SlideShare a Scribd company logo
4
Most read
9
Most read
10
Most read
Manpower Optimization Using
Full Time Equivalent (FTE)
White Paper by:
Eng. Mohammed Matar
Mohammed.m@Kafaa.sa
P a g e 1 | 11
FTE – WHITE PAPER
Version: 1.0
Contents
1- Executive Summary...............................................................................................................................................2
2- Case Study Overview............................................................................................................................................3
3- Methodologies.............................................................................................................................................................3
3.1 Tracking Hours....................................................................................................................................................3
3.2 Percentage Tracking ....................................................................................................................................4
3.3 FTE Management...........................................................................................................................................4
4- Solution approach...................................................................................................................................................4
4.1 The annual workload hours:......................................................................................................................5
4.2 The annual available working hours..................................................................................................5
4.2.A) The total scheduled annual hours ..........................................................................................5
4.2.B) Paid Time Off (PTO):.........................................................................................................................6
Sick-leave impact:..............................................................................................................................................6
Public holidays:......................................................................................................................................................6
Annual vacations.................................................................................................................................................7
Annual time for weekend hours:.............................................................................................................7
5- ........................................................................8
6- Solution Driven Options for Clients..........................................................................................................10
P a g e 2 | 11
FTE – WHITE PAPER
Version: 1.0
Manpower Optimization Using
Full Time Equivalent (FTE)
1- Executive Summary
Effective manpower optimization can make a significant
difference to the success of an organization.
Every organization aims to increase efficiency and reduce
operational costs, whilst maintaining high standards.
Nonetheless, with increasing competition and market demand,
organizations often put a lot of focus on meeting client
expectations, whilst possibly ineffectively managing their own
growth, thus, resulting in a creep in costs.
The ability to collate genuine internal data and transform it
into valuable knowledge to enhance performance and drive
efficiency is essential. This allows organizations to set
benchmarks, have a good visualization of performance, and
ensure operational excellence. Full-Time Equivalent (FTE)
approach is a technique which enables organizations to achieve
that.
This paper sheds light on FTE process and
highlights organizational benefits. Moreover, it features how
KAFAA successfully operated FTE management for one of its
clients in the manufacturing industry.
P a g e 3 | 11
FTE – WHITE PAPER
Version: 1.0
2- Case Study Overview
productions and packaging units, with over 200 employees
across its production department and other departments. As
the organization grew, so did employment rates, however,
operational efficiency was reduced, which resulted in conflict
between departments and manpower utilization.
KAFAA was consulted to formalize roles and
responsibilities, standardize processes, assess employee
workload and build an optimal operations structure, essentially
KAFAA needed to ensure operational excellence across the
organization. For purposes of this paper, the focus will be on
employee workload assessment, specifically, the utilization of FTE
which resulted in developing an optimal operations structure
KAFAA have successfully utilized FTE for a client in the
manufacturing industry, which has resulted in a 28% increase in
productivity and a 20% decrease in labor costs.
3- Methodologies
There are several methods to track and measure resource
utilization, such as Tracking Hours, Percentage Tracking and FTE
Management.
3.1 Tracking Hours
This is the most basic approach, where the standard
working hours per day are clocked. Along with its poor accuracy,
it fails to identify actual hours worked.
28%
Productivity
20%
Labor cost
P a g e 4 | 11
FTE – WHITE PAPER
Version: 1.0
3.2 Percentage Tracking
This is a more accurate systematic approach compared to
tracking hours. It tracks the hours worked on various tasks and
allocates a percentage. Thus, management is able to identify
how much time is spent on all tasks concerning a specific
employee. This can be used to track performance levels within a
department. However, it fails to incorporate factoring variants.
3.3 FTE Management
FTE Management is the most accurate, this technique is
adopted to assist leadership in analyzing manpower
performance, employee behavior and efficiency to make
informed decisions regarding utilization, budget control and
organizational structure. This method allows for a better analysis
technique, where the cost of labor is reconfigured into FTE units.
Moreover, deploying FTE as an informative tool enables root
cause analysis to identify hidden issues, as well as monitoring
4-Solution approach
Research must be conducted to gain an understanding of
how the organization operates, and identity management issues.
This sets a foundation to clarify employee working patterns and
HR policies. Such knowledge is necessary for designing an optimal
operational structure, once the FTE is calculated using statistical
methods.
FTE calculation depends on two main factors. The
first factor is the annual workload hours and the annual
available working hours is the second main factor.
FTE = The annual workload hours / The annual available
working hours
P a g e 5 | 11
FTE – WHITE PAPER
Version: 1.0
The annual available working hours = The total scheduled
annual hours PTO
Series of meetings and interviews will be conducted to
assess employee workload. Subsequently, the number of annual
workload hours is divided by the annual available working hours.
Below sections are explaining each factor separately with details.
4.1 The annual workload hours:
Calculating the annual workload hours starts with the
classification of tasks for each operation. The stopwatch and
record list are needed to apply the time and motion study for
each task. The table below shows an example of a record sheet.
TABLE 1.0: Annual workload hours
4.2 The annual available working hours
Calculating the annual available working hours is the total
scheduled annual hours excluding the Paid Time Off (PTO).
Below subsections are explaining each factor separately with
details.
4.2.A) The total scheduled annual hours
The formula below shows how to calculate the scheduled
annual hours:
Operation No.
Task
Duration
(Hour)
Freq. / week Annual Time (Hour)
Task 1 A X (A*X) * (No. of weeks/year)
Task 2 B Y (B*Y) * (No. of weeks/year)
Task 3 C Z (C*Z) * (No. of weeks/year)
The total annual workload hours Sum of all the above
P a g e 6 | 11
FTE – WHITE PAPER
Version: 1.0
Sick-leave impact (hrs)= Average sick leave days ×
contractual number of working hours
The total scheduled annual hours = 365 × contractual
number of working hours
4.2.B) Paid Time Off (PTO):
Paid Time Off (PTO) is any period that an employee is paid
while taking leave from work. The identification of PTO depends
on the company's policy, however it varies from one company to
another. This paper shows some examples of PTO that is
commonly used, such as sick leave impact, public holiday, the
Below are real examples that were used
follow:
• Sick-leave impact:
Calculate the Average number of sick-leave days per
employee by utilizing the HR database for at least one year.
Consider that each sick-leave day is equivalent to the contractual
number of working hours per day.
According to government regulation laws, steady working
hours shall not exceed 48 hours a week.
• Public holidays:
Calculate the Average number of public holidays per
employee based on government regulation and HR policies.
Consider that each public holiday is equivalent to the contractual
number of working hours per day.
Public Holiday (hrs) = Public holiday × contractual number
of working hours
P a g e 7 | 11
FTE – WHITE PAPER
Version: 1.0
Annual time for weekend (hrs) = contractual number of
working hours × number of weekend per week × 52
• Annual vacations
Calculate the annual allocated personal vacation days as
per the company regulations. These regulations must be in line
with the labor law.
• Annual time for weekend hours:
Calculate the annual time in an hour for weekend per
employee based on HR policies. Consider that each weekend is
equivalent to the contractual number of working hours per day.
Then, multiply by 52 weeks/year.
5- KAFAA’s FTE Application and Case Study Results
5.1 Client Concern
The client experienced a noticeable drop in efficiency,
whilst employees reported work overload across the
manufacturing facility.
factors where identified;
• Employee Underutilization.
• Management conflict across departments regarding resource
allocation and performance.
• Employees unclear of their roles and responsibilities.
FTE Management was recommended as a suitable solution to
resolve the c
P a g e 8 | 11
FTE – WHITE PAPER
Version: 1.0
5.2 Operational Excellence Assurance
al excellence team initiated this
engagement by closely monitoring, analyzing and recording
operational activities. This process involves identifying the
duration of every task as well as its frequency on a weekly basis.
A calculation is carried out for all the tasks composing an end to
end process to identify annual workload hours.
three operational streams (OPERATION #1, #2 and #3). Each of
which operates in two shifts on a daily basis. KAFAA team
monitored and recorded the workload hours by using TABLE 1.0.
T measure.
As per the calculations in subsection 4.2.B, PTO is an
important variable for available working hours (annual)
calculations. The below measures were concluded.
PTO measures.
Operation No.
The Total annual Workload
hours
1 7014.8 Hrs
2 1444.7 Hrs
3 2456 Hrs
PTO* Hours (annual)
Contractual Hours 624
Public Holidays 72
Sick Leave 24
Annual Vacation 184
* The PTO was calculated for each employee as per the company regulations
with (8) contractual hours per day, the weekend was one day and a half.
P a g e 9 | 11
FTE – WHITE PAPER
Version: 1.0
Successively, the sum of PTO was deducted from the total
scheduled annual hours to get the annual available working hours.
The last FTE variable was identifying tasks for each of the
three operations (OPERATION#1, #2 and #3). respectively, the
annual duration for every task was documented.
TABLE 4.0: FTE utilization and employee reduction rate.
The Table above shows the impact of FTE deployment on
a number of employees for each operation in the manufacturing
facility. Notably, there was an overall 22.78% reduction rate.
The FTE model deployed by KAFAA is regulated
respectively to alterable variables, where the percentage of work
completed for a specific process model, may be impacted by
factors such as employee skill set, machines condition, and
contractual annual hours.
5.3 Results
More than 22% headcount reduction occurred after FTE
deployment on operation#3, the number of resources
decreased to 22 employees instead of 40, which saved
approximately 300,000 SAR in 2017. Moreover, KAFAA aligned
with management and the HR department to redesign
operational structure, roles, and responsibilities and define
existing and required skillsets.
Operation Structure
Operation No.
No. of employees
(before FTE)
No. of employees
(After FTE)
1 11 11
2 28 28
3 40 22
Total 79 61
Reduction Rate: 22.78%
22%
Headcount
Saved
300,000 SAR
P a g e 10 | 11
FTE – WHITE PAPER
Version: 1.0
respectively, standardization was ensured across all operational
facilities. Moreover, employees were trained on the required
standards as a means of change management ensuring
efficiency rates are increased.
Benefits encountered by the client;
• Optimized resources utilization.
• Optimized resource budgeting.
• Identified leakage hours (wasted paid hour).
• Optimized HR employee management.
• Eliminated leadership conflict across departments.
FTE deployment and management aligns perfectly with
manufacturing facility operates optimally.
6- Solution Driven Options for Clients
Whether your organization is looking for methods to
drive efficiency, optimize spending or manpower utilization,
KAFAA provides all rounded operational excellence solutions
for various industries to meet specific needs.
It is highly recommended to adopt FTE management to
identification of inconsistencies and improvement
opportunities. Such knowledge is then integrated by KAFAA to
enhance operational efficiency, spending and HR employment
allocation. Subsequently, providing your management team
with a clear visualization of operational effectiveness.
P a g e 11 | 11
FTE – WHITE PAPER
Version: 1.0
About KAFAA Efficiency Excellence
Kafaa is a company that provides a wide range of
management consultancy and business transformation
services that aim to add value to our clients, utilizing our
local, regional and global expertise. We strive to build a real
Partnership with our clients. It is our policy to work closely
with each client with passion and commitment on a long-
term basis. To ensure achieving the best results, our team
integrates easily with our clients for better understanding
of their needs. Our subject matter expert will be happy to
discuss FTE with you in more details. As per our vision, we
will ensure to provide you with distinguishable
performance.
For more information, visit us at: www.kafaa.sa
Executive Leadership
Mohammed Nashar Alrashidi (CEO):
• Managing & Operating both
corporates and new
companies
• Lean and Operational
Excellence
• Business, organization and
cultural transformation
• Starting businesses and
project management
Majed Almeleak (GM):
• Supply chain excellence
• Lean and operational
excellence
• Transformation and project
management
• Business, organization and
cultural transformation
Hazem Hamam (Associate Partner):
• Lean and operational
excellence
• Initiatives management
• Business, organization and
cultural transformation
• FMCG and Power Generation
Mohammed Matar (Consultant):
• Production Planning
management
• Shipping planning
management
• Building KPIs
•
Auditor:
Author:

More Related Content

PPTX
Fleet management in Oracle Transport Management(otm)
PDF
Risk And Opportunities PowerPoint Presentation Slides
PPT
7 steps to world class manufacturing
PPTX
Efficiency
PDF
Types Of Organizational Structures And Org Charts PowerPoint Presentation Slides
PDF
Operations Strategy for Industry: A Case Study
PPTX
Process improvement presentation
PPTX
World class manufacturing (wcm)
Fleet management in Oracle Transport Management(otm)
Risk And Opportunities PowerPoint Presentation Slides
7 steps to world class manufacturing
Efficiency
Types Of Organizational Structures And Org Charts PowerPoint Presentation Slides
Operations Strategy for Industry: A Case Study
Process improvement presentation
World class manufacturing (wcm)

What's hot (20)

PPTX
Kpi for hr manager
PPT
Developing Metrics and KPI (Key Performance Indicators
PPTX
Productivity
PPT
Job evaluation methods
PDF
KRA for Head of HR
PPT
Job analysis
PPT
Compensation & benefits manager kpi
PPTX
Human Resource Planning Recruitment and Selection
PPT
Kpi calculation formula
PDF
New Employee Orientation: An Overview
PDF
Key Performance Indicators-KPIs
PPT
Hr functions and strategy ppt
PPTX
Strategic Workforce Planning
PPT
Value stream mapping training
PPTX
Competency based hr management
PPTX
METHODS OF PERFOMANCE APPRAISAL
PPS
Communication Strategy for HR
PPSX
Performance Appraisal
PDF
DOCX
Customer service manager performance appraisal
Kpi for hr manager
Developing Metrics and KPI (Key Performance Indicators
Productivity
Job evaluation methods
KRA for Head of HR
Job analysis
Compensation & benefits manager kpi
Human Resource Planning Recruitment and Selection
Kpi calculation formula
New Employee Orientation: An Overview
Key Performance Indicators-KPIs
Hr functions and strategy ppt
Strategic Workforce Planning
Value stream mapping training
Competency based hr management
METHODS OF PERFOMANCE APPRAISAL
Communication Strategy for HR
Performance Appraisal
Customer service manager performance appraisal
Ad

Similar to Manpower optimization using full time equivalent (FTE) (20)

PPTX
Work load analysis
PPTX
Class 4-Workforce Profile Pt.2 and Headcount and FTE.pptx
DOCX
Cost Classifications HCA270 Version 31Associate Level M.docx
DOCX
95S t a ffing The Manager’sResponsibili ty 9C H A.docx
DOCX
Annualizing Staff HCA270 Version 31Associate Level Materi.docx
PDF
Interns as ft es for employer penalty
DOCX
The Organizing FunctionOrganizingDistributing or.docx
PDF
Healthcare Reform - Employee Calculations
 
PDF
Fte guide fillfinal2
PPTX
ROI of HCM Automation with ONEMINT
PPT
Planning to Hire Temps for the Holiday Season? Look Before You Leap
PPT
Calculating FTE
PPTX
HRM_HRP.pptx
PDF
Affordable Care Act: The Clock is Ticking
DOC
Cats tutorial
PPT
Hrm gray dessler_job_analysis_mushfiqul_haque_mukit
PDF
Building the business case ROI for SaaS HR
PPTX
ROI on People Management Interventions - It is Possible!!
PDF
PPACA Presentation - Updated
PPT
HR User Group 0408
Work load analysis
Class 4-Workforce Profile Pt.2 and Headcount and FTE.pptx
Cost Classifications HCA270 Version 31Associate Level M.docx
95S t a ffing The Manager’sResponsibili ty 9C H A.docx
Annualizing Staff HCA270 Version 31Associate Level Materi.docx
Interns as ft es for employer penalty
The Organizing FunctionOrganizingDistributing or.docx
Healthcare Reform - Employee Calculations
 
Fte guide fillfinal2
ROI of HCM Automation with ONEMINT
Planning to Hire Temps for the Holiday Season? Look Before You Leap
Calculating FTE
HRM_HRP.pptx
Affordable Care Act: The Clock is Ticking
Cats tutorial
Hrm gray dessler_job_analysis_mushfiqul_haque_mukit
Building the business case ROI for SaaS HR
ROI on People Management Interventions - It is Possible!!
PPACA Presentation - Updated
HR User Group 0408
Ad

Recently uploaded (20)

PPTX
UNIT 4 Total Quality Management .pptx
PPTX
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
PPTX
Sustainable Sites - Green Building Construction
DOCX
573137875-Attendance-Management-System-original
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
PPTX
Lecture Notes Electrical Wiring System Components
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPTX
web development for engineering and engineering
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
additive manufacturing of ss316l using mig welding
PPT
Mechanical Engineering MATERIALS Selection
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
PPTX
OOP with Java - Java Introduction (Basics)
PDF
Operating System & Kernel Study Guide-1 - converted.pdf
PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
UNIT 4 Total Quality Management .pptx
FINAL REVIEW FOR COPD DIANOSIS FOR PULMONARY DISEASE.pptx
Sustainable Sites - Green Building Construction
573137875-Attendance-Management-System-original
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
Lecture Notes Electrical Wiring System Components
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
web development for engineering and engineering
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
additive manufacturing of ss316l using mig welding
Mechanical Engineering MATERIALS Selection
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
OOP with Java - Java Introduction (Basics)
Operating System & Kernel Study Guide-1 - converted.pdf
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx

Manpower optimization using full time equivalent (FTE)

  • 1. Manpower Optimization Using Full Time Equivalent (FTE) White Paper by: Eng. Mohammed Matar Mohammed.m@Kafaa.sa
  • 2. P a g e 1 | 11 FTE – WHITE PAPER Version: 1.0 Contents 1- Executive Summary...............................................................................................................................................2 2- Case Study Overview............................................................................................................................................3 3- Methodologies.............................................................................................................................................................3 3.1 Tracking Hours....................................................................................................................................................3 3.2 Percentage Tracking ....................................................................................................................................4 3.3 FTE Management...........................................................................................................................................4 4- Solution approach...................................................................................................................................................4 4.1 The annual workload hours:......................................................................................................................5 4.2 The annual available working hours..................................................................................................5 4.2.A) The total scheduled annual hours ..........................................................................................5 4.2.B) Paid Time Off (PTO):.........................................................................................................................6 Sick-leave impact:..............................................................................................................................................6 Public holidays:......................................................................................................................................................6 Annual vacations.................................................................................................................................................7 Annual time for weekend hours:.............................................................................................................7 5- ........................................................................8 6- Solution Driven Options for Clients..........................................................................................................10
  • 3. P a g e 2 | 11 FTE – WHITE PAPER Version: 1.0 Manpower Optimization Using Full Time Equivalent (FTE) 1- Executive Summary Effective manpower optimization can make a significant difference to the success of an organization. Every organization aims to increase efficiency and reduce operational costs, whilst maintaining high standards. Nonetheless, with increasing competition and market demand, organizations often put a lot of focus on meeting client expectations, whilst possibly ineffectively managing their own growth, thus, resulting in a creep in costs. The ability to collate genuine internal data and transform it into valuable knowledge to enhance performance and drive efficiency is essential. This allows organizations to set benchmarks, have a good visualization of performance, and ensure operational excellence. Full-Time Equivalent (FTE) approach is a technique which enables organizations to achieve that. This paper sheds light on FTE process and highlights organizational benefits. Moreover, it features how KAFAA successfully operated FTE management for one of its clients in the manufacturing industry.
  • 4. P a g e 3 | 11 FTE – WHITE PAPER Version: 1.0 2- Case Study Overview productions and packaging units, with over 200 employees across its production department and other departments. As the organization grew, so did employment rates, however, operational efficiency was reduced, which resulted in conflict between departments and manpower utilization. KAFAA was consulted to formalize roles and responsibilities, standardize processes, assess employee workload and build an optimal operations structure, essentially KAFAA needed to ensure operational excellence across the organization. For purposes of this paper, the focus will be on employee workload assessment, specifically, the utilization of FTE which resulted in developing an optimal operations structure KAFAA have successfully utilized FTE for a client in the manufacturing industry, which has resulted in a 28% increase in productivity and a 20% decrease in labor costs. 3- Methodologies There are several methods to track and measure resource utilization, such as Tracking Hours, Percentage Tracking and FTE Management. 3.1 Tracking Hours This is the most basic approach, where the standard working hours per day are clocked. Along with its poor accuracy, it fails to identify actual hours worked. 28% Productivity 20% Labor cost
  • 5. P a g e 4 | 11 FTE – WHITE PAPER Version: 1.0 3.2 Percentage Tracking This is a more accurate systematic approach compared to tracking hours. It tracks the hours worked on various tasks and allocates a percentage. Thus, management is able to identify how much time is spent on all tasks concerning a specific employee. This can be used to track performance levels within a department. However, it fails to incorporate factoring variants. 3.3 FTE Management FTE Management is the most accurate, this technique is adopted to assist leadership in analyzing manpower performance, employee behavior and efficiency to make informed decisions regarding utilization, budget control and organizational structure. This method allows for a better analysis technique, where the cost of labor is reconfigured into FTE units. Moreover, deploying FTE as an informative tool enables root cause analysis to identify hidden issues, as well as monitoring 4-Solution approach Research must be conducted to gain an understanding of how the organization operates, and identity management issues. This sets a foundation to clarify employee working patterns and HR policies. Such knowledge is necessary for designing an optimal operational structure, once the FTE is calculated using statistical methods. FTE calculation depends on two main factors. The first factor is the annual workload hours and the annual available working hours is the second main factor. FTE = The annual workload hours / The annual available working hours
  • 6. P a g e 5 | 11 FTE – WHITE PAPER Version: 1.0 The annual available working hours = The total scheduled annual hours PTO Series of meetings and interviews will be conducted to assess employee workload. Subsequently, the number of annual workload hours is divided by the annual available working hours. Below sections are explaining each factor separately with details. 4.1 The annual workload hours: Calculating the annual workload hours starts with the classification of tasks for each operation. The stopwatch and record list are needed to apply the time and motion study for each task. The table below shows an example of a record sheet. TABLE 1.0: Annual workload hours 4.2 The annual available working hours Calculating the annual available working hours is the total scheduled annual hours excluding the Paid Time Off (PTO). Below subsections are explaining each factor separately with details. 4.2.A) The total scheduled annual hours The formula below shows how to calculate the scheduled annual hours: Operation No. Task Duration (Hour) Freq. / week Annual Time (Hour) Task 1 A X (A*X) * (No. of weeks/year) Task 2 B Y (B*Y) * (No. of weeks/year) Task 3 C Z (C*Z) * (No. of weeks/year) The total annual workload hours Sum of all the above
  • 7. P a g e 6 | 11 FTE – WHITE PAPER Version: 1.0 Sick-leave impact (hrs)= Average sick leave days × contractual number of working hours The total scheduled annual hours = 365 × contractual number of working hours 4.2.B) Paid Time Off (PTO): Paid Time Off (PTO) is any period that an employee is paid while taking leave from work. The identification of PTO depends on the company's policy, however it varies from one company to another. This paper shows some examples of PTO that is commonly used, such as sick leave impact, public holiday, the Below are real examples that were used follow: • Sick-leave impact: Calculate the Average number of sick-leave days per employee by utilizing the HR database for at least one year. Consider that each sick-leave day is equivalent to the contractual number of working hours per day. According to government regulation laws, steady working hours shall not exceed 48 hours a week. • Public holidays: Calculate the Average number of public holidays per employee based on government regulation and HR policies. Consider that each public holiday is equivalent to the contractual number of working hours per day. Public Holiday (hrs) = Public holiday × contractual number of working hours
  • 8. P a g e 7 | 11 FTE – WHITE PAPER Version: 1.0 Annual time for weekend (hrs) = contractual number of working hours × number of weekend per week × 52 • Annual vacations Calculate the annual allocated personal vacation days as per the company regulations. These regulations must be in line with the labor law. • Annual time for weekend hours: Calculate the annual time in an hour for weekend per employee based on HR policies. Consider that each weekend is equivalent to the contractual number of working hours per day. Then, multiply by 52 weeks/year. 5- KAFAA’s FTE Application and Case Study Results 5.1 Client Concern The client experienced a noticeable drop in efficiency, whilst employees reported work overload across the manufacturing facility. factors where identified; • Employee Underutilization. • Management conflict across departments regarding resource allocation and performance. • Employees unclear of their roles and responsibilities. FTE Management was recommended as a suitable solution to resolve the c
  • 9. P a g e 8 | 11 FTE – WHITE PAPER Version: 1.0 5.2 Operational Excellence Assurance al excellence team initiated this engagement by closely monitoring, analyzing and recording operational activities. This process involves identifying the duration of every task as well as its frequency on a weekly basis. A calculation is carried out for all the tasks composing an end to end process to identify annual workload hours. three operational streams (OPERATION #1, #2 and #3). Each of which operates in two shifts on a daily basis. KAFAA team monitored and recorded the workload hours by using TABLE 1.0. T measure. As per the calculations in subsection 4.2.B, PTO is an important variable for available working hours (annual) calculations. The below measures were concluded. PTO measures. Operation No. The Total annual Workload hours 1 7014.8 Hrs 2 1444.7 Hrs 3 2456 Hrs PTO* Hours (annual) Contractual Hours 624 Public Holidays 72 Sick Leave 24 Annual Vacation 184 * The PTO was calculated for each employee as per the company regulations with (8) contractual hours per day, the weekend was one day and a half.
  • 10. P a g e 9 | 11 FTE – WHITE PAPER Version: 1.0 Successively, the sum of PTO was deducted from the total scheduled annual hours to get the annual available working hours. The last FTE variable was identifying tasks for each of the three operations (OPERATION#1, #2 and #3). respectively, the annual duration for every task was documented. TABLE 4.0: FTE utilization and employee reduction rate. The Table above shows the impact of FTE deployment on a number of employees for each operation in the manufacturing facility. Notably, there was an overall 22.78% reduction rate. The FTE model deployed by KAFAA is regulated respectively to alterable variables, where the percentage of work completed for a specific process model, may be impacted by factors such as employee skill set, machines condition, and contractual annual hours. 5.3 Results More than 22% headcount reduction occurred after FTE deployment on operation#3, the number of resources decreased to 22 employees instead of 40, which saved approximately 300,000 SAR in 2017. Moreover, KAFAA aligned with management and the HR department to redesign operational structure, roles, and responsibilities and define existing and required skillsets. Operation Structure Operation No. No. of employees (before FTE) No. of employees (After FTE) 1 11 11 2 28 28 3 40 22 Total 79 61 Reduction Rate: 22.78% 22% Headcount Saved 300,000 SAR
  • 11. P a g e 10 | 11 FTE – WHITE PAPER Version: 1.0 respectively, standardization was ensured across all operational facilities. Moreover, employees were trained on the required standards as a means of change management ensuring efficiency rates are increased. Benefits encountered by the client; • Optimized resources utilization. • Optimized resource budgeting. • Identified leakage hours (wasted paid hour). • Optimized HR employee management. • Eliminated leadership conflict across departments. FTE deployment and management aligns perfectly with manufacturing facility operates optimally. 6- Solution Driven Options for Clients Whether your organization is looking for methods to drive efficiency, optimize spending or manpower utilization, KAFAA provides all rounded operational excellence solutions for various industries to meet specific needs. It is highly recommended to adopt FTE management to identification of inconsistencies and improvement opportunities. Such knowledge is then integrated by KAFAA to enhance operational efficiency, spending and HR employment allocation. Subsequently, providing your management team with a clear visualization of operational effectiveness.
  • 12. P a g e 11 | 11 FTE – WHITE PAPER Version: 1.0 About KAFAA Efficiency Excellence Kafaa is a company that provides a wide range of management consultancy and business transformation services that aim to add value to our clients, utilizing our local, regional and global expertise. We strive to build a real Partnership with our clients. It is our policy to work closely with each client with passion and commitment on a long- term basis. To ensure achieving the best results, our team integrates easily with our clients for better understanding of their needs. Our subject matter expert will be happy to discuss FTE with you in more details. As per our vision, we will ensure to provide you with distinguishable performance. For more information, visit us at: www.kafaa.sa Executive Leadership Mohammed Nashar Alrashidi (CEO): • Managing & Operating both corporates and new companies • Lean and Operational Excellence • Business, organization and cultural transformation • Starting businesses and project management Majed Almeleak (GM): • Supply chain excellence • Lean and operational excellence • Transformation and project management • Business, organization and cultural transformation Hazem Hamam (Associate Partner): • Lean and operational excellence • Initiatives management • Business, organization and cultural transformation • FMCG and Power Generation Mohammed Matar (Consultant): • Production Planning management • Shipping planning management • Building KPIs • Auditor: Author: