Managing Light Rail …
at Light Speed!
Wendy Kaszycki, CCM PE
Director of Project Management
Exposition Metro Line Construction Authority
Overview
• Setting the Context
• Previous Process
• Document Upload Interface
• Results in Contract Management
• Results in SharePoint
• Conclusions
2
SETTING THE CONTEXT
3
Photos courtesy of EMLCA
About Expo
• Exposition Metro Line Construction Authority
• Created in 2003 by SB 504
• Design and build Expo Light Rail
• Rail will be operated by Metro
LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY
4
Expo LRT Project
Connecting the Beach to downtown LA!
5
PHASE 1
PHASE 2
Project Stats
Phase 1 Phase 2
STATIONS 12 7
DAILY RIDERSHIP 27,000 64,000
COST $930 million $1.5 billion
OPENING DATE 2012 2015
6
Phase 1 Process
• Paper
– EMAIL PDF’S OR CD’S TO DOCUMENT CONTROL
• Excel Logs
– INCOMING
– OUTGOING
• Routing Sheets
– LEAD IDENTIFIES DISTRIBUTION
– DOCUMENTS DISTRIBUTED TO SELECTED USERS
• Databases
– ACCESS FOR COST PROPOSALS AND CHANGE ORDERS
– METRO DATABASE FOR RFIS AND SUBMITTALS
7
Phase 2 Project Controls
• Contract Management (PCM)
– CONTRACT DOCUMENTS
– BUDGETING AND FORECASTING
• SharePoint
– DOCUMENT STORAGE/FILES
– LINKS TO PCM
• FIS
– METRO’S FINANCIAL SYSTEM
– CAPTURES ACTUAL EXPENDITURES
• P6
– SCHEDULING
8
Customized Components
• Web Interface
– ALLOWS COLLABORATION
– CONTRACTORS UPLOAD TO PCM AND SHAREPOINT
• SharePoint “smart folders”
– CUSTOMIZED AUTO-ROUTING
• “Actual Cost Mapping”
– REPORTS BUDGET, COMMITMENTS & ACTUALS TOGETHER
• EAC Upload/Export
– ALLOWS WAREHOUSING OF ESTIMATE AT COMPLETIONS
– FACILITATES REPORTING AND COMPARISONS
9
DOCUMENT UPLOAD INTERFACE
10
Photos courtesy of EMLCA
Web-Based DUI
• Mandatory
– MAJOR CONTRACTORS UPLOAD
• Parameters for Upload
– CONTRACT
– DOCUMENT TYPE
• Features
– CHANGE DOCUMENTS LINKED TO RELATED DOCUMENTS
– SUBMITTALS LINK TO UPLOADED SUBMITTAL LOG
11
Defining the DUI
12
1
• Reviewed Contracts
• Developed Process Flow
• Define Document Types, Screens, Modules
2
• Provided Mapping Specs for Data
• Default basic information (contract, to/from)
• Defined numbering convention for documents
3
• Wrote “hover over” Tool Tips
RFI Process Flow
13
2-Page Process flow for RFI Process
CO Process Flow
14
2-Page Process flow for Change Process
Sample Mapping Spec
15
Screen content maps to PCM data fields
DUI – What Users See
• User PCM Access and
Security determine
– PROJECT LIST
– DOCUMENT TYPES
16
DUI – RFI’s
• Add New RFI
• Revise RFI
– SELECT FROM PREVIOUSLY ONE
• Design-Bid-Build Projects
– A/E PROPOSED SOLUTIONS
17
DUI – New RFI’s
• Features
– DEFAULT TO/FROM
– TOOL TIPS
– CAPTURES CONTRACTOR’S
DOC #
• Completeness Check
– REQUIRED FIELDS
HIGHLIGHTED IF BLANK
WHEN “SUBMIT”
• Attachments
– REQUIRED FOR ALL DOCS
18
Sample Tool Tips Spec
19
Minimal Training due to Tool Tips for all fields
DUI –Proposals
• Proposals link to related documents
DUI – Other Correspondence
• Other Correspondence
– MAPS TO CORRESPONDENCE REC’D
• Document Type
– CUSTOM FIELD
– DYNAMIC DROPDOWN TO
DICTIONARY IN PCM
– SEPARATE SHAREPOINT FOLDERS BY
DOCUMENT TYPE
21
Upon Submitting Document
• Content Integrity
– ERRORS IF NOT ACCEPTABLE TO BOTH PCM AND SHAREPOINT
• Capacity
– ACCEPTS MULTIPLE ATTACHMENTS
– UP TO 100 MB TOTAL
• Automates Some Document Control Functions
– LOGS APPROPRIATE INFO IN PCM; CLOSES RELATED DOCUMENT
– USES PCM “VERSIONS”
– FILES IN SHAREPOINT FOLDER
22
1. Sends receipt email to user
2. cc: to Expo gmail account (by project)
ALSO IMPORTED TO PCM CORRESPONDENCE RECEIVED
Auto-Distribution
23
1: SAMPLE EMAIL TO USER
2: SAMPLES TO EXPO GMAIL AND PCM
RESULTS IN PCM
24
Photos courtesy of EMLCA
PCM - Proposals
Links Attachment to SharePoint
Logs
Contractor’s
Doc #
Creates
CM Doc
PCM - PROPOSALS
Creates Version
PCM – PROPOSALS
• PCM logs
– Contain DUI assigned & Contractor’s document
numbers
– Can be exported to Excel and sorted
PCM – PROPOSALS
Change Management
Writes
Referenced
Document Info
Uploads Contract
Number to
Custom Field
Assigns CM Doc # with
prefix for Contractor
PCM – PROPOSALS
Change Management
Sort by Change
Management
Number
Custom Contract Number
– Written by DUI
– Used in layouts
PCM – PROPOSALS
Related RFI
Change Management Number written
to related document
RESULTS IN SHAREPOINT
31
Photos courtesy of EMLCA
SharePoint - Upload
• Document Properties
• Date and Time stamped
• “Versions” if same
document file is
uploaded to same
SharePoint folder
SharePoint – File Structure
• Elements
– PHASE
– PROJECT
– CONTRACT
– DOCUMENT DIRECTION
– DOCUMENT TYPE
– SPEC SECTION (RFI’S & SUBMITTALS)
SharePoint – Folder Properties
• Customized Solution
– AUTO-ROUTING BY
DOCUMENT TYPE
• Defined Parameters
– INCOMING VS. OUTGOING:
• Info used in email
message
Incoming Message
• Identifies Lead and other Reviewers
• Indicates Due Dates
• Links directly to Document in SharePoint
35
Outgoing Message
• Emails to Contractor
• cc’s to Expo Staff
• Links directly to Document in SharePoint
36
System Coding
• Long-term relationship with Partners Consulting
• Previous Projects
– INTEGRATED EXPEDITION WITH JDE’S AND AN IN-HOUSE
FINANCIAL SYSTEM
– CONVERTED EXPEDITION 8.5 TO PCM12
– AUTOMATED P5/P6 BASELINING
• Proven Record of Success
37
Integration Methodology
• Needs analysis based on experience and best practices
• Develop integrations
• Rollout & refine
38
CONCLUSIONS
39
Photos courtesy of EMLCA
Challenges
• Diverse Users/Computers
– DIFFERENT WEB BROWSERS
– OUTSIDE USERS OWN IT CONSTRAINTS/LIMITATIONS
• Large Files
– ESPECIALLY DRAWING SUBMITTALS
• User Reluctance
– LOG IN TO GET DOCUMENTS VS PDF ATTACHMENTS
40
W I I F M
41
W I I F M
What’s In It For Me
42
WIIFM
• Streamlined Processes
– PAPERLESS COMMUNICATIONS
– MINIMIZES USER ENTRY & ELIMINATES USER ERROR
– REDUCES DUPLICATION (SINGLE POINT OF DATA ENTRY)
• User Access to Documents from Any Location
• Project Performance
– QUICKER RESPONSE AND BETTER COMMUNICATION
– BETTER DOCUMENTATION FOR CLAIMS AVOIDANCE
– EFFICIENT MANAGEMENT OF RESOURCES
– CREDIBLE REPORTING
• Proactive vs. Reactive Problem Resolution
– TEAM FREE TO ANALYZE, CONTROL AND CORRECT
43
Keys to Success
44
• Prior use of Expedition/PCM
• Extensive definition of policies
and processes
• Specifications & Documentation
• Testing, Testing, Testing
• Dedicated Resources to
Integration Team
• Operations Team Participation
QUESTIONS?
45
Photos courtesy of EMLCA

More Related Content

PDF
Pcm to unifier migration considerations - Oracle Primavera P6 Collaborate 14
PDF
P6 as cost management system - Oracle Primavera P6 Collaborate 14
PPTX
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
PPTX
Brts
PDF
Managing light rail at light speed white paper
PPTX
Project 2 Client Binder-2
PPTX
Who says you can't do records management in SharePoint?
PDF
How to Create a Workflow: 5 Tips to Get Started Quickly
Pcm to unifier migration considerations - Oracle Primavera P6 Collaborate 14
P6 as cost management system - Oracle Primavera P6 Collaborate 14
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Brts
Managing light rail at light speed white paper
Project 2 Client Binder-2
Who says you can't do records management in SharePoint?
How to Create a Workflow: 5 Tips to Get Started Quickly

Similar to Managing light rail at light speed ppt (20)

PDF
How to Develop Maintainable Custom Workflows in Office 365 Share Point Online?
PDF
Workflow Documentation: How to Increase Efficiency, Reduce Error, & Focus On ...
PPTX
Xybion Enterprise Content and Data Management
PPTX
SPSNH12 - SharePoint + Contract Management
PDF
205260 managing light rail projects with a lightweight team
PDF
CASE-4 Automating Business Processes in Denver: A Technical Case Study
PDF
"Leveraging SP for PM Workbook" for SPTech Conference at SFO
PPTX
WorkEngine Overview
PPTX
Creative solutions for managing e resources workflow
PDF
SP Summit 2009: Leveraging SP for PM Workshop
PDF
Taskly Final v4
PPTX
Want More Out of your SharePoint Environment? Extend your SharePoint Environm...
PPTX
Process Improvement through SharePoint Workflows. Connect the Click Points. G...
PPTX
Automate business processes using SharePoint Designer Workflows
PPT
]project-open[ Workflow Developer Tutorial Part 2
PDF
Jessica D Anson 2009
PDF
Migrating to Alfresco Part II: The “How” – Tools & Best Practices for Renovat...
PPTX
Project management-practices
PPTX
SharePoint Workflows - SharePoint Saturday Twin Cities April 2012
PPTX
CRMUG Webinar - The Basics of Workflows in Dynamics CRM
How to Develop Maintainable Custom Workflows in Office 365 Share Point Online?
Workflow Documentation: How to Increase Efficiency, Reduce Error, & Focus On ...
Xybion Enterprise Content and Data Management
SPSNH12 - SharePoint + Contract Management
205260 managing light rail projects with a lightweight team
CASE-4 Automating Business Processes in Denver: A Technical Case Study
"Leveraging SP for PM Workbook" for SPTech Conference at SFO
WorkEngine Overview
Creative solutions for managing e resources workflow
SP Summit 2009: Leveraging SP for PM Workshop
Taskly Final v4
Want More Out of your SharePoint Environment? Extend your SharePoint Environm...
Process Improvement through SharePoint Workflows. Connect the Click Points. G...
Automate business processes using SharePoint Designer Workflows
]project-open[ Workflow Developer Tutorial Part 2
Jessica D Anson 2009
Migrating to Alfresco Part II: The “How” – Tools & Best Practices for Renovat...
Project management-practices
SharePoint Workflows - SharePoint Saturday Twin Cities April 2012
CRMUG Webinar - The Basics of Workflows in Dynamics CRM
Ad

More from p6academy (20)

PDF
Oracle OpenWorld 2015
PDF
Plan and Execute the Right Projects— Easily and Affordably
PDF
What's New In Primavera P6 EPPM 17.1
PDF
Oracle Primavera Unifier What's New in Release 16.2
PDF
Oracle What's New In Primavera P6 16.2
PDF
What's New in Primavera Prime 16.1
PDF
What's New in Primavera Gateway 16.1
PDF
What's New In Primavera Analytics 16.1
PDF
What's New in Unifier 16.1
PDF
20160405 How to Install Primavera P6 16.1 Professional desktop
PDF
Oracle Primavera P6 16.1 Announced
PDF
Oracle Primavera Unifier 16.1
PDF
P6 Release 8 Application Considerations Overview
PDF
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
PDF
P6 Release 8 Installation Orientation
PDF
Oracle Primavera P6 R8 Release Value Proposition
PDF
Oracle Primavera P6 v7 Release Value Proposition
PDF
Oracle Primavera P6 Release Content Document (RCD)
PDF
Oracle Support Accreditation – Level 1 Study Guide
PDF
Oracle Primavera Support Accreditation Study Guide
Oracle OpenWorld 2015
Plan and Execute the Right Projects— Easily and Affordably
What's New In Primavera P6 EPPM 17.1
Oracle Primavera Unifier What's New in Release 16.2
Oracle What's New In Primavera P6 16.2
What's New in Primavera Prime 16.1
What's New in Primavera Gateway 16.1
What's New In Primavera Analytics 16.1
What's New in Unifier 16.1
20160405 How to Install Primavera P6 16.1 Professional desktop
Oracle Primavera P6 16.1 Announced
Oracle Primavera Unifier 16.1
P6 Release 8 Application Considerations Overview
Administering Users, Access and Views in P6 EPPM (Web) Release 8 and later
P6 Release 8 Installation Orientation
Oracle Primavera P6 R8 Release Value Proposition
Oracle Primavera P6 v7 Release Value Proposition
Oracle Primavera P6 Release Content Document (RCD)
Oracle Support Accreditation – Level 1 Study Guide
Oracle Primavera Support Accreditation Study Guide
Ad

Managing light rail at light speed ppt

  • 1. Managing Light Rail … at Light Speed! Wendy Kaszycki, CCM PE Director of Project Management Exposition Metro Line Construction Authority
  • 2. Overview • Setting the Context • Previous Process • Document Upload Interface • Results in Contract Management • Results in SharePoint • Conclusions 2
  • 3. SETTING THE CONTEXT 3 Photos courtesy of EMLCA
  • 4. About Expo • Exposition Metro Line Construction Authority • Created in 2003 by SB 504 • Design and build Expo Light Rail • Rail will be operated by Metro LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY 4
  • 5. Expo LRT Project Connecting the Beach to downtown LA! 5 PHASE 1 PHASE 2
  • 6. Project Stats Phase 1 Phase 2 STATIONS 12 7 DAILY RIDERSHIP 27,000 64,000 COST $930 million $1.5 billion OPENING DATE 2012 2015 6
  • 7. Phase 1 Process • Paper – EMAIL PDF’S OR CD’S TO DOCUMENT CONTROL • Excel Logs – INCOMING – OUTGOING • Routing Sheets – LEAD IDENTIFIES DISTRIBUTION – DOCUMENTS DISTRIBUTED TO SELECTED USERS • Databases – ACCESS FOR COST PROPOSALS AND CHANGE ORDERS – METRO DATABASE FOR RFIS AND SUBMITTALS 7
  • 8. Phase 2 Project Controls • Contract Management (PCM) – CONTRACT DOCUMENTS – BUDGETING AND FORECASTING • SharePoint – DOCUMENT STORAGE/FILES – LINKS TO PCM • FIS – METRO’S FINANCIAL SYSTEM – CAPTURES ACTUAL EXPENDITURES • P6 – SCHEDULING 8
  • 9. Customized Components • Web Interface – ALLOWS COLLABORATION – CONTRACTORS UPLOAD TO PCM AND SHAREPOINT • SharePoint “smart folders” – CUSTOMIZED AUTO-ROUTING • “Actual Cost Mapping” – REPORTS BUDGET, COMMITMENTS & ACTUALS TOGETHER • EAC Upload/Export – ALLOWS WAREHOUSING OF ESTIMATE AT COMPLETIONS – FACILITATES REPORTING AND COMPARISONS 9
  • 11. Web-Based DUI • Mandatory – MAJOR CONTRACTORS UPLOAD • Parameters for Upload – CONTRACT – DOCUMENT TYPE • Features – CHANGE DOCUMENTS LINKED TO RELATED DOCUMENTS – SUBMITTALS LINK TO UPLOADED SUBMITTAL LOG 11
  • 12. Defining the DUI 12 1 • Reviewed Contracts • Developed Process Flow • Define Document Types, Screens, Modules 2 • Provided Mapping Specs for Data • Default basic information (contract, to/from) • Defined numbering convention for documents 3 • Wrote “hover over” Tool Tips
  • 13. RFI Process Flow 13 2-Page Process flow for RFI Process
  • 14. CO Process Flow 14 2-Page Process flow for Change Process
  • 15. Sample Mapping Spec 15 Screen content maps to PCM data fields
  • 16. DUI – What Users See • User PCM Access and Security determine – PROJECT LIST – DOCUMENT TYPES 16
  • 17. DUI – RFI’s • Add New RFI • Revise RFI – SELECT FROM PREVIOUSLY ONE • Design-Bid-Build Projects – A/E PROPOSED SOLUTIONS 17
  • 18. DUI – New RFI’s • Features – DEFAULT TO/FROM – TOOL TIPS – CAPTURES CONTRACTOR’S DOC # • Completeness Check – REQUIRED FIELDS HIGHLIGHTED IF BLANK WHEN “SUBMIT” • Attachments – REQUIRED FOR ALL DOCS 18
  • 19. Sample Tool Tips Spec 19 Minimal Training due to Tool Tips for all fields
  • 20. DUI –Proposals • Proposals link to related documents
  • 21. DUI – Other Correspondence • Other Correspondence – MAPS TO CORRESPONDENCE REC’D • Document Type – CUSTOM FIELD – DYNAMIC DROPDOWN TO DICTIONARY IN PCM – SEPARATE SHAREPOINT FOLDERS BY DOCUMENT TYPE 21
  • 22. Upon Submitting Document • Content Integrity – ERRORS IF NOT ACCEPTABLE TO BOTH PCM AND SHAREPOINT • Capacity – ACCEPTS MULTIPLE ATTACHMENTS – UP TO 100 MB TOTAL • Automates Some Document Control Functions – LOGS APPROPRIATE INFO IN PCM; CLOSES RELATED DOCUMENT – USES PCM “VERSIONS” – FILES IN SHAREPOINT FOLDER 22
  • 23. 1. Sends receipt email to user 2. cc: to Expo gmail account (by project) ALSO IMPORTED TO PCM CORRESPONDENCE RECEIVED Auto-Distribution 23 1: SAMPLE EMAIL TO USER 2: SAMPLES TO EXPO GMAIL AND PCM
  • 24. RESULTS IN PCM 24 Photos courtesy of EMLCA
  • 25. PCM - Proposals Links Attachment to SharePoint Logs Contractor’s Doc # Creates CM Doc
  • 27. PCM – PROPOSALS • PCM logs – Contain DUI assigned & Contractor’s document numbers – Can be exported to Excel and sorted
  • 28. PCM – PROPOSALS Change Management Writes Referenced Document Info Uploads Contract Number to Custom Field Assigns CM Doc # with prefix for Contractor
  • 29. PCM – PROPOSALS Change Management Sort by Change Management Number Custom Contract Number – Written by DUI – Used in layouts
  • 30. PCM – PROPOSALS Related RFI Change Management Number written to related document
  • 31. RESULTS IN SHAREPOINT 31 Photos courtesy of EMLCA
  • 32. SharePoint - Upload • Document Properties • Date and Time stamped • “Versions” if same document file is uploaded to same SharePoint folder
  • 33. SharePoint – File Structure • Elements – PHASE – PROJECT – CONTRACT – DOCUMENT DIRECTION – DOCUMENT TYPE – SPEC SECTION (RFI’S & SUBMITTALS)
  • 34. SharePoint – Folder Properties • Customized Solution – AUTO-ROUTING BY DOCUMENT TYPE • Defined Parameters – INCOMING VS. OUTGOING: • Info used in email message
  • 35. Incoming Message • Identifies Lead and other Reviewers • Indicates Due Dates • Links directly to Document in SharePoint 35
  • 36. Outgoing Message • Emails to Contractor • cc’s to Expo Staff • Links directly to Document in SharePoint 36
  • 37. System Coding • Long-term relationship with Partners Consulting • Previous Projects – INTEGRATED EXPEDITION WITH JDE’S AND AN IN-HOUSE FINANCIAL SYSTEM – CONVERTED EXPEDITION 8.5 TO PCM12 – AUTOMATED P5/P6 BASELINING • Proven Record of Success 37
  • 38. Integration Methodology • Needs analysis based on experience and best practices • Develop integrations • Rollout & refine 38
  • 40. Challenges • Diverse Users/Computers – DIFFERENT WEB BROWSERS – OUTSIDE USERS OWN IT CONSTRAINTS/LIMITATIONS • Large Files – ESPECIALLY DRAWING SUBMITTALS • User Reluctance – LOG IN TO GET DOCUMENTS VS PDF ATTACHMENTS 40
  • 41. W I I F M 41
  • 42. W I I F M What’s In It For Me 42
  • 43. WIIFM • Streamlined Processes – PAPERLESS COMMUNICATIONS – MINIMIZES USER ENTRY & ELIMINATES USER ERROR – REDUCES DUPLICATION (SINGLE POINT OF DATA ENTRY) • User Access to Documents from Any Location • Project Performance – QUICKER RESPONSE AND BETTER COMMUNICATION – BETTER DOCUMENTATION FOR CLAIMS AVOIDANCE – EFFICIENT MANAGEMENT OF RESOURCES – CREDIBLE REPORTING • Proactive vs. Reactive Problem Resolution – TEAM FREE TO ANALYZE, CONTROL AND CORRECT 43
  • 44. Keys to Success 44 • Prior use of Expedition/PCM • Extensive definition of policies and processes • Specifications & Documentation • Testing, Testing, Testing • Dedicated Resources to Integration Team • Operations Team Participation