of Anthony Lester Fresno: Integrity and Impact
Rustomjee Pune - Luxury Lifestyle for Families and Investors
GYGY Mentis Premium Commercial Space in Noida
Whiteland Westin Residences Elite Edge Legacy @9999977783.pdf
Plots in Dholera Call:-8588-926-927 for Best Deal
DLF Privana North Elite Edge Legacy @9999977783.pdf
IVORY COUNTY BROCHURE CALL:-8588-926-927
Grandthum by Group 108 Construction Update July 2025
Top Reasons to Buy a Home in Mundhwa Pune in 2025
Make Yourself at Home - Raymond Mahim Mumbai
Signature Global Aspire 95 sector 95 gurugram
Whiteland The Aspen Sector 76, Gurgaon.pdf
Laguna Residence at City of Arabia, Dubai - ONE Development.pdf
Plots in Jattari Near Noida International Airport Yamuna Expressway Call:-858...
Technology & Flexibility: Tools for Retention Success | Christopher Birli
India Real Estate 2025Hottest Markets & Investment Insights.pdf
2 BHK Apartments in Devanahalli | Luxury Flats Near Bangalore Airport
Bayz 101 By Danube at Business Bay, Dubai.pdf
Signature global Orchard Avenue sector 93
industrial theory for the urban economics
The Driving Principles of Anthony Lester Fresno: Integrity and Impact

Managing claims best practices | 2-10 HBW

  • 1. Managing Claims Best Practices The key to preventing and managing claims for your home building business. LONG LIVE HAPPY HOMES® By: Alison Short Executive Vice President of New Home Division 2-10 Home Buyers Warranty®
  • 2. Why managing claims is important • Customer satisfaction • Reputation • Arbitration 4Reduces your risk of going to court • Saves money 4Court costs and lawyer fees can get expensive • Put focus back on fixing the issue and avoids escalation of disputes
  • 3. Stop them before they happen #1 Quality control #2 Have a process in place
  • 4. #1 Quality Control When hiring design professionals, consider the following: • Expertise in residential construction • Check references • Interview – does their working style match yours? • Look at other jobs they’ve worked on • Tell them what you expect • Listen to their recommendations Land Planner/ Civil Engineer Architect Geotechnical Engineer Structural Engineer
  • 5. #1 Quality Control When hiring a Land Planner/Civil Engineer, consider the following: • Must understand issues that impact the project • Must be familiar with all land use, wetland and environmental laws • May assist with feasibility studies • May be required to complete environmental impact studies • May assist in rezoning, as necessary
  • 6. #1 Quality Control When hiring an Architect, consider the following: • Make sure they understand your needs and expectations • Explore different solutions during conceptional design stage • Select the most promising concepts to develop • Must be buildable (i.e. Translate well from blueprint to actual construction) and cost-effective • Construction drawings should include detailed floor plans and elevations (with notes), specifications, framing and electrical plans • Review plans with mechanical trades prior to construction release
  • 7. #1 Quality Control When hiring a Geotechnical Engineer, consider the following: • Oversees placement of all fill soils used to support foundation elements • Performs soil testing on lots with fill or suspected fill soils • Critical in areas where expansive, active or other unstable soil conditions exist • Determines boring depths and spacing • Provides sufficient detail and recommendations for the structural engineer • Builder should retain documentation of all work performed
  • 8. #1 Quality Control When hiring a Structural Engineer, consider the following: • Responsible for foundation design in areas with expansive, active or other unstable soil conditions • Designs all post-tensioned slabs-on-ground, pier and grade beam and deep pile foundations • Inspects critical phases of construction, such as engineered foundation pre-pour or pile driving operations • Prepares detailed structural plans for multi-family or complex structures • Engineers shear walls to withstand seismic and wind loads • Understands budget constraints, including costs of materials and labor to complete project
  • 9. #2 Have processes in place CONSISTENT CLAIMS HANDLING Handle each claim the same way to avoid a homeowner claiming the builder was biased. For example, repairing one homeowner’s defect, but not repairing another homeowner’s issue who has the same defect.
  • 10. #2 Have processes in place SET EXPECTATIONS WITH HOME BUYERS It’s also important to let your buyers know the ins and outs of their new home, post-build. If something goes wrong or they have concerns, who should they call? How do they submit a formal complaint?
  • 11. Proactive communication Be open and actively listen to the homeowner’s complaints Be considerate to the homeowner by maintaining goodwill and building trust Convey information in terms the homeowner will understand
  • 12. Learn about the products 2-10 Home Buyers Warranty® offers, visit 2-10.com. LONG LIVE HAPPY HOMES®